CN105444403B - The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube - Google Patents
The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube Download PDFInfo
- Publication number
- CN105444403B CN105444403B CN201410498771.8A CN201410498771A CN105444403B CN 105444403 B CN105444403 B CN 105444403B CN 201410498771 A CN201410498771 A CN 201410498771A CN 105444403 B CN105444403 B CN 105444403B
- Authority
- CN
- China
- Prior art keywords
- heating
- heating tube
- time
- server
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention proposes that a kind of water-heater system, the water-heater system include:Electric heater, electric heater include:Liner and heating tube;Temperature detector, the temperature for detecting water in liner;Timer, the heating time for recording heating tube;Server, server are communicated with electric heater, and server judges the heating properties of heating tube according to the temperature of water in liner and the heating time of heating tube, and sends out standby signal when the heating properties of heating tube are unsatisfactory for setting condition;Mobile terminal, mobile terminal are communicated with server, for being prompted according to standby signal.The water-heater system of the present invention, can remind user to clean liner in time, improve the consciousness that user cleans liner, ensure water safety, reduce energy consumption.The present invention also proposes the monitoring method and electric heater and mobile terminal of a kind of heating tube of electric heater.
Description
Technical field
The present invention relates to the technical field of electrical appliances manufacturing, more particularly to a kind of electric water heater system, electric heater and electric hot water
The monitoring method of the heating tube of device and a kind of mobile terminal.
Background technology
With the improvement of living standards, electric heater has become the household electrical appliance generally used in family.In electric hot water
Device usage time is longer, and when liner of the user without cleaning electric heater in time, often cause heating tube fouling serious, because
And heating tube heating is insufficient, heating time will become more and more longer, influence normal use, increase energy consumption.In addition, heating tube
Fouling seriously can also cause local heating uneven and heating tube is caused to rupture.Therefore, electric heater needs to carry out periodically clear
It washes, to ensure the health and safety of user's water.
But most user does not have the consciousness of periodic cleaning liner or even some users not to know that needs are fixed
Phase cleans liner to remove the fouling in heating tube.In addition, when the heating tube fouling of electric heater is serious, user cannot be timely
Understand.
Invention content
The present invention is directed to solve above-mentioned one of technical problem at least to a certain extent.For this purpose, the present invention needs to propose
A kind of water-heater system, the water-heater system can remind user to clean heating tube in time, improve user and clean liner
Consciousness, ensure water safety, reduce energy consumption.
The present invention also proposes the monitoring method and a kind of electric heater and mobile terminal of a kind of heating tube of water heater.
To solve the above problems, one aspect of the present invention embodiment proposes that a kind of water-heater system, the water-heater system include:
Electric heater, the electric heater include:Liner and heating tube;Temperature detector, the temperature for detecting water in the liner;
Timer, the heating time for recording the heating tube;Server, the server are communicated with the electric heater,
The server judges the heating property of the heating tube according to the heating time of the temperature of water and the heating tube in the liner
Can, and send out standby signal when the heating properties of the heating tube are unsatisfactory for setting condition;Mobile terminal, the mobile terminal
It is communicated with the server, for being prompted according to the standby signal.
Water-heater system according to the ... of the embodiment of the present invention, during electric water heater heating, by the temperature of water in liner and
The heating time of heating tube is sent to server, and then server judges the heating of heating tube according to temperature change and heating time
Performance, and standby signal is sent out to mobile terminal when the heating properties of heating tube are unsatisfactory for setting condition, pass through mobile terminal
It reminds user to clean heating tube in time, improves the consciousness that user cleans liner, ensure water safety, reduce energy consumption.
In some embodiments of the invention, the server is additionally operable to obtain temperature according to the temperature of water in the liner
Difference in change, and the temperature change difference corresponding default heating time is obtained by inquiring preset relation curve, and according to institute
It states the heating time of heating tube and the default heating time judges the heating properties of the heating tube.
Wherein, when the difference in the heating time of the heating tube and the default heating time is more than default continuous default time
Between threshold value when, the server judges that the heating properties of the heating tube are unsatisfactory for imposing a condition.
In addition, in some embodiments of the invention, the electric heater is obtained every preset time to the server
Standard time to the timer to carry out time adjustment.
To solve the above problems, another aspect of the present invention embodiment proposes a kind of monitoring side of the heating tube of electric heater
Method, the electric heater are communicated with server, and the monitoring method includes the following steps:The server obtains the electricity
The heating time of the temperature and heating tube of water in the liner of water heater;The server according to the temperature of water in the liner with
And the heating time of the heating tube judges the heating properties of the heating tube;And the server adding in the heating tube
When hot property is unsatisfactory for imposing a condition, standby signal is sent out to mobile terminal to remind user.
The monitoring method of the heating tube of electric heater according to the ... of the embodiment of the present invention, during electric water heater heating, clothes
Business device receives the temperature of water and the heating time of heating tube in the liner that electric heater is sent, then according to temperature change and heating
Time judges the heating properties of heating tube, and sends out standby signal to shifting when the heating properties of heating tube are unsatisfactory for setting condition
Dynamic terminal improves the consciousness that user cleans liner to remind user to clean heating tube in time by mobile terminal, protects
Water safety is demonstrate,proved, energy consumption is reduced.
In some embodiments of the invention, the server is according to the temperature of water in the liner and the heating tube
Heating time judge the heating properties of the heating tube, further comprise:The server is according to the temperature of water in the liner
It is poor that degree obtains temperature change;The server is added by inquiring preset relation curve acquisition corresponding preset of temperature change difference
The hot time;The server judges adding for the heating tube according to the heating time and the default heating time of the heating tube
Hot property.
In some embodiments of the invention, the server adds according to the heating time and described preset of the heating tube
The hot time judges the heating properties of the heating tube, specifically includes:If the heating time of the heating tube adds with described preset
When the difference of hot time is more than preset time threshold continuous default time, then the server judges the heating properties of the heating tube not
Meet and imposes a condition.
In addition, in some embodiments of the invention, the above method further includes:The server is every preset time to institute
It states electric heater and sends the standard time to carry out time adjustment.
To solve the above problems, another aspect of the invention embodiment proposes that a kind of electric heater, the electric heater include:
Liner and heating tube;Temperature detector, the temperature for detecting water in the liner;First communication module;Timer, for remembering
Record the heating time of the heating tube;First control module, first control module control the first communication module by institute
Stating the heating time of the temperature of water and the heating tube in liner is sent to server.
Electric heater according to the ... of the embodiment of the present invention detects water in liner by temperature detector during heating
Temperature, and by the heating time of timer record heating tube, when the first control module control first communication module will heat
Between and hot water temperature be sent to server, for server carry out analysis and according to analysis result prompting user provide data base
Plinth.
To solve the above problems, another aspect of the present invention embodiment proposes that a kind of mobile terminal, the mobile terminal include:
Second communication module is unsatisfactory for the standby signal to impose a condition for receiving the heating properties of heating tube of electric heater;Prompt
Module;Second control module, second control module control the reminding module according to the standby signal and are prompted.
Mobile terminal according to the ... of the embodiment of the present invention receives the heating of the heating tube of electric heater by second communication module
The standby signal of performance, and then the second control module control reminding module is prompted, to which user can understand electric heating in time
The heating properties of the heating tube of hydrophone, and cleaned, the consciousness that user cleans inner container of electric water heater can be improved.
The additional aspect of the present invention and advantage will be set forth in part in the description, and will partly become from the following description
Obviously, or practice through the invention is recognized.
Description of the drawings
Above-mentioned and/or additional aspect and advantage of the invention will become from the following description of the accompanying drawings of embodiments
Obviously and it is readily appreciated that, wherein:
Fig. 1 is the block diagram according to the water-heater system of one embodiment of the present of invention;
Fig. 2 is the block diagram according to the water-heater system of an alternative embodiment of the invention;
Fig. 3 is the flow chart according to the monitoring method of the heating tube of the electric heater of one embodiment of the present of invention;
Fig. 4 is the flow chart according to the monitoring method of the heating tube of the electric heater of an alternative embodiment of the invention;
Fig. 5 is the block diagram according to the electric heater of one embodiment of the present of invention;And
Fig. 6 is the block diagram according to the mobile terminal of an alternative embodiment of the invention.
Reference numeral
Water-heater system 1000, electric heater 100, server 200 and mobile terminal 300, route device 400, liner 10
With heating tube 20, temperature detector 30 and timer 40, first communication module 50 and the first control module 60, second communication module
301, reminding module 302 and the second control module 303.
Specific implementation mode
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end
Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached
The embodiment of figure description is exemplary, and is only used for explaining the present invention, and is not construed as limiting the claims.
Following disclosure provides many different embodiments or example is used for realizing the different structure of the present invention.For letter
Change disclosure of the invention, hereinafter the component of specific examples and setting are described.Certainly, they are merely examples, and
It is not intended to limit the present invention.In addition, the present invention can in different examples repeat reference numerals and/or letter.It is this heavy
It is for purposes of simplicity and clarity, itself not indicate the relationship between discussed various embodiments and/or setting again.This
Outside, the present invention provides various specific techniques and material example, but those of ordinary skill in the art may realize that
The applicable property of other techniques and/or the use of other materials.In addition, fisrt feature described below second feature it
The structure of "upper" may include the embodiment that the first and second features are formed as being in direct contact, and can also include other feature shape
At the embodiment between the first and second features, such first and second feature may not be to be in direct contact.
In the description of the present invention, it should be noted that unless otherwise specified and limited, term " installation ", " connected ",
" connection " shall be understood in a broad sense, for example, it may be mechanical connection or electrical connection, can also be the connection inside two elements, it can
, can also indirectly connected through an intermediary, for the ordinary skill in the art to be to be connected directly, it can basis
Concrete condition understands the concrete meaning of above-mentioned term.
With reference to following description and drawings, it will be clear that these and other aspects of the embodiment of the present invention.In these descriptions
In attached drawing, some particular implementations in the embodiment of the present invention are specifically disclosed, to indicate to implement the implementation of the present invention
Some modes of the principle of example, but it is to be understood that the scope of embodiments of the invention is not limited.On the contrary, the present invention
Embodiment includes all changes, modification and the equivalent fallen within the scope of the spirit and intension of attached claims.
The heating of the water-heater system proposed according to embodiments of the present invention, water heater and water heater is described with reference to the accompanying drawings
The monitoring method and mobile terminal of pipe.
The water-heater system of the embodiment of the present invention is illustrated first.Fig. 1 is according to one embodiment of the present of invention
The block diagram of water-heater system.
As shown in Figure 1, the water-heater system 1000 of the embodiment of the present invention includes electric heater 100, server 200 and movement
Terminal 300.Server 200 is communicated with electric heater 100, and mobile terminal 300 is communicated with server 200.For example, electric
TCP/IP (Transmission Control may be used in data transmission between water heater 100 and server 200
Protocol/Internet Protocol, transmission control protocol/Internet Protocol), similarly, mobile terminal 300 with
TCP/IP communication agreement may be used in data transmission between server 200.
Electric heater 100 includes liner 10 and heating tube 20, temperature detector 30 and timer 40.Temperature detector 30 is used
In the temperature for detecting water in liner 10, timer 40 is used to record the heating time of heating tube 20, and timer 40 can be independent
Module or be the timing unit in 100 own controller of electric heater.The communication unit that electric heater 100 passes through its own
It is communicated after establishing connection with server 200, operation data can be sent out by communication unit under the control of the controller
It send to server 200, for example, the information such as the heating time of temperature and heating tube 20 of water in liner 10 are sent out by communication unit
It may include that electric heater 100 is run each time to send the data specifically sent to server 200, and heating tube 20 is begun to warm up
When liner 10 in the temperature of water, the time begun to warm up, heating terminate in liner 10 at the end of the temperature of water, heating time with
And unique machine identifier of electric heater 100.
Communication software is installed in server 200, the operation data for receiving electric heater 100, and then server 200
Operation data is analyzed and is stored, analysis result is generated and pushes to mobile terminal 300.For example, server 200 is according to electric heating
The temperature of water and the heating time of heating tube 20 judge the heating properties of heating tube 20 in the liner 10 of hydrophone 100, for example, service
Heating time and temperature change difference are compared by device 200 with preset condition, and are unsatisfactory for setting in the heating properties of heating tube 20
Standby signal is sent out when fixed condition, and be will be prompted to signal and pushed to mobile terminal 300.
And then mobile terminal 300 prompted according to standby signal, for example, by 20 heating properties prompt message of heating tube into
Row display, or reminded by sound or two kinds of forms are combined and reminded, to which user will be seen that the property of heating tube 20
Can, it is cleaned in time, ensures water safety, reduce energy consumption.
It is understood that as shown in Fig. 2, water-heater system 1000 further includes route device 400, route device 400 divides
It is not connect with electric heater 100 and server 200, electric heater 100 is carried out wirelessly by route device 400 and server 200
Communication.Similarly, mobile terminal 300 may be used after communication establishes connection with server 200 and carry out data communication,
The mode of the two wireless communication may include 2G/3G/GPRS etc..
The specific work process of the water-heater system of the embodiment of the present invention will be described in detail below.
Specifically, the temperature detector 30 of electric heater 100 examines the hot water temperature in 100 liner 10 of electric heater
It surveys, when electric heater 100 starts heating tube 20, heating initial time is recorded by timer 40, and pass through temperature detection
Device 30 detects hot water temperature, and when electric heater 100 closes heating tube 20, at the end of recording this time heating by timer 40
Between and hot water temperature detected by temperature detector 30, and by the initial temperature and end temp of water in liner 10, and
The initial time and the machine identifier of end time and electric heater 100 that timer 40 records are sent to server 200.
Wherein, in order to ensure the accuracy of data uplink time, electric heater 100 obtains standard every preset time to server 200
Such as Beijing time time to the timing of timer 40 to carry out time adjustment.In addition, in order to ensure the accuracy of fire data,
Only detect there is no water flow variation in liner 10 when, for example, when heating whole courage water, when excluding due to influencing heating with water
Between, operation data is sent to server 200 by 100 ability of electric heater.
Server 200 receives the operation data of electric heater 100 by the communication module itself installed, and is carried out to data
Analysis and storage.Specifically, the operation data that server 200 sends electric heater 100 according to the machine identifier received
Carry out classification analysis, that is to say, that each electric heater 100 all has corresponding list respectively in the database of server 200
Only data record.
It should be noted that electric heater 100 for the first time with server 200 establish connect when, server 200 will generate with
The preset relation curve of the electric heater 100 corresponding temperature difference and heating time.For example, server 200 will acquire the electric heating
Repeatedly such as 30 times heating times and the temperature data of hydrophone 100, and to heat the temperature difference namely in primary heating cycle
At the end of liner 10 in water temperature and initial water temperature difference as horizontal axis, unit is DEG C;With heating time namely one
For the difference of heating time and starting heating time at the end of in secondary heat cycles as the longitudinal axis, unit is the second.And then server
When 30 sample datas that 200 uses obtain calculate the heating of heating tube 20 of the electric heater 100 using average algorithm
Between with heating the temperature difference relation curve.The time of usual heating tube 20 and the change curve of temperature are usually linear change, institute
With the change curve of its time and temperature close to the fixed oblique line of slope, still, in fact, the heating time of heating tube 20 with plus
The curve of the hot temperature difference may also be made of multiple oblique line sections with Different Slope.
Server 200 constantly monitors the heating time of calculated heating tube 20 and the curve of the heating temperature difference as benchmark
The heating time of the heating tube 20 of the electric heater 100 and heating temperature.Specifically, in the operation for receiving electric heater 100
After data, server 200 is poor according to the temperature acquisition temperature change of water in liner 10, that is, in heating process in liner 10
The initial temperature of water and the difference of end temp, and the preset relation curve acquisition temperature change difference by inquiring aforementioned acquisition is right
The heating time of temperature change difference is corresponded in the default heating time for the heating tube 20 answered i.e. preset relation curve, and
The heating properties of heating tube 20 are judged according to the heating time of heating tube 20 and default heating time, if the heating of heating tube 20
Poor performance, then server 200 send out standby signal to mobile terminal 300 to remind user to clean in time.
Wherein, continuously it is more than preset time threshold default time in the difference of the heating time of heating tube 20 and default heating time
When, server 200 judges that the heating properties of heating tube 20 are unsatisfactory for imposing a condition.For example, if in continuous 3 heating inner liners 10
Heating time used in the temperature change difference of water corresponds to the heating time difference of temperature change difference with preset relation curve
50% or more, then server 200 think that the heating properties of the heating tube 20 of current electric heater 100 are low, need to repair
Maintenance.
It is illustrated below with a specific embodiment.For example, sample of the server 200 by acquisition electric heater 100
It is 1/ that the curve that the heating time of the heating tube 20 of the electric heater 100 and the temperature change difference of water is calculated, which is a slope,
2 oblique line, that is to say, that when heating tube 20 is heated, hot water temperature increases 10 DEG C and takes 10 minutes.If continuous 3 inspections
The hot water temperature of survey increases 10 DEG C and takes short time consumption that more than 15 minutes or other temperature changes were poor than preset relation curve
Upper corresponding heating time is more than 50%, then server 200 thinks that the heating properties of the heating tube 20 of the electric heater 100 are tight
It reduces again, then server 200 will push standby signal to the mobile terminal 300 of user, to remind by the communication module of itself
The user's electric heater 100 needs repair maintenance.
Communication software can be installed in mobile terminal 300, receive the standby signal that server 200 pushes and carry out display and
Prompt.Wherein, the communication software in mobile terminal 300 can be resident in systems in the form of background service, to guarantee
The message that server 200 pushes is received in time, even if can also receive server after user closes or exits communication software
The message of 200 push, further, user can be preengage after receiving prompting message repairs electric heater 100
Maintenance.
To sum up, the water-heater system of the embodiment of the present invention can acquire adding for electric heater 100 by server 200
Dsc data is as sample and calculates the preset relation curve of heating curves i.e. heating time and temperature change difference, and then according to pre-
If relation curve detect electric heater 100 heating tube 10 heating properties, and not by the liner capacity of electric heater 100,
The limitation of heating power, heating tube type, it is very general convenient, it is at low cost.Further, electric heater 100 is being detected
When the heating properties of heating tube 20 are deteriorated, server 200 will push prompting message to mobile terminal 300, and mobile terminal 300 will be led
It is dynamic to prompt the user whether to need to make house calls, more hommization.
In conclusion water-heater system according to the ... of the embodiment of the present invention, during electric water heater heating, by water in liner
Temperature and heating time of heating tube be sent to server, then server judges heating according to temperature change and heating time
The heating properties of pipe, and prompting message is sent out to mobile terminal when the heating properties of heating tube are unsatisfactory for setting condition, pass through
Mobile terminal reminds user to clean heating tube in time, improves the consciousness that user cleans liner, ensures water safety, reduces
Energy consumption.
Based on the water-heater system of above-mentioned aspect embodiment, another aspect of the present invention embodiment proposes a kind of electric heater
Heating tube monitoring method.Wherein, electric heater is communicated with server.
As shown in figure 3, the monitoring method of the heating tube of the electric heater of the embodiment of the present invention includes the following steps:
S1, server obtain electric heater liner in the temperature of water and the heating time of heating tube.
For example, electric heater detects the temperature of water in liner by temperature detector and passes through timer record heating tube
Heating time, electric heater established after connection by the communication unit of its own and server and communicated, can will transported
Row data are sent to server by communication unit, for example, by information such as the heating times of the temperature of water in liner and heating tube
It is sent to server by communication unit, the data specifically sent may include that electric heater is run each time, when beginning to warm up
The time and electric heating that the temperature of water, the time begun to warm up, heating terminate in liner at the end of the temperature of water, heating in liner
Unique machine identifier of hydrophone.Wherein, in order to ensure the accuracy of data uplink time, server every preset time to
Electric heater sends the standard time to carry out time adjustment.In addition, in order to ensure the accuracy of fire data, only in electric hot water
Device detects in liner when not having water flow variation, for example, when heating whole courage water, excludes due to influencing heating time with water,
The operation data of electric heater is sent to server.
S2, server judge the heating properties of heating tube according to the temperature of water in liner and the heating time of heating tube.
For example, after the heating time of heating tube of server reception electric heater and the temperature of hot water, by temperature change
Difference and heating time are compared with setting condition.And the relationship of temperature change difference and heating time whose is unsatisfactory for that
When part, that is, thinks that the heating properties of heating tube are unsatisfactory for imposing a condition, then follow the steps S3.
S3, server the heating properties of heating tube be unsatisfactory for impose a condition when, send out standby signal to mobile terminal with
Remind user.
For example, being shown heating tube heating properties prompt message by mobile terminal, or reminded by sound,
Or two kinds of forms are combined and are reminded, and to which user will be seen that the heating properties of heating tube, are cleaned in time, guarantee water
Safety reduces energy consumption.
Specifically, in one embodiment of the invention, as shown in figure 4, server according to the temperature of water in liner and
The heating time of heating tube judges that the heating properties of heating tube, i.e. step S2 further comprise:
S21, server are poor according to the temperature acquisition temperature change of water in liner.
Specifically, after receiving the operation data of electric heater, server obtains temperature according to the temperature of water in liner
Spend during difference in change, that is, electric water heater heating the initial temperature of water and the difference of end temp in liner.
S22, server obtain temperature change difference corresponding default heating time by inquiring preset relation curve.
It should be noted that when electric heater is established with server connect for the first time, server will generate and the electric hot water
The preset relation curve of the corresponding temperature difference of device and heating time.For example, server by acquire the electric heater repeatedly for example
30 heating times and temperature data, and to heat water of the temperature difference in the liner namely at the end of during primary heating recycles
Temperature and the difference of initial water temperature are used as horizontal axis, and unit is DEG C adding at the end of heating time is namely in primary heating cycle
For the difference of hot time and starting heating time as the longitudinal axis, unit is the second.And then server is using 30 sample datas obtained
The relation curve of the heating time and the heating temperature difference of the heating tube of the electric heater are calculated using average algorithm.Usually heating
The time of pipe and the change curve of temperature are usually linear change, so the change curve of its time and temperature is solid close to slope
Fixed oblique line, still, in fact, the curve of the heating time of heating tube and the heating temperature difference may also be by with the more of Different Slope
A oblique line section composition.
So server after the difference in change for obtaining inner container of electric water heater temperature, passes through the default of the above-mentioned acquisition of inquiry
Relation curve can be obtained the corresponding heating tube of temperature change difference default heating time i.e. preset relation curve in it is corresponding
The heating time of temperature change difference, and then execute step S23.
S23, server judge the heating properties of heating tube according to the heating time and default heating time of heating tube.
Specifically, if the heating time of heating tube and the difference of default heating time are continuously more than preset time threshold default time
When value, then server judges that the heating properties of heating tube are unsatisfactory for imposing a condition.
For example, if server judge in continuous 3 heating inner liners heating time used in the temperature change difference of water with
50% or more the heating time difference of temperature change difference is corresponded in preset relation curve, then it is assumed that the heating of current electric heater
The heating properties of pipe are low, need to repair maintenance.
It is illustrated below with a specific embodiment.For example, server is calculated by acquiring the sample of electric heater
The curve for going out the heating time of the heating tube of the electric heater and the temperature change difference of water is the oblique line that a slope is 1/2,
That is when heating tube is heated, hot water temperature increases 10 DEG C and takes 10 minutes.If the heat of continuous 3 detections of server
It is more right than institute on preset relation curve that 10 DEG C of coolant-temperature gage raising takes the short time consumption that more than 15 minutes or other temperature changes were poor
The heating time answered is more than 50%, then server thinks that the heating properties of the heating tube of the electric heater seriously reduce, then services
Device by by the communication module of itself push standby signal to user mobile terminal, with remind user's electric heater need into
Row maintenance.
The monitoring method of the heating tube of electric heater according to the ... of the embodiment of the present invention, during electric water heater heating, clothes
Business device receives the temperature of water and the heating time of heating tube in the liner that electric heater is sent, then according to temperature change and heating
Time judges the heating properties of heating tube, and sends out standby signal to shifting when the heating properties of heating tube are unsatisfactory for setting condition
Dynamic terminal improves the consciousness that user cleans liner to remind user to clean heating tube in time by mobile terminal, protects
Water safety is demonstrate,proved, energy consumption is reduced.
Embodiment in accordance with a further aspect of the present invention is described with reference to the accompanying drawings proposes a kind of electric heater.
Fig. 5 is the block diagram according to the electric heater of one embodiment of the present of invention.As shown in figure 5, the embodiment of the present invention
Electric heater 100 includes that liner 10 and heating tube 20, temperature detector 30, timer 40, first communication module 50 and first are controlled
Molding block 60.
Temperature detector 30 is used to detect the temperature of water in liner 10.When timer 40 is used to record the heating of heating tube 20
Between.First control module 60 is connect with temperature detecting module 30, timer 40 and first communication module 50 respectively, wherein timing
Device 40 can be the timing unit being integrated in the first control module 60, and first communication module 50 and the first control module 60 can be with
It is connected by UART serial communication interfaces, and then the first control module 60 controls first communication module 50 by the temperature of water in liner 10
The heating time of degree and heating tube 20 is sent to server.
It is understood that electric heater 100 is carried out wireless communication by route device and server.Wherein, in order to protect
The accuracy of data uplink time is demonstrate,proved, electric heater 100 is when preset time obtains standard time such as Beijing to server
Between with to the timing of timer 40 carry out time adjustment.In addition, in order to ensure the accuracy of fire data, only in detecting
When there is no water flow variation in courage 10, for example, when heating whole courage water, exclude due to influencing heating time with water, just by electric hot water
It may include that electric heater 100 is run each time that the operation data of device 100, which is sent to the data that server is specifically sent, heating
The temperature of water, the time begun to warm up, heating in liner 10 at the end of the temperature of water, heating in liner 10 when pipe 20 is begun to warm up
The time of end and unique machine identifier of electric heater 100, and then server analyzes the data of reception, and
Carry out sending out reminder message when the heating properties of heating tube are low to the mobile terminal of user.
Electric heater according to the ... of the embodiment of the present invention detects water in liner by temperature detector during heating
Temperature, and by the heating time of timer record heating tube, when the first control module control first communication module will heat
Between and hot water temperature be sent to server, for server carry out analysis and according to analysis result prompting user provide data base
Plinth.
The mobile terminal that embodiment proposes according to another aspect of the invention is described with reference to the accompanying drawings.
Fig. 6 is the block diagram according to the mobile terminal of one embodiment of the present of invention.As shown in fig. 6, the embodiment of the present invention
Mobile terminal 300 includes second communication module 301, reminding module 302 and the second control module 303.
The heating properties for the heating tube that second communication module 301 is used to receive electric heater are unsatisfactory for the prompt to impose a condition
Signal, such as the heating time to heating tube in the operation data such as heating process of electric heater and hot water temperature by server
The analysis of the difference in change of degree judges that the heating properties of heating tube are not good enough, then server sends standby signal to mobile terminal 300.
By second communication module 301 receive heating tube be unsatisfactory for impose a condition standby signal after, second control
Module 303 controls reminding module 302 according to standby signal and is prompted.Such as reminding module 302 can carry out presentation of information, or
It is reminded by sound or two kinds of forms is combined and reminded, to which user will be seen that the performance of heating tube, carried out in time
Cleaning ensures water safety, reduces energy consumption.
Mobile terminal according to the ... of the embodiment of the present invention receives the heating of the heating tube of electric heater by second communication module
The promotion signal of performance, and then the second control module control reminding module is prompted, to which user can understand electric heating in time
The heating properties of the heating tube of hydrophone, and cleaned, the consciousness that user cleans inner container of electric water heater can be improved.
Any process described otherwise above or method description are construed as in flow chart or herein, and expression includes
It is one or more for realizing specific logical function or process the step of executable instruction code module, segment or portion
Point, and the range of the preferred embodiment of the present invention includes other realization, wherein can not press shown or discuss suitable
Sequence, include according to involved function by it is basic simultaneously in the way of or in the opposite order, to execute function, this should be of the invention
Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use
In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for
Instruction execution system, device or equipment (system of such as computer based system including processor or other can be held from instruction
The instruction fetch of row system, device or equipment and the system executed instruction) it uses, or combine these instruction execution systems, device or set
It is standby and use.For the purpose of this specification, " computer-readable medium " can any can be included, store, communicating, propagating or passing
Defeated program is for instruction execution system, device or equipment or the dress used in conjunction with these instruction execution systems, device or equipment
It sets.The more specific example (non-exhaustive list) of computer-readable medium includes following:Electricity with one or more wiring
Interconnecting piece (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only memory
(ROM), erasable edit read-only storage (EPROM or flash memory), fiber device and portable optic disk is read-only deposits
Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable
Medium, because can be for example by carrying out optical scanner to paper or other media, then into edlin, interpretation or when necessary with it
His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each section of the present invention can be realized with hardware, software, firmware or combination thereof.Above-mentioned
In embodiment, software that multiple steps or method can in memory and by suitable instruction execution system be executed with storage
Or firmware is realized.It, and in another embodiment, can be under well known in the art for example, if realized with hardware
Any one of row technology or their combination are realized:With the logic gates for realizing logic function to data-signal
Discrete logic, with suitable combinational logic gate circuit application-specific integrated circuit, programmable gate array (PGA), scene
Programmable gate array (FPGA) etc..
Those skilled in the art are appreciated that realize all or part of step that above-described embodiment method carries
Suddenly it is that relevant hardware can be instructed to complete by program, the program can be stored in a kind of computer-readable storage medium
In matter, which includes the steps that one or a combination set of embodiment of the method when being executed.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing module, it can also
That each unit physically exists alone, can also two or more units be integrated in a module.Above-mentioned integrated mould
The form that hardware had both may be used in block is realized, can also be realized in the form of software function module.The integrated module is such as
Fruit is realized in the form of software function module and when sold or used as an independent product, can also be stored in a computer
In read/write memory medium.
Storage medium mentioned above can be read-only memory, disk or CD etc..
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example
Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not
Centainly refer to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be any
One or more embodiments or example in can be combined in any suitable manner.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is by appended claims and its equivalent limits.
Claims (8)
1. a kind of water-heater system, which is characterized in that including:
Electric heater, the electric heater include:
Liner and heating tube;
Temperature detector, the temperature for detecting water in the liner;
Timer, the heating time for recording the heating tube;
Server, the server are communicated with the electric heater, and the server is according to the temperature of water in the liner
The heating properties of the heating tube are judged with the heating time of the heating tube, and are unsatisfactory in the heating properties of the heating tube
Standby signal is sent out when setting condition;
Mobile terminal, the mobile terminal are communicated with the server, for being prompted according to the standby signal.
2. water-heater system according to claim 1, which is characterized in that the server is additionally operable to according in the liner
The temperature acquisition temperature change of water is poor, and passes through and inquire the corresponding default heating of the preset relation curve acquisition temperature change difference
Time, and judge according to the heating time of the heating tube and the default heating time heating properties of the heating tube.
3. water-heater system according to claim 2, which is characterized in that wherein, the heating tube heating time with
When the difference of the default heating time is more than preset time threshold continuous default time, the server judge the heating tube plus
Hot property is unsatisfactory for imposing a condition.
4. water-heater system as described in claim 1, which is characterized in that the electric heater is every preset time to the clothes
The device acquisition standard time be engaged in carry out time adjustment to the timer.
5. a kind of monitoring method of the heating tube of electric heater, which is characterized in that the electric heater is communicated with server,
The monitoring method includes the following steps:
The server obtains the temperature of water and the heating time of heating tube in the liner of the electric heater;
The server judges the heating tube according to the heating time of the temperature of water and the heating tube in the liner
Heating properties;And
The server the heating properties of the heating tube be unsatisfactory for impose a condition when, send out standby signal to mobile terminal with
Remind user.
6. the monitoring method of the heating tube of electric heater according to claim 5, which is characterized in that the server according to
The heating time of the temperature of water and the heating tube judges the heating properties of the heating tube in the liner, further wraps
It includes:
The server is poor according to the temperature acquisition temperature change of water in the liner;
The server obtains the temperature change difference corresponding default heating time by inquiring preset relation curve;
The server judges the heating of the heating tube according to the heating time and the default heating time of the heating tube
Performance.
7. the monitoring method of the heating tube of electric heater according to claim 6, which is characterized in that the server according to
The heating time of the heating tube and the default heating time judge the heating properties of the heating tube, specifically include:
If the heating time of the heating tube and the difference of the default heating time are continuously more than preset time threshold default time
When, then the server judges that the heating properties of the heating tube are unsatisfactory for imposing a condition.
8. the monitoring method of the heating tube of electric heater as claimed in claim 5, which is characterized in that further include:
The server sends the standard time to carry out time adjustment every preset time to the electric heater.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410498771.8A CN105444403B (en) | 2014-09-25 | 2014-09-25 | The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410498771.8A CN105444403B (en) | 2014-09-25 | 2014-09-25 | The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105444403A CN105444403A (en) | 2016-03-30 |
CN105444403B true CN105444403B (en) | 2018-09-11 |
Family
ID=55554893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410498771.8A Active CN105444403B (en) | 2014-09-25 | 2014-09-25 | The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105444403B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106907846B (en) * | 2017-03-10 | 2019-05-07 | 华北电力大学 | A kind of water heater and its temprature control method |
CN107357344A (en) * | 2017-09-07 | 2017-11-17 | 广州辰创科技发展有限公司 | A kind of temperature and humidity monitoring system and method applied to inside FOD radar front ends |
CN110081612B (en) * | 2019-04-04 | 2022-05-31 | 芜湖美的厨卫电器制造有限公司 | Control method of gas water heater and gas water heater |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1801516A1 (en) * | 2005-12-23 | 2007-06-27 | Rhea Vendors S.p.A. | Method and apparatus for treating limescale deposits within water heaters in beverage dispensing machines |
CN101004289A (en) * | 2006-10-08 | 2007-07-25 | 东北电力大学 | Real time system for monitoring dirt on heating surface of water storage type water heater |
CN101893322A (en) * | 2010-07-07 | 2010-11-24 | 云南航天工业总公司 | Method for detecting scale limit value of container on line for burned protection |
CN103616870A (en) * | 2013-11-27 | 2014-03-05 | 中山华帝燃具股份有限公司 | Remote control's electric water heater fault diagnosis system |
CN203759465U (en) * | 2013-12-24 | 2014-08-06 | 苏州巨浪热水器有限公司 | Water heater monitoring device |
-
2014
- 2014-09-25 CN CN201410498771.8A patent/CN105444403B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1801516A1 (en) * | 2005-12-23 | 2007-06-27 | Rhea Vendors S.p.A. | Method and apparatus for treating limescale deposits within water heaters in beverage dispensing machines |
CN101004289A (en) * | 2006-10-08 | 2007-07-25 | 东北电力大学 | Real time system for monitoring dirt on heating surface of water storage type water heater |
CN101893322A (en) * | 2010-07-07 | 2010-11-24 | 云南航天工业总公司 | Method for detecting scale limit value of container on line for burned protection |
CN103616870A (en) * | 2013-11-27 | 2014-03-05 | 中山华帝燃具股份有限公司 | Remote control's electric water heater fault diagnosis system |
CN203759465U (en) * | 2013-12-24 | 2014-08-06 | 苏州巨浪热水器有限公司 | Water heater monitoring device |
Also Published As
Publication number | Publication date |
---|---|
CN105444403A (en) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11100594B1 (en) | Correlating resource usage data to a waste scoring system | |
CN105444403B (en) | The monitoring method and mobile terminal of water-heater system, electric heater and its heating tube | |
CN103926096B (en) | A kind of electromagnetic oven Remote Fault Diagnosis system and diagnostic method | |
US20130048625A1 (en) | Estimating temperature | |
JP5046676B2 (en) | Home anomaly detection method, apparatus, and program therefor | |
KR102078652B1 (en) | Apparatus and method for detecting event in a smart plug | |
US20200000310A1 (en) | Dishwasher thermometer with wireless temperature logger and associated methods | |
CN104137142A (en) | Electronic apparatus | |
CN105395040A (en) | Method, device and system for controlling electric stewpot and electric stewpot | |
US11366075B2 (en) | Method for determining an amount of deposition of scale on a heating element and household appliance comprising a heating element | |
CN105725791A (en) | Control method and system of water dispenser, server and water dispenser | |
CN106289833B (en) | Fault detection method and device for heat storage body | |
CN105739320A (en) | Smart home control method based on application scene | |
CN103939961A (en) | Pan deviation detecting method and heating appliance | |
WO2011151622A2 (en) | Determining an indication of a background level of utility consumption | |
CN105476441A (en) | Cooking appliance, heat preservation control method of cooking appliance and heat preservation control device of cooking appliance | |
CN109406115A (en) | Scale detection method and liquid heating apparatus | |
CN109237543B (en) | Dry burning prevention control method and dry burning prevention system | |
US20170288472A1 (en) | Appliance for wireless power and data transfer | |
CN109237540A (en) | The control method and anti-dry system of anti-dry | |
JP5502117B2 (en) | Equipment operation estimation device, safety estimation system, equipment operation estimation method and program | |
US9679472B2 (en) | Energy consumption evaluation system having reduced energy consumption | |
JP2020514931A (en) | Improvement of low frequency energy decomposition technique | |
CN203455136U (en) | Electric pressure cooker and fault detection device thereof | |
CN109237527B (en) | Dry burning prevention control method and dry burning prevention system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220727 Address after: 241000 west side of 3 / F, No.5 office building, new energy and new materials gathering area, Fuzhou Road, Jiangbei District, Wuhu City, Anhui Province Patentee after: Wuhu Midea intelligent kitchen electricity Manufacturing Co.,Ltd. Address before: 241009 Wan Chun East Road, East Wuhu economic and Technological Development Zone, Wuhu, Anhui Patentee before: WUHU MIDEA KITCHEN AND BATH APPLIANCES MFG. Co.,Ltd. |