CN105386456B - The ground pilework of the tower electric power support of Anti-inclining - Google Patents

The ground pilework of the tower electric power support of Anti-inclining Download PDF

Info

Publication number
CN105386456B
CN105386456B CN201510909955.3A CN201510909955A CN105386456B CN 105386456 B CN105386456 B CN 105386456B CN 201510909955 A CN201510909955 A CN 201510909955A CN 105386456 B CN105386456 B CN 105386456B
Authority
CN
China
Prior art keywords
concrete bodies
pile
upper left
upper right
bodies
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510909955.3A
Other languages
Chinese (zh)
Other versions
CN105386456A (en
Inventor
徐卫
廖云川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510909955.3A priority Critical patent/CN105386456B/en
Publication of CN105386456A publication Critical patent/CN105386456A/en
Application granted granted Critical
Publication of CN105386456B publication Critical patent/CN105386456B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/35Foundations formed in frozen ground, e.g. in permafrost soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses the ground pilework of the tower electric power support of Anti-inclining,Including bottom concrete bodies,The front-end and back-end of bottom concrete bodies are provided with connection steel bar column,Bottom concrete bodies top is provided with upper left concrete bodies and upper right concrete bodies,Upper left concrete bodies are relative to the symmetrical distribution of the following sagittal axis of base concrete body of upper right concrete bodies,Upper left concrete bodies and upper right concrete bodies top are provided with connection channel member,The connection steel bar column of connection steel bar column and upper right concrete bodies through upper left concrete bodies passes through the bottom surface of connection channel member,Multiple pile connecting poles are provided with the protrusion platform region of upper left concrete bodies,Multiple pile connecting poles are provided with the protrusion platform region of upper right concrete bodies,All pile connecting poles are in the circular array arrangement of overlook direction,Pile connecting pole top is provided with pile,Pile connecting pole is connected by ring flange with pile bottom.The advantage of the invention is that:Simple structure, low cost is simple and quick.

Description

The ground pilework of the tower electric power support of Anti-inclining
Technical field
The present invention relates to the ground pilework in power equipment, specifically the ground pilework of the tower electric power support of Anti-inclining.
Background technology
Electric wire tower pile is subject to the foundation system of electric wire tower.The infrastructure mode of existing electric wire tower pile is: A pit-hole is excavated, a template for cylinder row is then built, concrete grout is injected in template, wait after concrete coagulation i.e. shape Into foundation structure.The construction duration of this structure is long, complex procedures, and suitable weather conditions temperature area, and high and cold Area's aforesaid way is not suitable for, and in extremely frigid zones, the condensation process of concrete can freeze, and structural strength can be affected, therefore on Structure is stated in extremely frigid zones, such as Chinese Qinghai-xizang Plateau Region can not use said structure, form the existing confession of China's western region Electric strength is smaller, and infrastructure is inadequate.
The content of the invention
It is an object of the invention to provide a kind of ground pilework of the tower electric power support of Anti-inclining, the tower electric power of this Anti-inclining The ground pilework of support utilizes modular construction, and realization overcomes the purpose of the environment of extremely frigid zones, with quick, convenient, no The ground pilework of the erection tower electric power support of Anti-inclining of icing.
The purpose of the present invention is achieved through the following technical solutions:The ground pilework of the tower electric power support of Anti-inclining, bag The groove set in pile hole bottom surface is included, the bottom concrete bodies for being shaped as cuboid are filled with groove, bottom concrete bodies Upper surface flushes with pile hole bottom surface, and the front end of concrete bodies of going to the bottom is provided with least 2 connection steel bar columns, concrete bodies of going to the bottom Rear end be provided with least 2 connection steel bar columns, bottom concrete bodies top be provided with upper left concrete bodies and upper right concrete Body, upper left concrete bodies are left relative to the symmetrical distribution of the following sagittal axis of base concrete body of upper right concrete bodies The front-end and back-end of upper concrete bodies and the front-end and back-end of upper right concrete bodies are provided with the through hole for moving towards up and down, even Steel bar column through the through hole is connect, the bottom surface of upper left concrete bodies and the bottom surface of upper right concrete bodies are neat with pile hole bottom surface It is flat;Upper left concrete bodies and upper right concrete bodies top are provided with connection channel member, through the connection reinforcing bar of upper left concrete bodies The connection steel bar column of post and upper right concrete bodies passes through the bottom surface of connection channel member, the central region and upper right of upper left concrete bodies The central region of concrete bodies is provided with protrusion platform, and multiple pile connections are provided with the protrusion platform region of upper left concrete bodies Post, is provided with multiple pile connecting poles in the protrusion platform region of upper right concrete bodies, all pile connecting poles overlook direction into Circular array is arranged, and pile connecting pole top is provided with pile, and pile connecting pole is connected by ring flange with pile bottom.
Pile external diameter is arranged with pile outer sleeve, and in overlook direction, pile hole bottom surface is provided with several around pile axle Line carries out the auxiliary positioning bar of circular array arrangement, and all auxiliary positioning bars are sequentially linked together with connection reinforcing bar A, Suo Youfu Locating rod is helped all to be connected on pile outer sleeve by connecting reinforcing bar B, all auxiliary positioning bars are all connected to by connecting reinforcing bar C On four perisporiums in pile hole, on four perisporiums that connection reinforcing bar C top pressures are cheated to pile.
Also include straight-flanked ring rubber blanket, connection channel member is located at straight-flanked ring rubber blanket central area, and straight-flanked ring rubber blanket will Connection channel member is coated on inside it, and straight-flanked ring rubber blanket top is provided with flute profile concrete bodies, the opening of flute profile concrete bodies Downwards, the notch of flute profile concrete bodies is just crimped on straight-flanked ring rubber blanket, and connection channel member is located at flute profile concrete bodies In vallecular cavity region.
The principle explanation of said structure:Bottom concrete bodies, upper left concrete bodies and upper right concrete bodies are prefabricated Concrete body, structure foundation basis constitutes structure foundation basis, the at the scene tower electric power support of construction Anti-inclining Ground pilework when, no longer using filling concrete operate.Bottom concrete bodies are placed into groove, can prevent coagulation of going to the bottom The soil body thinks that peripheral direction is shifted.Attachment structure as connection channel member is passed through using steel bar column is connected so that lower base concrete Body, upper left concrete bodies and upper right concrete bodies these three parts are combined together, and then pass through flange using pile connecting pole Disk and pile so that pile is installed on said structure foundation.Connection steel bar column and connection channel member and pile connection Post and ring flange are formed to the left and right of upper left concrete bodies and upper right concrete bodies to connection.For conventional arrangement, upper left coagulation The soil body and upper right concrete bodies can be using the structures of a monoblock, it is contemplated that the construction weight of the structure of a monoblock and company The insertion difficult problem of steel bar column is connect, the present invention uses above-mentioned Split type structure, so can easily insert connection steel bar column.On Stating structure can solve the Frozen soil problems of extremely frigid zones, and efficiency of construction is very high.
Because soil layer has the air connection easy oxidation and rusting of channel member, in order to realize the anti-oxidation guarantor to connecting channel member Shield, also including straight-flanked ring rubber blanket, connection channel member is located at straight-flanked ring rubber blanket central area, and straight-flanked ring rubber blanket is by link slot Steel part is coated on inside it, and straight-flanked ring rubber blanket top is provided with flute profile concrete bodies, and Open Side Down for flute profile concrete bodies, groove The notch of shape concrete bodies is just crimped on straight-flanked ring rubber blanket, and connection channel member is located at the vallecular cavity region of flute profile concrete bodies It is interior.Straight-flanked ring rubber blanket of the invention, flute profile concrete bodies composition seal, rectangle is suppressed using the gravity of flute profile concrete bodies Ring rubber blanket so that flute profile concrete bodies are internally formed cavity, inside will not air inlet.
The constructing operation of said structure is first to excavate pile hole, and the bottom surface compacting that pile is cheated is levelling, then in center Domain excavates to form groove, and groove floor compacting is levelling, is then placed into bottom concrete bodies, then places upper left concrete bodies, Connection steel bar column passes through upper left concrete bodies, then places upper right concrete bodies, and connection steel bar column passes through upper right concrete bodies, then Connection channel member is installed, pile is finally connected to pile connecting pole, is finally backfilled, compacting pile hole.Whole operation is without scene Concrete grouting operation.
In order to prevent causing pile over-tilting, pile external diameter to be arranged with pile outer sleeve because geology changes, overlook On direction, pile hole bottom surface is provided with several carries out the auxiliary positioning bar of circular array arrangement, all auxiliary around pile axis Locating rod is sequentially linked together with connection reinforcing bar A, and all auxiliary positioning bars are all connected to pile outer sleeve by connecting reinforcing bar B On, all auxiliary positioning bars are all connected on four perisporiums that pile is cheated by connecting reinforcing bar C, and connection reinforcing bar C top pressures to pile are cheated Four perisporiums on, expanded to the Auxiliary support scope of pile using said structure, play a part of dispersive stress, so as to effectively delay The solution inclined problem of pile.
Preferably, connection steel bar column lower end extend to bottom concrete bodies inside and with bottom concrete bodies inside steel Muscle cage is welded.Increase structural strength.
Preferably, upper left concrete bodies and upper right concrete bodies are cuboid, upper left concrete bodies and upper right concrete Body symmetry arrangement forms square after being close to.Increase structural strength.
Increase structural strength.Connect the opening up of channel member.Increase structural strength.
Increase structural strength.The connection steel bar column of upper left concrete bodies has 16, the connection steel bar column of upper right concrete bodies 16 connection steel bar columns for having 16, upper left concrete bodies are arranged into the row of 2 row 8,16 connection steel bar columns of upper right concrete bodies Into the arrangement of the row of 2 row 8.Increase structural strength.
The advantage of the invention is that:Simple structure, low cost is simple and quick, and realization overcomes the environment of extremely frigid zones Purpose, with it is quick, convenient, it is non-icing set up the tower electric power support of Anti-inclining ground pilework.
Brief description of the drawings
Fig. 1 is schematic side view of the invention.
Fig. 2 is schematic top plan view of the invention.
Fig. 3 is the schematic side view of the embodiment of the present invention 2.
Fig. 4 is the schematic top plan view of the embodiment of the present invention 2.
Fig. 5 is the schematic top plan view of the embodiment of the present invention 3.
Reference in figure is expressed as:1st, pile hole;2nd, bottom concrete bodies;3rd, upper left concrete bodies;4th, it is right Upper concrete bodies;5th, steel bar column is connected;6th, channel member is connected;7th, pile connecting pole;8th, pile;9th, protrusion platform;10th, flute profile coagulation The soil body;11st, straight-flanked ring rubber blanket;12nd, pile outer sleeve;13rd, auxiliary positioning bar;131st, connection reinforcing bar A;132nd, connection reinforcing bar B; 133rd, connection reinforcing bar C.
Specific embodiment
With reference to embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention are not limited In this.
Embodiment 1:
As Figure 1-Figure 2.
The ground pilework of the tower electric power support of Anti-inclining, is included in pile and cheats the groove that 1 bottom surface is set, and shape is filled with groove Shape is the bottom concrete bodies 2 of cuboid, and upper surface and the pile of concrete bodies 2 of going to the bottom are cheated 1 bottom surface and flushed, concrete bodies of going to the bottom 2 front-end and back-end are provided with connection steel bar column 5, and the front end of concrete bodies 2 of going to the bottom is provided with least 2 connection steel bar columns 5, The rear end of bottom concrete bodies 2 is provided with least 2 connection steel bar columns 5, and the top of bottom concrete bodies 2 is provided with upper left concrete Body 3 and upper right concrete bodies 4, upper left concrete bodies 3 are relative to the upper right concrete bodies sagittal axle of base concrete body 2 below 4 The symmetrical distribution of line, the front-end and back-end of upper left concrete bodies 3 and the front-end and back-end of upper right concrete bodies 4 are all provided with The through hole for moving towards up and down is equipped with, connection steel bar column 5 passes through the through hole, the bottom surface and upper right concrete bodies 4 of upper left concrete bodies 3 Bottom surface and pile cheat 1 bottom surface and flush;Upper left concrete bodies 3 and the top of upper right concrete bodies 4 are provided with connection channel member 6, The connection steel bar column 5 of connection steel bar column 5 and upper right concrete bodies 4 through upper left concrete bodies 3 passes through the bottom of connection channel member 6 Face, the central region of upper left concrete bodies 3 and the central region of upper right concrete bodies 4 are provided with protrusion platform 9, upper left concrete Multiple pile connecting poles 7 are provided with the region of protrusion platform 9 of body 3, are provided with the region of protrusion platform 9 of upper right concrete bodies 4 many Individual pile connecting pole 7, all pile connecting poles 7 are provided with ground in the circular array arrangement of overlook direction, the top of pile connecting pole 7 Stake 8, pile connecting pole 7 is connected by ring flange with the bottom of pile 8.
The principle explanation of said structure:Bottom concrete bodies 2, upper left concrete bodies 3 and upper right concrete bodies 4 are prefabricated Good concrete body, structure foundation basis constitutes structure foundation basis, at the scene the tower electric power branch of construction Anti-inclining During the ground pilework of frame, no longer operated using filling concrete.Bottom concrete bodies 2 are placed into groove, can prevent bottom Concrete bodies 2 think that peripheral direction is shifted.Attachment structure as connection channel member 6 is passed through using steel bar column 5 is connected so that bottom Concrete bodies 2, upper left concrete bodies 3 and upper right concrete bodies 4 these three parts are combined together, then using pile connecting pole 7 by ring flange and pile 8 so that pile is installed on said structure foundation.Connection steel bar column 5 and connection channel member 6, And pile connecting pole 7 and ring flange are formed to the left and right of upper left concrete bodies 3 and upper right concrete bodies 4 to connection.Routine sets For putting, upper left concrete bodies 3 and upper right concrete bodies 4 can be using the structures of a monoblock, it is contemplated that the knot of a monoblock The construction weight of structure body and the insertion difficult problem of connection steel bar column 5, the present invention use above-mentioned Split type structure, so can be conveniently Insertion connection steel bar column 5.Said structure can solve the Frozen soil problems of extremely frigid zones, and efficiency of construction is very high.
The constructing operation of said structure is first to excavate pile hole 1, and the bottom surface compacting in pile hole 1 is levelling, then at center Region excavates to form groove, and groove floor compacting is levelling, is then placed into bottom concrete bodies 2, then places upper left concrete Body 3, connection steel bar column 5 passes through upper left concrete bodies 3, then places upper right concrete bodies 4, and connection steel bar column 5 is mixed through upper right The solidifying soil body 4, then connection channel member 6 is installed, pile 8 is finally connected to pile connecting pole 7, finally backfill, compacting pile hole 1. Concrete grouting of the whole operation without scene is operated.
Preferably, the lower end of connection steel bar column 5 extend to the bottom inside of concrete bodies 2 and with bottom concrete bodies 2 inside Reinforcing bar cage welding.Increase structural strength.
Preferably, upper left concrete bodies 3 and upper right concrete bodies 4 are cuboid, upper left concrete bodies 3 and upper right coagulation The symmetry arrangement of the soil body 4 forms square after being close to.Increase structural strength.
Increase structural strength.Connect the opening up of channel member.Increase structural strength.
Increase structural strength.The connection steel bar column 5 of upper left concrete bodies 3 has 16, the connection reinforcing bar of upper right concrete bodies 4 Post 5 has 16, the row arrangement of 16 5 one-tenth of steel bar column of connection, 2 row 8 of upper left concrete bodies 3,16 connections of upper right concrete bodies 4 The row of 5 one-tenth of steel bar column, 2 row 8 is arranged.Increase structural strength.
Embodiment 2
As shown in Figure 3 and Figure 4.The present embodiment is on the basis of embodiment 1:Because soil layer has air connection channel member 6 Easy oxidation and rusting, in order to realize the protection against oxidation to connecting channel member 6, also including straight-flanked ring rubber blanket 11, connects channel-section steel Part 6 is located at the central area of straight-flanked ring rubber blanket 11, and straight-flanked ring rubber blanket 11 is coated on channel member 6 is connected inside it, straight-flanked ring The top of rubber blanket 11 is provided with flute profile concrete bodies 10, and Open Side Down for flute profile concrete bodies, and the notch of flute profile concrete bodies is firm It is crimped on well on straight-flanked ring rubber blanket 11, connection channel member 6 is located in the vallecular cavity region of flute profile concrete bodies.Rectangle of the invention Ring rubber blanket 11, the composition seal of flute profile concrete bodies 10, straight-flanked ring rubber blanket is suppressed using the gravity of flute profile concrete bodies 10 11 so that flute profile concrete bodies 10 are internally formed cavity, inside will not air inlet.Before stating structure in realization, it is necessary to Filling with sealant at gap between upper left concrete bodies 3 and upper right concrete bodies 4.
Embodiment 3
Such as Fig. 1 and Fig. 5.The present embodiment is on the basis of embodiment 1 or embodiment 2:Anti- pile tilting gearing is additionally provided with, In order to prevent causing pile over-tilting because geology changes, the external diameter of pile 8 is arranged with pile outer sleeve 12, in overlook direction On, 1 bottom surface of pile hole is provided with several carries out the auxiliary positioning bar 13 of circular array arrangement, all auxiliary around the axis of pile 8 Locating rod 13 is sequentially linked together with connection reinforcing bar A131, and all auxiliary positioning bars 13 are all connected to by connecting reinforcing bar B132 On pile outer sleeve 12, all auxiliary positioning bars 13 are all connected on four perisporiums in pile hole 1 by connecting reinforcing bar C133, connection Reinforcing bar C133 top pressures are cheated on 1 four perisporiums to pile, and the Auxiliary support scope to pile is expanded using said structure, play dispersion The effect of stress, so as to effectively alleviate the inclined problem of pile.
As described above, then can well realize the present invention.

Claims (4)

1. the ground pilework of the tower electric power support of Anti-inclining, it is characterised in that:It is included in pile hole(1)The groove that bottom surface is set, The bottom concrete bodies for being shaped as cuboid are filled with groove(2), concrete bodies of going to the bottom(2)Upper surface and pile cheat(1)Bottom Face flushes, concrete bodies of going to the bottom(2)Front end be provided with least 2 connection steel bar columns(5), concrete bodies of going to the bottom(2)Rear end It is provided with least 2 connection steel bar columns(5), concrete bodies of going to the bottom(2)Top is provided with upper left concrete bodies(3)With upper right coagulation The soil body(4), upper left concrete bodies(3)Relative to upper right concrete bodies(4)Following base concrete body(2)Sagittal axis is in a left side Right symmetrical, upper left concrete bodies(3)Front-end and back-end and upper right concrete bodies(4)Front-end and back-end be respectively provided with There is the through hole for moving towards up and down, connect steel bar column(5)Through the through hole, upper left concrete bodies(3)Bottom surface and upper right concrete Body(4)Bottom surface and pile cheat(1)Bottom surface flushes;Upper left concrete bodies(3)With upper right concrete bodies(4)Top is provided with company Access slot steel part(6), through upper left concrete bodies(3)Connection steel bar column(5)With upper right concrete bodies(4)Connection steel bar column (5)Through connection channel member(6)Bottom surface, upper left concrete bodies(3)Central region and upper right concrete bodies(4)Middle region Domain is provided with protrusion platform(9), upper left concrete bodies(3)Protrusion platform(9)Multiple pile connecting poles are provided with region(7), Upper right concrete bodies(4)Protrusion platform(9)Multiple pile connecting poles are provided with region(7), all pile connecting poles(7)Bowing The circular array arrangement of apparent direction, pile connecting pole(7)Top is provided with pile(8), pile connecting pole(7)By ring flange with Pile(8)Bottom connects;Pile(8)External diameter is arranged with pile outer sleeve(12), in overlook direction, pile hole(1)Bottom surface sets Several are equipped with around pile(8)Axis carries out the auxiliary positioning bar of circular array arrangement(13), all auxiliary positioning bars(13)It is suitable It is secondary to use connection reinforcing bar A(131)Link together, all auxiliary positioning bars(13)All by connecting reinforcing bar B(132)It is connected to pile Outer sleeve(12)On, all auxiliary positioning bars(13)All by connecting reinforcing bar C(133)It is connected to pile hole(1)Four perisporiums on, Connection reinforcing bar C(133)Top pressure is cheated to pile(1)Four perisporiums on;
Connection steel bar column(5)Lower end extend to bottom concrete bodies(2)It is internal and with bottom concrete bodies(2)Internal reinforcing bar Cage is welded;
Upper left concrete bodies(3)With upper right concrete bodies(4)It is cuboid, upper left concrete bodies(3)With upper right concrete bodies (4)Symmetry arrangement forms square after being close to.
2. the ground pilework of the tower electric power support of Anti-inclining according to claim 1, it is characterised in that:Also include straight-flanked ring Rubber blanket(11), connect channel member(6)Positioned at straight-flanked ring rubber blanket(11)Central area, straight-flanked ring rubber blanket(11)By link slot Steel part(6)It is coated on inside it, straight-flanked ring rubber blanket(11)Top is provided with flute profile concrete bodies(10), flute profile concrete bodies (10)Open Side Down, flute profile concrete bodies(10)Notch be just crimped on straight-flanked ring rubber blanket(11)On, connect channel member (6)Positioned at flute profile concrete bodies(10)Vallecular cavity region in.
3. the ground pilework of the tower electric power support of Anti-inclining according to claim 1, it is characterised in that:Connection channel member (6)It is opening up.
4. the ground pilework of the tower electric power support of Anti-inclining according to claim 1, it is characterised in that:Upper left concrete bodies (3)Connection steel bar column(5)There are 16, upper right concrete bodies(4)Connection steel bar column(5)There are 16, upper left concrete bodies(3) 16 connection steel bar columns(5)Into the arrangement of the row of 2 row 8, upper right concrete bodies(4)16 connection steel bar columns(5)Into the row of 2 row 8 row Row.
CN201510909955.3A 2015-12-10 2015-12-10 The ground pilework of the tower electric power support of Anti-inclining Active CN105386456B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510909955.3A CN105386456B (en) 2015-12-10 2015-12-10 The ground pilework of the tower electric power support of Anti-inclining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510909955.3A CN105386456B (en) 2015-12-10 2015-12-10 The ground pilework of the tower electric power support of Anti-inclining

Publications (2)

Publication Number Publication Date
CN105386456A CN105386456A (en) 2016-03-09
CN105386456B true CN105386456B (en) 2017-05-31

Family

ID=55419189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510909955.3A Active CN105386456B (en) 2015-12-10 2015-12-10 The ground pilework of the tower electric power support of Anti-inclining

Country Status (1)

Country Link
CN (1) CN105386456B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962549B (en) * 2020-08-19 2021-10-08 山东金城建设有限公司 Anti-overturning construction method for existing tower crane under working condition of adjacent foundation pile

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5020357B2 (en) * 2010-06-30 2012-09-05 中国電力株式会社 Foundation construction method of tower structure and its foundation structure
CN103410368B (en) * 2013-08-30 2016-01-20 新疆兵团水利水电工程集团有限公司 For the vertical rod reinforcement means in soil excavation
CN203701104U (en) * 2014-01-23 2014-07-09 普瑞康建筑材料(临沂)有限公司 Connection structure for prefabricated open column and foundation pit
CN205276301U (en) * 2015-12-10 2016-06-01 国网四川省电力公司乐山供电公司 Power wire tower ground stake system prevents inclining

Also Published As

Publication number Publication date
CN105386456A (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN103074898A (en) Multi-row pile foundation pit support structure and construction method thereof
CN203669112U (en) Added-storey steel frame column base joint on top of multilayer concrete frame structure
CN102953385B (en) Construction method for changing support of foundation pit at irregular place of rampway
CN203487640U (en) Beam column connection T type node applied in top-down method
CN103437370A (en) Method and supporting structure for slip resisting and soil retaining of abrupt slope
CN104863177A (en) Composite retaining wall structure and construction method thereof
CN206554091U (en) The foundation ditch temporary support structures of anti-Nearby Structure foundation deformation
CN105386456B (en) The ground pilework of the tower electric power support of Anti-inclining
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN105350566B (en) Ground pile structure of tower type electric power support
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN203498839U (en) Foundation pit retaining structure for controlling deformation of existing building
CN209277090U (en) Withered phase cofferdam pile formula barricade
CN205242441U (en) Oval contrary shaft of doing of suspension type
CN106638622A (en) Foundation pit temporary supporting structure and foundation pit construction method for preventing adjacent building foundation from deforming
CN204676581U (en) A kind of rock foundation overhead power transmission line line pole tower and bracing wire novel foundation
CN201334668Y (en) Moso bamboo row pile
CN107448005B (en) Device for horizontally expanding existing underground space in non-excavation mode
CN205296200U (en) Power wire tower ground stake system
CN205276301U (en) Power wire tower ground stake system prevents inclining
CN205676899U (en) A kind of foundation ditch permanent support structure based on double bored concrete pile
CN104594375B (en) A kind of rock foundation overhead power transmission line line pole tower and guyed foundation and construction technology
CN208088311U (en) Back-pressure de-bowed type pile slab supporting structure after stake
CN207047868U (en) A kind of pattern foundation pit supporting structure barricade
CN202925551U (en) Foundation pit brace replacing and construction structure at irregular place of ramp

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant