CN105407317A - Time synchronization system based on intelligent substation video monitoring - Google Patents

Time synchronization system based on intelligent substation video monitoring Download PDF

Info

Publication number
CN105407317A
CN105407317A CN201510715834.5A CN201510715834A CN105407317A CN 105407317 A CN105407317 A CN 105407317A CN 201510715834 A CN201510715834 A CN 201510715834A CN 105407317 A CN105407317 A CN 105407317A
Authority
CN
China
Prior art keywords
network
video
intelligent substation
time synchronization
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510715834.5A
Other languages
Chinese (zh)
Inventor
熊丽霞
邹进
谢国强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510715834.5A priority Critical patent/CN105407317A/en
Publication of CN105407317A publication Critical patent/CN105407317A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N7/00Television systems
    • H04N7/18Closed-circuit television [CCTV] systems, i.e. systems in which the video signal is not broadcast
    • GPHYSICS
    • G04HOROLOGY
    • G04RRADIO-CONTROLLED TIME-PIECES
    • G04R20/00Setting the time according to the time information carried or implied by the radio signal
    • G04R20/02Setting the time according to the time information carried or implied by the radio signal the radio signal being sent by a satellite, e.g. GPS

Landscapes

  • Engineering & Computer Science (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Multimedia (AREA)
  • Signal Processing (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Closed-Circuit Television Systems (AREA)

Abstract

The invention discloses a time synchronization system based on intelligent substation video monitoring, which comprises a video monitoring network server, a WEB browsing server, a GPS time synchronization device and an all digital IPC system, wherein the all digital IPC system is arranged at an intelligent substation end, and through a high-speed communication data network, network NTP time synchronization is carried out; GPS time synchronization signals are received for the NTP time synchronization, the video monitoring network server is connected with the time synchronization device for network time synchronization, each timing device is provided with a time synchronization assembly in a unified mode, and a network time synchronization function is provided; and the intelligent substation supports NTP(SNTP) time synchronization based on an IEC61850 technology protocol, and through a network switch, time synchronization is directly carried out on an intelligent substation video monitoring host. The video acquisition monitoring time synchronization requirements are met, the time synchronization precision can reach an ms level, and the time synchronization problem existing in operation and monitoring of the intelligent substation can be solved.

Description

A kind of based on system during intelligent substation video monitoring pair
Technical field
The present invention relates to a kind of based on system during intelligent substation video monitoring pair, belong to intelligent substation monitoring technique field.
Background technology
Along with the expansion of electrical network scale, the raising of power equipment automatization level, most of intelligent substation has possessed four remote control function, achieves unattended operation.But after transformer station's unattended operation, cause a lot of problem, the substation equipment damage etc. that comparatively outstanding automation communication network fault, the realization of Remote and safety problem, outside destroy and artificial origin cause.Therefore Remote Video Monitoring System for Substation just seems particularly important, namely " remote viewing " technology.The photographic technique system of intelligent substation, can environmental parameter outside remote monitoring electrical production to greatest extent, make operations staff or repair and maintenance personnel in office or machine room just each environmental parameter of energy real time inspection distant place transformer station, in conjunction with long-distance video, more can grasp the dynamic in real time of each transformer station clearly, for decision-making provides foundation.Found by investigation, the intelligent substation video monitoring system run at present is from lot of domestic and international different manufacturers, it is all independent operating, when there is no unified time pair, the time of video monitoring is exactly the device time itself, long-time running, and life period is forbidden, the problems such as time delay or time stopping, bringing difficulty to fault inquiry and judgement.Trace it to its cause and mainly comprise the problem of following three aspects, one is that what mainly to pay close attention to video monitoring system at present is quality, response speed and the memory capacity that picture gathers, and there is ignoring in various degree when real-time pair.Two is plant stand equipment when not support pair, requirement when most plant stand video monitoring does not meet network pair by inquiry, when producer does not arrange network pair interface or time response module.Three is main station system demands when not meeting network pair, needs when not meeting NTP network pair.
Summary of the invention
The object of the invention is, for intelligent substation video monitoring exist pair time problem, propose a kind of based on system during intelligent substation video monitoring pair.
Technical scheme of the present invention is, a kind of based on system during intelligent substation video monitoring pair, comprises video surveillance network server, WEB browser server, gps time synchronizer and digital IPC system.
Video surveillance network server, for monitoring, storing the video image of each intelligent substation transmission.
WEB browser server, for managing, consulting the video image of each intelligent substation transmission.
Gps time synchronizer, for assembly during installation pair, when carrying out network pair.
Digital IPC system, for gathering the video image from each plant stand, carries out storage management, telemonitoring and transmitting-receiving to image.
Described digital IPC Operation system setting at intelligent substation end, by high speed communication data net, when carrying out networking NTP couple; During NTP couple receive be GPS couple time signal, video surveillance network server is connected with time synchronism apparatus, when carrying out network pair, assembly during each time service device unification installation pair, possesses network time adjustment function, intelligent substation based on IEC61850 technical protocol, support NTP(SNTP) pair time, during by the network switch directly to intelligent substation video monitoring main frame pair.
Described video surveillance network server, gps time synchronizer are connected Electric Power Communication Data net with WEB browser server by network; Protocol component during video surveillance network server installation NTP couple, is connected with gps time synchronizer by network; Digital IPC system connects Electric Power Communication Data net by network and connects video surveillance network server, gps time synchronizer and WEB browser server.
Described digital IPC system front end comprises network code module and analog video camera, the analog video signal that analog video camera collects by described network code module is compressed into digital signal, by central processing unit, digital signal is carried out stores processor, again by the digital data transmission after process to the video monitoring main frame of intelligent substation, system when transferring to main website pair by communication data net; Gps time synchronizer provides when multiple pair and serves, during network enabled NTP and SNTP couple, gps time synchronizer sends Perfect Time, described video surveillance network server is as the main website of time monitoring, collect the video image from each plant stand, possess storage management, telemonitoring, image transmission/reception critical function, transferred the video pictures of each plant stand by web browser.
When of the present invention pair, principle builds the video networking system based on all-digital signal, by high speed communication data net, when carrying out networking NTP couple.The time message that NTP transmits with gps time code is for normative reference, use UTC as time standard, based on UPC/IP, use hierarchy type Annual distribution model, there is higher flexibility, various network environment can be adapted to, NTP not only can correct current time, and can the change of time regulate voluntarily, even if network environment changes, also the rectification of not influence time, has higher reliability and stability.
The invention has the beneficial effects as follows, a kind of video monitoring system based on full-digital network of the present invention, meet video acquisition monitoring pair time requirement, pair time precision reach ms level, solve intelligent substation operation monitoring exist pair time problem.This method by should in video monitoring system during network N TP couple, by transformer station's high speed communication data network, when realizing main, plant stand network exact pair.The network all-digital signal (IPC) that transformer substation end of the present invention adopts, compare with Internet video Semi-digital formula system with embedded video recorder digital analog mixed system (DVR), network digitization system advantage is more obvious, opening and the pardon of system are stronger, network configuration is simply clear, no matter the video flowing of fully digitalization is in storage, transmission, multiple users share, or the dilatation of system, upgrading aspect all become abnormal simple, easily.
Accompanying drawing explanation
Fig. 1 be intelligent substation video monitoring system and network pair time figure;
Fig. 2 is full-digital network video camera schematic diagram.
Embodiment
The present invention specifically implements in intelligent substation video monitoring system, as shown in Figure 1.
The present embodiment one comprises video surveillance network server, gps time synchronizer, WEB browser server and digital IPC system based on system during intelligent substation video monitoring pair.Video surveillance network server, gps time synchronizer server are connected Electric Power Communication Data net with WEB browser server by network; Protocol component during video surveillance network server installation NTP couple, is connected with gps time synchronizer server by network.Video surveillance network server and WEB browser server, for monitoring, storing, manage, consult the video image of each transformer station transmission.
As shown in Figure 2, described IPC system front end is combined by network code module and analog video camera, the analog video signal that analog video camera collects by coding module is compressed into digital signal, by central processing unit, digital signal is carried out stores processor, again by the digital data transmission after process to supervisory control of substation main frame, then transfer to video surveillance network server by switch and router by communication data net; Gps time synchronizer provides when multiple pair and serves, during network enabled NTP and SNTP couple, during GPS couple, server sends Perfect Time, video surveillance network server is as the main website of time monitoring, collect the video image from each plant stand, possess the critical functions such as storage management, telemonitoring, image transmission/reception, transferred the video pictures of each plant stand by web browser.

Claims (3)

1. based on system during intelligent substation video monitoring pair, it is characterized in that, when described pair, system comprises:
Video surveillance network server, for monitoring, storing the video image of each intelligent substation transmission;
WEB browser server, for managing, consulting the video image of each intelligent substation transmission;
Gps time synchronizer, for assembly during installation pair, when carrying out network pair;
Digital IPC system, for gathering the video image from each plant stand, carries out storage management, telemonitoring and transmitting-receiving to image;
Described digital IPC Operation system setting at intelligent substation end, by high speed communication data net, when carrying out networking NTP couple; During NTP couple receive be GPS couple time signal, video surveillance network server is connected with time synchronism apparatus, when carrying out network pair, assembly during each time service device unification installation pair, possesses network time adjustment function, intelligent substation based on IEC61850 technical protocol, support NTP(SNTP) pair time, during by the network switch directly to intelligent substation video monitoring main frame pair.
2. a kind of setting means based on system during intelligent substation video monitoring pair according to claim 1, it is characterized in that, described video surveillance network server, gps time synchronizer are connected Electric Power Communication Data net with WEB browser server by network; Protocol component during video surveillance network server installation NTP couple, is connected with gps time synchronizer by network; Digital IPC system connects Electric Power Communication Data net by network and connects video surveillance network server, gps time synchronizer and WEB browser server.
3. a kind of setting means based on system during intelligent substation video monitoring pair according to claim 1, it is characterized in that, described digital IPC system front end comprises network code module and analog video camera, the analog video signal that analog video camera collects by described network code module is compressed into digital signal, by central processing unit, digital signal is carried out stores processor, again by the digital data transmission after process to the video monitoring main frame of intelligent substation, system when transferring to main website pair by communication data net; Gps time synchronizer provides when multiple pair and serves, during network enabled NTP and SNTP couple, gps time synchronizer sends Perfect Time, described video surveillance network server is as the main website of time monitoring, collect the video image from each plant stand, possess storage management, telemonitoring, image transmission/reception critical function, transferred the video pictures of each plant stand by web browser.
CN201510715834.5A 2015-10-30 2015-10-30 Time synchronization system based on intelligent substation video monitoring Pending CN105407317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510715834.5A CN105407317A (en) 2015-10-30 2015-10-30 Time synchronization system based on intelligent substation video monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510715834.5A CN105407317A (en) 2015-10-30 2015-10-30 Time synchronization system based on intelligent substation video monitoring

Publications (1)

Publication Number Publication Date
CN105407317A true CN105407317A (en) 2016-03-16

Family

ID=55472528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510715834.5A Pending CN105407317A (en) 2015-10-30 2015-10-30 Time synchronization system based on intelligent substation video monitoring

Country Status (1)

Country Link
CN (1) CN105407317A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107425934A (en) * 2017-04-07 2017-12-01 成都府河电力自动化成套设备有限责任公司 The time synchronism apparatus of intelligent substation on-line monitoring
CN111061147A (en) * 2019-11-28 2020-04-24 南京国电南自电网自动化有限公司 Wireless network-based regional intelligent substation time service system and method

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004260390A (en) * 2003-02-25 2004-09-16 Aiphone Co Ltd Video intercom device
JP2008503984A (en) * 2004-06-21 2008-02-07 ドルビー・ラボラトリーズ・ライセンシング・コーポレーション Frame synchronization of digital cinema playback system with Ethernet NTP time
CN102315928A (en) * 2011-08-30 2012-01-11 广东电网公司电力科学研究院 Test method of IED network clock synchronization precision based on GOOSE mechanism
CN103023149A (en) * 2012-12-12 2013-04-03 天津市电力公司 Intelligent power distribution terminal and intelligent power distribution system based on IEC61850
CN104065935A (en) * 2014-06-27 2014-09-24 山东山大电力技术有限公司 Automatic time synchronization system for transformer substation video monitoring mainframe and time synchronization method thereof
CN203984577U (en) * 2014-06-27 2014-12-03 山东山大电力技术有限公司 Transformer substation video monitoring host computer automatically to time system
CN104902207A (en) * 2015-06-17 2015-09-09 四川特伦特科技股份有限公司 High speed signal collection method
CN204721494U (en) * 2015-06-23 2015-10-21 国家电网公司 High-altitude is wireless inspection instrument
CN106780638A (en) * 2017-01-15 2017-05-31 四川精目科技有限公司 A kind of high speed camera compresses image fast reconstructing method
CN106851321A (en) * 2017-01-15 2017-06-13 四川精目科技有限公司 A kind of least square regression high speed camera compresses image rebuilding method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004260390A (en) * 2003-02-25 2004-09-16 Aiphone Co Ltd Video intercom device
JP2008503984A (en) * 2004-06-21 2008-02-07 ドルビー・ラボラトリーズ・ライセンシング・コーポレーション Frame synchronization of digital cinema playback system with Ethernet NTP time
CN102315928A (en) * 2011-08-30 2012-01-11 广东电网公司电力科学研究院 Test method of IED network clock synchronization precision based on GOOSE mechanism
CN103023149A (en) * 2012-12-12 2013-04-03 天津市电力公司 Intelligent power distribution terminal and intelligent power distribution system based on IEC61850
CN104065935A (en) * 2014-06-27 2014-09-24 山东山大电力技术有限公司 Automatic time synchronization system for transformer substation video monitoring mainframe and time synchronization method thereof
CN203984577U (en) * 2014-06-27 2014-12-03 山东山大电力技术有限公司 Transformer substation video monitoring host computer automatically to time system
CN104902207A (en) * 2015-06-17 2015-09-09 四川特伦特科技股份有限公司 High speed signal collection method
CN204721494U (en) * 2015-06-23 2015-10-21 国家电网公司 High-altitude is wireless inspection instrument
CN106780638A (en) * 2017-01-15 2017-05-31 四川精目科技有限公司 A kind of high speed camera compresses image fast reconstructing method
CN106851321A (en) * 2017-01-15 2017-06-13 四川精目科技有限公司 A kind of least square regression high speed camera compresses image rebuilding method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107425934A (en) * 2017-04-07 2017-12-01 成都府河电力自动化成套设备有限责任公司 The time synchronism apparatus of intelligent substation on-line monitoring
CN111061147A (en) * 2019-11-28 2020-04-24 南京国电南自电网自动化有限公司 Wireless network-based regional intelligent substation time service system and method

Similar Documents

Publication Publication Date Title
CN101776711B (en) Electric energy metering system substation
CN202166879U (en) Power intelligent dispatch management system
CN104297574A (en) Substation power frequency electromagnetic environment monitoring system
CN102325149B (en) Intelligent network remote terminal unit (RTU) system of electrified railway
CN102035257A (en) Panoramic data analysis scheme of intelligent transformer substation
CN103545924A (en) Secondary equipment state online monitoring method
CN203135591U (en) Micro-grid centralized monitoring system used for photovoltaic building integrated combination
CN204538819U (en) A kind of High-low voltage switch cabinet supervising device based on Internet of Things
CN104580245A (en) Power distribution terminal 104 message parsing system and parsing method thereof
CN104065935A (en) Automatic time synchronization system for transformer substation video monitoring mainframe and time synchronization method thereof
CN105790794A (en) Transformer area line online identification system
CN204906004U (en) Distributed intelligent regional power grid of network layering
CN116846920A (en) Intelligent supervision real-time monitoring system
CN105407317A (en) Time synchronization system based on intelligent substation video monitoring
CN105471539B (en) A method of synchronous data collection is realized based on passive optical network
CN207502668U (en) A kind of system of the power distribution network main equipment live detection based on power line carrier, PLC
CN203984577U (en) Transformer substation video monitoring host computer automatically to time system
CN103166235A (en) System for controlling power station reactive power automatic compensation based on third generation (3G) technology
CN106849346B (en) A kind of system for testing power distribution automation equipment time adjustment function and timekeeping performance
CN205265371U (en) Transformer substation's long -range fortune dimension management and control device
CN204442011U (en) Supervisory control system and transformer station
CN103645417A (en) Pure internet access-prepositioned data acquisition method
CN203070068U (en) Perception transmission equipment
CN201910670U (en) Intelligent parameter acquisition cabinet
CN105471108A (en) Full-caliber power generation data collecting terminal facing network source coordination

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160316