CN105445583A - Transformer station lightning arrester test method - Google Patents

Transformer station lightning arrester test method Download PDF

Info

Publication number
CN105445583A
CN105445583A CN201510846982.0A CN201510846982A CN105445583A CN 105445583 A CN105445583 A CN 105445583A CN 201510846982 A CN201510846982 A CN 201510846982A CN 105445583 A CN105445583 A CN 105445583A
Authority
CN
China
Prior art keywords
lightning arrester
voltage
arrester
temperature
conduction current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510846982.0A
Other languages
Chinese (zh)
Inventor
魏光
吴彬
王强
潘光午
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Yucheng Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510846982.0A priority Critical patent/CN105445583A/en
Publication of CN105445583A publication Critical patent/CN105445583A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/003Environmental or reliability tests

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Thermistors And Varistors (AREA)

Abstract

The invention relates to the lightning arrester test technology and particularly relates to a transformer station lightning arrester test method. The transformer station lightning arrester test method comprises steps of cleaning the surface of the lightning arrester and detecting whether damages exist and whether two end heads are loosen or corroded, detecting the lightning arrester conditions of internal damping and porcelain sleeve cracking, detecting whether the contact of the parallel connection resistor is sound or whether the parallel connection resistor is aged and spoiled or broken, detecting insulation resistance, detecting conduction current, converting the temperature of the conduction current, and measuring the power frequency discharge. The transformer station lightning arrester test method is applicable to the FZ series valve type lightning arrester and eliminates the safety hidden danger of the lightning arrester.

Description

一种变电站避雷器试验方法A test method for substation lightning arrester

技术领域technical field

本发明涉及避雷器试验技术,具体涉及一种变电站避雷器试验方法。The invention relates to a lightning arrester test technology, in particular to a test method for a substation lightning arrester.

背景技术Background technique

避雷器有管型避雷器、阀型避雷器及氧化锌避雷器。避雷器通常接在导线和地之间,与被保护设备并联。当被保护设备在正常工作电压下运行时,避雷器不动作,即对地视为断路。一旦出现过电压,且危及被保护设备绝缘时,避雷器立即动作,将高电压冲击电流导向大地,从而限制电压幅值,保护电气设备绝缘。当过电压消失后,避雷器迅速恢复原状,使系统能够正常供电。Arresters include tubular arresters, valve arresters and zinc oxide arresters. The arrester is usually connected between the wire and the ground, and connected in parallel with the protected equipment. When the protected equipment is running under the normal working voltage, the arrester does not act, that is, it is regarded as an open circuit to the ground. Once an overvoltage occurs and endangers the insulation of the protected equipment, the arrester will act immediately to guide the high-voltage surge current to the ground, thereby limiting the voltage amplitude and protecting the insulation of the electrical equipment. When the overvoltage disappears, the arrester quickly returns to its original state, so that the system can supply power normally.

大部分的避雷器试验均在每年雷雨季节前及大修后或必要时进行,现有技术中关于避雷器的试验方法一直未曾有过规范描述,不同的变电站有不同的试验方法,而目前大多数的变电站并没有具体的规定,对于试验的规范和约束力较差,而避雷器的试验结果直接影响到避雷器的好坏,结果不准确甚至会影响到整个变电站的用电安全。Most of the arrester tests are carried out before the thunderstorm season and after overhaul or when necessary. There has never been a specification description for the test method of the arrester in the prior art. Different substations have different test methods. At present, most substations do not There are no specific regulations, and the specifications and constraints for the test are poor. The test results of the arrester directly affect the quality of the arrester, and the inaccurate results may even affect the safety of the entire substation.

发明内容Contents of the invention

本发明提供一种变电站避雷器试验方法,解决现有技术中避雷器试验不规范的问题,具体技术方案如下:The present invention provides a method for testing lightning arresters in substations, which solves the problem of irregular testing of lightning arresters in the prior art. The specific technical solutions are as follows:

一种变电站避雷器试验方法,包括如下步骤:A method for testing a substation lightning arrester, comprising the steps of:

S1将避雷器表面清洁干净,检查有无外伤,两端头有无松动及锈蚀;S1 Clean the surface of the arrester, check whether there is any trauma, and whether the two ends are loose and rusted;

S2检查避雷器内部受潮、瓷套裂纹情况,并检查并联电阻的接触是否良好,是否老化变质和断裂;S2 Check the moisture inside the arrester and the cracks of the porcelain sleeve, and check whether the parallel resistance is in good contact, whether it is aged, deteriorated and broken;

S3绝缘电阻测试:测量绝缘时用5000V绝缘电阻表测量,对于多元件组成的避雷器,应对每个元件单独测量其对地的绝缘电阻值;S3 Insulation resistance test: Use a 5000V insulation resistance meter to measure the insulation. For a multi-component arrester, each component should be individually measured for its insulation resistance to the ground;

S4测量电导电流:采用半波整流方法,通过调压器调压变压器升压获得交流高压,再通过整流元件变成直流高压加在待测避雷器一侧,利用毫安表靠近避雷器的高压侧来测量电导电流,在高压整流回路中加入电容量在0.1nF以上的滤波电容器,采用静电电压表测量整流回路中的直流试验电压;S4 Measure conductance current: use the half-wave rectification method, step up the voltage through the voltage regulator transformer to obtain AC high voltage, and then pass the rectification element into DC high voltage and add it to the side of the arrester to be tested, and use the milliampere meter to approach the high voltage side of the arrester To measure the conductance current, add a filter capacitor with a capacitance above 0.1nF to the high-voltage rectification circuit, and use an electrostatic voltmeter to measure the DC test voltage in the rectification circuit;

S5电导电流的温度换算:电导电流与温度有关,试验时应记录室温。电导电流的标准是温度为20℃时的数值,当测试时温度与标准温度相差超过5℃时,应换算至20℃时的数值,其温度换算式为S5 Temperature conversion of conductance current: The conductance current is related to temperature, and the room temperature should be recorded during the test. The standard value of conductance current is the value when the temperature is 20°C. When the difference between the test temperature and the standard temperature exceeds 5°C, it should be converted to the value at 20°C. The temperature conversion formula is

I20=IT[I+K(20-T)/10]=ITKt I 20 =IT[I+K(20-T)/10]=ITK t

,式中I20为换算到20℃时的电导电流;T为测量时的实测室温;K为温度每变化10℃时电导电流变化的百分数,一般取K=0.05;Kt为电导电流的温度换算系数;, where I 20 is the conductance current converted to 20°C; T is the measured room temperature during measurement; K is the percentage change of the conductance current when the temperature changes by 10°C, generally K=0.05; K t is the temperature of the conductance current conversion factor;

S6:工频放电电压测量:调整单相自耦调压器AV均匀升高电压,升压速度控制在从刚开始升压至避雷器放电接触器脱扣时为4~5s,试验电压的波形采用正弦波,每个避雷器重复3次工频放电测试,每次试验间隔不得小于一分钟,工频放电电压取三次试验的平均值,间隙放电后0.5s内切断电源,在回路中装设了过流速断保护装置,并使通过避雷器的工频电流限制在0.2~0.7A范围之内。S6: Power frequency discharge voltage measurement: adjust the single-phase auto-coupling voltage regulator AV to increase the voltage evenly, and the boosting speed is controlled from the beginning of boosting to 4-5s when the arrester discharge contactor trips. The waveform of the test voltage adopts Sine wave, repeat the power frequency discharge test for each arrester 3 times, the interval between each test should not be less than one minute, take the average value of the power frequency discharge voltage of the three tests, cut off the power supply within 0.5s after the gap discharge, and install an overvoltage protection circuit in the circuit The flow rate breaks the protection device and limits the power frequency current passing through the arrester within the range of 0.2-0.7A.

优选的,所述步骤S4中微安表与避雷器之间采用屏蔽导线连接。Preferably, in the step S4, a shielded wire is used to connect the microammeter and the arrester.

优选的,所述步骤S4中电容量在0.1nF以上的滤波电容器可用移相电容器代替。Preferably, in the step S4, the filter capacitor with a capacitance above 0.1nF can be replaced by a phase shift capacitor.

优选的,所述S6中单相自耦调压器升压的方法有两种:一是手动操作,配有时间控制装置,即在单相自耦调压器转把上固定一根绝缘棒,当电压升至接近灭弧电压时,迅速转动,直到避雷器放电跳闸;二是电动操作,即用一电动机通过传动装置操作调压器升压,避雷器放电后,过电流跳闸。Preferably, there are two methods for boosting the voltage of the single-phase autovoltage regulator in S6: one is manual operation, equipped with a time control device, that is, an insulating rod is fixed on the handle of the single-phase autovoltage regulator , when the voltage rises to close to the arc-extinguishing voltage, it rotates rapidly until the arrester discharges and trips; the second is electric operation, that is, a motor is used to operate the voltage regulator through the transmission device to boost the voltage, and after the arrester is discharged, the over-current trips.

有益效果:Beneficial effect:

本发明提供了一种变电站避雷器试验方法,适用于FZ系列阀型避雷器,通过实验步骤排除避雷器的安全隐患,提高了避雷器的检验准确性。The invention provides a test method for a substation lightning arrester, which is suitable for FZ series valve type lightning arresters, eliminates potential safety hazards of the lightning arresters through experimental steps, and improves the inspection accuracy of the lightning arresters.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为测电导电流接线示意图;Fig. 1 is a schematic diagram of measuring conductance current wiring;

图2为测工频放电电压接线示意图。Figure 2 is a schematic diagram of measuring power frequency discharge voltage wiring.

具体实施方式detailed description

为使本发明实施例的目的、技术方案和优点更加清楚,下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, not all Example. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

实施例1:Example 1:

如图1、图2所示,一种变电站避雷器试验方法,包括如下步骤:As shown in Figure 1 and Figure 2, a test method for a substation lightning arrester includes the following steps:

S1将避雷器表面清洁干净,检查有无外伤,两端头有无松动及锈蚀;S1 Clean the surface of the arrester, check whether there is any trauma, and whether the two ends are loose and rusted;

S2主要检查避雷器的密封情况,检查避雷器内部受潮、瓷套裂纹情况,并检查并联电阻的接触是否良好,是否老化变质和断裂;S2 mainly checks the sealing condition of the arrester, checks the moisture inside the arrester, the cracks of the porcelain sleeve, and checks whether the parallel resistance is in good contact, whether it is aged, deteriorated and broken;

S3绝缘电阻测试:当避雷器内部受潮后,绝缘电阻明显下降,标准≥2000MΩ,绝缘电阻斌没有明确规定,只能与前一次值进行比较,测量绝缘时用5000V绝缘电阻表测量,对于多元件组成的避雷器,应对每个元件单独测量其对地的绝缘电阻值;S3 Insulation resistance test: When the interior of the arrester is damp, the insulation resistance drops significantly, the standard is ≥2000MΩ, the insulation resistance bin is not clearly specified, and can only be compared with the previous value. When measuring the insulation, use a 5000V insulation resistance meter to measure it. For multi-component components The lightning arrester should measure the insulation resistance value of each component separately to the ground;

S4测量电导电流:主要检查并联电阻老化,若接触不良,电导电流明显下降,若断裂,电导电流下降为零,若受潮,电导电流急剧增加达1000μA以上,采用半波整流方法,通过调压器调压变压器升压获得交流高压,再通过整流元件变成直流高压加在待测避雷器一侧,利用毫安表靠近避雷器的高压侧来测量电导电流,在高压整流回路中加入电容量在0.1nF以上的滤波电容器,采用静电电压表测量整流回路中的直流试验电压;如图2所示,PA1、PA2、PA3:电流表;AV:调压器;T:试验变压器;V:高压硅堆;R1:保护电阻;PV1:低压侧电压表;PV2:直接测量试验电压的静电电压表;C:滤波电容器;F:避雷器,由于并联电阻的非线性,所施加的高压整流电压的脉动对测量结果影响较大,一般要求电压脉动不超过±1.5%,因此在高压整流回路中,应加电容量在0.1nF以上的滤波电容器。如果没有合适的电容器,可用移相电容器代替,此时电容器可按其交流额定电压的3倍用于直流高压回路中。应在高压侧直接测量试验电压,以保证试验结果的可靠性。常采用静电电压表直接测量直流试验电压,也可用高阻器串电流表(或用电阻分压器接电压表)测量,应注意对测量系统的校验,使测量误差不大于2%。电导电流的测量,应尽量避免导线等设备的电晕电流和其他杂散电流的影响。如果避雷器接地端可以断开,则电流表在避雷器的接地端,即图1中2的位置;如果避雷器接地端不能断开,则电流表接在图1中1的位置,并从电流表至避雷器的引线需加屏蔽,读数时应注意安全,电流表准确度应大于1.5级。S4 Measure conductance current: Mainly check the aging of parallel resistors. If the contact is poor, the conductance current will drop significantly. If it is broken, the conductance current will drop to zero. If it is damp, the conductance current will increase sharply to more than 1000μA. Use the half-wave rectification method to pass through the voltage regulator. The voltage regulating transformer is boosted to obtain AC high voltage, and then through the rectifier element, it becomes DC high voltage and added to the side of the arrester to be tested, and the conductance current is measured by a milliampere meter close to the high voltage side of the arrester, and a capacitance of 0.1nF is added to the high voltage rectification circuit For the filter capacitor above, use an electrostatic voltmeter to measure the DC test voltage in the rectification circuit; as shown in Figure 2, PA1, PA2, PA3: ammeter; AV: voltage regulator; T: test transformer; V: high voltage silicon stack; R1 : Protection resistor; PV1: Low-voltage side voltmeter; PV2: Electrostatic voltmeter for direct measurement of test voltage; C: Filter capacitor; F: Lightning arrester, due to the non-linearity of the parallel resistance, the pulsation of the applied high-voltage rectified voltage affects the measurement results It is relatively large, and generally requires that the voltage ripple does not exceed ±1.5%, so in the high-voltage rectification circuit, a filter capacitor with a capacity of more than 0.1nF should be added. If there is no suitable capacitor, it can be replaced by a phase-shifting capacitor. At this time, the capacitor can be used in the DC high-voltage circuit according to 3 times its AC rated voltage. The test voltage should be measured directly on the high voltage side to ensure the reliability of the test results. An electrostatic voltmeter is often used to directly measure the DC test voltage, and a high-resistance series ammeter (or a resistor divider connected to a voltmeter) can also be used for measurement. Attention should be paid to the calibration of the measurement system so that the measurement error is not greater than 2%. In the measurement of conductance current, the influence of corona current and other stray currents of equipment such as wires should be avoided as much as possible. If the ground terminal of the arrester can be disconnected, the ammeter is at the ground terminal of the arrester, that is, the position 2 in Figure 1; if the ground terminal of the arrester cannot be disconnected, the ammeter is connected to the position 1 in Figure 1, and the lead wire from the ammeter to the arrester Shielding is required, safety should be paid attention to when reading, and the accuracy of the ammeter should be greater than 1.5.

S5电导电流的温度换算:电导电流与温度有关,试验时应记录室温。电导电流的标准是温度为20℃时的数值,当测试时温度与标准温度相差超过5℃时,应换算至20℃时的数值,其温度换算式为S5 Temperature conversion of conductance current: The conductance current is related to temperature, and the room temperature should be recorded during the test. The standard value of conductance current is the value when the temperature is 20°C. When the difference between the test temperature and the standard temperature exceeds 5°C, it should be converted to the value at 20°C. The temperature conversion formula is

I20=IT[I+K(20-T)/10]=ITKt I 20 =IT[I+K(20-T)/10]=ITK t

,式中I20为换算到20℃时的电导电流;T为测量时的实测室温;K为温度每变化10℃时电导电流变化的百分数,一般取K=0.05;Kt为电导电流的温度换算系数,在规定的试验电压下,有并联电阻的阀型避雷器的电导电流数值应在一定范围内,若电导电流明显增加,说明内部有受潮现象;若电导电流明显下降,则是并联电阻发生断裂或开焊;, where I 20 is the conductance current converted to 20°C; T is the measured room temperature during measurement; K is the percentage change of the conductance current when the temperature changes by 10°C, generally K=0.05; K t is the temperature of the conductance current Conversion factor, under the specified test voltage, the conductance current value of the valve-type surge arrester with parallel resistance should be within a certain range. If the conductance current increases significantly, it means that there is moisture inside; if the conductance current decreases significantly, it is the parallel resistance. Fracture or open welding;

S6:工频放电电压测量:调整单相自耦调压器AV均匀升高电压,升压速度控制在从刚开始升压至避雷器放电接触器脱扣时为4~5s,试验电压的波形采用正弦波,每个避雷器重复3次工频放电测试,每次试验间隔不得小于一分钟,工频放电电压取三次试验的平均值,间隙放电后0.5s内切断电源,在回路中装设了过流速断保护装置,并使通过避雷器的工频电流限制在0.2~0.7A范围之内,通过测量阀型避雷器的工频放电电压,能够反映其火花间隙结构及特性是否正常、检验其保护性能是否正常。工频放电电压不能过高,否则意味着避雷器的冲击电压太高(因为避雷器的冲击系数是一定的)。这样,当大气过电压袭来时,避雷器不能可靠动作,影响避雷器的保护性能。所以在试验规程中都规定了工频放电电压的上限值,要求工频放电电压值不能超过上限值。同时,工频放电电压也不能太低,否则灭弧电压也随之降低,以致在某些情况下不能切断工频续流,甚至引起避雷器爆炸。另外,还可能在内部过电压下出现误动(普通阀型避雷器的通流能力小,一般不允许在内部过电压下动作)。所以试验规程中规定了工频放电电压的下限值,要求工频放电电压值不得低于下限值。S6: Power frequency discharge voltage measurement: adjust the single-phase auto-coupling voltage regulator AV to increase the voltage evenly, and the boosting speed is controlled from the beginning of boosting to 4-5s when the arrester discharge contactor trips. The waveform of the test voltage adopts Sine wave, repeat the power frequency discharge test for each arrester 3 times, the interval between each test should not be less than one minute, take the average value of the power frequency discharge voltage of the three tests, cut off the power supply within 0.5s after the gap discharge, and install an overvoltage protection circuit in the circuit Flow rate cut-off protection device, and limit the power frequency current passing through the arrester within the range of 0.2-0.7A. By measuring the power frequency discharge voltage of the valve-type arrester, it can reflect whether the structure and characteristics of the spark gap are normal, and check whether the protection performance is normal. normal. The power frequency discharge voltage cannot be too high, otherwise it means that the surge voltage of the arrester is too high (because the shock coefficient of the arrester is certain). In this way, when the atmospheric overvoltage strikes, the arrester cannot operate reliably, which affects the protection performance of the arrester. Therefore, the upper limit value of the power frequency discharge voltage is stipulated in the test procedures, and the power frequency discharge voltage value must not exceed the upper limit value. At the same time, the power frequency discharge voltage should not be too low, otherwise the arc extinguishing voltage will also decrease, so that in some cases the power frequency continuous current cannot be cut off, and even the arrester may explode. In addition, misoperation may occur under internal overvoltage (the flow capacity of ordinary valve arresters is small, and it is generally not allowed to operate under internal overvoltage). Therefore, the lower limit value of the power frequency discharge voltage is stipulated in the test procedure, and the power frequency discharge voltage value must not be lower than the lower limit value.

所述步骤S4中微安表与避雷器之间采用屏蔽导线连接,微安表与避雷器之间采用屏蔽导线,使得测量结果受杂散电流的影响很小,提高准确度;所述步骤S4中电容量在0.1nF以上的滤波电容器可用移相电容器代替,所述S6中单相自耦调压器升压的方法有两种:一是手动操作,配有时间控制装置,即在单相自耦调压器转把上固定一根绝缘棒,当电压升至接近灭弧电压时,迅速转动,直到避雷器放电跳闸;二是电动操作,即用一电动机通过传动装置操作调压器升压,避雷器放电后,过电流跳闸。In the step S4, a shielded wire is used to connect the microammeter and the arrester, and a shielded wire is used between the microammeter and the arrester, so that the measurement results are less affected by stray currents and the accuracy is improved; in the step S4, the electric The filter capacitor with a capacity above 0.1nF can be replaced by a phase-shifting capacitor. There are two ways to boost the voltage of the single-phase auto-transformer in the S6: one is manual operation, equipped with a time control device, that is, in the single-phase auto-transformer An insulating rod is fixed on the turning handle of the voltage regulator. When the voltage rises to close to the arc-extinguishing voltage, it rotates rapidly until the arrester discharges and trips; After discharge, the overcurrent trips.

本发明提供了一种变电站避雷器试验方法,适用于FZ系列阀型避雷器,通过实验步骤排除避雷器的安全隐患,提高了避雷器的检验准确性。The invention provides a test method for a substation lightning arrester, which is suitable for FZ series valve type lightning arresters, eliminates potential safety hazards of the lightning arresters through experimental steps, and improves the inspection accuracy of the lightning arresters.

以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be described in the foregoing embodiments Modifications are made to the recorded technical solutions, or equivalent replacements are made to some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims (4)

1. a transformer substation arrester test method, is characterized in that, comprises the steps:
S1 is clean by lightning arrester surface cleaning, and check with or without wound, two ends has non-loosening and corrosion;
Whether S2 checks lightning arrester internal wetted, insulator cracks, and checks that whether the contact of parallel resistance is good, aged deterioration and fracture;
S3 megger test: measure with 5000V insulation resistance meter when measuring insulation, for the lightning arrester of multicomponent composition, tackles its insulating resistance value over the ground of each element independent measurement;
S4 measures conduction current: adopt half-wave rectification method, ac high-voltage is obtained by the boosting of pressure regulator adjustable transformer, become high direct voltage by rectifier cell again and be added in lightning arrester side to be measured, utilize milliammeter near the high-pressure side of lightning arrester to measure conduction current, in high-voltage rectifying loop, add the filter capacitor of electric capacity at more than 0.1nF, adopt the DC experiment voltage in electrostatic voltmeter measurement commutating circuit;
The temperature conversion of S5 conduction current: conduction current is relevant with temperature, should record room temperature during test.The numerical value that the standard of conduction current is temperature when being 20 DEG C, when temperature and standard temperature differ by more than 5 DEG C when tested, numerical value when should be scaled to 20 DEG C, its temperature conversion formula is
I 20=IT[I+K(20-T)/10]=ITK t
I in formula 20conduction current during for being converted to 20 DEG C; Actual measurement room temperature when T is measurement; K is the percentage of temperature conduction current change when often changing 10 DEG C, generally gets K=0.05; K tfor the temperature conversion factor of conduction current;
S6: power-frequency sparkover voltage is measured: adjustment single-phase self-coupling pressure regulator AV even boosted voltage; it is 4 ~ 5s that the rate of rise controls when boosting to lightning arrester discharge contactor and thread off from just; the waveform of trial voltage adopts sinusoidal wave; each lightning arrester repeats 3 power-frequency discharge tests; each intertrial interval must not be less than one minute; power-frequency sparkover voltage gets the mean value of three tests; 0.5s internal cutting off power supply after gap discharge; install instantaneous over-current protective device in the loop, and made to be limited within 0.2 ~ 0.7A scope by the power current of lightning arrester.
2. transformer substation arrester test method as claimed in claim 1, is characterized in that, adopt shielded conductor to be connected in described step S4 between microampere meter with lightning arrester.
3. transformer substation arrester test method as claimed in claim 1, it is characterized in that, in described step S4, electric capacity can replace with phase-shift capacitor at the filter capacitor of more than 0.1nF.
4. transformer substation arrester test method as claimed in claim 1, it is characterized in that, in described S6, the method for single-phase self-coupling pressure regulator boosting has two kinds: one to be manual operation, is furnished with time-controlling arrangement, namely on single-phase self-coupling pressure regulator handle, an insulation rod is fixed, when voltage rises to close to extinguishing voltage, rotate rapidly, until lightning arrester discharge tripping operation; Two is electric operatings, is namely boosted by actuator operation pressure regulator with a motor, after lightning arrester discharge, and overcurrent trip.
CN201510846982.0A 2015-11-27 2015-11-27 Transformer station lightning arrester test method Pending CN105445583A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510846982.0A CN105445583A (en) 2015-11-27 2015-11-27 Transformer station lightning arrester test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510846982.0A CN105445583A (en) 2015-11-27 2015-11-27 Transformer station lightning arrester test method

Publications (1)

Publication Number Publication Date
CN105445583A true CN105445583A (en) 2016-03-30

Family

ID=55556012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510846982.0A Pending CN105445583A (en) 2015-11-27 2015-11-27 Transformer station lightning arrester test method

Country Status (1)

Country Link
CN (1) CN105445583A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106526356A (en) * 2016-10-14 2017-03-22 国网上海市电力公司 Metal oxide lightning arrester live-line detection validity test system
CN108663591A (en) * 2018-05-18 2018-10-16 中国电力科学研究院有限公司 A kind of device and method for verifying the control logic and control sequential of controllable arrester
CN109239505A (en) * 2016-08-18 2019-01-18 赵万云 A kind of test of lightning arrester device
CN111077400A (en) * 2020-01-08 2020-04-28 国网福建省电力有限公司 A 10KV zinc oxide arrester fault monitoring device and its control method
CN112505364A (en) * 2020-11-23 2021-03-16 国网宁夏电力有限公司中卫供电公司 Experimental arrester insulation fixed bolster and arrester electrical test device of using
CN114062810A (en) * 2021-11-11 2022-02-18 国网湖南省电力有限公司 Fracture prediction method for zinc oxide line arrester

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
中华人名共和国电子工业部: "《中华人名共和国电子行业标准SJ/T31399-94》", 1 June 1994 *
中华人民共和国国家发展和改革委员会: "《中华人民共和国电力行业标准DL/T474.5-2006》", 6 May 2006 *
艾特贸易网: "阀型避雷器试验及其结果分析判断", 《HTTP://WWW.AITMY.COM/NEWS/201412/11/NEWS_74738.HTML》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109239505A (en) * 2016-08-18 2019-01-18 赵万云 A kind of test of lightning arrester device
CN106526356A (en) * 2016-10-14 2017-03-22 国网上海市电力公司 Metal oxide lightning arrester live-line detection validity test system
CN108663591A (en) * 2018-05-18 2018-10-16 中国电力科学研究院有限公司 A kind of device and method for verifying the control logic and control sequential of controllable arrester
CN111077400A (en) * 2020-01-08 2020-04-28 国网福建省电力有限公司 A 10KV zinc oxide arrester fault monitoring device and its control method
CN112505364A (en) * 2020-11-23 2021-03-16 国网宁夏电力有限公司中卫供电公司 Experimental arrester insulation fixed bolster and arrester electrical test device of using
CN114062810A (en) * 2021-11-11 2022-02-18 国网湖南省电力有限公司 Fracture prediction method for zinc oxide line arrester
CN114062810B (en) * 2021-11-11 2023-07-25 国网湖南省电力有限公司 Fracture prediction method for zinc oxide line lightning arrester

Similar Documents

Publication Publication Date Title
CN105445583A (en) Transformer station lightning arrester test method
Metwally et al. Online condition monitoring of surge arresters based on third-harmonic analysis of leakage current
CN105277857B (en) A kind of bushing shell for transformer of monitoring on-line makes moist the method for defect
FI115488B (en) Method and apparatus for detecting a breaking earth fault in a power distribution network
CN103728481B (en) Method and device for detecting metal oxide arrester resistive current
WO2019139973A1 (en) Temporary overvoltage and ground fault overvoltage protection based on arrester current measurement and analysis
CN108919026B (en) Live detection method for leakage current of lightning arrester
JP2019032315A (en) Grounding factor determination method
Christodoulou et al. Measurement of the resistive leakage current in surge arresters under artificial rain test and impulse voltage subjection
CN104280637A (en) Lightning arrester online monitoring signal collection device with shielding function
CN106526406A (en) Inter-tern short-circuit detection device, analysis method and device for voltage transformer
CN112305352A (en) Voltage reconstruction MOA resistive current testing method based on in-phase capacitive equipment
CN211236675U (en) Calibration device for automatic tuning controller of arc suppression coil
CN111781471A (en) Transformer AC and DC composite withstand voltage test system and method
CN207882327U (en) A kind of network voltage full frequency-domain monitoring device based on wideband wide range CT
CN204065294U (en) With the lightning arrester line monitor signal harvester of function of shielding
CN106483360A (en) Method using 220V power supply on-line monitoring arrester resistance current
Banjanin et al. Experimental registration and numerical simulation of the transient overvoltages caused by single phase intermittent arc earth fault in 35 kV network with isolated neutral
CN107884613A (en) A kind of line voltage full frequency-domain monitoring device and method based on wideband wide range CT
Larsen et al. In-service testing and diagnosis of gapless metal oxide surge arresters
CN103698596A (en) Device and method for measuring high voltage of electric power system
CN206096222U (en) Isolated neutral system capacitance current testing arrangement
CN112305348A (en) Method for quickly testing resistive current of reconstructed MOA (metal oxide arrester) by considering in-phase capacitive equipment
CN114859159A (en) Performance test method of harmonic elimination device based on varistor type current limiting technology
JP6736454B2 (en) Ground voltage detector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160330

RJ01 Rejection of invention patent application after publication