CN105421499A - 一种地库抗浮施工方法 - Google Patents
一种地库抗浮施工方法 Download PDFInfo
- Publication number
- CN105421499A CN105421499A CN201510824872.4A CN201510824872A CN105421499A CN 105421499 A CN105421499 A CN 105421499A CN 201510824872 A CN201510824872 A CN 201510824872A CN 105421499 A CN105421499 A CN 105421499A
- Authority
- CN
- China
- Prior art keywords
- poured
- ater
- casting
- post
- basement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/10—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure
- E02D31/12—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against soil pressure or hydraulic pressure against upward hydraulic pressure
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Revetment (AREA)
Abstract
本发明公开了一种地库抗浮施工方法,包括以下步骤:(1)检查地库顶板,清理基层:检查地库顶板无严重质量缺陷,清理、干燥基层,满足防水施工要求;(2)防水层施工:包括刮非固化沥青防水涂料和粘贴聚乙烯丙纶卷材;(3)回填覆土:检验土质→距离后浇带附近1000mm左右通长设置挡水台→分层铺设回填覆土→分层夯实;(4)局部用钢板连通后浇带:结合现场实际需要设置通道用钢板局部连通后浇带,保证后浇带之间有无阻碍通道;(5)浇筑后浇带:后浇带满足施工条件时,进行后浇带浇筑,待养护完成以后回填后浇带部分的覆土。本发明在不浇筑沉降后浇带的情况下提前覆土,减少地下水对地库的上浮力,提高地库的结构安全,并减少工期,节约成本。
Description
技术领域
本发明涉及地下建筑抗浮施工领域,具体涉及一种地库抗浮施工方法。
背景技术
随着城市建设的快速发展,地下空间的开发成为城市发展的必然趋势,地下建筑的抗浮问题也日益突出,合理的选择抗浮措施直接影响到地下工程的安全性和经济性。通常采用结构自重、抗拔桩和顶板覆土来抵抗地下水浮力,而一般设计要求地库沉降后浇带应在楼座主体施工完毕一段时间后浇筑。采用传统的抗浮措施,由于需要等待沉降后浇带的浇筑完成并养护好才能进行覆土,必然会造成施工工期较长;其次无覆土时间越长,地库受到上浮力的时间也相应越长,影响结构安全;另外地库顶板沉降后浇带没有连通,对于大面积地库而言,地库内施工极不方便;最后不提前覆土,降水不可停止,增加成本。
申请号为201510271245.2的对比文件1公开了一种无抗拔桩的地库抗浮施工方法,通过基坑开挖、预埋套管、防水保护层施工、浇筑地库底板、确定排水沟位置、浇筑整浇层、排水沟防水处理、回填土加强、封堵的步骤,减少地下水对地库的浮力,但操作繁琐,延长工期。申请号为201310110659.8的对比文件2公开了一种地下室抗浮板的泄压结构及其施工方法,从建筑物的建筑起始阶段解决了地下水的浮力问题,包括步骤:(1)垫层下方铺设有一层砂砾层、(2)集水坑四周铺设有过滤层在砂砾层内铺设有导流管、(3)导流管汇集到过滤层内,在集水坑的侧壁上安装有引流管、(4)集水坑通过引流管与过滤层连通;该方法存在引流管处的防水处理不当容易造成漏水的问题。申请号为201420072526.6的对比文件3公开了一种地下室抗浮锚筋的防水构造,利用过渡防水层适应局部可能产生的上浮变形,结构复杂,前期准备工作较多,外界影响因素大,实际工程应用不便。
发明内容
本发明要解决的技术问题是,针对现有地库抗浮施工存在的上述不足,提供一种地库抗浮施工方法,在不浇筑沉降后浇带的情况下提前覆土,减少地下水对地库的上浮力,提高地库的结构安全,并减少工期,节约成本。
本发明为解决上述技术问题所采用的技术方案是:
一种地库抗浮施工方法,包括以下步骤:
(1)检查地库顶板,清理基层:检查地库顶板无严重质量缺陷,清理、干燥基层,满足防水施工要求;
(2)防水层施工:包括刮非固化沥青防水涂料和粘贴聚乙烯丙纶卷材;
(3)回填覆土:检验土质→距离后浇带附近1000mm左右通长设置挡水台→分层铺设回填覆土→分层夯实;
(4)局部用钢板连通后浇带:结合现场实际需要设置通道用钢板局部连通后浇带,保证后浇带6之间有无阻碍通道;
(5)浇筑后浇带:后浇带满足施工条件时,进行后浇带浇筑,待养护完成以后回填后浇带部分的覆土。
按上述方案,所述步骤(3)中,分层铺设回填的覆土靠近挡水台的方向形成边坡,所述边坡距离挡水台的距离为400~600mm。
按上述方案,所述边坡的坡度为1:1.5~1:1。
按上述方案,所述步骤(3)中,挡水台的宽×高为100mm×100mm(或根据实际情况在该尺寸附近调整)。
与常规施工方法相比,本发明的有益效果:
1、地库顶板覆土相当于增加配重,将该工序提前至浇筑后浇带之前,减少了地库的受到上浮力的时间,有利于地库结构安全;
2、沉降后浇带浇筑前进行地库顶板覆土,不需等待后浇带浇筑完成再进行覆土,对于大面积地库而言缩短工期;
3、地库顶板覆土可在沉降后后浇带局部连通,修筑施工临时道路,对于大面积地库而言,方便地库内其他楼座施工;
4、减少降水作业时间:地库顶板覆土以后,即可停止降水,节约成本。
附图说明
图1为本发明地库抗浮施工方法中各层结构的平面示意图;
图2为本发明后浇带局部连通剖面图;
图3为本发明覆土局部剖面图;
图中,1-基层,2-防水层,3-挡水台,5-覆土,6-后浇带,7-钢板。
具体实施方式
下面结合附图和实施例对本发明技术方案进行详细的描述。
参照图1~图3所示,本发明所述的地库抗浮施工方法,包括以下步骤:
(1)检查地库顶板,清理基层:检查地库顶板无严重质量缺陷,清理、干燥基层1,满足防水施工要求;
(2)防水层施工:包括刮非固化沥青防水涂料和粘贴聚乙烯丙纶卷材;
(3)防水层施工完毕以后进行回填覆土5:检验土质→距离后浇带6附近1000mm左右通长设置挡水台3→分层铺设回填覆土5→分层夯实;分层铺设回填的覆土5靠近挡水台3的方向形成坡度为1:1左右的边坡(坡度可根据回填厚度和回填土质进行适当调整),所述边坡距离挡水台3的距离为500mm左右;挡水台3的宽×高为100mm×100mm或根据实际情况在该尺寸附近调整;
(4)局部用钢板连通后浇带:结合现场实际需要设置通道用钢板7局部连通后浇带6,保证后浇带6之间有无阻碍通道,如图2所示;
(5)浇筑后浇带:后浇带6满足施工条件时,进行后浇带6浇筑,待养护完成以后回填后浇带6部分的覆土5,如图3所示。
显然,上述实施例仅仅是为清楚地说明本发明所作的举例,而并非是对本发明的实施方式的限定。对于所属领域的普通技术人员来说,依本发明的精神所引伸出的显而易见的变化或变动仍处于本发明的保护范围之中。
Claims (4)
1.一种地库抗浮施工方法,其特征在于,包括以下步骤:
(1)检查地库顶板,清理基层:检查地库顶板无严重质量缺陷,清理、干燥基层,满足防水施工要求;
(2)防水层施工:包括刮非固化沥青防水涂料和粘贴聚乙烯丙纶卷材;
(3)回填覆土:检验土质→距离后浇带附近1000mm左右通长设置挡水台→分层铺设回填覆土→分层夯实;
(4)局部用钢板连通后浇带:结合现场实际需要设置通道用钢板局部连通后浇带,保证后浇带之间有无阻碍通道;
(5)浇筑后浇带:后浇带满足施工条件时,进行后浇带浇筑,待养护完成以后回填后浇带部分的覆土。
2.根据权利要求1所述的地库抗浮施工方法,其特征在于,所述步骤(3)中,分层铺设回填的覆土靠近挡水台的方向形成边坡,所述边坡距离挡水台的距离为400~600mm。
3.根据权利要求2所述的地库抗浮施工方法,其特征在于,所述边坡的坡度为1:1.5~1:1。
4.根据权利要求1所述的地库抗浮施工方法,其特征在于,所述步骤(3)中,挡水台的宽×高为100mm×100mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510824872.4A CN105421499B (zh) | 2015-11-24 | 2015-11-24 | 一种地库抗浮施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510824872.4A CN105421499B (zh) | 2015-11-24 | 2015-11-24 | 一种地库抗浮施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105421499A true CN105421499A (zh) | 2016-03-23 |
CN105421499B CN105421499B (zh) | 2018-01-19 |
Family
ID=55500010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510824872.4A Active CN105421499B (zh) | 2015-11-24 | 2015-11-24 | 一种地库抗浮施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105421499B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760722A (zh) * | 2017-02-28 | 2017-05-31 | 南通华荣建设集团有限公司 | 无桩基单层地下车库抗浮施工方法 |
CN109252553A (zh) * | 2018-09-07 | 2019-01-22 | 江苏兴厦建设工程集团有限公司 | 一种无抗拔桩地库抗浮结构及施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4879851A (en) * | 1988-02-18 | 1989-11-14 | Joseph Boccia | Hollow kick molding |
CN204475369U (zh) * | 2015-02-10 | 2015-07-15 | 浙江宝田环境建设有限公司 | 一种穿越浅覆土抗浮防沉顶管结构 |
CN104846841A (zh) * | 2015-05-26 | 2015-08-19 | 江苏南通三建集团有限公司 | 一种无抗拔桩的地库抗浮施工方法 |
-
2015
- 2015-11-24 CN CN201510824872.4A patent/CN105421499B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4879851A (en) * | 1988-02-18 | 1989-11-14 | Joseph Boccia | Hollow kick molding |
CN204475369U (zh) * | 2015-02-10 | 2015-07-15 | 浙江宝田环境建设有限公司 | 一种穿越浅覆土抗浮防沉顶管结构 |
CN104846841A (zh) * | 2015-05-26 | 2015-08-19 | 江苏南通三建集团有限公司 | 一种无抗拔桩的地库抗浮施工方法 |
Non-Patent Citations (1)
Title |
---|
胡兴: ""独立式地下车库抗浮设计与抗浮措施"", 《广东土木与建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106760722A (zh) * | 2017-02-28 | 2017-05-31 | 南通华荣建设集团有限公司 | 无桩基单层地下车库抗浮施工方法 |
CN109252553A (zh) * | 2018-09-07 | 2019-01-22 | 江苏兴厦建设工程集团有限公司 | 一种无抗拔桩地库抗浮结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105421499B (zh) | 2018-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102535488B (zh) | 一种高水位地下室底板防水施工方法 | |
CN103510528A (zh) | 用于地下结构抗浮的盲沟排水结构 | |
CN107386326A (zh) | 地下综合管廊结构及其施工方法 | |
CN110029690B (zh) | 一种渗滤液检漏收集结构及其施工方法 | |
CN102433886A (zh) | 一种集水井内增加降水井施工方法 | |
CN104762982B (zh) | 一种富水红砂岩地质地下水位控制的施工方法 | |
CN212477844U (zh) | 一种地下室排水减压抗浮结构 | |
CN103741715A (zh) | 一种新型地下室防水疏水施工方法 | |
CN201567582U (zh) | 一种基坑降水节水装置 | |
CN109629609B (zh) | 利用稻壳灰混凝土的填埋场衬垫层锚固结构 | |
CN104234089A (zh) | 一种地下室防排水结合的施工方法 | |
CN105421499A (zh) | 一种地库抗浮施工方法 | |
CN202440826U (zh) | 一种高水位地下室底板防水系统 | |
CN204326119U (zh) | 一种桩筏基础抗浮结构 | |
CN207176737U (zh) | 一种斜井机械式地下停车场 | |
CN202850062U (zh) | 建筑物或构筑物的水浮力控制装置 | |
CN110258660A (zh) | 地下室抗浮的减压泄水井的制作工艺以及封井工艺 | |
CN103114605B (zh) | 防渗疏水层结构及施工方法 | |
CN108755724A (zh) | 综合管廊体外疏排水防水方法 | |
CN214245855U (zh) | 隔水控压抗浮结构 | |
CN107354958A (zh) | 可防路面塌陷且方便检修的城市管路布设方法及管路结构 | |
CN211228563U (zh) | 一种装配式地下水排渗盲沟排水系统 | |
CN203654332U (zh) | 一种新型地下室防水疏水施工结构 | |
CN113818482A (zh) | 一种减少不均匀沉降的新旧管廊连接方法 | |
CN112195980A (zh) | 隔水控压抗浮结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |