CN105387270A - Air pipe installation lifting system and method - Google Patents

Air pipe installation lifting system and method Download PDF

Info

Publication number
CN105387270A
CN105387270A CN201510859816.4A CN201510859816A CN105387270A CN 105387270 A CN105387270 A CN 105387270A CN 201510859816 A CN201510859816 A CN 201510859816A CN 105387270 A CN105387270 A CN 105387270A
Authority
CN
China
Prior art keywords
airduct
hinged
bracket
plate
elevator system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510859816.4A
Other languages
Chinese (zh)
Other versions
CN105387270B (en
Inventor
杨德志
夏春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201510859816.4A priority Critical patent/CN105387270B/en
Publication of CN105387270A publication Critical patent/CN105387270A/en
Application granted granted Critical
Publication of CN105387270B publication Critical patent/CN105387270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/06Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported by levers for vertical movement
    • B66F7/065Scissor linkages, i.e. X-configuration
    • B66F7/0666Multiple scissor linkages vertically arranged
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/10Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks
    • B66F7/16Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks
    • B66F7/18Lifting frames, e.g. for lifting vehicles; Platform lifts with platforms supported directly by jacks by one or more hydraulic or pneumatic jacks by a single central jack
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F7/00Lifting frames, e.g. for lifting vehicles; Platform lifts
    • B66F7/28Constructional details, e.g. end stops, pivoting supporting members, sliding runners adjustable to load dimensions

Abstract

The invention provides an air pipe installation lifting system and method. The system comprises an assembly lifting device and an installation lifting device. The assembly lifting device comprises prismatic telescopic operating tables. An air pipe is assembled on the prismatic telescopic operating tables. The installation lifting device comprises a center base, supporting legs, a hydraulic cylinder, a hydraulic pump and a bracket. The supporting legs are located at the bottom of the center base. The hydraulic cylinder is connected with the top of the center base. The bracket is connected with an end socket of a piston rod of the hydraulic cylinder. The hydraulic pump is connected with the hydraulic cylinder through a pipeline. The installation of the air pipe is completed on the bracket. The air pipe installation lifting system is simple in structure, convenient to operate and capable of saving labor, reducing potential safety hazards of indoor aloft work and improving the working efficiency and working quality.

Description

A kind of airduct installs elevator system and method
Technical field
The invention belongs to the technical field of building installation engineering, particularly relate to a kind of airduct and elevator system and method are installed.
Background technique
The airduct installing engineering of current many interior of buildings is a part very important in electromechanical installation, airduct is generally positioned at top, house, distance ground range is higher, whole airduct is made up of multistage, and first install airduct needs airduct to be raised to certain altitude, general by first airduct is positioned over scaffold, near its setting height(from bottom), then by several workman manual elevation extremely accurate setting height(from bottom), two sections of airducts are connected, now airduct is fixed to the connection between two sections of airducts.The installation of next section of airduct is carried out after installing, movable Scaffold is to new airduct mounting point, repeat aforesaid operations, this mounting type combines for constructor's man-made assembly and manual elevation, in addition, and large many of large-scale public place airduct sectional dimension, during airduct splicing, side inconvenience is down reinforced, and its efficiency of construction is low, and the coordinative construction personnel of needs are many.
Summary of the invention
Technical problem to be solved by this invention is for above-mentioned Problems existing, there is provided a kind of airduct that elevator system and method are installed, airduct picking-up and installation can be carried out flexibly safely, decrease the potential safety hazard of indoor upper-air operation, improve working efficiency and workmanship.
The present invention solves the problems of the technologies described above adopted technological scheme: elevator system installed by a kind of airduct, it is characterized in that, comprise assembling lifting device and lifting device is installed, described assembling lifting device is prismatic scaling operation platform, described prismatic scaling operation platform comprises top board, base plate, vertically expansion bracket, described vertical expansion bracket two ends are hinged with described top board and base plate respectively, and top board one side end face is provided with fixture, and base plate bottom surface is provided with roller; Described installation lifting device comprises center base, supporting leg, oil hydraulic cylinder, oil hydraulic pump and bracket, described supporting leg is located at the bottom of described center base, described oil hydraulic cylinder is connected with the top of center base, described bracket is connected with the termination of the piston rod of oil hydraulic cylinder, and described oil hydraulic pump is connected by pipeline with oil hydraulic cylinder.
By such scheme, described vertical expansion bracket comprises fork-shearing frame, lower fork-shearing frame and manual driving device, on described, lower fork-shearing frame is symmetrical arranged composition by the Crossware that Liang Ge center is hinged, the bottom of upper fork-shearing frame and the top of lower fork-shearing frame are hinged by two coupling shafts, the center of a coupling shaft is provided with bearing support, the center of another root coupling shaft is provided with nut, described manual driving device comprises the first leading screw and the first crank, one end and the described nut of described first leading screw are spirally connected, the other end is located by described bearing support, described first crank is connected with the termination of the first leading screw the other end, described top board bottom surface and plate top surface are arranged with two groups of articulated mountings respectively, described articulated mounting comprises the projection being provided with hinging hole and the grid having bar-shaped trough, the bottom of the Crossware of lower fork-shearing frame is hinged respectively by bearing pin and described projection and grid, the top of the Crossware of upper fork-shearing frame is hinged respectively by bearing pin and described projection and grid, and described bearing pin can slide along bar-shaped trough.
By such scheme, described fixture comprises pipe hook, cover plate, degree of tightness lid and hook, described pipe hook, cover plate and degree of tightness lid are arcuate structure, pipe hook opening is connected with described top board one side end face outwardly, pipe hook top is provided with hinged seat, bottom is provided with the first barb, both sides, cover plate one end and described hinged seat are hinged, one end of the cover plate the other end and described degree of tightness lid is hinged, the degree of tightness lid the other end is provided with the second barb, described hook one end and degree of tightness lid are hinged, the hook the other end and described first barb phase configuration.
By such scheme, described bracket comprises main supporting plate, left support plate, right support plate and horizontal extension frame, a described left side, right support plate is connected with described Main shoe plate both sides respectively by described horizontal extension frame, described horizontal extension frame forms by the Crossware that several center is hinged is hinged successively, main supporting plate both sides end face and a left side, the inner side end of right support plate is arranged with up and down two pieces of grids, described grid has bar-shaped trough, the termination of the Crossware at horizontal extension frame two ends is hinged by bearing pin and grid, in horizontal extension frame, the bottom of two central pivot point is respectively equipped with nut and bearing support, one end and the described nut of the second leading screw are spirally connected, the other end is located by described bearing support, the termination of the second leading screw the other end is connected with the second crank.
By such scheme, described Main shoe plate two ends are arranged with four guide holes, and the inner side end both sides of described left support plate, right support plate are provided with guide rod, described guide rod and described guide hole phase configuration.
By such scheme, described center base end face outside uniform intervals is provided with several notch, and described supporting leg one end to be inserted in described notch and is connected by take-up, and supporting leg is provided with roller.
By such scheme, described take-up comprises cylindrical sleeves, back-up ring and clipping device, described cylindrical sleeves embeds the notch top of described center base, described clipping device is cylinder square folds, described cylinder square folds while be provided with horizontal section, clipping device insert cylindrical sleeves, external part and described back-up ring phase configuration, one end upper surface of described supporting leg is provided with inner groovy, described inner groovy and cylinder square folds cylinder arch face phase configuration.
By such scheme, described supporting leg comprises inner sleeve and outer sleeve, and described inner sleeve has several positioning hole, and described outer sleeve is provided with self-locking device, and inner sleeve is connected by self-locking device with outer sleeve.
By such scheme, described self-locking device comprises " U " type bearing, pull bar and spring, the center of described " U " type bearing is passed in one end of described pull bar, the termination of the other end is provided with handle, one end of pull bar is circumferentially provided with boss in face, described spring overcoat is on pull bar, and both ends of the spring offsets with described boss and " U " type bearing respectively, pull bar and described positioning hole phase configuration.
Method for improving installed by a kind of airduct, it is characterized in that, comprises the steps:
A) airduct is assembled, according to the assembled length of airduct and path, place prismatic scaling operation platform, the prismatic scaling operation platform be located along the same line is by clamp same steel pipe, each section of airduct is positioned over respectively on the top board of corresponding prismatic scaling operation platform, the flange screw of airduct top and both sides is installed, rotates the first crank and raise vertical expansion bracket, airduct is risen to assembled height easy-to-operat personnel and to stand the assembling of the flange screw carrying out airduct bottom;
B) airduct is installed, installation lifting device is moved to below airduct, by the length of self-locking device adjustment supporting leg, rotate the second crank again, the length of adjustment horizontal extension frame, is adjusted to the loaded area of bracket and adapts with airduct, primer fluid press pump and oil hydraulic cylinder, bracket is increased to airduct mounting point, reinforces Air duct hanging bracket, complete installation.
The invention has the beneficial effects as follows: provide a kind of airduct that elevator system and method are installed, adopt assembling lifting device that airduct is risen to assembled height, do not need to bend over to complete bolton below air duct flange, ease of assembly, by installation lifting device, the airduct assembled is promoted to setting height(from bottom) to install, decreases the potential safety hazard of indoor upper-air operation.
Accompanying drawing explanation
Fig. 1 is the structural representation of one embodiment of the invention.
Fig. 2 is the structural representation of the assembling lifting device of one embodiment of the invention.
Fig. 3 is the structural representation of the installation lifting device of one embodiment of the invention.
Fig. 4 is the structural representation of the cylinder square folds of one embodiment of the invention.
Fig. 5 is the structural representation of the self-locking device of one embodiment of the invention.
Fig. 6 is the structural representation of the fixture of one embodiment of the invention.
Wherein: 1-prismatic scaling operation platform, 2-installs lifting device, 3-top board, 4-base plate, the vertical expansion bracket of 5-, the upper fork-shearing frame of 6-, fork-shearing frame under 7-, 8-coupling shaft, 9-bearing support, 10-nut, 11-first crank, 12-first leading screw, 13-projection, 14-grid, 15-center base, 16-supporting leg, 17-oil hydraulic cylinder, 18-oil hydraulic pump, 19-bracket, 20-main supporting plate, 21-left support plate, 22-right support plate, 23-horizontal extension frame, 24-second crank, 25-second leading screw, 26-guide hole, 27-guide rod, 28-pipe hook, 29-cover plate, 30-degree of tightness lid, 31-links up with, 32-first barb, 33-second barb, 34-notch, 35-roller, 36-inner sleeve, 37-outer sleeve, 38-positioning hole, 39-self-locking device, 40-take-up, 41-" U " type bearing, 42-pull bar, 43-spring, 44-handle, 45-boss, 46-cylindrical sleeves, 47-back-up ring, 48-cylinder square folds, 49-horizontal section, 50-airduct.
Embodiment
For understanding the present invention better, below in conjunction with drawings and Examples, the invention will be further described.
As Figure 1-3, elevator system installed by a kind of airduct, comprise assembling lifting device and lifting device 2 is installed, assembling lifting device is prismatic scaling operation platform 1, prismatic scaling operation platform comprises top board 3, base plate 4, vertically expansion bracket 5, vertical expansion bracket two ends are hinged with top board and base plate respectively, and top board one side end face is provided with fixture; Lifting device is installed and comprises center base 15, supporting leg 16, oil hydraulic cylinder 17, oil hydraulic pump 18 and bracket 19, supporting leg is located at the bottom of center base, oil hydraulic cylinder is connected with the top of center base, bracket is connected with the termination of the piston rod of oil hydraulic cylinder, oil hydraulic pump is connected by pipeline with oil hydraulic cylinder, oil hydraulic pump is bought oil after oil suction from fuel tank, be the pressure energy of hydraulic oil by changes mechanical energy, hydraulic oil achieves direction, pressure, Flow-rate adjustment by integrated package (or valve combination), be transferred in the liquid oil cylinder of hydraulic machinery by external pipeline, promote various oil hydraulic cylinder mechanical work.
Vertical expansion bracket comprises fork-shearing frame 6, lower fork-shearing frame 7 and manual driving device, upper and lower fork-shearing frame is symmetrical arranged composition by the Crossware that Liang Ge center is hinged, the bottom of upper fork-shearing frame and the top of lower fork-shearing frame are hinged by two coupling shafts 8, the center of a coupling shaft is provided with bearing support 9, the center of another root coupling shaft is provided with nut 10, manual driving device comprises the first leading screw 12 and the first crank 11, one end and the nut of the first leading screw are spirally connected, the other end is located by bearing support, and the first crank is connected with the termination of the first leading screw the other end; Top board bottom surface and plate top surface are arranged with two groups of articulated mountings respectively, articulated mounting comprises the projection 13 being provided with hinging hole and the grid 14 having bar-shaped trough, the bottom of the Crossware of lower fork-shearing frame is hinged respectively by bearing pin and projection and grid, the top of the Crossware of upper fork-shearing frame is hinged respectively by bearing pin and projection and grid, bearing pin can slide along bar-shaped trough, rotate the first crank, the first screw mandrel is driven to rotate, thus change the length of vertical expansion bracket, promote or reduce ceiling height.
As shown in Figure 6, fixture comprises pipe hook 28, cover plate 29, degree of tightness lid 30 and hook 31, pipe hook, cover plate and degree of tightness lid are arcuate structure, pipe hook opening is connected with top board one side end face outwardly, pipe hook top is provided with hinged seat, bottom is provided with the first barb 32, both sides, cover plate one end and hinged seat are hinged, one end of the cover plate the other end and degree of tightness lid is hinged, the degree of tightness lid the other end is provided with the second barb 33, hook one end and degree of tightness lid are hinged, the hook the other end and the first barb phase configuration, arrange the second barb to adopt assistant tool to assist the switching action of degree of tightness lid.
Bracket comprises main supporting plate 20, left support plate 21, right support plate 22 and horizontal extension frame 23, left, right support plate is connected with Main shoe plate both sides respectively by horizontal extension frame, horizontal extension frame forms by the Crossware that several center is hinged is hinged successively, main supporting plate both sides end face and a left side, the inner side end of right support plate is arranged with up and down two pieces of grids 14, grid has bar-shaped trough, the termination of the Crossware at horizontal extension frame two ends is hinged by bearing pin and grid, in horizontal extension frame, the bottom of two central pivot point is respectively equipped with nut and bearing support, one end and the nut of the second leading screw 25 are spirally connected, the other end is located by bearing support, the termination of the second leading screw the other end is connected with the second crank 24, rotate the second crank, the second screw mandrel is driven to rotate, thus change the length of horizontal extension frame, adjustment is left, distance between right support plate and main supporting plate, adapt to the loaded area of airduct to be installed, Main shoe plate two ends are arranged with four guide holes 26, left support plate, the inner side end both sides of right support plate are provided with guide rod 27, guide rod and described guide hole phase configuration, work as a left side, when right support plate is subjected to displacement, increased and Main shoe plate join strength by guide rod, ensure the flatness of bracket.
As in Figure 3-5, center base end face outside uniform intervals is provided with several notch 34, and supporting leg one end is inserted in notch and is also connected by take-up 40, supporting leg is provided with roller 35, supporting leg is made up of inner sleeve 36 and outer sleeve 37, inner sleeve has positioning hole 38, and outer sleeve is provided with self-locking device 39, self-locking device comprises " U " type bearing 41, pull bar 42 and spring 43, the center of " U " type bearing is passed in one end of pull bar, the termination of the other end is provided with handle 44, one end of pull bar is circumferentially provided with boss 45 in face, spring overcoat is on pull bar, both ends of the spring offsets with boss and " U " type bearing respectively, pull bar and positioning hole phase configuration, operator hold handle and upwards pull pull bar, spring contraction, pull bar and positioning hole depart from, now inner sleeve can be moved to suitable position, operator's releasing lever, spring reset, pull bar one end is inserted corresponding positioning hole and is fixed, different mounting points and different airduct weight is adapted to by supporting leg length adjustment, take-up comprises cylindrical sleeves 46, back-up ring 47 and clipping device, cylindrical sleeves embeds the notch top of center base, clipping device is cylinder square folds 48, cylinder square folds while be provided with horizontal section 49, clipping device while insert cylindrical sleeves, external part and back-up ring phase configuration, the rotation of cylinder square folds is when raising up, the horizontal section on its one side and the internal surface of notch are put down, and can insert supporting leg arbitrarily, during cylinder square folds rotating down pressing, in the inner groovy of its cylinder arch face press-in supporting leg upper surface, to lock.
Adopting above-mentioned airduct to install elevator system, to carry out the step of airduct installation as follows:
1, airduct 50 is assembled, according to the assembled length of airduct and path, place prismatic scaling operation platform, the prismatic scaling operation platform be located along the same line is by clamp same steel pipe, each section of airduct is positioned over respectively on the top board of corresponding prismatic scaling operation platform, the flange screw of airduct top and both sides is installed, rotates the first crank and raise vertical expansion bracket, airduct is risen to assembled height easy-to-operat personnel and to stand the assembling of the flange screw carrying out airduct bottom;
2, airduct is installed, installation lifting device is moved to below airduct, by the length of self-locking device adjustment supporting leg, rotate the second crank again, the length of adjustment horizontal extension frame, is adjusted to the loaded area of bracket and adapts with airduct, primer fluid press pump and oil hydraulic cylinder, bracket is increased to airduct mounting point, reinforces Air duct hanging bracket, complete installation.

Claims (10)

1. elevator system installed by an airduct, it is characterized in that, comprise assembling lifting device and lifting device is installed, described assembling lifting device is prismatic scaling operation platform, described prismatic scaling operation platform comprises top board, base plate, vertically expansion bracket, described vertical expansion bracket two ends are hinged with described top board and base plate respectively, and top board one side end face is provided with fixture, and base plate bottom surface is provided with roller; Described installation lifting device comprises center base, supporting leg, oil hydraulic cylinder, oil hydraulic pump and bracket, described supporting leg is located at the bottom of described center base, described oil hydraulic cylinder is connected with the top of center base, described bracket is connected with the termination of the piston rod of oil hydraulic cylinder, and described oil hydraulic pump is connected by pipeline with oil hydraulic cylinder.
2. elevator system installed by a kind of airduct according to claim 1, it is characterized in that, described vertical expansion bracket comprises fork-shearing frame, lower fork-shearing frame and manual driving device, on described, lower fork-shearing frame is symmetrical arranged composition by the Crossware that Liang Ge center is hinged, the bottom of upper fork-shearing frame and the top of lower fork-shearing frame are hinged by two coupling shafts, the center of a coupling shaft is provided with bearing support, the center of another root coupling shaft is provided with nut, described manual driving device comprises the first leading screw and the first crank, one end and the described nut of described first leading screw are spirally connected, the other end is located by described bearing support, described first crank is connected with the termination of the first leading screw the other end, described top board bottom surface and plate top surface are arranged with two groups of articulated mountings respectively, described articulated mounting comprises the projection being provided with hinging hole and the grid having bar-shaped trough, the bottom of the Crossware of lower fork-shearing frame is hinged respectively by bearing pin and described projection and grid, the top of the Crossware of upper fork-shearing frame is hinged respectively by bearing pin and described projection and grid, and described bearing pin can slide along bar-shaped trough.
3. elevator system installed by a kind of airduct according to claim 1, it is characterized in that, described fixture comprises pipe hook, cover plate, degree of tightness lid and hook, described pipe hook, cover plate and degree of tightness lid are arcuate structure, pipe hook opening is connected with described top board one side end face outwardly, pipe hook top is provided with hinged seat, bottom is provided with the first barb, both sides, cover plate one end and described handing-over seat are hinged, one end of the cover plate the other end and described degree of tightness lid is hinged, the degree of tightness lid the other end is provided with the second barb, described hook one end and degree of tightness lid are hinged, the hook the other end and described first barb phase configuration.
4. elevator system installed by a kind of airduct according to claim 1, it is characterized in that, described bracket comprises main supporting plate, left support plate, right support plate and horizontal extension frame, a described left side, right support plate is connected with described Main shoe plate both sides respectively by described horizontal extension frame, described horizontal extension frame forms by the Crossware that several center is hinged is hinged successively, main supporting plate both sides end face and a left side, the inner side end of right support plate is arranged with up and down two pieces of grids, described grid has bar-shaped trough, the termination of the Crossware at horizontal extension frame two ends is hinged by bearing pin and grid, in horizontal extension frame, the bottom of two central pivot point is respectively equipped with nut and bearing support, one end and the described nut of the second leading screw are spirally connected, the other end is located by described bearing support, the termination of the second leading screw the other end is connected with the second crank.
5. elevator system installed by a kind of airduct according to claim 4, and it is characterized in that, described Main shoe plate two ends are arranged with four guide holes, and the inner side end both sides of described left support plate, right support plate are provided with guide rod, described guide rod and described guide hole phase configuration.
6. elevator system installed by a kind of airduct according to claim 1, and it is characterized in that, described center base end face outside uniform intervals is provided with several notch, and described supporting leg one end to be inserted in described notch and is connected by take-up, and supporting leg is provided with roller.
7. elevator system installed by a kind of airduct according to claim 6, it is characterized in that, described take-up comprises cylindrical sleeves, back-up ring and clipping device, described cylindrical sleeves embeds the notch top of described center base, described clipping device is cylinder square folds, described cylinder square folds while be provided with horizontal section, clipping device while insert cylindrical sleeves, external part and described back-up ring phase configuration, one end upper surface of described supporting leg is provided with inner groovy, described inner groovy and cylinder square folds cylinder arch face phase configuration.
8. elevator system installed by a kind of airduct according to claim 6, it is characterized in that, described supporting leg comprises inner sleeve and outer sleeve, and described inner sleeve has several positioning hole, described outer sleeve is provided with self-locking device, and inner sleeve is connected by self-locking device with outer sleeve.
9. elevator system installed by a kind of airduct according to claim 8, it is characterized in that, described self-locking device comprises " U " type bearing, pull bar and spring, the center of described " U " type bearing is passed in one end of described pull bar, the termination of the other end is provided with handle, and one end of pull bar is circumferentially provided with boss in face, and described spring overcoat is on pull bar, both ends of the spring offsets with described boss and " U " type bearing respectively, pull bar and described positioning hole phase configuration.
10. a method for improving installed by airduct, it is characterized in that, comprises the steps:
A) airduct is assembled, according to the assembled length of airduct and path, place prismatic scaling operation platform, the prismatic scaling operation platform be located along the same line is by clamp same steel pipe, each section of airduct is positioned over respectively on the top board of corresponding prismatic scaling operation platform, the flange screw of airduct top and both sides is installed, rotates the first crank and raise vertical expansion bracket, airduct is risen to assembled height easy-to-operat personnel and to stand the assembling of the flange screw carrying out airduct bottom;
B) airduct is installed, installation lifting device is moved to below airduct, by the length of self-locking device adjustment supporting leg, rotate the second crank again, the length of adjustment horizontal extension frame, is adjusted to the loaded area of bracket and adapts with airduct, primer fluid press pump and oil hydraulic cylinder, bracket is increased to airduct mounting point, reinforces Air duct hanging bracket, complete installation.
CN201510859816.4A 2015-11-30 2015-11-30 A kind of air hose installation lifting system and method Active CN105387270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510859816.4A CN105387270B (en) 2015-11-30 2015-11-30 A kind of air hose installation lifting system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510859816.4A CN105387270B (en) 2015-11-30 2015-11-30 A kind of air hose installation lifting system and method

Publications (2)

Publication Number Publication Date
CN105387270A true CN105387270A (en) 2016-03-09
CN105387270B CN105387270B (en) 2018-08-21

Family

ID=55419857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510859816.4A Active CN105387270B (en) 2015-11-30 2015-11-30 A kind of air hose installation lifting system and method

Country Status (1)

Country Link
CN (1) CN105387270B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106629483A (en) * 2017-03-21 2017-05-10 中国五冶集团有限公司 Air pipe mounting bracket
CN109626281A (en) * 2018-11-27 2019-04-16 国网山东省电力公司烟台市福山区供电公司 A kind of substation equipment maintenance and repair safety belt suspension device
CN109955856A (en) * 2017-12-25 2019-07-02 北京世纪东方通讯设备有限公司 Column a tail wind pipe mounting assembly
CN111271929A (en) * 2020-02-15 2020-06-12 连云港韬惠实业有限公司 Air supply equipment and control method thereof
CN112963616A (en) * 2021-03-20 2021-06-15 南通通博设备安装工程有限公司 Air pipe installation lifting system
CN116972226A (en) * 2023-08-21 2023-10-31 江苏江中集团有限公司 Installation equipment for splicing auxiliary air pipes in narrow vertical shaft and construction method of installation equipment

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2873090Y (en) * 2005-09-06 2007-02-28 海尔集团公司 Sterilizing cabinet or dish washing machine equiped with tableware frame
US20090250672A1 (en) * 2008-04-03 2009-10-08 Chi-Ting Lin Lifting Cart
CN202090610U (en) * 2011-06-01 2011-12-28 三一重工股份有限公司 Concrete equipment and conveying pipe positioning device thereof
CN203373078U (en) * 2013-07-29 2014-01-01 奉化市南方机械制造有限公司 Moving jacking type workpiece transmission rack
CN203918487U (en) * 2014-04-25 2014-11-05 浙江工业大学之江学院 Auto repair is processed flexible jig with clamping plate
CN204310769U (en) * 2014-11-05 2015-05-06 武夷学院 A kind of portable hand double layer lifting platform/table
CN104627899A (en) * 2015-02-04 2015-05-20 黄骅 Shear type lifting platform
CN204689555U (en) * 2015-06-18 2015-10-07 浙江中兴机械制造有限公司 A kind of hydraulic conveyor

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2873090Y (en) * 2005-09-06 2007-02-28 海尔集团公司 Sterilizing cabinet or dish washing machine equiped with tableware frame
US20090250672A1 (en) * 2008-04-03 2009-10-08 Chi-Ting Lin Lifting Cart
CN202090610U (en) * 2011-06-01 2011-12-28 三一重工股份有限公司 Concrete equipment and conveying pipe positioning device thereof
CN203373078U (en) * 2013-07-29 2014-01-01 奉化市南方机械制造有限公司 Moving jacking type workpiece transmission rack
CN203918487U (en) * 2014-04-25 2014-11-05 浙江工业大学之江学院 Auto repair is processed flexible jig with clamping plate
CN204310769U (en) * 2014-11-05 2015-05-06 武夷学院 A kind of portable hand double layer lifting platform/table
CN104627899A (en) * 2015-02-04 2015-05-20 黄骅 Shear type lifting platform
CN204689555U (en) * 2015-06-18 2015-10-07 浙江中兴机械制造有限公司 A kind of hydraulic conveyor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
袁景森: "钢桁架下大口径螺旋风管整体吊装技术", 《施工技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106629483A (en) * 2017-03-21 2017-05-10 中国五冶集团有限公司 Air pipe mounting bracket
CN109955856A (en) * 2017-12-25 2019-07-02 北京世纪东方通讯设备有限公司 Column a tail wind pipe mounting assembly
CN109955856B (en) * 2017-12-25 2024-01-09 北京世纪东方智汇科技股份有限公司 Train tail tuber pipe installation component
CN109626281A (en) * 2018-11-27 2019-04-16 国网山东省电力公司烟台市福山区供电公司 A kind of substation equipment maintenance and repair safety belt suspension device
CN111271929A (en) * 2020-02-15 2020-06-12 连云港韬惠实业有限公司 Air supply equipment and control method thereof
CN111271929B (en) * 2020-02-15 2021-10-22 连云港韬惠实业有限公司 Air supply equipment and control method thereof
CN112963616A (en) * 2021-03-20 2021-06-15 南通通博设备安装工程有限公司 Air pipe installation lifting system
CN116972226A (en) * 2023-08-21 2023-10-31 江苏江中集团有限公司 Installation equipment for splicing auxiliary air pipes in narrow vertical shaft and construction method of installation equipment
CN116972226B (en) * 2023-08-21 2024-04-05 江苏江中集团有限公司 Installation equipment for splicing auxiliary air pipes in narrow vertical shaft and construction method of installation equipment

Also Published As

Publication number Publication date
CN105387270B (en) 2018-08-21

Similar Documents

Publication Publication Date Title
CN105387270A (en) Air pipe installation lifting system and method
CN204901062U (en) A three -dimensional antidetonation gallows
CN105333225A (en) Wire twisting type installing and lifting device for air pipes
CN105347245A (en) Worm gear leading screw type lifting device for mounting of air duct
CN202577588U (en) Adjustable mounting positioning support for spherical joint space steel structure
CN106764048A (en) The method that airduct installation is carried out using self-locking type wind pipe suspension bracket
CN105927845A (en) Transformation method of regular polygonal thin oil sealed gas cabinet
CN104895329A (en) Lifting-following conveying and pouring device of silo sliding formwork library wall concrete
CN205310207U (en) Lift operation panel of electromechanical pipelining
CN110977924A (en) Tunnel gas pipeline installation manipulator
CN108100938A (en) Multistage thick stick synchronous lifting device
CN207465118U (en) Extracting tool and disassembling system
CN210940437U (en) Long-range hose expansion device for repairing hose
CN107477251B (en) A kind of industrial machinery water-supply-pipe
CN210968622U (en) Tool for quickly installing air duct
CN207480503U (en) Below bearing type generator thrust bearing bearing shell dismantling device
CN206016776U (en) A kind of beam pumping unit hydraulically extensible counter-jib
CN220516711U (en) Simple top plate bolt mounting tool
CN204493222U (en) A kind of submersible pump unit for pipeline pressurization
CN205919007U (en) Piping erection quick adjustment location support frame
CN210757295U (en) Support frame for mounting valve
CN211444934U (en) Valve gap jacking equipment for valve maintenance
CN205479959U (en) Emergent extrusion cut -off equipment of heavy -calibre steel pipeline
CN220727366U (en) Adjustable pipeline bracket
CN205330570U (en) Automatic control operation platform for workover rig

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant