CN105401694A - Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib - Google Patents

Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib Download PDF

Info

Publication number
CN105401694A
CN105401694A CN201510709669.2A CN201510709669A CN105401694A CN 105401694 A CN105401694 A CN 105401694A CN 201510709669 A CN201510709669 A CN 201510709669A CN 105401694 A CN105401694 A CN 105401694A
Authority
CN
China
Prior art keywords
reinforcing bar
circular hole
truss
limb plate
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510709669.2A
Other languages
Chinese (zh)
Inventor
苏何先
潘文
白羽
杨晓东
赖正聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201510709669.2A priority Critical patent/CN105401694A/en
Publication of CN105401694A publication Critical patent/CN105401694A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/36Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention relates to a manufacturing method of a truss type steel rib with circular holes and application of the truss type steel rib, and belongs to the technical field of structure construction. For the problems that in a special-shaped column structure, the construction difficulty can be increased when ordinary solid web type steel ribs are added in a joint area, and bonding between concrete and the steel ribs can be insufficient when only the steel ribs are added in the joint area, the truss type steel rib with the circular holes is provided. In the special-shaped column structure construction, the truss type steel rib, manufactured through the manufacturing method, with the circular holes is added in the joint area, the joint construction is facilitated on the premise that cost is not increased, relative sliding between the joint area concrete and the steel rib is overcome, and the improvement of the anti-seismic performance of joints is not affected and even facilitated.

Description

A kind of preparation method of the truss-like reinforcing bar with circular hole and application thereof
Technical field
The present invention relates to a kind of preparation method and application thereof of the truss-like reinforcing bar with circular hole, belong to structure construction technology field.
Background technology
Concrete profiled rod structure has do not reveal post angle in building function, and the feature such as Lateral resisting ability is strong in structural performance, is a kind of form of structure meeting modern architecture developing direction and trend, deeply favors by user.A large amount of theoretical and experimental investigations and engineering practice show, concrete profiled pile structural seismic performance is undesirable.2006, the concrete profiled pile tecnical regulations regulation of country's issuing and implementation, 8 degree (0.2g) area, Framed Structure with Special-Shaped Columns maximum height was only 12m, and this regulation causes difficulty to concrete profiled rod structure applying of highlight lines area.The foundation of this regulation is that the research carried out in industry authorizing standard process finds, ultimate bearing capacity of joints deficiency is the undesirable major embodiment of concrete profiled pile structural seismic performance, and this also becomes the governing factor of the maximum maxi-mum height of the concrete profiled rod structure in highly seismic region.Difficulty is applied in highlight lines area for solving concrete profiled rod structure, the scholar of Some Domestic colleges and universities and R&D institution proposes a lot of measure for the improvement of special-shaped column structure anti-seismic performance, such as adopt steel reinforced concrete special-shaped columns, adopt base isolation, node area adopts high-strength concrete, node area haunch, node area adds shaped steel reinforcing bar etc.Adopt this Study on Measures achievement of steel reinforced concrete special-shaped columns maximum, effect is also better, but cost is higher; The achievement in research of base isolation mode is adopted mainly to concentrate on theory analysis aspect; Node area adopts high-strength concrete measure to have some improvement to concrete profiled pile structural seismic performance, but adopts high-strength concrete to cause ductility of joint to be deteriorated; The achievement in research of node area haunch is less; The measure that node area adds shaped steel reinforcing bar improves successful to concrete profiled pile structural seismic performance, cost is lower, it is a kind of economically viable measure, but node area adds shaped steel reinforcing bar can bring certain difficulty to node construction, be mainly reflected in common steel flanged beam shaped steel reinforcing bar and add membership blocking-up beam column longitudinal reinforcement passing in node area, node area stirrup construction simultaneously also can be hindered.In addition, find in theory analysis, under seismic loading, only node area adds shaped steel reinforcing bar and there will be shaped steel reinforcing bar deficiency bonding with between concrete, there is the mutual changing of the relative positions, cause the problem of constructional difficulties and bonding deficiency after adding shaped steel reinforcing bar for node area, the present invention proposes a kind of truss-like reinforcing bar improving the band circular hole of the construction of concrete profiled pile structure node and enhancing reinforcing bar and concrete bonding.
Summary of the invention
The technical problem to be solved in the present invention is: the present invention is directed to special-shaped column structure and add in node area common steel flanged beam shaped steel reinforcing bar can increase difficulty and reinforcing bar and concrete bonding deficiency problem to construction, propose a kind of preparation method and the application that improve the truss-like reinforcing bar of the special-shaped column structure node construction band circular hole bonding with reinforcing bar with strengthening node area concrete, by processing the shaped steel reinforcing bar adding node area, form the truss-like reinforcing bar of band circular hole, under the prerequisite not increasing cost, not only facilitate node construction, enhance bonding with between reinforcing bar of node area concrete, and do not affect even be conducive to Seismic Behavior promote.
Technical solution of the present invention is: a kind of particular content of preparation method of the truss-like reinforcing bar with circular hole is as follows:
First according to hetermorphiscal column Types of nodes, processing reinforcing bar front end limb plate 1, rear end shaped steel and limb bar 3; According to hetermorphiscal column node area number of steel bars and distribution situation, determine quantity and the distribution of circular hole 4 on front end limb plate 1; Then carry out circular hole 4 to process; Again according to hetermorphiscal column Types of nodes, front end limb plate 1 and rear end shaped steel to be welded as a whole the truss-like reinforcing bar being formed and be with circular hole by limb bar 3.Spacing wherein between front end limb plate 1 with rear end shaped steel must ensure that corresponding beam steel all can pass, but considers from load transmission between front end limb plate 1 and rear end shaped steel, and spacing between the two should be not excessive yet, therefore between the two apart from the half of getting corresponding deck-siding.
Another object of the present invention is that the truss-like reinforcing bar of the band circular hole preparation method of the truss-like reinforcing bar of described band circular hole obtained is applied to and improves special-shaped column structure node construction and strengthen the bonding of node area concrete and reinforcing bar.
When the truss-like reinforcing bar of described band circular hole uses, the lifting of the truss-like reinforcing bar of the band circular hole made to bean column node place, truss-like reinforcing bar with circular hole should be placed on the central authorities of beam cross-section, during colligation beam reinforced steel bar, according to reinforcement construction figure, longitudinal reinforcement and the stirrup that node area need be run through front end limb plate 1 can not be truncated through circular hole 4 reserved on front end limb plate 1 and the joint gap front end limb plate 1 and rear end shaped steel, meanwhile, the reinforcing bar of circular hole 4 and front end limb plate 1 and rear end shaped steel joint gap is run through as the peg retraining reinforcing bar slippage.
The front end limb plate 1 of truss-like reinforcing bar is attacked and bores circular hole 4, circular hole 4 is attacked and bored principle is ensure that the reinforcing bar that hetermorphiscal column node area runs through front end limb plate 1 can not be truncated by design drawing construction, at least large than the diameter the running through front end limb plate 1 reinforcing bar 2mm of circular hole 4 diameter, to guarantee the through smoothly of reinforcing bar in work progress.
The invention has the beneficial effects as follows:
1, truss-like reinforcing bar node shaped steel reinforcing bar being made as band circular hole is conducive to node area reinforcing bar and passes, and ensure that the continuity of beam main tendon, facilitates node construction; Circular hole 4 on front end limb plate 1, as the passage of node stirrup and floor bar, ensure that smooth construction and the structural specifications of node area stirrup and floor bar.
2, node shaped steel reinforcing bar is made as the truss-like reinforcing bar of band circular hole, not only can not weakens the effect that node adds shaped steel reinforcing bar, also can promote the anti-seismic performance of node to a certain extent.Beam main tendon, in the continuity of node area, ensure that beam main tendon is in the stressed continuity of node area; The circular hole 4 of limb plate as node area floor bar and stirrup through passage, strictly can carry out reinforcement construction by designing requirement, ensure that construction quality, simultaneously, the shear stud shaped steel reinforcing bar and concrete is can be used as through the floor bar of circular hole 4 and stirrup, prevent the Relative sliding between steel reinforced concrete, increase the globality of joints.
3, front end limb plate 1 and the rear end shaped steel of being with the truss-like reinforcing bar of circular hole weld by limb bar 3 entirety formed, and easy to make, cost is lower.
Accompanying drawing explanation
Fig. 1 is the truss-like reinforcing bar schematic diagram of band circular hole of the present invention.
Each label in Fig. 1: 1-forelimb plate, 2-rear end L-type steel, 3-limb bar, 4-circular hole, 5-rear end T-steel, 6-rear end ten shaped steel.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the invention will be further described.
Embodiment 1: as shown in Figure 1, a kind of particular content of preparation method of the truss-like reinforcing bar with circular hole is as follows:
First according to hetermorphiscal column Types of nodes, processing front end limb plate 1, rear end shaped steel and limb bar 3;
For L-type hetermorphiscal column node, rear end shaped steel is processed as rear end L-type steel 2, according to hetermorphiscal column node area number of steel bars and distribution situation, determines quantity and the distribution of circular hole 4 on front end limb plate 1; Then carry out circular hole 4 to process, circular hole 4 is attacked and bored principle is ensure that the reinforcing bar that hetermorphiscal column node area runs through front end limb plate 1 can not be truncated, at least large than the diameter the running through front end limb plate 1 reinforcing bar 2mm of circular hole 4 diameter by design drawing construction; Front end limb plate 1 and rear end L-type steel 2 are welded as a whole by limb bar 3, form the L-type truss-like reinforcing bar of band circular hole, the spacing wherein between front end limb plate 1 with rear end L-type steel 2 gets the half of corresponding deck-siding.
Embodiment 2: as shown in Figure 1, a kind of particular content of preparation method of the truss-like reinforcing bar with circular hole is as follows:
First according to hetermorphiscal column Types of nodes, processing front end limb plate 1, rear end shaped steel and limb bar 3;
For T-shaped hetermorphiscal column node, rear end shaped steel is processed as rear end T-steel 5, according to hetermorphiscal column node area number of steel bars and distribution situation, determines quantity and the distribution of circular hole 4 on front end limb plate 1; Then carry out circular hole 4 to process, circular hole 4 is attacked and bored principle is ensure that the reinforcing bar that hetermorphiscal column node area runs through front end limb plate 1 can not be truncated, at least large than the diameter the running through front end limb plate 1 reinforcing bar 2mm of circular hole 4 diameter by design drawing construction; Front end limb plate 1 and rear end T-steel 5 are welded as a whole by limb bar 3, form the T-shaped truss-like reinforcing bar of band circular hole, the spacing wherein between front end limb plate 1 with rear end T-steel 5 gets the half of corresponding deck-siding.
Embodiment 3: as shown in Figure 1, a kind of particular content of preparation method of the truss-like reinforcing bar with circular hole is as follows:
First according to hetermorphiscal column Types of nodes, processing front end limb plate 1, rear end shaped steel and limb bar 3;
For ten type hetermorphiscal column nodes, rear end shaped steel is processed as rear end ten shaped steel 6, according to hetermorphiscal column node area number of steel bars and distribution situation, determines quantity and the distribution of circular hole 4 on front end limb plate 1; Then carry out circular hole 4 to process, circular hole 4 is attacked and bored principle is ensure that the reinforcing bar that hetermorphiscal column node area runs through front end limb plate 1 can not be truncated, at least large than the diameter the running through front end limb plate 1 reinforcing bar 2mm of circular hole 4 diameter by design drawing construction; Front end limb plate 1 and rear end ten shaped steel 6 are welded as a whole by limb bar 3, form ten type truss-like reinforcing bars of band circular hole, the spacing wherein between front end limb plate 1 with rear end ten shaped steel 6 gets the half of corresponding deck-siding.
Embodiment 4: as shown in Figure 1, it is as follows with the bonding particular content of reinforcing bar to improve special-shaped column structure node construction and to strengthen node concrete that the truss-like reinforcing bar of the band circular hole that the method proposed by the present embodiment 1 or embodiment 2 or embodiment 3 completes is applied to hetermorphiscal column node:
When the truss-like reinforcing bar of described band circular hole uses, the lifting of the truss-like reinforcing bar of the band circular hole made to bean column node place, truss-like reinforcing bar should be placed on the central authorities of beam cross-section, during colligation beam reinforced steel bar, according to reinforcement construction figure, longitudinal reinforcement and the stirrup that node area need be run through front end limb plate 1 reserve circular hole 4 and the joint gap front end limb plate 1 and rear end shaped steel through on front end limb plate 4, meanwhile, the reinforcing bar of circular hole 4 and front end limb plate 1 and rear end shaped steel joint gap is run through as the peg retraining reinforcing bar slippage.
Truss-like reinforcing bar node shaped steel reinforcing bar being made as band circular hole is conducive to node area reinforcing bar and passes, and ensure that the continuity of beam main tendon, facilitates node construction; Circular hole 4 on front end limb plate 1, as the passage of node stirrup and floor bar, ensure that smooth construction and the structural specifications of node area stirrup and floor bar.
Node shaped steel reinforcing bar is made as the truss-like reinforcing bar of band circular hole, not only can not weakens the effect that node adds shaped steel reinforcing bar, also can promote the anti-seismic performance of node to a certain extent.Beam main tendon, in the continuity of node area, ensure that beam main tendon is in the stressed continuity of node area; The circular hole 4 of limb plate as node area floor bar and stirrup through passage, strictly can carry out reinforcement construction by designing requirement, ensure that construction quality, simultaneously, the shear stud shaped steel reinforcing bar and concrete is can be used as through the floor bar of circular hole 4 and stirrup, prevent the Relative sliding between steel reinforced concrete, increase the globality of joints.
The front end limb plate of the truss-like reinforcing bar with circular hole and rear end shaped steel weld by limb bar 3 entirety formed, and easy to make, cost is lower.
By reference to the accompanying drawings specific embodiments of the invention are explained in detail above, but the present invention is not limited to above-described embodiment, in the ken that those of ordinary skill in the art possess, various change can also be made under the prerequisite not departing from present inventive concept.

Claims (5)

1. a preparation method for the truss-like reinforcing bar with circular hole, is characterized in that: the preparation method of the truss-like reinforcing bar of described band circular hole is as follows:
First according to hetermorphiscal column Types of nodes, processing reinforcing bar front end limb plate (1), rear end shaped steel and limb bar (3); According to hetermorphiscal column node area number of steel bars and distribution situation, determine quantity and the distribution of the upper circular hole (4) in front end limb plate (1); Then circular hole (4) processing is carried out; Again according to hetermorphiscal column Types of nodes, front end limb plate (1) and rear end shaped steel to be welded as a whole the truss-like reinforcing bar being formed and be with circular hole by limb bar (3).
2. the preparation method of the truss-like reinforcing bar of band circular hole according to claim 1, it is characterized in that: carry out circular hole (4) and add man-hour, front end limb plate (1) is attacked and bores circular hole (4), must ensure when attacking brill hetermorphiscal column node area run through front end limb plate (1) reinforcing bar can by design drawing construction and be not truncated, at least large than the diameter running through front end limb plate (1) the reinforcing bar 2mm of circular hole (4) diameter.
3. the preparation method of the truss-like reinforcing bar of band circular hole according to claim 1, is characterized in that: described front end limb plate (1) and the spacing between the shaped steel of rear end get the half of corresponding deck-siding.
4. the truss-like reinforcing bar of band circular hole that the preparation method of the truss-like reinforcing bar of band circular hole according to claim 1 obtains is applied to and improves special-shaped column structure node construction and strengthen the bonding of node area concrete and reinforcing bar.
5. the truss-like reinforcing bar of band circular hole according to claim 4 is applied to and improves special-shaped column structure node construction and strengthen the bonding of node area concrete and reinforcing bar, it is characterized in that: when the truss-like reinforcing bar of band circular hole uses, the lifting of the truss-like reinforcing bar of the band circular hole made to bean column node place, truss-like reinforcing bar with circular hole should be placed on the central authorities of beam cross-section, during colligation beam reinforced steel bar, according to reinforcement construction figure, longitudinal reinforcement and the stirrup that node area need be run through front end limb plate (1) reserve circular hole (4) and the joint gap front end limb plate (1) and rear end shaped steel through front end limb plate (1) is upper, simultaneously, run through the reinforcing bar of circular hole (4) and front end limb plate (1) and rear end shaped steel joint gap as the peg retraining reinforcing bar slippage.
CN201510709669.2A 2015-10-28 2015-10-28 Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib Pending CN105401694A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510709669.2A CN105401694A (en) 2015-10-28 2015-10-28 Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510709669.2A CN105401694A (en) 2015-10-28 2015-10-28 Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib

Publications (1)

Publication Number Publication Date
CN105401694A true CN105401694A (en) 2016-03-16

Family

ID=55467414

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510709669.2A Pending CN105401694A (en) 2015-10-28 2015-10-28 Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib

Country Status (1)

Country Link
CN (1) CN105401694A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2206830A1 (en) * 1997-05-15 1998-11-15 Le Groupe Canam Manac Inc. High rise steel column
CN200975061Y (en) * 2006-12-05 2007-11-14 西安建筑科技大学 Solid-web steel disposition section steel
CN201209291Y (en) * 2008-06-06 2009-03-18 昆明理工大学 Steel board reinforced concrete special-shaped pillar
CN202380574U (en) * 2011-11-28 2012-08-15 北京工业大学 Core barrel with mild steel sleeves at bottoms and hidden steel plates in concrete-filled steel tube frame
CN203440996U (en) * 2013-09-16 2014-02-19 南京工业大学 Steel-reinforced concrete special-shaped column having T-shaped section and provided with steel-reinforced webs with quadrangular holes
CN104234314A (en) * 2014-09-29 2014-12-24 南京工业大学 Honeycomb-shaped web crossed-section special-shaped steel column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2206830A1 (en) * 1997-05-15 1998-11-15 Le Groupe Canam Manac Inc. High rise steel column
CN200975061Y (en) * 2006-12-05 2007-11-14 西安建筑科技大学 Solid-web steel disposition section steel
CN201209291Y (en) * 2008-06-06 2009-03-18 昆明理工大学 Steel board reinforced concrete special-shaped pillar
CN202380574U (en) * 2011-11-28 2012-08-15 北京工业大学 Core barrel with mild steel sleeves at bottoms and hidden steel plates in concrete-filled steel tube frame
CN203440996U (en) * 2013-09-16 2014-02-19 南京工业大学 Steel-reinforced concrete special-shaped column having T-shaped section and provided with steel-reinforced webs with quadrangular holes
CN104234314A (en) * 2014-09-29 2014-12-24 南京工业大学 Honeycomb-shaped web crossed-section special-shaped steel column

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陆兴鑫: "一种新型型钢异形柱节点抗剪承载力的可行性研究", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Similar Documents

Publication Publication Date Title
CN104032864B (en) The web perforate H section steel connecting node that buckling-restrained steel plate wall is connected with concrete frame
CN104963415B (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN108331158A (en) A kind of joint connection in site method of precast reinforced concrete beam column
CN106638989B (en) Steel-pipe column and reinforced concrete column add conversion node of roof beam and contain its building
CN108487453B (en) Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam
CN101024975A (en) Shaped-steel concrete frame-steel supporting structure section-changeable conversion node
CN203531147U (en) Embedded type anchor bolt connecting structure for I-shaped steel column
CN207003651U (en) A kind of assembling steel plate barrel shape RCS space nodes
WO2020181794A1 (en) Fabricated self-restoration pitch point
CN104805958A (en) Bi-stage yielding energy dissipation steel coupling beam applied to coupled shear wall structure
CN105926774B (en) A kind of end plate connection monoblock type Composite frame beam and combinations thereof method
CN107100275A (en) The angle steel web member connecting node that a kind of steel plate shear force wall is connected with concrete frame
CN106245769B (en) A kind of structure of profile steel concrete column beam column universal nodes
CN204626777U (en) A kind of flexible shear structure connecting girder steel and concrete slab
CN207436371U (en) A kind of constructing structure of super-span girder with rolled steel section en cased in concrete
CN107587606A (en) High performance concrete chain type combining structure
CN103821234A (en) Joint construction for steel-reinforced concrete column and reinforced concrete beam
CN201209291Y (en) Steel board reinforced concrete special-shaped pillar
CN209339326U (en) A kind of steel-concrete combined joint
CN204715540U (en) A kind of round steel pipe binding type steel concrete column and steel beam joint structure
CN204715539U (en) A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure
CN203782894U (en) Joint structure of steel-reinforced concrete column and reinforced concrete beam
CN105401694A (en) Manufacturing method of truss type steel rib with circular holes and application of truss type steel rib
CN108412124A (en) Assembled ultra-high performance concrete-part shaped steel combination beam and its construction method
CN109138220A (en) The compound assembled skeleton of fiber cement board, wall component and assembled steel reinforced concrete shear wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160316

RJ01 Rejection of invention patent application after publication