CN105444704A - 一种基于gps的桥梁实时位移监测方法 - Google Patents
一种基于gps的桥梁实时位移监测方法 Download PDFInfo
- Publication number
- CN105444704A CN105444704A CN201510810869.7A CN201510810869A CN105444704A CN 105444704 A CN105444704 A CN 105444704A CN 201510810869 A CN201510810869 A CN 201510810869A CN 105444704 A CN105444704 A CN 105444704A
- Authority
- CN
- China
- Prior art keywords
- gps
- receiver
- bridge
- optical transmitter
- monitoring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B15/00—Measuring arrangements characterised by the use of electromagnetic waves or particle radiation, e.g. by the use of microwaves, X-rays, gamma rays or electrons
Landscapes
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- General Physics & Mathematics (AREA)
- Position Fixing By Use Of Radio Waves (AREA)
Abstract
本发明涉及一种基于GPS的桥梁实时位移监测方法,GPS基准站的输出端通过RTK差分信号连接有第一光端机,第一光端机输出端连接有分配器,分配器上连接有第二光端机和通讯工控机,第二光端机通过光纤通讯链路与若干个GPS监测站相信号连接,若干个GPS监测站与GPS监测中心相信号连接,所述的通讯工控机连接有网络光端机,网络光端机上连接有HUB,HUB上连接有服务器和分析工作站,服务器与GPS基准站相连接。所述的一种基于GPS的桥梁实时位移监测方法,利用GPS实时监测大桥位移显示出独特的优越性、特别是实时性和高采样率的数据为大桥的状态分析提供了方便的条件。
Description
技术领域
本发明涉及GPS的领域,尤其是一种基于GPS的桥梁实时位移监测方法。
背景技术
广深珠高速公路虎门大桥位于广东省珠海一角洲中部,跨越珠江干流狮了烊出海航道、该桥是珠江一角洲陆路交通的联系枢纽,是沟通广东东南两类公路网的咽喉道、虎门大桥工程是中跨越珠江水面的虎门大桥及东西两岸引道和配套工程组成、路全长为15762km,双向6个车道,含各种桥梁20座、其中虎门大桥长4606m,跨越在主航道上的主跨是888m的悬索桥,跨越辅航道270m的是预应力混凝土连续钢构桥及引桥,另外还有3座隧道、悬索桥在风荷载下设计水平最大位移为095m,垂直最大位移为129m,大桥各点基振频率集中在0088-064HZ之间、中于虎门大桥位于热带风暴多发区,大桥安全性监测十分重要、如何监测台风、地震、车载及温度变化对桥梁位移的影响尤为重要、目前用于结构监测的方法主要有:经纬仪、位移传感器、加速度传感器和激光测量方法。
发明内容
本发明要解决的技术问题是:为了克服上述中存在的问题,提供了一种基于GPS的桥梁实时位移监测方法。
本发明解决其技术问题所采用的技术方案是:一种基于GPS的桥梁实时位移监测方法,包括GPS基准站、GPS监测站、光纤通信链路、GPS监测中心,所述的GPS基准站的输出端通过RTK差分信号连接有第一光端机,第一光端机输出端连接有分配器,分配器上连接有第二光端机和通讯工控机,第二光端机通过光纤通讯链路与若干个GPS监测站相信号连接,若干个GPS监测站与GPS监测中心相信号连接,所述的通讯工控机连接有网络光端机,网络光端机上连接有HUB,HUB上连接有服务器和分析工作站,服务器与GPS基准站相连接。
所述的GPS监测站上连接有远程控制器。
所述的分析工作站输出端连接有大屏幕显示器和网络打印机。
本发明的有益效果是:所述的一种基于GPS的桥梁实时位移监测方法,利用GPS实时监测大桥位移显示出独特的优越性、特别是实时性和高采样率的数据为大桥的状态分析提供了方便的条件,也为大桥的管理部门的诀决策提供了依据,使大桥的安全得到了保证、整个系统显现了广阔的应用前景。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是本发明所述的一种基于GPS的桥梁实时位移监测方法的整体结构示意图。
附图中标记分述如下:1、GPS基准站,2、GPS监测站,3、光纤通信链路,4、GPS监测中心,5、第一光端机,6、分配器,7、第二光端机,8、通讯工控机,9、网络光端机,10、HUB,11、服务器,12、分析工作站,13、远程控制器,14、大屏幕显示器,15、网络打印机,。
具体实施方式
现在结合附图对本发明作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本发明的基本结构,因此其仅显示与本发明有关的构成。
如图1所示的一种基于GPS的桥梁实时位移监测方法,包括GPS基准站1、GPS监测站2、光纤通信链路3、GPS监测中心4,GPS基准站1的输出端通过RTK差分信号连接有第一光端机5,第一光端机5输出端连接有分配器6,分配器6上连接有第二光端机7和通讯工控机8,第二光端机7通过光纤通讯链路与若干个GPS监测站2相信号连接,若干个GPS监测站2与GPS监测中心4相信号连接,通讯工控机8连接有网络光端机9,网络光端机9上连接有HUB10,HUB10上连接有服务器11和分析工作站12,服务器11与GPS基准站1相连接,GPS监测站2上连接有远程控制器13,分析工作站12输出端连接有大屏幕显示器14和网络打印机15。
以上述依据本发明的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项发明技术思想的范围内,进行多样的变更以及修改。本项发明的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。
Claims (3)
1.一种基于GPS的桥梁实时位移监测方法,其特征是:包括GPS基准站(1)、GPS监测站(2)、光纤通信链路(3)、GPS监测中心(4),所述的GPS基准站(1)的输出端通过RTK差分信号连接有第一光端机(5),第一光端机(5)输出端连接有分配器(6),分配器(6)上连接有第二光端机(7)和通讯工控机(8),第二光端机(7)通过光纤通讯链路(3)与若干个GPS监测站(2)相信号连接,若干个GPS监测站(2)与GPS监测中心(4)相信号连接,所述的通讯工控机(8)连接有网络光端机(9),网络光端机(9)上连接有HUB(10),HUB(10)上连接有服务器(11)和分析工作站(12),服务器(11)与GPS基准站(1)相连接。
2.根据权利要求1所述的一种基于GPS的桥梁实时位移监测方法,其特征是:所述的GPS监测站(2)上连接有远程控制器(13)。
3.根据权利要求1所述的一种基于GPS的桥梁实时位移监测方法,其特征是:所述的分析工作站(12)输出端连接有大屏幕显示器(14)和网络打印机(15)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510810869.7A CN105444704A (zh) | 2015-11-21 | 2015-11-21 | 一种基于gps的桥梁实时位移监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510810869.7A CN105444704A (zh) | 2015-11-21 | 2015-11-21 | 一种基于gps的桥梁实时位移监测方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105444704A true CN105444704A (zh) | 2016-03-30 |
Family
ID=55555181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510810869.7A Pending CN105444704A (zh) | 2015-11-21 | 2015-11-21 | 一种基于gps的桥梁实时位移监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105444704A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110074953A1 (en) * | 2006-04-28 | 2011-03-31 | Frank Rauscher | Image Data Collection From Mobile Vehicles With Computer, GPS, and IP-Based Communication |
CN103090825A (zh) * | 2012-12-10 | 2013-05-08 | 陕西西北铁道电子有限公司 | 一种基于北斗兼容型的铁路桥梁状态监测系统 |
CN103175576A (zh) * | 2011-12-23 | 2013-06-26 | 西安迅腾科技有限责任公司 | 具有远程参数配置功能的桥梁健康监测数据采集仪 |
CN103941605A (zh) * | 2014-04-11 | 2014-07-23 | 郭敏 | 用于桥梁监测的传感器同步控制器 |
-
2015
- 2015-11-21 CN CN201510810869.7A patent/CN105444704A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110074953A1 (en) * | 2006-04-28 | 2011-03-31 | Frank Rauscher | Image Data Collection From Mobile Vehicles With Computer, GPS, and IP-Based Communication |
CN103175576A (zh) * | 2011-12-23 | 2013-06-26 | 西安迅腾科技有限责任公司 | 具有远程参数配置功能的桥梁健康监测数据采集仪 |
CN103090825A (zh) * | 2012-12-10 | 2013-05-08 | 陕西西北铁道电子有限公司 | 一种基于北斗兼容型的铁路桥梁状态监测系统 |
CN103941605A (zh) * | 2014-04-11 | 2014-07-23 | 郭敏 | 用于桥梁监测的传感器同步控制器 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204630570U (zh) | 一种轨道交通基础沉降监测装置 | |
CN103398682A (zh) | 一种桥梁位移监测系统及其监测方法 | |
CN209978951U (zh) | 一种桥梁结构健康监测系统 | |
CN108880669A (zh) | 光缆故障点地面直线距离定位方法与装置 | |
CN103591930B (zh) | 分布式光纤监测隧道沉降的装置和方法 | |
Hall et al. | Using fibre optic cables to deliver intelligent traffic management in smart cities | |
CN203587095U (zh) | 分布式光纤监测隧道沉降的装置 | |
CN114370853A (zh) | 高速铁路差异性沉降的监测系统、监测方法及监测终端 | |
CN105444704A (zh) | 一种基于gps的桥梁实时位移监测方法 | |
CN107493317B (zh) | 基于bds的桥梁结构相对形变监测系统与方法 | |
CN210268887U (zh) | 一种光纤振动传感器及大跨径桥梁振动监测系统 | |
CN203249647U (zh) | 一种基于gsm短信的桥梁状态监测系统 | |
CN102953305A (zh) | 多级控制网gps优化组合测量法 | |
WO2021176683A1 (ja) | 光ファイバセンシングシステム、光ファイバセンシング方法、及び光ファイバセンシング装置 | |
Cousins et al. | Monitoring of the Queensferry Crossing, Scotland | |
CN203164690U (zh) | 基于物联网的桥梁建设用监控系统 | |
CN106530144A (zh) | 一种节段拼装架设施工信息化管理系统 | |
Wan et al. | Development of an automatic monitoring system for ground settlement induced by shield tunnelling | |
CN205091925U (zh) | 一种用于高架桥出口匝道的预警装置 | |
CN201229178Y (zh) | 高架桥面结构安全光纤智能检测及预警系统 | |
Xu et al. | Discussion on monitoring technology proposal for high and steep side-Slope on railway in mountain area | |
CN204920972U (zh) | 大跨度棚洞结构 | |
Miyamoto | Development of a remote monitoring system for road condition assessment and application | |
CN114764666A (zh) | 一种公路隧道安全监测方法 | |
CN108622107A (zh) | 一种城市轨道交通出入线接轨布置结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160330 |