CN105442846A - Concrete false bracket supporting device - Google Patents
Concrete false bracket supporting device Download PDFInfo
- Publication number
- CN105442846A CN105442846A CN201510768389.9A CN201510768389A CN105442846A CN 105442846 A CN105442846 A CN 105442846A CN 201510768389 A CN201510768389 A CN 201510768389A CN 105442846 A CN105442846 A CN 105442846A
- Authority
- CN
- China
- Prior art keywords
- fixed
- concrete
- hinged mode
- bracket
- upper bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The invention discloses a concrete false bracket supporting device which comprises a base. A lower support is fixed to the front end of the base, an upper support is fixed to the upper end of the lower support, a casing is fixed to the upper end of the base, a first hydraulic cylinder is fixed to the upper end of the casing, a second hydraulic cylinder is fixed to the front end of the lower support, and a motor is installed at the rear end of the upper support. A driving wheel is fixed to a shaft of the motor, a supporting wheel is installed on the upper support, guide pillars are installed on the left and right of the upper support, a sliding plate is arranged in the front of the upper support, a supporting frame is fixed to the front end of the sliding plate, and a manufacturing groove is fixed to the front end of the supporting frame. The concrete false bracket supporting device has the advantages of being small in occupied space and convenient to use. Through the matching of the manufacturing groove, the lower support and the upper support, the pouring of a concrete false bracket is performed, the preparation time for pouring is reduced, manpower and material resources are saved, and the concrete pouring quality is guaranteed.
Description
Technical field
The present invention relates to false bracket concrete placing installation technical field, specifically the false bracket bracing or strutting arrangement of a kind of concrete.
Background technology
Along with the development in epoch, the utilization of concrete construction gets more and more.Concrete construction refers to cement to be major gelled material, adds the necessary chemical admixture such as water, sand, stone, through the building that uniform stirring is formed.In the casting process of concrete construction, the concrete of lower floor, after solidifying, needs the upper strata of building building, but due in the process of drying, the concrete shrinkage on upper strata, the concrete on top moves down, and causes top to build deficiency.
People are in order to solve this deficiency, can in the process of the pouring concrete on upper strata, a concrete storage area can be set, the concrete on such upper strata is in the process of drying, can the concrete of storage area herein be added in the concrete on upper strata, final again by cement excision herein, and these outstanding position people are referred to as false bracket.In concrete casting process, false bracket needs just can be built by the support of steel frame construction.Therefore market needs a kind of false bracket bracing or strutting arrangement replacing steel frame construction.
Summary of the invention
In order to solve the problems of the technologies described above, the invention provides the false bracket bracing or strutting arrangement of a kind of concrete.
The present invention solves its technical problem and realizes by the following technical solutions:
The false bracket bracing or strutting arrangement of a kind of concrete, comprise base, the front end of described base is fixed with lower carriage by hinged mode, the upper end of described lower carriage is fixed with upper bracket by hinged mode, the lower end of described base is evenly provided with support wheel, the upper end of base is fixed with housing, and the upper end of described housing is fixed with a hydraulic cylinder by hinged mode, and the other end of a described hydraulic cylinder is fixed on lower carriage by hinged mode.During use, a hydraulic cylinder stretches out, and drives lower carriage to rotate, and is one of necessary condition of device use.
The front end of described lower carriage is fixed with No. two hydraulic cylinders by hinged mode, and the other end of described No. two hydraulic cylinders is fixed on upper bracket by hinged mode.During use, No. two hydraulic cylinders stretch out, and drive upper support frame to rotate, and provide necessary condition for device uses.
The rear end of described upper bracket is provided with motor, the axle of described motor is fixed with driving wheel, described upper bracket is provided with directive wheel, left and right two that state upper bracket are all provided with guide pillar, the front of upper bracket is provided with can along the sliding panel of guide pillar movement, described driving wheel, be connected by chain between directive wheel with sliding panel, the front end of described sliding panel is fixed with bracing frame, and the front end of support frame as described above is fixed with material stock groove.During use, machine operation, drives driving wheel to rotate, and driving wheel drives chain to move, chain pulls sliding panel to move, and sliding panel drives bracing frame to move, and bracing frame drives material stock groove to move, when sliding panel moves to certain position, motor quits work, and material stock groove stops in position.
The upper end of described housing is provided with inclined plane.During use, arranging of inclined plane can provide support for lower carriage, reduces parking space, saves manpower and materials.
The invention has the beneficial effects as follows:
The present invention has takes up an area the advantages such as space is little, easy to use, is coordinated, achieve building of concrete vacation bracket, reduce the time of building, save manpower and materials, ensure that the quality of concreting by material stock groove, lower carriage with upper bracket.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is right view of the present invention;
Fig. 2 is rear elevation of the present invention;
Fig. 3 is perspective view of the present invention.
Detailed description of the invention
In order to make object of the present invention, technical scheme and beneficial effect clearly, below in conjunction with accompanying drawing, be described in detail the preferred embodiments of the present invention, the present invention will be further described, to facilitate the technical staff to understand.
As shown in Figure 1 to Figure 3, the false bracket bracing or strutting arrangement of a kind of concrete, comprise base 1, the front end of described base 1 is fixed with lower carriage 2 by hinged mode, the upper end of described lower carriage 2 is fixed with upper bracket 3 by hinged mode, and the lower end of described base 1 is evenly provided with support wheel 4, and the upper end of base 1 is fixed with housing 5, the upper end of described housing 5 is fixed with a hydraulic cylinder 6 by hinged mode, and the other end of a described hydraulic cylinder 6 is fixed on lower carriage 2 by hinged mode.During use, a hydraulic cylinder 6 stretches out, and drives lower carriage 2 to rotate, and is one of necessary condition of device use.
The front end of described lower carriage 2 is fixed with No. two hydraulic cylinders 7 by hinged mode, and the other end of described No. two hydraulic cylinders 7 is fixed on upper bracket 3 by hinged mode.During use, No. two hydraulic cylinders 7 stretch out, and drive upper support frame 13 to rotate, and provide necessary condition for device uses.
The rear end of described upper bracket 3 is provided with motor 8, the axle of described motor 8 is fixed with driving wheel 9, described upper bracket 3 is provided with directive wheel 10, left and right two that state upper bracket 3 are all provided with guide pillar 11, the front of upper bracket 3 is provided with can along the sliding panel 12 of guide pillar 11 movement, described driving wheel 9, be connected by chain between directive wheel 10 with sliding panel 12, the front end of described sliding panel 12 is fixed with bracing frame 13, and the front end of support frame as described above 13 is fixed with material stock groove 14.During use, motor 8 works, driving wheel 9 is driven to rotate, driving wheel 9 drives chain to move, and chain pulls sliding panel 12 to move, and sliding panel 12 drives bracing frame 13 to move, bracing frame 13 drives material stock groove 14 to move, when sliding panel 12 moves to certain position, motor 8 quits work, and material stock groove 14 stops in position.
The upper end of described housing 5 is provided with inclined plane 5a.During use, arranging of inclined plane 5a can provide support for lower carriage 2, reduces parking space, saves manpower and materials.
During use, a hydraulic cylinder 6 works, lower carriage 2 is driven to rotate, when lower carriage 2 rotates to certain angle, No. two hydraulic cylinders 7 work, upper bracket 3 is driven to rotate, when upper bracket 3 rotates to certain angle, motor 8 works, driving wheel 9 is driven to rotate, driving wheel 9 drives chain to move, chain pulls sliding panel 12 to move, sliding panel 12 drives bracing frame 13 to move, bracing frame 13 drives material stock groove 14 to move, when sliding panel 12 moves to certain position, motor 8 quits work, material stock groove 14 stops in position, at this moment concrete can be poured in material stock groove 14.
What finally illustrate is, above preferred embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although by above preferred embodiment to invention has been detailed description, but those skilled in the art are to be understood that, various change can be made to it in the form and details, and not depart from claims of the present invention limited range.
Claims (2)
1. the false bracket bracing or strutting arrangement of concrete, comprise base, it is characterized in that: the front end of described base is fixed with lower carriage by hinged mode, the upper end of described lower carriage is fixed with upper bracket by hinged mode, the lower end of described base is evenly provided with support wheel, the upper end of base is fixed with housing, the upper end of described housing is fixed with a hydraulic cylinder by hinged mode, the other end of a described hydraulic cylinder is fixed on lower carriage by hinged mode, the front end of described lower carriage is fixed with No. two hydraulic cylinders by hinged mode, the other end of described No. two hydraulic cylinders is fixed on upper bracket by hinged mode, the rear end of described upper bracket is provided with motor, the axle of described motor is fixed with driving wheel, described upper bracket is provided with directive wheel, state a left side for upper bracket, right two are all provided with guide pillar, the front of upper bracket is provided with can along the sliding panel of guide pillar movement, described driving wheel, be connected by chain between directive wheel with sliding panel, the front end of described sliding panel is fixed with bracing frame, the front end of support frame as described above is fixed with material stock groove.
2. the false bracket bracing or strutting arrangement of a kind of concrete according to claim 1, is characterized in that: the upper end of described housing is provided with inclined plane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510768389.9A CN105442846B (en) | 2015-11-05 | 2015-11-05 | A kind of concrete vacation corbels support device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510768389.9A CN105442846B (en) | 2015-11-05 | 2015-11-05 | A kind of concrete vacation corbels support device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105442846A true CN105442846A (en) | 2016-03-30 |
CN105442846B CN105442846B (en) | 2018-01-05 |
Family
ID=55553436
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510768389.9A Active CN105442846B (en) | 2015-11-05 | 2015-11-05 | A kind of concrete vacation corbels support device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105442846B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351448A (en) * | 2016-09-28 | 2017-01-25 | 宜兴市宏天机械设备有限公司 | Self-propelled concrete pouring machine |
CN110847076A (en) * | 2019-11-28 | 2020-02-28 | 湖南青蓝文化传媒集团有限公司 | Guideboard mounting equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB868439A (en) * | 1958-08-27 | 1961-05-17 | Robert William Archer Lorimer | A new and improved cavity wall bracket |
CN1563612A (en) * | 2004-03-15 | 2005-01-12 | 中国第二十冶金建设公司 | Construction method for underground structure through half reverse course of action of inverting connection |
CN101372872A (en) * | 2008-10-20 | 2009-02-25 | 中冶实久建设有限公司 | Method for implementing hot rolling swirl pool constructional engineering by top-down method |
CN102191779A (en) * | 2010-03-05 | 2011-09-21 | 中国京冶工程技术有限公司厦门分公司 | Topdown construction method of basement exterior wall |
CN104594361A (en) * | 2015-01-14 | 2015-05-06 | 济南轨道交通集团有限公司 | Construction method of H-shaped enclosure pile and enclosure structure as main structure |
CN105113541A (en) * | 2015-09-06 | 2015-12-02 | 上海建工二建集团有限公司 | Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same |
-
2015
- 2015-11-05 CN CN201510768389.9A patent/CN105442846B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB868439A (en) * | 1958-08-27 | 1961-05-17 | Robert William Archer Lorimer | A new and improved cavity wall bracket |
CN1563612A (en) * | 2004-03-15 | 2005-01-12 | 中国第二十冶金建设公司 | Construction method for underground structure through half reverse course of action of inverting connection |
CN101372872A (en) * | 2008-10-20 | 2009-02-25 | 中冶实久建设有限公司 | Method for implementing hot rolling swirl pool constructional engineering by top-down method |
CN102191779A (en) * | 2010-03-05 | 2011-09-21 | 中国京冶工程技术有限公司厦门分公司 | Topdown construction method of basement exterior wall |
CN104594361A (en) * | 2015-01-14 | 2015-05-06 | 济南轨道交通集团有限公司 | Construction method of H-shaped enclosure pile and enclosure structure as main structure |
CN105113541A (en) * | 2015-09-06 | 2015-12-02 | 上海建工二建集团有限公司 | Self-supporting bent-frame-free and template-free basement beam-free floor and inverse construction method of same |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351448A (en) * | 2016-09-28 | 2017-01-25 | 宜兴市宏天机械设备有限公司 | Self-propelled concrete pouring machine |
CN110847076A (en) * | 2019-11-28 | 2020-02-28 | 湖南青蓝文化传媒集团有限公司 | Guideboard mounting equipment |
Also Published As
Publication number | Publication date |
---|---|
CN105442846B (en) | 2018-01-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105442846A (en) | Concrete false bracket supporting device | |
CN206170286U (en) | Prefabricated piping lane mould | |
CN202037710U (en) | Demoulding device for aerated concrete block bodies | |
CN206722342U (en) | plastering machine | |
CN210415003U (en) | Small-size concrete mixer | |
CN206668285U (en) | It is easy to the tunnel central trench chassis efficiently constructed | |
CN205466729U (en) | Dedicated two -stage rotary drum formula cement mortar of construction mixes machine | |
CN105437380B (en) | A kind of false bracket rope saw cutting machine | |
CN205043992U (en) | Tray upper plate device of stone material | |
CN202731934U (en) | Tunnel non-short-sidewall type pouring device | |
CN105442848B (en) | A kind of false bracket mould | |
CN208055828U (en) | A kind of municipal administration cement concrete road road surface roadbed, which is safeguarded, uses concrete repair equipment | |
CN205955750U (en) | Rounded rectangle cross -section tunnel steel mould trolley for concrete lining | |
CN105328799B (en) | A kind of false bracket device for excising | |
CN105345624A (en) | Fake corbel grinding machine | |
CN206468089U (en) | A kind of easy construction and firm steel tower | |
CN204487811U (en) | Concrete mixer travel steering device and concrete mixer thereof | |
CN219669546U (en) | Loading attachment is used in concrete processing | |
CN219294354U (en) | Concrete hopper with adjustable concrete box girder class is pour | |
CN215291403U (en) | Pouring template for building construction | |
CN204772914U (en) | Turn round king's piece mould | |
CN217399335U (en) | Mixer for road construction | |
CN203994220U (en) | The energy-conservation concrete central mix plant of novel suspended type | |
CN211007683U (en) | Rotary concrete pouring equipment | |
CN105345852B (en) | A kind of false bracket cutting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210220 Address after: 225300 in Caiguan industrial concentration area, Zhangdian Town, Jiangyan District, Taizhou City, Jiangsu Province Patentee after: Jiangsu Ding Chen Cable Co.,Ltd. Address before: Room 3F309, Block A, Electronic Industry Park, Jiujiang District, Wuhu City, Anhui Province Patentee before: WUHU SAITE CONSTRUCTION EQUIPMENT Co.,Ltd. |