CN105426281B - A kind of power switch machine test method, system and blade server - Google Patents

A kind of power switch machine test method, system and blade server Download PDF

Info

Publication number
CN105426281B
CN105426281B CN201510730665.2A CN201510730665A CN105426281B CN 105426281 B CN105426281 B CN 105426281B CN 201510730665 A CN201510730665 A CN 201510730665A CN 105426281 B CN105426281 B CN 105426281B
Authority
CN
China
Prior art keywords
blade
server
blades
test
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510730665.2A
Other languages
Chinese (zh)
Other versions
CN105426281A (en
Inventor
张迎华
闫秋芳
颜飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dawning Information System (Liaoning) Co., Ltd.
Dawning Information Industry Co Ltd
Original Assignee
Dawning Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dawning Information Industry Co Ltd filed Critical Dawning Information Industry Co Ltd
Priority to CN201510730665.2A priority Critical patent/CN105426281B/en
Publication of CN105426281A publication Critical patent/CN105426281A/en
Application granted granted Critical
Publication of CN105426281B publication Critical patent/CN105426281B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/22Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
    • G06F11/26Functional testing
    • G06F11/263Generation of test inputs, e.g. test vectors, patterns or sequences ; with adaptation of the tested hardware for testability with external testers
    • G06F11/2635Generation of test inputs, e.g. test vectors, patterns or sequences ; with adaptation of the tested hardware for testability with external testers using a storage for the test inputs, e.g. test ROM, script files

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Sources (AREA)
  • Test And Diagnosis Of Digital Computers (AREA)

Abstract

This application provides a kind of power switch machine test method, system and blade server, the blade server includes communication blade and other blades, and for being communicated with test server, the test method includes the communication blade:Other blades execute shutdown action according to pre-stored shutdown test program in the blade server;The communication blade collects the on-off state information of other blades, and the information being collected into is uploaded to after the test server and executes shutdown action;The PDU switches of the blade server receive and execute the power off command that the test server is sent;The blade server power-up booting.Since each blade voluntarily executes power-off operation in the application, communication blade collects the on-off state information of other blades and is uploaded to test server, blade server powers on after all blades shut down, PDU switches automatically power off, and solves the problems, such as that AC tests can not be carried out on blade server in the prior art.

Description

A kind of power switch machine test method, system and blade server
Technical field
This application involves a kind of field of computer technology more particularly to power switch machine test method, system and blade clothes Business device.
Background technology
With the rapid proliferation of internet, taking on the server of network backbone becomes to become more and more important.Although server is just Normally opened shutdown is a simple flow, but affects the stabilization of whole system, and in general, server itself closes suddenly Close or restart automatically or it is artificial cause server moment abnormal power switch behavior such as to close or restart, all can be to service Device generates damage.Therefore, alternating current (AC, Alternating Current) ON/OFF power switches test is test server One important step of stability.
Server can be generally divided into tower server, rack-mount server and blade type according to the difference of contour structures Server three types.Currently, currently existing scheme can only be directed to tower server or rack-mount server carries out AC switching on and shutting down Test, can not complete the test of FCL blade server.
Prior art deficiency is:
Currently, currently existing scheme can only be directed to tower server, rack-mount server carries out AC switching on and shutting down tests, it can not be complete At the test of blade server.
Invention content
The embodiment of the present application proposes a kind of power switch machine test method, system and blade server, existing to solve It can only be directed to tower server, rack-mount server progress AC switching on and shutting down tests in technology, blade server can not be completed The technical issues of test.
The embodiment of the present application provides a kind of power switch machine test method, is used for the power switch of test blades server Machine state, the blade server include communication blade and other blades, and the communication blade is used to communicate with test server, Described method includes following steps:
Other blades execute shutdown according to pre-stored shutdown test program and move in step 101, the blade server Make;
Step 102, the communication blade collect the on-off state information of other blades, and the information being collected into is uploaded to Shutdown action is executed after the test server;
Step 103, the blade server PDU switches receive and execute the power-off life that the test server is sent It enables;
Step 104, blade server power-up booting.
The embodiment of the present application provides a kind of blade server, the blade server include communication blade, other blades, PDU is switched and starting module, and the communication blade with test server for communicating, other blades are equal in the blade server Including the first execution module, the communication blade includes collection module, uploading module and the second execution module;Wherein,
First execution module of other blades, it is dynamic for executing shutdown according to pre-stored shutdown test program Make;
The collection module of the communication blade, the on-off state information for collecting other blades;
The uploading module of the communication blade, for the information being collected into be uploaded to the test server;
It is described communication blade the second execution module, for by the information being collected into be uploaded to the test server it Afterwards, shutdown action is executed according to pre-stored shutdown test program;
The PDU switches, the power off command sent for receiving and executing the test server;
The starting module, for executing power-up power-on operation.
The embodiment of the present application also provides a kind of power switch machine test system, including blade server as described above and Test server, the test server include:
Receiving module, the information uploaded for receiving the communication blade;
Sending module sends power off command for being switched to the PDU.
It has the beneficial effect that:
Power switch machine test method, system and the blade server that the embodiment of the present application is provided, in blade server Other blades execute shutdown action according to shutdown test program is prestored to, and the communication blade collects the switch of other blades The information being collected into is uploaded to after the test server and executes shutdown action by machine status information;The blade server PDU switches receive and execute the power off command that the test server is sent;The blade server power-up booting.Due to this Each blade voluntarily executes power-off operation in application embodiment, other blades are collected using the communication blade in blade server On-off state information, and the information being collected into is uploaded to test server, the blade server shuts down in all blades, PDU switches upper electric-opening after automatically powering off, realizes and tests the automatic power switch machine of blade, in the prior art can not solve The problem of carrying out AC tests on blade server.
Description of the drawings
The specific embodiment of the application is described below with reference to accompanying drawings, wherein:
Fig. 1 shows the flow diagram that power switch machine test method is implemented in the embodiment of the present application;
Fig. 2 shows operational process schematic diagrames one in the embodiment of the present application;
Fig. 3 shows operational process schematic diagram two in the embodiment of the present application;
Fig. 4 shows the structural schematic diagram of blade server in the embodiment of the present application;
Fig. 5 shows the structural schematic diagram of power switch machine test system in the embodiment of the present application;
Fig. 6 shows the interaction schematic diagram of test server and blade server in the embodiment of the present application.
Specific implementation mode
In order to which the technical solution and advantage that make the application are more clearly understood, below in conjunction with attached drawing to the exemplary of the application Embodiment is described in more detail, it is clear that and described embodiment is only a part of the embodiment of the application, rather than The exhaustion of all embodiments.And in the absence of conflict, the feature in the embodiment and embodiment in this explanation can be mutual It is combined.
Inventor notices during invention:
Current program can only be directed to tower server and rack-mount server carries out AC switching on and shutting down tests.In order to ensure knife The stability of piece server controls its product quality, so AC ON/OFF testing tool of the exploitation specifically for blade server It is very necessary.
Based on this, the embodiment of the present application proposes a kind of power switch machine test method, system and blade server, below It illustrates.
Fig. 1 shows the flow diagram that power switch machine test method is implemented in the embodiment of the present application, as shown, institute Power switch machine test method is stated to may include steps of:
Other blades execute shutdown according to pre-stored shutdown test program and move in step 101, the blade server Make;
Step 102, the communication blade collect the on-off state information of other blades, and the information being collected into is uploaded to Shutdown action is executed after the test server;
Power distribution unit (PDU, the Power Distibution Unit) switch of step 103, the blade server Receive and execute the power off command that the test server is sent;
Step 104, blade server power-up booting.
In specific implementation, existing operating system shutdown programm may be used in shutdown test program, and the application is not done herein It repeats.
The embodiment of the present application can be compatible with most of Linux releases, such as Redhat, suse, in (SuSE) Linux OS Under the test of AC on/off power switch machines is carried out to blade server, and output test result, be automatically performed AC power supplies switch and survey Examination, improves the working efficiency of test, solves the problems, such as that AC tests can not be carried out on blade server in the prior art.
In addition, the power switch machine test method that the embodiment of the present application is provided, it can be direct after the completion of program compiles It uses, is compiled without repeating.
In implementation, the method may further include:
According to the preconfigured cycle-index of the blade server, cycle executes the step 101~step 104.
In specific implementation, blade server can be pre-filled with configuration file, may include following for test in configuration file Ring number.Assuming that cycle-index is 2, then, after the power-up booting of insert server, jumps to step 101 and continue cycling through Execute test next time.
In implementation, all blades execute shutdown according to pre-stored shutdown test program and move in the blade server Before work, the method may further include:
The communication blade according to the network interconnection agreements of all blades in the blade server collected in advance (IP, Internet Protocol) address to other blades send copy shutdown test program.
In specific implementation, pre-stored shutdown test program can be by described on other blades in the blade server Communication blade is sent in advance, is write shutdown test program on each blade respectively without tester, is greatly improved Testing efficiency.Also, since communication blade can be communicated with test server, when specific implementation, can also pass through test server It sends test program and is copied to other blades to communicating blade, then by communication blade, further increase testing efficiency so that blade The power switch machine test automation of server.
In implementation, other blades execute shutdown according to pre-stored shutdown test program and move in the blade server Before work, the method may further include:
Clear up the operation trace on the blade server.
In specific implementation, it may have existed and tested early period on the blade server before new round test Or the operation trace left when other operations can be before test first by these operation traces in order to improve the accuracy of test Mark cleans up.
In implementation, the blade server power-up booting is specifically as follows the blade server and is opened according to preconfigured Machine delay time executes power-up power-on operation.
In specific implementation, the blade server can be pre-configured with the delay time of booting, shutdown every time, for example, After all blade shutdown, PDU power-off, the blade server can be waited for according to the pre-set starting-up delay time A period of time goes up electric-opening again;On the blade server after electric-opening, each blade can be according to pre-set shutdown Delay time is waited for a period of time and executes shutdown action, the switching on and shutting down run with server under better simulation of real scenes again Process.
For the ease of the implementation of the application, illustrated below with example.
The realization of shell (linux) script may be used in the embodiment of the present application, and software program can be packaged into 1 compressed package, 2 grades of bibliographic structures.3 files are stored under root.
The ends Server (test server) involved in the embodiment of the present application, the ends Client (blade server) and by control visitor Family end (communication blade), wherein the ends Server also refer to the host for test blades server, and the ends Client can refer to Be blade server, also referred to be responsible for the blade that communicates with the ends Server on blade server by control client.
Specific file directory can be as follows:
(1) ends Server:
The ends Server server monitoring programme;
The ends Server.c server monitoring programme source code;
Actest_apc.sh PDU power managements control program;
(2) ends Client:
Acclient and server-side communication program;
Acclient.c and server-side communication program source code;
Ac_copyfile_toclient.expect encapsulates automatic program of file copy;
Ac_excute_script.expect encapsulates script automatic program execution;
Servers-all IP address is collected in the ac_ipaddr_list girffs;
Ac_setpwd_userac.expect encapsulates automatic stopping code program;
Ac_setup_ctl.conf configuration informations;
Ac_setup_ctl_loop.sh loop control programs;
Automated log on is arranged in autologin.sh;
Program automatic running is arranged in autoopen.sh;
The operation quantity of virtual terminal (tty) is arranged in auto_configure_tty.sh;
Init.sh initialization programs;
README illustrates document;
The functional total deployment program of setup.sh institutes;
(3) by control client:
Ac_copyfile_host.expect encapsulates automatic program of file copy;
Ac_setup_underctl.conf configuration informations;
Ac_setup_underctl.sh mainstream process control programs;
Automated log on is arranged in autologin.sh;
Automatic running is arranged in autoopen.sh;
(4) illustrate document:
The storage operation program illustrates document under docs.
Document directory structure can be as follows:
ACTEST_BLADE_V2.0 (master catalogue)
|-ac_blade
| | acclient
| | acclient.c
| | ac_copyfile_toclient.expect
| | ac_excute_script.expect
| | ac_ipaddr_list
| | ac_setpwd_userac.expect
| | ac_setup_ctl.conf
| | ac_setup_ctl_loop.sh
| | autologin.sh
| | autoopen.sh
| | auto_configure_tty.sh
| | init.sh
| | README
| | setup.sh
|
| ac_copyfile_host.expect
| ac_setup_underctl.conf
| ac_setup_underctl.sh
| autologin.sh
| autoopen.sh
|-ac_server
| actest_apc.sh
| server
| server.c
readme.docx
Fig. 2 shows operational process schematic diagrames one in the embodiment of the present application, as shown, the software program operational process It may comprise steps of:
Step 201, server end can run the ends Server monitoring programme (" ./server " program), wait for knife Piece server sends signal by control client (communication blade);
Step 202 configures conf files by control client (communication blade), fills in configuration information (cycle-index, delay Delay times etc.);
Step 203, the IP address that all blades in girff are collected by control client (communication blade);
Be responsible in blade server blade (referred to as communication blade) collection blade server communicate with the ends Server it is interior its The IP address of his blade.
Step 204 runs setup.sh by control client (communication blade), and deployed environment is simultaneously tested;
In step 205, all blades in girff isolated operation shift to an earlier date copy automatically come program (such as:ac_ setup_underctl.sh)
After collecting other blade information by control client (communication blade), signal is sent to the ends Server for step 206;
Step 207, tester can check the information collection status of control blade at the ends server S erver;
Etc. end to be tested, tester can also check whether log information is normal at the ends Server.
Fig. 3 shows operational process schematic diagram two in the embodiment of the present application, and the detailed process that Fig. 3 is Fig. 2 describes, as schemed institute Show, may include steps of:
Step 301, blade server (ends Client) are initialized, cleaning operation trace (test case etc. before Data);
Step 302, runtime server end (ends Server) program open dynamic host configuration protocol (DHCP, Dynamic Host Configuration Protocol) service;
Step 303 fills in configuration information by control client (communication blade), and operation is by control client (communication blade) Setup programs start test;
Step 304, program of file copy to other blades and are run;
Step 305, the information that other blades are collected by control client (communication blade);
Step 306 judges whether to collect and complete:
If being collected into the information of all blades, 307 are thened follow the steps;
If not collecting completion (may be caused by abnormal cause), terminate;
Step 307 sends a message to the ends server S erver by control client (communication blade);
If information has been uploaded to after the ends Server and has voluntarily closed other blades by normal shutdown, the communication blade Machine.
Step 308, the ends server S erver are switched to PDU sends control message, controls the PDU switch circuit breakings;
The PDU switch circuit breakings, the blade server close power supply;
Step 309 opens power supply, server power-up booting;
Step 310 judges whether to meet service condition again, such as:Judge whether the cycle for having met configuration information Number, if can not be communicated with the ends Server.
If meeting service condition again, 305 are thened follow the steps;
If not meeting service condition again, terminate.
Based on same inventive concept, a kind of blade server is additionally provided in the embodiment of the present application, due to these equipment solutions Certainly the principle of problem is similar to a kind of power switch machine test method, therefore the implementation of these equipment may refer to the reality of method It applies, overlaps will not be repeated.
Fig. 4 shows the structural schematic diagram of blade server in the embodiment of the present application, as shown, the blade server May include communication blade, other blades, PDU switches and starting module, the communication blade can be used for and test server Communication, other interior blades of the blade server include the first execution module, and the communication blade includes collection module, uploads Module and the second execution module;Wherein,
First execution module 401 of other blades, for executing shutdown according to pre-stored shutdown test program Action;
The collection module 402 of the communication blade, the on-off state information for collecting other blades;
The uploading module 403 of the communication blade, for the information being collected into be uploaded to the test server;
Second execution module 404 of the communication blade, for the information being collected into be uploaded to the test server Later, shutdown action is executed according to pre-stored shutdown test program;
The PDU switches 405, the power off command sent for receiving and executing the test server;
The starting module 406, for executing power-up power-on operation.
In implementation, the communication blade may further include:
Program sending module, for according to the IP address of all blades in the blade server collected in advance to other blades Send the shutdown test program of copy.
In implementation, the blade server may further include:
Loop module, for according to the preconfigured cycle-index of the blade server, triggering other blades successively, leading to Believe blade, PDU switches and starting module.
In implementation, the blade server may further include:
Trace cleaning modul, in the blade server other blades according to pre-stored shutdown test program Before executing shutdown action, the operation trace on the blade server is cleared up.
In implementation, the starting module specifically can be used for according to the preconfigured starting-up delay time for executing power-up Power-on operation.
In specific implementation, the blade server that the embodiment of the present application is provided can be located in girff, form blade service Device system.
Based on same inventive concept, the embodiment of the present application also provides a kind of power switch machines to test system.
Fig. 5 shows the structural schematic diagram of power switch machine test system in the embodiment of the present application, as shown, the electricity It may include blade server as described above and test server that source switch machine, which tests system, and the test server includes:
Receiving module 501, the information uploaded for receiving the communication blade;
Sending module 502 sends power off command for being switched to the PDU.
Fig. 6 shows the interaction schematic diagram of test server and blade server in the embodiment of the present application, as shown, knife Piece server can initialize first, cleaning operation trace;Test server opens DHCP service;Test server with communicate knife Piece establishes connection;
Communication blade fills in configuration information, runs setup programs;
It communicates blade and sends program of file copy to other blades, other blades run the program of file copy, the communication blade Collect the information of other blades;
Blade upload information is communicated to test server;
Test server switchs to PDU and sends control message, PDU switch circuit breakings;
Starting module powers on, booting.
For convenience of description, each section of apparatus described above is divided into various modules with function or unit describes respectively. Certainly, each module or the function of unit can be realized in same or multiple softwares or hardware when implementing the application.
It should be understood by those skilled in the art that, embodiments herein can be provided as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, the application can be used in one or more wherein include computer usable program code computer The computer program production implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) The form of product.
The application is with reference to method, the flow of equipment (system) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that can be realized by computer program instructions every first-class in flowchart and/or the block diagram The combination of flow and/or box in journey and/or box and flowchart and/or the block diagram.These computer programs can be provided Instruct the processor of all-purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine so that the instruction executed by computer or the processor of other programmable data processing devices is generated for real The device for the function of being specified in present one flow of flow chart or one box of multiple flows and/or block diagram or multiple boxes.
These computer program instructions, which may also be stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that instruction generation stored in the computer readable memory includes referring to Enable the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one box of block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device so that count Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, in computer or The instruction executed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in a box or multiple boxes.
Although the preferred embodiment of the application has been described, created once a person skilled in the art knows basic Property concept, then additional changes and modifications may be made to these embodiments.So it includes excellent that the following claims are intended to be interpreted as It selects embodiment and falls into all change and modification of the application range.

Claims (9)

1. a kind of power switch machine test method, which is characterized in that be used for the power switch machine state of test blades server, institute It includes communication blade and other blades to state blade server, and the communication blade with test server for communicating, the method Include the following steps:
Clear up the operation trace on the blade server;
Other blades execute shutdown action according to pre-stored shutdown test program in step 101, the blade server;
Step 102, the communication blade collect the on-off state information of other blades, the information being collected into are uploaded to described Shutdown action is executed after test server;
Step 103, the blade server PDU switches receive and execute the power off command that the test server is sent;
Step 104, blade server power-up booting.
2. the method as described in claim 1, which is characterized in that all blades are tested according to shutdown in the blade server Before program executes shutdown action, further comprise:
The communication blade sends to other blades according to the IP address of all blades in the blade server collected in advance and copies Shutdown test program.
3. the method as described in claim 1, which is characterized in that further comprise:
According to the preconfigured cycle-index of the blade server, cycle executes the step 101~step 104.
4. the method as described in claim 1, which is characterized in that the blade server power-up booting is specially the blade clothes Device be engaged according to execution of preconfigured starting-up delay time power-up power-on operation.
5. a kind of blade server, which is characterized in that the blade server include communication blade, other blades, PDU switch and Starting module, the communication blade with test server for communicating, other blades include first in the blade server Execution module, the communication blade include trace cleaning modul, collection module, uploading module and the second execution module;Wherein,
Trace cleaning modul is used for other blades in the blade server and is executed according to pre-stored shutdown test program Before shutdown action, the operation trace on the blade server is cleared up;
First execution module of other blades, for executing shutdown action according to pre-stored shutdown test program;
The collection module of the communication blade, the on-off state information for collecting other blades;
The uploading module of the communication blade, for the information being collected into be uploaded to the test server;
Second execution module of the communication blade is pressed after the information being collected into is uploaded to the test server Shutdown action is executed according to pre-stored shutdown test program;
The PDU switches, the power off command sent for receiving and executing the test server;
The starting module, for executing power-up power-on operation.
6. blade server as claimed in claim 5, which is characterized in that the communication blade further comprises:
Program sending module, for being sent to other blades according to the IP address of all blades in the blade server collected in advance The shutdown test program of copy.
7. blade server as claimed in claim 5, which is characterized in that further comprise:
Loop module, for according to the preconfigured cycle-index of the blade server, triggering other blades, communication knife successively Piece, PDU switches and starting module.
8. blade server as claimed in claim 5, which is characterized in that the starting module is specifically used for basis and is pre-configured with The starting-up delay time execute power-up power-on operation.
Include the blade server as described in claim 5 to 8 is any and testing service 9. a kind of power switch machine tests system Device, the test server include:
Receiving module, the information uploaded for receiving the communication blade;
Sending module sends power off command for being switched to the PDU.
CN201510730665.2A 2015-10-30 2015-10-30 A kind of power switch machine test method, system and blade server Active CN105426281B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510730665.2A CN105426281B (en) 2015-10-30 2015-10-30 A kind of power switch machine test method, system and blade server

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510730665.2A CN105426281B (en) 2015-10-30 2015-10-30 A kind of power switch machine test method, system and blade server

Publications (2)

Publication Number Publication Date
CN105426281A CN105426281A (en) 2016-03-23
CN105426281B true CN105426281B (en) 2018-09-07

Family

ID=55504500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510730665.2A Active CN105426281B (en) 2015-10-30 2015-10-30 A kind of power switch machine test method, system and blade server

Country Status (1)

Country Link
CN (1) CN105426281B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106294043A (en) * 2016-08-04 2017-01-04 浪潮电子信息产业股份有限公司 Method for testing automatic startup and shutdown
CN106502845A (en) * 2016-10-12 2017-03-15 郑州云海信息技术有限公司 A kind of automated testing method for doing AC switching on and shutting down to server
CN106817413A (en) * 2017-01-11 2017-06-09 郑州云海信息技术有限公司 A kind of control node method for start-up and shutdown, system and RMC
CN109656771A (en) * 2018-12-19 2019-04-19 广东浪潮大数据研究有限公司 A kind of method, system and the server of JBOD storage equipment test

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102236054A (en) * 2010-04-28 2011-11-09 鸿富锦精密工业(深圳)有限公司 Power on/off test device and method
CN102752156A (en) * 2011-04-19 2012-10-24 鸿富锦精密工业(深圳)有限公司 Test device for server
CN103051490A (en) * 2012-11-26 2013-04-17 浪潮电子信息产业股份有限公司 Method for carrying out startup and shutdown testing on blade server
CN103970627A (en) * 2013-02-06 2014-08-06 深圳市杰和科技发展有限公司 Automatic computer power supply switching test system and method
CN104102568A (en) * 2014-06-26 2014-10-15 中国航天科工集团第三研究院第八三五七研究所 Multi-serial port communication test system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200705172A (en) * 2005-07-21 2007-02-01 Inventec Corp Testing system and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102236054A (en) * 2010-04-28 2011-11-09 鸿富锦精密工业(深圳)有限公司 Power on/off test device and method
CN102752156A (en) * 2011-04-19 2012-10-24 鸿富锦精密工业(深圳)有限公司 Test device for server
CN103051490A (en) * 2012-11-26 2013-04-17 浪潮电子信息产业股份有限公司 Method for carrying out startup and shutdown testing on blade server
CN103970627A (en) * 2013-02-06 2014-08-06 深圳市杰和科技发展有限公司 Automatic computer power supply switching test system and method
CN104102568A (en) * 2014-06-26 2014-10-15 中国航天科工集团第三研究院第八三五七研究所 Multi-serial port communication test system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
一种刀片式服务器测试系统的设计;杨明涛等;《自动化与仪表》;20120425;第27卷(第4期);第43-46页 *

Also Published As

Publication number Publication date
CN105426281A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN111245898B (en) Network equipment online method, device, server and storage medium
CN105426281B (en) A kind of power switch machine test method, system and blade server
US20230081942A1 (en) Automatically Deployed Information Technology (IT) System and Method
KR101954480B1 (en) Automated build-out of a cloud-computing stamp
CN102752137B (en) The apparatus and method of virtual machine network parameter are initiatively set
CN110990026B (en) Automatic deployment method and system for PaaS platform
CN107483243A (en) A kind of automatic deployment method and equipment of OpenStack platforms
CN112929236A (en) Broadband micropower wireless protocol interoperability test system for electricity consumption information acquisition system
US20140040441A1 (en) System and method for the configuration of a clustered simulation network
CN103200036A (en) Automated configuration method of electrical power system cloud computing platform
Le et al. SALSA: A framework for dynamic configuration of cloud services
CN105068900A (en) Testing method for remote control server cold reboot
CN111324599B (en) Block chain experiment system and management method
CN105204955A (en) Method and device for correcting faults of virtual machines
CN104268041B (en) A kind of Vehicular display device equipment frequently switches on machine automatic closed loop test method
Ramon Intel Galileo and Intel Galileo Gen 2: API Features and Arduino Projects for Linux Programmers
CN107070747A (en) A kind of method of the automatic test network interface card network connection stability under network card binding pattern
CN111813495A (en) Node testing method and device, storage medium and electronic device
CN108989123A (en) A kind of server configuration method and device
CN111343011A (en) Openstack network fusion control method and system for cloud management platform
CN113434255A (en) Virtual equipment creating method and device
US8612793B2 (en) Dynamic power and performance calibration of data processing systems
CN107870840A (en) The multiple test instruction automatic execution methods of server based on IPMI
Unruh et al. Compiling Abstract Specifications into Concrete {Systems—Bringing} Order to the Cloud
CN114443067B (en) CPLD (complex programmable logic device) file burning system and CPLD file burning method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191009

Address after: 110002 No.1 Shuguang street, Liaodongwan New District, Panjin City, Liaoning Province

Co-patentee after: Sugon Information Industry Co., Ltd.

Patentee after: Dawning Information System (Liaoning) Co., Ltd.

Address before: 300384 Tianjin city Xiqing District Huayuan Industrial Zone (outer ring) Haitai Huake Street No. 15 1-3

Patentee before: Sugon Information Industry Co., Ltd.

TR01 Transfer of patent right