CN105371355A - Floor heating water temperature control method and system - Google Patents

Floor heating water temperature control method and system Download PDF

Info

Publication number
CN105371355A
CN105371355A CN201410421781.1A CN201410421781A CN105371355A CN 105371355 A CN105371355 A CN 105371355A CN 201410421781 A CN201410421781 A CN 201410421781A CN 105371355 A CN105371355 A CN 105371355A
Authority
CN
China
Prior art keywords
floor
temperature difference
heating
optimized
floor heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410421781.1A
Other languages
Chinese (zh)
Other versions
CN105371355B (en
Inventor
钟文朝
曹浩
欧阳光
袁明征
黄娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201410421781.1A priority Critical patent/CN105371355B/en
Publication of CN105371355A publication Critical patent/CN105371355A/en
Application granted granted Critical
Publication of CN105371355B publication Critical patent/CN105371355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a floor heating water temperature control method and system. The method comprises the following steps that floor heating parameters are collected and comprise the floor material, the floor thickness and the floor heating pipe distributing distance; the water supply temperature is calculated according to the formula: T=Tc*m+(H-60)*T1-d*T2+C, and the floor heating is controlled for heating according to the water supply temperature; after the floor heating runs the preset first heating time according to the water supply temperature calculated in advance, the temperature difference of floors is detected; the indoor temperature difference between the indoor environment temperature and the preset indoor environment temperature is detected; and according to the floor temperature difference and the indoor temperature difference, the indoor temperature difference correction value and the floor material limitation factor are optimized, and the step of calculating the water supply temperature is executed repeatedly. Different water supply temperatures can be automatically set according to different materials, the temperature rising rate and the indoor comfort degree of the floors are guaranteed, the floors are prevented from being heated rapidly so that cracking can be prevented, and it is also prevented that temperature rising is low while the heating time is too long; and the indoor temperature difference correction value and the floor material limitation factor are optimized constantly, the indoor environment is more comfortable, and more energy is saved.

Description

Floor heating temperature control method of water and system
Technical field
The present invention relates to heating technology field, particularly relate to a kind of floor heating temperature control method of water and system.
Background technology
Floor heating has energy-conservation, indoor comfort advantages of higher, is just being widely used in indoor heating in winter.But because floor has unique thermal inertia, and different floor materials, the thermal inertia that it presents is different, makes floor heating different from common air-conditioning heating.Traditional floor heating, using supply water temperature as control object, and supply water temperature is just set by the user.There is following shortcoming in this kind of control: if the supply water temperature of setting is too high, then floor temperature can be too high and ftracture, and have uncomfortable, not energy-conservation shortcoming; If the supply water temperature of setting is too low, then heated up slowly in floor, and the heat time is long; Supply water temperature needs artificial setting, runs not intelligent; Supply water temperature is as unique control objectives, and its heating rate is uncontrollable, if heating rate is too fast, floor may be caused to ftracture, and when heating runs first, seems particularly important; There is no Long-distance Control cloud database, effectively the known more excellent ruuning situation for specifically sheet material matter can not be fed back to general control system, other looms not to be correlated with operational factor by Long-distance Control cloud database automatic acquisition, shorten self-regulating process.
Summary of the invention
Do not distinguish for traditional floor heating control method the problem that floor material supplies identical supply water temperature, the invention provides a kind of basis differently sheet material matter supply different supply water temperature and optimize floor heating temperature control method of water and the system of supply water temperature.
For reaching goal of the invention, the invention provides a kind of floor heating temperature control method of water, comprising the following steps:
Gather floor heating parameter, described floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch;
According to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with described Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value;
Floor heating according to precalculate the described supply water temperature T drawn run first preset heating duration t1 after, detect floor temperature difference T1;
Detect the difference of indoor environment temperature and default indoor environment temperature, be denoted as indoor temperature difference T2;
According to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m, and returns the step performing and calculate supply water temperature.
As a kind of embodiment, describedly according to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m, comprises the steps:
Judge whether the second described floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference;
If so, then according to described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m;
If not, then process is not optimized to described indoor temperature difference correction value and described floor material restriction factor.
As a kind of embodiment, describedly according to indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m, comprises the steps:
When described indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15;
As the described indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15;
As the described indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15;
When described indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
As a kind of embodiment, open in floor heating and run, and after gathering floor heating parameter, further comprising the steps of:
According to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature;
Detect the temperature gap Δ T of described initial supply water temperature and current position warm water temperature;
Described temperature gap is divided into n part, and every portion is Δ T/n;
The front 3rd of described floor heating heating is preset in heating duration t3, by described ground warm water temperature intensification Δ T/n in every t3/n time, after the t3 time, and floor heating heating according to described initial Water temperature control.
As a kind of embodiment, described according to formula T=T c* before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, further comprising the steps of:
The operational factor stored in the described floor heating parameter gathered and cloud database is compared;
If there is the operational factor that described floor heating parameter is corresponding in described cloud database, then control floor heating heating according to described operational factor;
If there is no the operational factor that described floor heating parameter is corresponding in described cloud database, then perform described according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates the step of initial supply water temperature;
According to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m described, and according to formula T=T c* after m+ (H-60) * T1-d*T2+C calculates supply water temperature, further comprising the steps of:
The described operational factor of described floor heating parameter and correspondence is stored in described cloud database.
The present invention also provides a kind of floor heating water temperature control system, comprises acquisition module, computing module, first detection module, the second detection module and optimization process module, wherein:
Described acquisition module, for gathering floor heating parameter, described floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch;
Described computing module, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with described Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value;
Described first detection module, for floor heating according to precalculate the described supply water temperature T drawn run first preset heating duration t1 after, detect floor temperature difference T1;
Described second detection module, for detecting the difference of indoor environment temperature and default indoor environment temperature, is denoted as indoor temperature difference T2;
Described optimization process module, for being optimized process according to described floor temperature difference T1 and described indoor temperature difference T2 to described indoor temperature difference correction value C and described floor material restriction factor m, and according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and returns described computing module.
As a kind of embodiment, described optimization process module comprises judging unit, for judging whether the second described floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference; If so, then according to described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m; If not, then process is not optimized to described indoor temperature difference correction value and described floor material restriction factor.
As a kind of embodiment, described judging unit comprises the first optimization subelement, and second optimizes subelement, and the 3rd optimizes subelement and the 4th optimizes subelement, wherein:
Described first optimizes subelement, for when described indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15;
Described second optimizes subelement, for as the described indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15;
Described 3rd optimizes subelement, for as the described indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15;
Described 4th optimizes subelement, for when described indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
As a kind of embodiment, also comprise initial supply water temperature module, the 3rd detection module, wait sub-module and intensification module, wherein:
Described initial supply water temperature module, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature;
Described 3rd detection module, for detecting the temperature gap Δ T of described initial supply water temperature and current position warm water temperature;
Described sub-module such as grade, for described temperature gap being divided into n part, every portion is Δ T/n;
Described intensification module, before heating for described floor heating, the 3rd presets in heating duration t3, by described ground warm water temperature intensification Δ T/n in every t3/n time period, after the t3 time, floor heating heating according to described initial Water temperature control.
As a kind of embodiment, also comprise compare of analysis module and memory module, wherein:
Described compare of analysis module, for described according to formula T=T c*, before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, the operational factor stored in the described floor heating parameter gathered and cloud database is compared; If there is the operational factor that described floor heating parameter is corresponding in described cloud database, then control floor heating heating according to described operational factor; If there is no the operational factor that described floor heating parameter is corresponding in described cloud database, then enter described initial supply water temperature module;
Described memory module, for being optimized process according to described floor temperature difference T1 and described indoor temperature difference T2 to described indoor temperature difference correction value C and described floor material restriction factor m described, and according to formula T=T c*, after m+ (H-60) * T1-d*T2+C calculates supply water temperature, the described operational factor of described floor heating parameter and correspondence is stored in described cloud database.
Beneficial effect of the present invention comprises:
Floor heating temperature control method of water of the present invention and system, gather floor heating parameter, according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, heat with Water temperature control floor heating, after heating duration is preset in heating first, second presets heating duration comes into effect, detect the floor temperature difference of all sense cycle, detect indoor environment temperature and calculate the indoor temperature difference of indoor environment temperature and default indoor environment temperature, and according to the floor temperature difference and indoor temperature, process is optimized to indoor temperature difference correction value and floor material restriction factor, the indoor temperature difference correction value optimized and floor material restriction factor are substituted into formula T=T c* the supply water temperature of m+ (H-60) * T1-d*T2+C calculation optimization, and with the Water temperature control floor heating optimized heating.It can realize automatically setting different supply water temperatures according to unlike material, ensures floor heating rate and indoor comfort degree; Automatically control heating rate according to differently sheet material matter, prevention floor is heated too fast and ftractures, and also prevents from heating up slowly and causing the heat time long simultaneously.In control floor heating with in the supply water temperature heating process automatically set, continue to optimize indoor temperature difference correction value and floor material restriction factor, and then optimize supply water temperature, make indoor environment more comfortable, and more energy-conservation.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of an embodiment of floor heating temperature control method of water of the present invention;
Fig. 2 is the schematic flow sheet of another embodiment of floor heating temperature control method of water of the present invention;
Fig. 3 is the structural representation of an embodiment of floor heating water temperature control system of the present invention.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, floor heating temperature control method of water of the present invention and system are further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Shown in Figure 1, the embodiment of the present invention provides a kind of floor heating temperature control method of water, comprises the following steps:
S100, gather floor heating parameter, floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch.
S200, according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value.
S300, after running the t1 time, detects floor temperature difference T1.
S400, detects the difference of indoor environment temperature and default indoor environment temperature, is denoted as indoor temperature difference T2.
S500, is optimized process according to floor temperature difference T1 and indoor temperature difference T2 to indoor temperature difference correction value C and floor material restriction factor m, returns step S200.
Floor heating temperature control method of water of the present invention, user inputs the floor material M of current indoor environment by human-computer interaction interface (line control machine), floor thick-ness H, floor heating pipe stringing space D, and selected " warm water temperature pre-setting function automatically ", now more manually supply water temperature can not be set.Start ground warm water temperature pre-setting function automatically, the controller of floor heating gathers the floor heating parameter of user's input, according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates the supply water temperature of above-mentioned floor heating parameter automatically, feeds back to heating part by heating part Automatic-heating, after being heated to supply water temperature, controlling floor heating and heats with this supply water temperature.Wherein heating part includes but not limited to frequency-changeable compressor, frequency conversion fan, and variable firepower is coal-fired, burnt gas wall hanging furnace, and adjusting shift exports heating etc.Floor heating presets heating duration t1 with supply water temperature heating first, and the first default heating duration t1 is a long time, and the abundant intensification of assure feed water temperature and supply water temperature are to the abundant heating on floor.After heating duration t1 is preset in heating first, floor detecting element (as floor temperature survey meter) detects floor temperature difference T1, and presets heating duration t2 for time-count cycle with second.Wherein the second default heating duration t2 comes into effect after floor heating heating reaches the first default heating duration t1, and it is a shorter time.Preset in heating duration t2 second, a floor surface temperature is detected every a sense cycle, and the floor temperature difference (floor surface temperature of current detection deducts the floor surface temperature detected last time) calculated in each sense cycle, detecting element can not all detect all the time, each detection and next time detect between have certain time interval, be defined as sense cycle.Multiple continuous print sense cycle is comprised in second default heating duration.Preset second the floor temperature difference T1 detecting multiple sense cycle in heating duration t2 (time-count cycle), effectively can eliminate metrical error.Detector unit (as indoor temperature temperature-sensitive bag) detects indoor environment temperature, calculate the indoor temperature difference T2 of indoor environment temperature and default indoor environment temperature, indoor temperature difference correction value C and floor material restriction factor m is optimized according to floor temperature difference T1 and indoor temperature Δ T2, return step S200, continue to calculate supply water temperature, and heat with this Water temperature control floor heating.It can realize automatically supplying different supply water temperature according to differently sheet material matter, ensures floor heating rate and indoor comfort degree, prevents floor to be heated too fast and cracking or be heated slow and the heat time is long; In control floor heating with in the supply water temperature heating process automatically set, continue to optimize indoor temperature difference correction value C and floor material restriction factor m, and then optimize supply water temperature, make indoor environment more comfortable, and more energy-conservation.
It should be noted that, T is supply water temperature, and its least unit is 0.5 DEG C, T cfor standard floor heating supply water temperature (preferred empirical value is 45 DEG C); M is floor material restriction factor (obtained by great many of experiments, prestore in the controller, preferred empirical value is 1.15); H is floor thick-ness (scope is [20,80], and unit is mm, and system default is 60mm); T1 is floor thick-ness correction temperature (preferred empirical value is 0.1); D is floor heating pipe cloth tube pitch modifying factor, and D is that (scope is [10,30] to floor heating pipe cloth tube pitch, and unit is mm, system default 17.5), when D ∈ [10,12.5), d=1.2, when D ∈ [12.5,15), d=1.1, as D ∈ [15,17.5), d=1.0, when D ∈ [17.5,20), d=0.9, when D ∈ [20,22.5), d=-0.9, when D ∈ [22.5,30), d=-1.0; T2 is floor heating pipe cloth tube pitch correction temperature (preferred empirical value is 1.5); C is indoor temperature difference correction value (scope is [-2,5], is defaulted as 0); Floor material M comprises simplex concrete floor, timber floor, ceramic tile, marble, other (being defaulted as timber floor).
As a kind of embodiment, shown in Figure 2, step S500 comprises the steps:
S510, judges whether the second floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference.
S511, is if so, then optimized process according to described indoor temperature difference T2 to indoor temperature difference correction value C and floor material restriction factor m.
S511, if not, is not then optimized process to indoor temperature difference correction value C and floor material restriction factor m.
After heating duration t1 is preset in floor heating heating first, second presets heating duration t2 (time-count cycle) comes into effect, within a time-count cycle (namely continue second presets heating duration t2), floor detecting element detects the floor temperature difference of the multiple sense cycle of continuous print, judge whether the second all floors temperature difference preset in heating duration t2 continued all is less than or equal to the default floor temperature difference, if preset floor temperature difference T1 in heating duration t2 continue second to have and be greater than the default floor temperature difference, explanatorily plate temperature is unstable, floor temperature is unstable, indoor environment temperature change greatly, now process is not optimized to indoor temperature difference correction value C and floor material restriction factor m, continue to detect the floor temperature difference and the indoor temperature difference, if preset floor temperature difference T1 in heating duration t2 continue second be all less than the default floor temperature difference, floor temperature is stablized, indoor environment is relatively stable, according to indoor temperature difference T2, process is optimized to indoor temperature difference correction value C and floor material restriction factor m, make indoor environment more comfortable, and more energy-conservation.
In order to more clearly explain the implementation process of this embodiment, being described, what deserves to be explained is below in conjunction with concrete parameter, the parameter in embodiment only for explaining this embodiment, and is not used in this embodiment of restriction:
If the second default heating duration t2 is 2min, sense cycle is 40s, after heating duration 30min is preset in floor heating heating first, floor detecting element detects floor surface temperature at once, a floor surface temperature is detected again after sense cycle 40s, calculate the floor temperature difference T11 of floor surface temperature in 40s, judge whether Δ T11 is less than or equal to the default floor temperature difference, after 40s, detect floor surface temperature again, calculate floor temperature difference T12 in 40s, judge whether Δ T12 is less than or equal to the default floor temperature difference, the rest may be inferred, detect a floor surface temperature every 40s later, calculate floor temperature difference T1n in 40s, and judge whether Δ T1n is less than or equal to the default floor temperature difference.When judging that in continuous print 3 40s (namely second presetting heating duration 2min), the floor temperature difference is all less than or equal to the default floor temperature difference, then judge that floor temperature difference T1 satisfies condition, then carry out the step according to indoor temperature difference T2, described indoor temperature difference correction value C and described floor material restriction factor m being optimized to process.Wherein: second presets heating duration t2 timing from detecting the time point of floor surface temperature at every turn.
As a kind of embodiment, step S511 comprises the steps:
When indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15.
As the indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15.
As the indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15.
When indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
When above-described embodiment is optimized process, comprise the optimization of indoor temperature difference correction value C and the optimization to flooring board matter restriction factor m.When wherein optimizing indoor temperature difference correction value C, its optimal value is divided into four kinds of situations, is respectively when Δ T2≤-2 DEG C, is optimized for C=-Δ T2*1.2; As-2 DEG C of < Δ T2<0 DEG C, be optimized for C=-Δ T2*0.8; As 0 DEG C≤Δ T2<1 DEG C, be optimized for C=0; When Δ T2>=1 DEG C, be optimized for C=-Δ T2*1.5; After optimization, according to formula T=T c* the supply water temperature after m+ (H-60) * T1-d*T2+C calculation optimization, and control floor heating by the supply water temperature heating after optimization, make indoor environment more comfortable, and more energy-conservation.After this suboptimization, when meeting the condition of the above-mentioned floor temperature difference, detect once the indoor temperature difference every preset time t 4, and upgrade once indoor temperature difference correction value C according to indoor temperature difference T2, real-time update supply water temperature.At the end of this floor heating heating, preserve the last indoor temperature difference correction value C upgraded, when upper once floor heating start heating, directly carry out assignment with the indoor temperature difference correction value C of the last renewal of preserving, calculate supply water temperature, reduce the optimization time.
When user inputs floor heating parameter, floor material have selected " other ", then when starting shooting first, floor material is defaulted as " timber floor ", comprehensively other parameters, and calculate the supply water temperature heated first, when heating first, indoor temperature difference correction value is defaulted as 0.After heating duration is preset in heating first, when judging that the second floor temperature difference T1 preset in heating duration continued all is less than or equal to the default floor temperature difference, flooring board matter restriction factor m is optimized, its optimal value is divided into situation in four, be respectively when Δ T2≤-2 DEG C, be optimized for m=-(Δ T2+2)/10+1.15; As-2 DEG C of < Δ T2<0 DEG C, be optimized for m=-(Δ T2+2)/10*0.9+1.15; As 0 DEG C≤Δ T2<1 DEG C, be optimized for m=1.15; When Δ T2 >=1 DEG C, be optimized for m=-(Δ T2-1)/10+1.15; Optimally sheet material matter restriction factor m, makes supply water temperature supply water by the temperature meeting most this floor material, will floor be caused because temperature rise is too fast to ftracture, and also the heat time will be made long because temperature rise is crossed slow.After floor material restriction factor m optimizes, according to formula T=T c* the supply water temperature after m+ (H-60) * T1-d*T2+C calculation optimization, and control floor heating by the supply water temperature heating after optimization, make indoor environment temperature more comfortable, and more energy-conservation.After this suboptimization, when meeting the condition of the above-mentioned floor temperature difference, the indoor temperature difference is detected once every preset time t 4, and upgrade a floor material restriction factor m according to the indoor temperature difference, so that real-time update supply water temperature, supply water temperature is supplied water with the temperature of the most coincidently sheet material matter, in heating process, ensures that floor material is not damaged all the time, and make indoor environment temperature comfortable, simultaneously more energy-conservation.At the end of floor heating heats first, preserve the last floor material restriction factor upgraded, as floor material restriction factor (indoor floor is generally infrequently changed) on this new floor, reduce the optimization time.
As a kind of embodiment, open in floor heating and run, and after gathering floor heating parameter, further comprising the steps of:
S110, according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature;
S120, detects the temperature gap Δ T of initial supply water temperature and current position warm water temperature.
S130, is divided into n part by temperature gap, every portion is Δ T/n.
S140, the front 3rd of floor heating heating is preset in heating duration t3, by ground warm water temperature intensification Δ T/n in every t3/n time, after the t3 time, according to initial Water temperature control floor heating heating.
Local HVAC is crossed after artificial setting or above-mentioned floor heating pre-setting function automatically obtain initial supply water temperature, detection floor heating has just started ground warm water temperature when heating, and calculate the temperature gap Δ T of initial supply water temperature and current position warm water temperature, this temperature gap is divided into n part, every portion is Δ T/n, in the 3rd default heating duration t3 that floor heating has just started to heat, by ground warm water temperature intensification Δ T/n in every t3/n time, after ground warm water temperature is warming up to initial supply water temperature, with initial Water temperature control floor heating heating.Its Quick uniform that can realize ground warm water temperature heats up, and will be split in floor because intensification is too fast, also heating duration will be made long because of crossing slow.Heat and the 3rd to preset after heating duration t3, after ground warm water temperature reaches initial heating water temperature, remove above-mentioned control, ground warm water temperature heats according to initial supply water temperature, first presets heating duration t1 starts timing, carry out step S200, after heating duration is preset in floor heating heating first, ensure that water temperature plays one's part to the full if having time, according to the floor temperature difference and the indoor temperature difference, indoor temperature difference correction value C and floor material display factor m is optimized, realize the Automatic Optimal of supply water temperature, improve indoor environment comfortableness, reduce energy waste.
As a kind of embodiment, according to formula T=T c* before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, further comprising the steps of:
S100 ', compares the operational factor stored in the floor heating parameter of collection and cloud database.
S200 ', if the operational factor having floor heating parameter corresponding in cloud database, then controls floor heating heating according to operational factor.
S110, if the operational factor not having floor heating parameter corresponding in cloud database, then performs according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates the step of initial supply water temperature.
According to floor temperature difference T1 and indoor temperature difference T2, process is being optimized to indoor temperature difference correction value C and floor material restriction factor m, and according to formula T=T c* after m+ (H-60) * T1-d*T2+C calculates supply water temperature, further comprising the steps of:
S600, is stored in the operational factor of floor heating parameter and correspondence in described cloud database.
Before automatically setting supply water temperature according to floor heating parameter, first judge whether have operational factor corresponding to this floor heating parameter in cloud database, if the operational factor that in cloud database, this floor heating parameter existing is corresponding, then directly utilize the relevant operational factor of its correspondence to control, shorten the process of setting automatically and optimization supply water temperature.If the operational factor that in cloud database, this floor heating parameter is not corresponding, then carry out step S110, enter " warm water temperature pre-setting function automatically ".Carrying out time " warm water temperature pre-setting function automatically ", by the different models that floor heating parameters combination is formed, automatically supply water temperature is calculated according to floor heating parameter, and the indoor temperature difference correction value C optimized when the different floors temperature difference and the indoor temperature difference and floor material restriction factor m is transferred to cloud database by network savvy, and be stored in cloud database, facilitate floor heating again to open or other floor heatings heating time directly from the data of high in the clouds, obtain relevant operational factor, control heating, shorten and automatically set optimizing process.
Based on same inventive concept, present invention also offers a kind of floor heating water temperature control system, the principle of dealing with problems due to this system is similar to aforementioned a kind of floor heating temperature control method of water, and therefore the enforcement of this system see the enforcement of preceding method, can repeat part and repeat no more.
The floor heating water temperature control system that the embodiment of the present invention provides, shown in Figure 3, comprise acquisition module 100, computing module 200, first detection module 300, the second detection module 400 and optimization process module 500, wherein: acquisition module 100, for gathering floor heating parameter, floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch.Computing module 200, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value.First detection module 300, for floor heating according to precalculate the supply water temperature T that draws run first preset heating duration t1 after, detect floor temperature difference T1.Second detection module 400, for detecting the difference of indoor environment temperature and default indoor environment temperature, is denoted as indoor temperature difference T2.Optimization process module 500, for being optimized process according to floor temperature difference T1 and indoor temperature difference T2 to indoor temperature difference correction value C and floor material restriction factor m, and returns computing module 200.
Floor heating water temperature control system of the present invention, user, by line control machine input floor heating parameter, starts " warm water temperature pre-setting function automatically ", after obtaining floor heating parameter, according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, heat with Water temperature control floor heating, after heating is preset in heating first, second presets heating duration comes into effect, detect the floor temperature difference, this floor temperature difference is the difference of the floor surface temperature every sense cycle, multiple continuous print sense cycle is comprised in second default heating duration, detect indoor environment temperature and calculate the indoor temperature difference of indoor environment temperature and default indoor environment temperature, according to the floor temperature difference and indoor temperature, process is optimized to indoor temperature difference correction value C and floor material restriction factor m, indoor temperature difference correction value C after optimization and floor material restriction factor m is substituted into formula T=T c* the supply water temperature of m+ (H-60) * T1-d*T2+C calculation optimization, and control floor heating by the supply water temperature heating optimized.It can set different supply water temperatures automatically according to unlike material, ensures floor heating rate and indoor comfort degree; Automatically control heating rate according to differently sheet material matter, prevention floor is heated too fast and ftractures, and also prevents from heating up slowly and causing the heat time long simultaneously.In control floor heating with in the supply water temperature heating process automatically set, continue to optimize indoor temperature difference correction value and floor material restriction factor, and then optimize supply water temperature, make indoor environment more comfortable, and more energy-conservation.
As a kind of embodiment, optimization process module 500 comprises judging unit 510, for judging whether the second floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference; If so, then according to indoor temperature difference T2, process is optimized to indoor temperature difference correction value C and floor material restriction factor m; If not, then process is not optimized to indoor temperature difference correction value and floor material restriction factor.
As a kind of embodiment, judging unit 510 comprises the first optimization subelement 511, second and optimizes subelement the 512, three optimization subelement 513 and the 4th optimization subelement 514.Wherein: first optimizes subelement 511, for when described indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15.Second optimizes subelement 512, for as the indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15.3rd optimizes subelement 513, for as the indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15.4th optimizes subelement 514, for when indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
As a kind of embodiment, also comprise initial supply water temperature module the 110, three detection module 120, wait sub-module 130 and intensification module 140.Wherein: initial supply water temperature module 110, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature.3rd detection module 120, for detecting the temperature gap Δ T of initial supply water temperature and current position warm water temperature.Deng sub-module 130, for temperature gap is divided into n part, every portion is Δ T/n.Intensification module 140, in the 3rd default heating duration t3 before floor heating heating, by ground warm water temperature intensification Δ T/n in every t3/n time period, after the t3 time, according to initial Water temperature control floor heating heating.
As a kind of embodiment, also comprise compare of analysis module 100 ' and memory module 600.Wherein: compare of analysis module 110 ', for according to formula T=T c*, before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, the operational factor stored in the floor heating parameter of collection and cloud database is compared; If there is the operational factor that floor heating parameter is corresponding in cloud database, then control floor heating heating according to operational factor; If there is no the operational factor that floor heating parameter is corresponding in cloud database, then enter initial supply water temperature module 110.Memory module 600, for being optimized process according to floor temperature difference T1 and indoor temperature difference T2 to indoor temperature difference correction value C and floor material restriction factor m, and according to formula T=T c*, after m+ (H-60) * T1-d*T2+C calculates supply water temperature, the operational factor of floor heating parameter and correspondence is stored in described cloud database.
The above embodiment only have expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (10)

1. a floor heating temperature control method of water, is characterized in that, comprises the following steps:
Gather floor heating parameter, described floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch;
According to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with described Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value;
Floor heating according to precalculate the described supply water temperature T drawn run first preset heating duration t1 after, detect floor temperature difference T1;
Detect the difference of indoor environment temperature and default indoor environment temperature, be denoted as indoor temperature difference T2;
According to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m, and returns the step performing and calculate supply water temperature.
2. floor heating temperature control method of water according to claim 1, it is characterized in that, describedly according to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m, comprises the steps:
Judge whether the second described floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference;
If so, then according to described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m;
If not, then process is not optimized to described indoor temperature difference correction value and described floor material restriction factor.
3. floor heating temperature control method of water according to claim 2, is characterized in that, is describedly optimized process according to indoor temperature difference T2 to described indoor temperature difference correction value C and described floor material restriction factor m, comprises the steps:
When described indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15;
As the described indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15;
As the described indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15;
When described indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
4. the floor heating temperature control method of water according to any one of claims 1 to 3, is characterized in that, opens run in floor heating, and after gathering floor heating parameter, further comprising the steps of:
According to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature;
Detect the temperature gap Δ T of described initial supply water temperature and current position warm water temperature;
Described temperature gap is divided into n part, and every portion is Δ T/n;
The front 3rd of described floor heating heating is preset in heating duration t3, by described ground warm water temperature intensification Δ T/n in every t3/n time, after the t3 time, and floor heating heating according to described initial Water temperature control.
5. floor heating temperature control method of water according to claim 4, is characterized in that, described according to formula T=T c* before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, further comprising the steps of:
The operational factor stored in the described floor heating parameter gathered and cloud database is compared;
If there is the operational factor that described floor heating parameter is corresponding in described cloud database, then control floor heating heating according to described operational factor;
If there is no the operational factor that described floor heating parameter is corresponding in described cloud database, then perform described according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates the step of initial supply water temperature;
According to described floor temperature difference T1 and described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m described, and according to formula T=T c* after m+ (H-60) * T1-d*T2+C calculates supply water temperature, further comprising the steps of:
The described operational factor of described floor heating parameter and correspondence is stored in described cloud database.
6. a floor heating water temperature control system, is characterized in that, comprises acquisition module, computing module, first detection module, the second detection module and optimization process module, wherein:
Described acquisition module, for gathering floor heating parameter, described floor heating parameter comprises floor material, floor thick-ness and floor heating pipe cloth tube pitch;
Described computing module, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates supply water temperature, and with described Water temperature control floor heating heating, wherein, T is supply water temperature, T cfor standard floor heating supply water temperature, m is floor material restriction factor, and H is floor thick-ness, and T1 is floor thick-ness correction temperature, and d is floor heating pipe cloth tube pitch modifying factor, and T2 is floor heating pipe cloth tube pitch correction temperature, and C is indoor temperature difference correction value;
Described first detection module, for floor heating according to precalculate the described supply water temperature T drawn run first preset heating duration t1 after, detect floor temperature difference T1;
Described second detection module, for detecting the difference of indoor environment temperature and default indoor environment temperature, is denoted as indoor temperature difference T2;
Described optimization process module, for being optimized process according to described floor temperature difference T1 and described indoor temperature difference T2 to described indoor temperature difference correction value C and described floor material restriction factor m, and returns described computing module.
7. floor heating water temperature control system according to claim 6, is characterized in that, described optimization process module comprises judging unit, for judging whether the second described floor temperature difference T1 preset in heating duration t2 is all less than or equal to the default floor temperature difference; If so, then according to described indoor temperature difference T2, process is optimized to described indoor temperature difference correction value C and described floor material restriction factor m; If not, then process is not optimized to described indoor temperature difference correction value and described floor material restriction factor.
8. floor heating water temperature control system according to claim 7, is characterized in that, described judging unit comprises the first optimization subelement, and second optimizes subelement, and the 3rd optimizes subelement and the 4th optimizes subelement, wherein:
Described first optimizes subelement, for when described indoor temperature difference T2≤-2 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.2, floor material restriction factor m is optimized for m=-(Δ T2+2)/10+1.15;
Described second optimizes subelement, for as the described indoor temperature difference-2 DEG C of < Δ T2<0 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*0.8, floor material restriction factor m is optimized for m=-(Δ T2+2)/10*0.9+1.15;
Described 3rd optimizes subelement, for as the described indoor temperature difference 0 DEG C≤Δ T2<1 DEG C, indoor temperature difference correction value C is optimized for C=0, floor material restriction factor m is optimized for m=1.15;
Described 4th optimizes subelement, for when described indoor temperature difference T2 >=1 DEG C, indoor temperature difference correction value C is optimized for C=-Δ T2*1.5, floor material restriction factor m is optimized for m=-(Δ T2-1)/10+1.15.
9. the floor heating water temperature control system according to any one of claim 6 to 8, is characterized in that, also comprises initial supply water temperature module, and the 3rd detection module waits sub-module and intensification module, wherein:
Described initial supply water temperature module, for according to formula T=T c* m+ (H-60) * T1-d*T2+C calculates initial supply water temperature;
Described 3rd detection module, for detecting the temperature gap Δ T of described initial supply water temperature and current position warm water temperature;
Described sub-module such as grade, for described temperature gap being divided into n part, every portion is Δ T/n;
Described intensification module, before heating for described floor heating, the 3rd presets in heating duration t3, by described ground warm water temperature intensification Δ T/n in every t3/n time period, after the t3 time, floor heating heating according to described initial Water temperature control.
10. floor heating water temperature control system according to claim 9, is characterized in that, also comprises compare of analysis module and memory module, wherein:
Described compare of analysis module, for described according to formula T=T c*, before m+ (H-60) * T1-d*T2+C calculates initial supply water temperature, the operational factor stored in the described floor heating parameter gathered and cloud database is compared; If there is the operational factor that described floor heating parameter is corresponding in described cloud database, then control floor heating heating according to described operational factor; If there is no the operational factor that described floor heating parameter is corresponding in described cloud database, then enter described initial supply water temperature module;
Described memory module, for being optimized process according to described floor temperature difference T1 and described indoor temperature difference T2 to described indoor temperature difference correction value C and described floor material restriction factor m described, and according to formula T=T c*, after m+ (H-60) * T1-d*T2+C calculates supply water temperature, the described operational factor of described floor heating parameter and correspondence is stored in described cloud database.
CN201410421781.1A 2014-08-25 2014-08-25 Floor heating temperature control method of water and system Active CN105371355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410421781.1A CN105371355B (en) 2014-08-25 2014-08-25 Floor heating temperature control method of water and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410421781.1A CN105371355B (en) 2014-08-25 2014-08-25 Floor heating temperature control method of water and system

Publications (2)

Publication Number Publication Date
CN105371355A true CN105371355A (en) 2016-03-02
CN105371355B CN105371355B (en) 2018-01-16

Family

ID=55373783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410421781.1A Active CN105371355B (en) 2014-08-25 2014-08-25 Floor heating temperature control method of water and system

Country Status (1)

Country Link
CN (1) CN105371355B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104864480A (en) * 2014-02-24 2015-08-26 珠海格力电器股份有限公司 Method for debugging floor heating system adopting air-source heat pump
CN107560099A (en) * 2017-07-10 2018-01-09 珠海格力电器股份有限公司 The control method and device of residential central air- unit
CN112097306A (en) * 2020-08-10 2020-12-18 珠海格力电器股份有限公司 Temperature difference control method, device and system and water heater
CN114440297A (en) * 2022-01-12 2022-05-06 深圳市紫衡技术有限公司 Energy-saving control method, system, equipment and medium for heating system
CN115371303A (en) * 2022-07-14 2022-11-22 浙江中广电器集团股份有限公司 EVI waterless floor heating multi-split control method based on floor material temperature control

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62202960A (en) * 1986-02-10 1987-09-07 フル−イツドマスタ− インコ−ポレ−テツド Warm-water heating controller
CN2382985Y (en) * 1999-02-05 2000-06-14 方明道 Electronic automatic constant temperature controller for room
CN202416784U (en) * 2011-12-30 2012-09-05 广州市番禺康达木业有限公司 Novel solid wood floor
CN202868851U (en) * 2012-10-15 2013-04-10 虞仕洁 Floor heating water mixing temperature control center
CN202882310U (en) * 2012-06-21 2013-04-17 谢章仁 Self-heating floor board
CN103180670A (en) * 2011-10-25 2013-06-26 松下电器产业株式会社 Heating system and method for controlling heating system
CN103912914A (en) * 2014-04-22 2014-07-09 珠海格力电器股份有限公司 Floor heating control method
KR101500943B1 (en) * 2013-06-28 2015-03-10 린나이코리아 주식회사 Method for controlling combustion of boiler using temperature sensor for supplying and returing hot water

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62202960A (en) * 1986-02-10 1987-09-07 フル−イツドマスタ− インコ−ポレ−テツド Warm-water heating controller
CN2382985Y (en) * 1999-02-05 2000-06-14 方明道 Electronic automatic constant temperature controller for room
CN103180670A (en) * 2011-10-25 2013-06-26 松下电器产业株式会社 Heating system and method for controlling heating system
CN202416784U (en) * 2011-12-30 2012-09-05 广州市番禺康达木业有限公司 Novel solid wood floor
CN202882310U (en) * 2012-06-21 2013-04-17 谢章仁 Self-heating floor board
CN202868851U (en) * 2012-10-15 2013-04-10 虞仕洁 Floor heating water mixing temperature control center
KR101500943B1 (en) * 2013-06-28 2015-03-10 린나이코리아 주식회사 Method for controlling combustion of boiler using temperature sensor for supplying and returing hot water
CN103912914A (en) * 2014-04-22 2014-07-09 珠海格力电器股份有限公司 Floor heating control method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104864480A (en) * 2014-02-24 2015-08-26 珠海格力电器股份有限公司 Method for debugging floor heating system adopting air-source heat pump
CN104864480B (en) * 2014-02-24 2018-09-11 珠海格力电器股份有限公司 The adjustment method of Floor Heating System with Air Source Heat Pump
CN107560099A (en) * 2017-07-10 2018-01-09 珠海格力电器股份有限公司 The control method and device of residential central air- unit
CN112097306A (en) * 2020-08-10 2020-12-18 珠海格力电器股份有限公司 Temperature difference control method, device and system and water heater
CN112097306B (en) * 2020-08-10 2021-09-28 珠海格力电器股份有限公司 Temperature difference control method, device and system and water heater
CN114440297A (en) * 2022-01-12 2022-05-06 深圳市紫衡技术有限公司 Energy-saving control method, system, equipment and medium for heating system
CN114440297B (en) * 2022-01-12 2023-08-18 深圳市紫衡技术有限公司 Energy-saving control method, system, equipment and medium for heating system
CN115371303A (en) * 2022-07-14 2022-11-22 浙江中广电器集团股份有限公司 EVI waterless floor heating multi-split control method based on floor material temperature control

Also Published As

Publication number Publication date
CN105371355B (en) 2018-01-16

Similar Documents

Publication Publication Date Title
CN105371355A (en) Floor heating water temperature control method and system
CN106642303B (en) Heating control system and method
CN102466296B (en) Defrosting control method applied to heat pump air conditioning unit
CN105352190B (en) The energy-saving control method of solar energy, heat pump and the compound hot-water heating system of three kinds of energy of combustion gas
CN106016760A (en) Energy-saving control method for self-adaptation frequency-conversion heat pump hot water heating system
CN104390312B (en) A kind of air-conditioning assistor electrical heating operation method
CN102374665B (en) A kind of automatic temperature control system of central fuel gas water heating device and method
CN104879876A (en) Air conditioner control method and air conditioner
RU2403509C2 (en) System of combined boilers, device for control of combined boilers, method for installation and operation of network of serially connected boilers
CN102607138B (en) Air-conditioning control method and air-conditioning control system for comprehensively-energy-saving building
CN103644628B (en) A kind of energy-saving method for air conditioner and device
CN106642729A (en) Gas water heater and method for adjusting hot water temperature of gas water heater
CN104962727A (en) Continuous annealing furnace heating section furnace-temperature control system and method
WO2018214704A1 (en) Method and apparatus for controlling air conditioner
CN109237798B (en) Control method of gas combustion device and gas combustion device
CN102538069A (en) Intelligent electric heating pre-controlling method
CN105371498A (en) Automatic control method for air energy water heater
CN105091050A (en) Control system and method for commercial electromagnetic soup furnace
CN105650812A (en) Control method for indoor fan of air conditioner and air conditioner
CN104165406B (en) Heating system of automatic energy-saving wall hanging stove and energy saving method thereof
KR101240478B1 (en) Boiler control method
CN105402895A (en) Intelligent energy-saving control method for air source heat pump water heater
CN110043949B (en) Complementary optimization self-heating intelligent regulation and control energy-saving system and method
CN204388219U (en) A kind of municipal heating systems heat exchange station control system
CN104266239A (en) Control method and system of microwave oven

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant