CN105414426B - A kind of hot-swage method of kirsite small specification tube or bar - Google Patents

A kind of hot-swage method of kirsite small specification tube or bar Download PDF

Info

Publication number
CN105414426B
CN105414426B CN201510923197.0A CN201510923197A CN105414426B CN 105414426 B CN105414426 B CN 105414426B CN 201510923197 A CN201510923197 A CN 201510923197A CN 105414426 B CN105414426 B CN 105414426B
Authority
CN
China
Prior art keywords
kirsite
hot
swage
bar
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510923197.0A
Other languages
Chinese (zh)
Other versions
CN105414426A (en
Inventor
王昌
于振涛
王云
刘春潮
牛金龙
余森
刘汉源
麻西群
程军
崔亚军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Institute for Non Ferrous Metal Research
Original Assignee
Northwest Institute for Non Ferrous Metal Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Institute for Non Ferrous Metal Research filed Critical Northwest Institute for Non Ferrous Metal Research
Priority to CN201510923197.0A priority Critical patent/CN105414426B/en
Publication of CN105414426A publication Critical patent/CN105414426A/en
Application granted granted Critical
Publication of CN105414426B publication Critical patent/CN105414426B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J5/00Methods for forging, hammering, or pressing; Special equipment or accessories therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21JFORGING; HAMMERING; PRESSING METAL; RIVETING; FORGE FURNACES
    • B21J3/00Lubricating during forging or pressing
    • CCHEMISTRY; METALLURGY
    • C22METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
    • C22FCHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
    • C22F1/00Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
    • C22F1/16Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of other metals or alloys based thereon
    • C22F1/165Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of other metals or alloys based thereon of zinc or cadmium or alloys based thereon

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Crystallography & Structural Chemistry (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Forging (AREA)

Abstract

The invention discloses a kind of kirsite small specification tube or the hot-swage method of bar, the method includes:Multi-pass hot-swage is carried out under conditions of being 150 DEG C~250 DEG C in temperature by kirsite pipe or kirsite bar stock, kirsite tubing or the diameter no more than Zinc alloy bar of 6mm of external diameter no more than 6mm are obtained accordingly;Intermediate annealing process are carried out to kirsite pipe or kirsite bar stock during hot-swage, it is 50%~70% to control the total deformation before first time intermediate annealing process, and the total deformation between adjacent intermediate annealing process twice is 50%~70%.The present invention prepares kirsite small specification tube/bar using hot-swage method, larger compressive strain can be produced using kirsite under hot-working, the machining deformation amount of single pass is improved, crystal grain thinning is realized, is made second to be mutually uniformly distributed, so as to lift the mechanical property of kirsite small specification tube/bar.

Description

A kind of hot-swage method of kirsite small specification tube or bar
Technical field
The invention belongs to small dimension non-ferrous metal tube, the forming processing technology field of bar, and in particular to a kind of zinc is closed The hot-swage method of golden small specification tube or bar.
Background technology
High performance small dimension kirsite pipe, bar are preferable degradable medical metal materials, with good market Application prospect.However, kirsite is Patterns for Close-Packed Hexagonal Crystal structure, temperature-room type plasticity deformability is poor, and high temperature deformation easily occurs brilliant again Grain length is big and hot tearing, and plastic deformation temperatures interval is narrow.Common production small dimension metal tube, the method for bar have rolling, drawing And extruding.However, rolling it is difficult with is difficult control when hot-working causes limited pass deformation, various manufacturing procedure and small dimension Deflection processed;Tension stress during drawing, single pass heavy deformation is often less than 20% and is also easy to produce defect;Extruding is typically as system For small dimension kirsite pipe, the process of bar stock material, such as existing continuous casting and extrusion (A of CN 102814478) and to cast zinc The processing method that alloy carries out continuously extruded (A of CN 101698205) is difficult to prepare the small rule of external diameter or below diameter 6mm Lattice kirsite pipe, bar.
The content of the invention
The technical problems to be solved by the invention are for above-mentioned the deficiencies in the prior art, there is provided a kind of small rule of kirsite The hot-swage method of lattice tubing or bar.The method can produce larger compressive strain using kirsite under hot-working, improve single track Secondary machining deformation amount, realizes crystal grain thinning, makes second to be mutually uniformly distributed, so as to lift kirsite small specification tube/bar Mechanical property;Kirsite small specification tube/the bar prepared using the method, tensile strength, yield strength and elongation are warmmer 16%~30%, 21%~33% and 10%~21% is improved before swaging respectively.
In order to solve the above technical problems, the technical solution adopted by the present invention is:A kind of kirsite small specification tube or bar Hot-swage method, it is characterised in that the method includes:It is 150 DEG C~250 in temperature by kirsite pipe or kirsite bar stock Multi-pass hot-swage is carried out under conditions of DEG C, the kirsite tubing or diameter no more than 6mm of external diameter no more than 6mm are obtained accordingly Zinc alloy bar;Intermediate annealing process are carried out during hot-swage to kirsite pipe or kirsite bar stock, control is for the first time Total deformation before intermediate annealing process is 50%~70%, and the total deformation between adjacent intermediate annealing process twice is 50% ~70%;The pass deformation of the hot-swage is 10%~40%, and total deformation is not less than 70%;The kirsite pipe The diameter of external diameter and kirsite bar stock is no more than 25mm.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that intermediate annealing process Oil removal treatment is carried out to kirsite pipe after preceding a time hot-swage, kirsite pipe is removed after remaining passage hot-swage Oil processing and pickling processes;Directly kirsite bar stock is carried out at intermediate annealing after a time hot-swage before intermediate annealing process Reason, mechanical grinding is carried out after remaining passage hot-swage to kirsite bar stock.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that the intermediate annealing Pickling removal surface scale is carried out after treatment to the kirsite pipe through intermediate annealing process, it is right after the intermediate annealing process Polishing removal surface scale is carried out through the kirsite bar stock of intermediate annealing process.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that the intermediate annealing The temperature for the treatment of is 150 DEG C~300 DEG C, and soaking time is 30min~60min.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that when the kirsite During a diameter of 10mm~25mm of the external diameter of pipe or kirsite bar stock, the pass deformation of hot-swage is 10%~40%, and Pass deformation is gradually reduced, and the diameter of the kirsite bar stock after the external diameter of kirsite pipe after hot-swage or hot-swage is small When 10mm, it is 10%~30% to control the pass deformation of hot-swage, and pass deformation is gradually reduced.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that when the kirsite When the external diameter of pipe or the diameter of kirsite bar stock are less than 10mm, the pass deformation of hot-swage is 10%~30%, and passage Deflection is gradually reduced.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that during hot-swage Control to swage the head speed of mainshaft for 200r/min~300r/min.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that the hot-swage Feeding speed is 3mm/s~20mm/s.
A kind of above-mentioned kirsite small specification tube or the hot-swage method of bar, it is characterised in that the kirsite pipe Before base hot-swage, on core bar uniform application by graphite powder and butter according to 1:The lubricant of the mass ratio mixing of (6~10).
The present invention has advantages below compared with prior art:
1st, the present invention prepares kirsite small specification tube/bar using hot-swage method, can be produced using kirsite under hot-working The larger compressive strain of life, improves the machining deformation amount of single pass, realizes crystal grain thinning, makes second to be mutually uniformly distributed, so as to be lifted The mechanical property of kirsite small specification tube/bar.
2nd, the kirsite small specification tube/bar prepared using the method for the present invention, tensile strength, yield strength and elongation Rate compared with improving 16%~30%, 21%~33% and 10%~21% respectively before hot-swage.
3rd, the method for the present invention is applied to the preparation of kirsite pipe wire rod, and especially external diameter/diameter is not more than 6mm's Kirsite small specification tube/bar, it is to avoid the technique that existing kirsite small specification tube/bar preparation method is present is difficult to control System and the easily problem of generation defect.
Below by embodiment, technical solution of the present invention is described in further detail.
Specific embodiment
Embodiment 1
External diameter 5.1mm is prepared with hot-swage method, as a example by the Zn-0.1Mg-0.05Sr kirsite tubing of wall thickness 0.65mm, side Method is as follows:
To external diameter 9mm, the Zn-0.1Mg-0.05Sr kirsites pipe of wall thickness 1.5mm carries out 7 passage hot-swages, obtains outer Footpath is 5.1mm, and wall thickness is the Zn-0.1Mg-0.05Sr kirsite tubing of 0.65mm, and total deformation is 74.3%, every time heat rotation Before forging on core bar uniform application by graphite powder and butter according to 1:The lubricant of 8 mass ratio mixing, the feeding of hot-swage Speed is 3mm/s~12mm/s, and hot-swage technological parameter is shown in Table 1;
The hot-swage technological parameter of the embodiment 1 of table 1
To kirsite pipe after 1st passage, the 2nd passage, the 4th passage, the 5th passage, the 6th passage and the 7th passage hot-swage Base carries out oil removal treatment and pickling processes;Oil removal treatment is carried out after 3rd passage hot-swage to kirsite pipe, 200 are then carried out The intermediate annealing process of DEG C insulation 30min, then carry out pickling removal surface scale, then carry out the 4th passage hot-swage.
The tensile strength of Zn-0.1Mg-0.05Sr kirsites tubing manufactured in the present embodiment is 305MPa, and yield strength is 254MPa, elongation is 20%, and tensile strength, yield strength and elongation compared with improving 16%, 21% and respectively before hot-swage 18%.
Embodiment 2
External diameter 5.9mm is prepared with hot-swage method, as a example by the Zn-0.5Fe-0.03Ca kirsite tubing of wall thickness 0.6mm, method It is as follows:
To external diameter 16mm, the Zn-0.5Fe-0.03Ca kirsites pipe of wall thickness 2.5mm carries out 8 passage hot-swages, obtains outer Footpath is 5.9mm, and wall thickness is the Zn-0.5Fe-0.03Ca kirsite tubing of 0.6mm, and total deformation is 90.6%, every time heat rotation Before forging on core bar uniform application by graphite powder and butter according to 1:The lubricant of 6 mass ratio mixing, the feeding of hot-swage Speed is 8mm/s~16mm/s, and hot-swage technological parameter is shown in Table 2;
The hot-swage technological parameter of the embodiment 2 of table 2
To kirsite pipe after 1st passage, the 3rd passage, the 4th passage, the 6th passage, the 7th passage and the 8th passage hot-swage Base carries out oil removal treatment and pickling processes;Oil removal treatment is carried out after 2nd passage hot-swage to kirsite pipe, 230 are then carried out The intermediate annealing process of DEG C insulation 30min, then carry out pickling removal surface scale, then carry out the 3rd passage hot-swage;5th Oil removal treatment is carried out to kirsite pipe after passage hot-swage, 200 DEG C of intermediate annealing process of insulation 40min are then carried out, connect Carries out pickling removal surface scale, then carries out the 6th passage hot-swage.
The tensile strength of Zn-0.5Fe-0.03Ca kirsites tubing manufactured in the present embodiment is 280MPa, and yield strength is 206MPa, elongation is 17%, and tensile strength, yield strength and elongation compared with improving 27%, 26% and respectively before hot-swage 13%.
Embodiment 3
External diameter 5.9mm is prepared with hot-swage method, as a example by the Zn-0.1Mg-0.05Sr kirsite tubing of wall thickness 0.6mm, method It is as follows:
To external diameter 25mm, the Zn-0.1Mg-0.05Sr kirsites pipe of wall thickness 5.5mm carries out 11 passage hot-swages, obtains External diameter is 5.9mm, and wall thickness is the Zn-0.1Mg-0.05Sr kirsite tubing of 0.6mm, and total deformation is 97.0%, every time heat Before swaging on core bar uniform application by graphite powder and butter according to 1:The lubricant of 10 mass ratio mixing, hot-swage is sent Material speed is 10mm/s~20mm/s, and hot-swage technological parameter is shown in Table 3;
The hot-swage technological parameter of the embodiment 3 of table 3
1st passage, the 3rd passage, the 4th passage, the 6th passage, the 7th passage, the 9th passage, the 10th passage and the 11st passage heat Oil removal treatment and pickling processes are carried out to kirsite pipe after swaging;Kirsite pipe is removed after 2nd passage hot-swage Oil processing, then carries out 250 DEG C of intermediate annealing process of insulation 30min, then carries out pickling removal surface scale, then carry out 3rd passage hot-swage;Oil removal treatment is carried out after 5th passage hot-swage to kirsite pipe, 230 DEG C of insulation 40min are then carried out Intermediate annealing process, then carry out pickling removal surface scale, then carry out the 6th passage hot-swage;After 8th passage hot-swage Oil removal treatment is carried out to kirsite pipe, 200 DEG C of intermediate annealing process of insulation 40min are then carried out, pickling is then carried out and is gone Except surface scale, then carry out the 9th passage hot-swage.
The tensile strength of Zn-0.1Mg-0.05Sr kirsites tubing manufactured in the present embodiment is 313MPa, and yield strength is 233MPa, elongation is 22%, and tensile strength, yield strength and elongation compared with improving 30%, 33% and respectively before hot-swage 16%.
Embodiment 4
By taking the Zn-0.1Mg-0.05Sr Zinc alloy bars that hot-swage method prepares diameter 4.5mm as an example, method is as follows:
Zn-0.1Mg-0.05Sr kirsites bar stock to diameter 9mm carries out 6 passage hot-swages, obtains a diameter of 4.5mm's Zn-0.1Mg-0.05Sr Zinc alloy bars, total deformation is 75.0%, and the feeding speed of hot-swage is 3mm/s~12mm/s, heat Technological parameter of swaging is shown in Table 4;
The hot-swage technological parameter of the embodiment 4 of table 4
Machine is carried out to kirsite bar stock after 1st passage, the 2nd passage, the 4th passage, the 5th passage and the 6th passage hot-swage Tool is polished;150 DEG C of intermediate annealing process of insulation 60min are carried out after 3rd passage hot-swage to kirsite bar stock, is then beaten Grind off except surface scale, then carry out the 4th passage hot-swage.
The tensile strength of Zn-0.1Mg-0.05Sr Zinc alloy bars manufactured in the present embodiment is 302MPa, and yield strength is 243MPa, elongation is 21%, and tensile strength, yield strength and elongation compared with improving 21%, 23% and respectively before hot-swage 10%.
Embodiment 5
By taking the Zn-0.1Mg-0.05Sr Zinc alloy bars that hot-swage method prepares diameter 5.4mm as an example, method is as follows:
Zn-0.1Mg-0.05Sr kirsites bar stock to diameter 18mm carries out 8 passage hot-swages, obtains a diameter of 5.4mm Zn-0.1Mg-0.05Sr Zinc alloy bars, total deformation is 91.0%, and the feeding speed of hot-swage is 8mm/s~16mm/s, Hot-swage technological parameter is shown in Table 5;
The hot-swage technological parameter of the embodiment 5 of table 5
To kirsite rod after 1st passage, the 3rd passage, the 4th passage, the 6th passage, the 7th passage and the 8th passage hot-swage Base carries out mechanical grinding;250 DEG C of intermediate annealing process of insulation 30min are carried out after 2nd passage hot-swage to kirsite bar stock, so After carry out polishing removal surface scale, then carry out the 3rd passage hot-swage;Kirsite bar stock is carried out after 5th passage hot-swage 200 DEG C of intermediate annealing process of insulation 40min, then carry out polishing removal surface scale, then carry out the 6th passage hot-swage.
The tensile strength of Zn-0.1Mg-0.05Sr Zinc alloy bars manufactured in the present embodiment is 314MPa, and yield strength is 252MPa, elongation is 21%, and tensile strength, yield strength and elongation compared with improving 29%, 33% and respectively before hot-swage 18%.
Embodiment 6
By taking the Zn-0.5Fe-0.03Ca Zinc alloy bars that hot-swage method prepares diameter 5.8mm as an example, method is as follows:
Zn-0.5Fe-0.03Ca kirsites bar stock to diameter 24.5mm carries out 10 passage hot-swages, obtains a diameter of The Zn-0.5Fe-0.03Ca Zinc alloy bars of 5.8mm, total deformation is 94.4%, the feeding speed of hot-swage for 8mm/s~ 20mm/s hot-swage technological parameters are shown in Table 6;
The hot-swage technological parameter of the embodiment 6 of table 6
It is right after 1st passage, the 3rd passage, the 4th passage, the 6th passage, the 7th passage, the 8th passage and the 10th passage hot-swage Kirsite bar stock carries out mechanical grinding;Move back the centre that 300 DEG C of insulation 30min are carried out to kirsite bar stock after 2nd passage hot-swage Fire treatment, then carries out polishing removal surface scale, then carry out the 3rd passage hot-swage;To kirsite after 5th passage hot-swage Bar stock carries out 250 DEG C of intermediate annealing process of insulation 40min, then carries out polishing removal surface scale, then carry out the 6th passage Hot-swage;150 DEG C of intermediate annealing process of insulation 30min are carried out after 9th passage hot-swage to kirsite bar stock, is then beaten Grind off except surface scale, then carry out the 10th passage hot-swage.
The tensile strength of Zn-0.5Fe-0.03Ca Zinc alloy bars manufactured in the present embodiment is 296MPa, and yield strength is 237MPa, elongation is 17%, and tensile strength, yield strength and elongation compared with improving 26%, 30% and respectively before hot-swage 21%.
The above, is only presently preferred embodiments of the present invention, and any limitation is not done to the present invention, every according to invention skill Any simple modification, change and equivalent structure change that art is substantially made to above example, still fall within the technology of the present invention In the protection domain of scheme.

Claims (9)

1. a kind of hot-swage method of kirsite small specification tube or bar, it is characterised in that the method includes:By kirsite pipe Base or kirsite bar stock carry out multi-pass hot-swage under conditions of being 150 DEG C~250 DEG C in temperature, external diameter are obtained accordingly little It is not more than the Zinc alloy bar of 6mm in the kirsite tubing or diameter of 6mm;To kirsite pipe or kirsite during hot-swage Bar stock carries out intermediate annealing process, controls the total deformation before first time intermediate annealing process for 50%~70%, it is adjacent twice Total deformation between intermediate annealing process is 50%~70%;The pass deformation of the hot-swage is 10%~40%, always Deflection is not less than 70%;The external diameter of the kirsite pipe and the diameter of kirsite bar stock are no more than 25mm.
2. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that in Between oil removal treatment is carried out to kirsite pipe after a time hot-swage before annealing, to kirsite after remaining passage hot-swage Pipe carries out oil removal treatment and pickling processes;In directly being carried out to kirsite bar stock after a time hot-swage before intermediate annealing process Between make annealing treatment, mechanical grinding is carried out to kirsite bar stock after remaining passage hot-swage.
3. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that institute Pickling removal surface scale is carried out to the kirsite pipe through intermediate annealing process after stating intermediate annealing process, the centre is moved back Polishing removal surface scale is carried out after fire treatment to the kirsite bar stock through intermediate annealing process.
4. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that institute It is 150 DEG C~300 DEG C to state the temperature of intermediate annealing process, and soaking time is 30min~60min.
5. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that when During a diameter of 10mm~25mm of the external diameter of the kirsite pipe or kirsite bar stock, the pass deformation of hot-swage is 10% ~40%, and pass deformation gradually reduces, the kirsite rod after the external diameter of kirsite pipe after hot-swage or hot-swage When the diameter of base is less than 10mm, it is 10%~30% to control the pass deformation of hot-swage, and pass deformation is gradually reduced.
6. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that when When the external diameter of the kirsite pipe or the diameter of kirsite bar stock are less than 10mm, the pass deformation of hot-swage for 10%~ 30%, and pass deformation gradually reduces.
7. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that heat Control to swage the head speed of mainshaft in rotary swaging process for 200r/min~300r/min.
8. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that institute The feeding speed for stating hot-swage is 3mm/s~20mm/s.
9. the hot-swage method of a kind of kirsite small specification tube according to claim 1 or bar, it is characterised in that institute Before stating kirsite pipe hot-swage, on core bar uniform application by graphite powder and butter according to 1:The mass ratio of (6~10) is mixed The lubricant of conjunction.
CN201510923197.0A 2015-12-11 2015-12-11 A kind of hot-swage method of kirsite small specification tube or bar Active CN105414426B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510923197.0A CN105414426B (en) 2015-12-11 2015-12-11 A kind of hot-swage method of kirsite small specification tube or bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510923197.0A CN105414426B (en) 2015-12-11 2015-12-11 A kind of hot-swage method of kirsite small specification tube or bar

Publications (2)

Publication Number Publication Date
CN105414426A CN105414426A (en) 2016-03-23
CN105414426B true CN105414426B (en) 2017-07-04

Family

ID=55493210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510923197.0A Active CN105414426B (en) 2015-12-11 2015-12-11 A kind of hot-swage method of kirsite small specification tube or bar

Country Status (1)

Country Link
CN (1) CN105414426B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106756680B (en) * 2016-11-23 2018-09-07 西北有色金属研究院 A kind of processing method of high-strength magnesium alloy small-sized bar
CN106862298B (en) * 2017-02-15 2018-08-24 西安爱德万思医疗科技有限公司 A kind of preparation method of the degradable kirsite capillary silk material of medical bio
CN108300952B (en) * 2017-08-21 2019-12-10 广东省材料与加工研究所 preparation method of medical magnesium alloy stent
CN108262368B (en) * 2017-08-21 2020-04-10 广东省材料与加工研究所 Preparation method of high-performance medical magnesium alloy thin-wall pipe
CN111375713A (en) * 2018-12-27 2020-07-07 南京理工大学 Rotary swaging preparation method of high-strength aluminum conductor
CN110743933B (en) * 2019-10-29 2020-11-27 西北有色金属研究院 Thermal processing method of medical cobalt-based alloy small and micro pipe
CN111687237A (en) * 2020-06-18 2020-09-22 成都先进金属材料产业技术研究院有限公司 Cold rolling method of thick-wall capillary titanium alloy seamless pipe

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3909406B2 (en) * 2002-02-06 2007-04-25 大同特殊鋼株式会社 Method for producing Ni-based alloy material
CN103157956A (en) * 2011-12-16 2013-06-19 北京有色金属研究总院 Processing method of nickel-titanium memorial alloy tube with thin diameter and thick wall
CN103789711A (en) * 2014-02-14 2014-05-14 西安爱德万思医疗科技有限公司 Preparation method of medical biodegradable zinc alloy capillary tube
CN103861887A (en) * 2014-03-20 2014-06-18 北京科技大学 Preparation method of high-performance copper/titanium bimetal capillary tube
CN104624713A (en) * 2014-12-17 2015-05-20 北京有色金属研究总院 Fabrication method of small precise thin-wall seamless titanium alloy tube

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3909406B2 (en) * 2002-02-06 2007-04-25 大同特殊鋼株式会社 Method for producing Ni-based alloy material
CN103157956A (en) * 2011-12-16 2013-06-19 北京有色金属研究总院 Processing method of nickel-titanium memorial alloy tube with thin diameter and thick wall
CN103789711A (en) * 2014-02-14 2014-05-14 西安爱德万思医疗科技有限公司 Preparation method of medical biodegradable zinc alloy capillary tube
CN103861887A (en) * 2014-03-20 2014-06-18 北京科技大学 Preparation method of high-performance copper/titanium bimetal capillary tube
CN104624713A (en) * 2014-12-17 2015-05-20 北京有色金属研究总院 Fabrication method of small precise thin-wall seamless titanium alloy tube

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
旋锻法加工低塑性有色金属异型材的应用研究;方树铭;《锻压技术》;20071031;第32卷(第5期);第69-72页 *

Also Published As

Publication number Publication date
CN105414426A (en) 2016-03-23

Similar Documents

Publication Publication Date Title
CN105414426B (en) A kind of hot-swage method of kirsite small specification tube or bar
CN106756680B (en) A kind of processing method of high-strength magnesium alloy small-sized bar
CN108746447A (en) A kind of anticorodal forge piece manufacturing process
CN112719179B (en) Forging method of TC1 titanium alloy bar
CN105463277B (en) A kind of rods and bars of aluminium alloy and its production method
CN101927312A (en) Method for processing TC4 titanium alloy into forged rings
CN109248980A (en) The manufacturing method of GH4169 alloy bar material
CN102397889B (en) Process for preparing GH4145 alloy pipes
CN103981472B (en) A kind of Equal-channel Angular Pressing prepares the method for the pure titanium of Ultra-fine Grained
CN112453298B (en) Cold working method of high-temperature alloy rod and wire for fastener
CN111534772A (en) Preparation method of TC4 titanium alloy finished bar with short process and low cost
CN105363823A (en) Method for rolling aluminum alloy sheet forge pieces
CN106890865A (en) Major diameter AQ80M magnesium alloy cakes material squeezes the integrated forming technology of forging
CN105397000A (en) Rolling method of titanium alloy plate-shaped forgings
CN103447433A (en) Preparation method of large-sized magnesium alloy forged disc
CN105441713A (en) A titanium alloy seamless tube and a manufacturing method thereof
CN111889535B (en) Preparation method of zirconium alloy bar
CN105256228A (en) High-malleability high-density pre-hardened plastic die steel and manufacturing method thereof
CN109772890A (en) A kind of Ultra-fine Grained milling method of large scale high temperature alloy bar
CN104368621A (en) Manufacturing method of metal plate
CN107012363A (en) A kind of manufacturing process of TC4 titanium alloy oil well pipes
CN107740020A (en) A kind of preparation method of titanium nickel tube material
CN109746359A (en) A kind of hot-swage method of kirsite small specification tube or bar
CN113523013B (en) Production process of thick-wire-diameter titanium alloy wire
CN102152069A (en) Method for producing steel sectional material of air valve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant