CN105448487B - 一种铁芯支撑装置及其支撑方法 - Google Patents
一种铁芯支撑装置及其支撑方法 Download PDFInfo
- Publication number
- CN105448487B CN105448487B CN201410400345.6A CN201410400345A CN105448487B CN 105448487 B CN105448487 B CN 105448487B CN 201410400345 A CN201410400345 A CN 201410400345A CN 105448487 B CN105448487 B CN 105448487B
- Authority
- CN
- China
- Prior art keywords
- iron core
- support device
- magnetic metallic
- metallic supports
- core support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacturing Cores, Coils, And Magnets (AREA)
Abstract
本发明涉及一种铁芯支撑装置及其支撑方法,包括非导磁金属支撑件和绝缘层,其中非导磁金属支撑件的支撑面形状与铁芯轮廓形状吻合,绝缘层设于非导磁金属支撑件的支撑面上;方法包括以下步骤:制作非导磁金属支撑件,预留安装孔;将绝缘材料直接浇注在非导磁金属支撑件上,形成具有绝缘层的铁芯支撑装置;将上述铁芯支撑装置外轮廓与铁芯的外轮廓相对应,外侧通过铁芯夹件将铁芯支撑装置顶紧后,由安装螺栓紧固。本发明在干燥过程中不变形、不开裂,不吸潮;有利于铁芯干燥处理,装置本身强度好,支撑面积减小,为更加安全可靠的新结,铁芯支撑结构的改进促进了高压变压器技术的发展。
Description
技术领域
本发明涉及一种电力变压器制造技术,具体的说是一种铁芯支撑装置及其支撑方法。
背景技术
目前我国电力事业飞速发展,电力变压器的需求量猛增,对其产量及质量也提出更高的要求。
随着电力变压器容量越来越大,电压等级越来越高,产品的安全可靠性的要求更高。而现有变压器铁芯支撑装置是由层压木或层压纸板加工而成,铁芯支撑装置在铁芯干燥过程中容易变形、开裂;铁芯支撑装置本身容易吸潮;铁芯支撑装置本身强度不够好,需要放置面积较大。
目前,能够满足上述要求的铁芯支撑装置相关的技术尚未见报道
发明内容
针对现有技术中变压器铁芯支撑装置在干燥过程中容易变形、开裂、强度差等不足之处,本发明要解决的技术问题是提供一种在干燥过程中不变形、不开裂、强度好的铁芯支撑装置及其支撑方法。
为解决上述技术问题,本发明采用的技术方案是:
本发明一种铁芯支撑装置,包括非导磁金属支撑件和绝缘层,其中非导磁金属支撑件的支撑面形状与铁芯轮廓形状吻合,绝缘层设于非导磁金属支撑件的支撑面上。
所述非导磁金属支撑件端部设有安装孔。
所述非导磁金属支撑件采用铝材。
所述绝缘层为聚氨酯橡胶。
本发明一种铁芯支撑方法,包括以下步骤:
制作非导磁金属支撑件,预留安装孔;
将绝缘材料直接浇注在非导磁金属支撑件上,形成具有绝缘层的铁芯支撑装置;
将上述铁芯支撑装置外轮廓与铁芯的外轮廓相对应,外侧通过铁芯夹件将铁芯支撑装置顶紧后,由安装螺栓紧固。
所述铁芯支撑装置外轮廓为阶梯状,与铁芯的截面形状相对应。
所述铁芯支撑装置的安装数量根据实际需要确定。
所述非导磁金属支撑件采用铝材;绝缘层为聚氨酯橡胶。
本发明具有以下有益效果及优点:
1.本发明由于非导磁金属支撑件采用铝材支撑件,绝缘层采用聚氨酯橡胶,在干燥过程中不变形、不开裂,不吸潮;有利于铁芯干燥处理。
2.本发明装置本身强度好,支撑面积减小,为更加安全可靠的新结,铁芯支撑结构的改进促进了高压变压器技术的发展。
附图说明
图1为本发明铁芯支撑装结构置示意图;
图2为图1的侧视图;
图3为本发明铁芯支撑装置的安装方式示意图;
图4为图3的侧视图。
其中,101为铝材支撑件,102为聚氨酯橡胶,103为安装螺栓,104为铁芯夹件,105为铁芯支撑装置,106为铁芯。
具体实施方式
下面结合说明书附图对本发明作进一步阐述。
本发明一种铁芯支撑装置,包括非导磁金属支撑件和绝缘层,其中非导磁金属支撑件的支撑面形状与铁芯轮廓形状吻合,绝缘层设于非导磁金属支撑件的支撑面上,非导磁金属支撑件端部设有安装孔。
如图1、2所示,本发明提供了一种新型的铁芯支撑装置,此铁芯支撑装置由两部份组成:非导磁金属支撑件和绝缘层,本实施例中,非导磁金属支撑件为铝材支撑件101,绝缘层为聚氨酯橡胶102。
铝材支撑件101根据铁芯的尺寸设计成阶梯状,即用铝材料做成的支撑件的支撑面形状与铁芯台阶相同,加工成型,同时留两个安装螺纹孔,将一定厚度的聚氨酯橡胶102直接浇注在铝材支撑件101上。
如图3、4所示,本发明一种铁芯支撑方法,包括以下步骤:
制作非导磁金属支撑件,预留安装孔;
将绝缘材料直接浇注在非导磁金属支撑件上,形成具有绝缘层的铁芯支撑装置106;
将上述铁芯支撑装置106外轮廓与铁芯的外轮廓相对应,外侧通过铁芯夹件104将铁芯支撑装置105顶紧后,由安装螺栓103紧固。
所述铁芯支撑装置105外轮廓为阶梯状,与铁芯106的截面形状相对应。
铁芯支撑装置105的安装数量根据实际需要确定。
安装如图3所示:将铁芯支撑装置105的阶梯与铁芯106的级相对应,外侧用铁芯夹件将铁芯支撑装置105顶紧后用安装螺栓103紧固上,铁芯支撑装置105的安装数量根据实际需要确定,但比原结构支撑面积小;然后在台阶上部直接铸上一定厚度的台阶形的聚氨酯橡胶102做为绝缘层。
此铁芯支撑装置装配在铁芯干燥过程中不变形、不开裂;铁芯支撑装置本身不吸潮;铁芯支撑装置本身强度好,支撑面积减小。
Claims (4)
1.一种铁芯支撑装置,其特征在于:包括非导磁金属支撑件和绝缘层,其中非导磁金属支撑件的支撑面形状与铁芯轮廓形状吻合,绝缘层设于非导磁金属支撑件的支撑面上;所述非导磁金属支撑件端部设有安装孔;非导磁金属支撑件采用铝材,用铝材做成的支撑件的支撑面形状与铁芯台阶相同,加工成型,同时留两个安装螺纹孔;绝缘层为聚氨酯橡胶,将聚氨酯橡胶直接浇注在非导磁金属支撑件上。
2.一种铁芯支撑方法,其特征在于包括以下步骤:
制作非导磁金属支撑件,预留安装孔;
将绝缘材料直接浇注在非导磁金属支撑件上,形成具有绝缘层的铁芯支撑装置;
将上述铁芯支撑装置外轮廓与铁芯的外轮廓相对应,铁芯支撑装置外侧通过铁芯夹件将铁芯支撑装置顶紧后,由安装螺栓通过安装孔紧固;
所述铁芯支撑装置外轮廓为阶梯状,与铁芯的截面形状相对应。
3.按权利要求2所述的铁芯支撑方法,其特征在于:所述铁芯支撑装置的安装数量根据实际需要确定。
4.按权利要求2所述的铁芯支撑方法,其特征在于:所述非导磁金属支撑件采用铝材;绝缘层为聚氨酯橡胶。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410400345.6A CN105448487B (zh) | 2014-08-14 | 2014-08-14 | 一种铁芯支撑装置及其支撑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410400345.6A CN105448487B (zh) | 2014-08-14 | 2014-08-14 | 一种铁芯支撑装置及其支撑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105448487A CN105448487A (zh) | 2016-03-30 |
CN105448487B true CN105448487B (zh) | 2018-10-12 |
Family
ID=55558572
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410400345.6A Active CN105448487B (zh) | 2014-08-14 | 2014-08-14 | 一种铁芯支撑装置及其支撑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105448487B (zh) |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE553581A (zh) * | 1954-05-12 | |||
CN2651902Y (zh) * | 2003-08-09 | 2004-10-27 | 特变电工衡阳变压器有限公司 | 变压器铁心垫脚枕木 |
CN201149999Y (zh) * | 2007-12-28 | 2008-11-12 | 中电电气集团有限公司 | 消弧线圈压梁垫块装置 |
CN201220966Y (zh) * | 2008-07-03 | 2009-04-15 | 贵阳铝镁设计研究院 | 铝电解槽集气罩的绝缘支撑结构 |
CN201796693U (zh) * | 2010-07-27 | 2011-04-13 | 吴江市变压器厂有限公司 | 变压器铁芯拉带结构 |
CN201765914U (zh) * | 2010-09-01 | 2011-03-16 | 安徽裕宏机电设备有限公司 | 变压器铁芯支撑架 |
CN201956166U (zh) * | 2010-12-21 | 2011-08-31 | 四川东方变压器集团有限公司 | 一种大容量变压器铁芯夹件结构 |
CN103077791A (zh) * | 2012-12-30 | 2013-05-01 | 南阳金牛电气有限公司 | 一种内置绝缘底座的金属氧化物避雷器 |
CN203312009U (zh) * | 2013-05-27 | 2013-11-27 | 佛山市欧立电子有限公司 | 一种ups变压器及电抗器绕组的散热气道结构 |
CN203588796U (zh) * | 2013-08-30 | 2014-05-07 | 申大变压器有限公司 | 一种水下专用变压器 |
-
2014
- 2014-08-14 CN CN201410400345.6A patent/CN105448487B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105448487A (zh) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102510182B (zh) | 辅助扇形片定子铁心叠压装置 | |
CN203562277U (zh) | 具有石墨烯涂层的电抗器 | |
CN203351369U (zh) | 单相非晶合金铁芯干式中频变压器 | |
CN102693816A (zh) | 一种非晶合金铁芯干式配电变压器 | |
CN105448487B (zh) | 一种铁芯支撑装置及其支撑方法 | |
CN204165114U (zh) | 一种节能发热木地板 | |
CN203910427U (zh) | 一种变压器器身托板支撑结构 | |
CN205327666U (zh) | 汽车零件搬运防滑托板装置 | |
CN103887045A (zh) | 一种立体卷铁心变压器夹件 | |
CN203760271U (zh) | 一种立体卷铁心变压器夹件 | |
CN203721436U (zh) | 一种35kV立体三角形卷铁心电力变压器 | |
CN203377578U (zh) | 一种新型避雷器安装结构 | |
CN203966793U (zh) | 一种干式变压器低压引线固定结构 | |
CN103573005B (zh) | 一种复合材料杆塔加固装置及其加固方法 | |
CN204632534U (zh) | 一种立体卷铁心干式变压器铁心夹件的拉板结构及其铁心 | |
CN203481022U (zh) | 一种在大容量变压器的夹件上安装磁屏蔽的装配结构 | |
CN203423043U (zh) | 一种高强度矩形内绕组支撑骨架 | |
CN204947769U (zh) | 发电机定子端部绝缘支架的固定结构 | |
CN206370324U (zh) | 一种便于拆卸和安装的平板变压器 | |
CN204760193U (zh) | 一种新型立体卷铁心干式变压器铁心 | |
CN103123861B (zh) | 一种变压器器身压板处理工艺 | |
CN205211547U (zh) | 节能环保的干式变压器 | |
CN104228604A (zh) | 一种中低速磁浮列车悬浮电磁铁 | |
CN202906618U (zh) | 电动车电机定子铁芯和绝缘板的改良结构 | |
CN105499781B (zh) | 一种爆炸焊接支撑装置及其应用 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |