CN105369974A - prefabricated hollow slab core-buried pore-forming tube - Google Patents

prefabricated hollow slab core-buried pore-forming tube Download PDF

Info

Publication number
CN105369974A
CN105369974A CN201510641525.8A CN201510641525A CN105369974A CN 105369974 A CN105369974 A CN 105369974A CN 201510641525 A CN201510641525 A CN 201510641525A CN 105369974 A CN105369974 A CN 105369974A
Authority
CN
China
Prior art keywords
pore
hollow slab
tube
precast hollow
fin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510641525.8A
Other languages
Chinese (zh)
Inventor
李昌州
陈定球
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Minsheng Zhuyou Co Ltd
Original Assignee
China Minsheng Zhuyou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Minsheng Zhuyou Co Ltd filed Critical China Minsheng Zhuyou Co Ltd
Priority to CN201510641525.8A priority Critical patent/CN105369974A/en
Publication of CN105369974A publication Critical patent/CN105369974A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/06Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention provides a prefabricated hollow slab core-buried pore-forming tube. The prefabricated hollow slab core-buried pore-forming tube comprises a tube body which is a penetrating hollow tube, and the tube body is formed by assembling multiple sheet bars. In this way, when the tube body is the penetrating hollow tube which is applied to the interior of a prefabricated hollow slab, the ends of the hollow tube are in a penetrating mode, the penetrating hollow tube better facilitates producing of the prefabricated hollow slab through a vertical mold, if a support core-pulling mold is further arranged in the hollow tube, after concrete pouring is completed, the support core-pulling mold is pulled out, and therefore the thickness of the pore-forming tube wall can be greatly decreased. In addition, due to the fact that the tube body is formed by assembling the multiple sheet bars, transportation and storage of the pore-forming tube are convenient, and transportation and storage in a split mode can save a large amount of space; meanwhile, the sources of the materials of the pore-forming tube are wide, waste construction bamboo and wood formworks can be adopted to be cut, assembled and connected through nails to form the pore-forming tube, or boards such as calcium silicate boards and gypsum boards which are low in cost can be utilized to be cut, assembled and connected to form the pore-forming tube, reduction of the cost of the pore-forming tube is facilitated, and application and promotion are easy.

Description

A kind of precast hollow slab buries core pore-forming pipe
Technical field
The present invention relates to a kind of building unit, particularly a kind of precast hollow slab buries core pore-forming pipe.
Background technology
China's Urbanization Construction is fast-developing, and construction scope ranks first in the world.Current, industrialization of construction industry is extremely urgent, and builing industry green construction transition, energy-saving and emission-reduction in building course, manufacture the precast hollow slab with superior structural performance, extremely need in order to build assembled architecture.
At present, the reinforced concrete floor of domestic employing has cast-in-situ floor and precast hollow slab floor, cast-in-situ floor good integrity, but needs on-the-spot formwork, then concreting, construction period difficulty is large, and template loss is large, and cost is high, and prefabricated building hollowcore slab does not need on-the-spot formwork, short construction period, cost is low, is therefore widely used in all kinds of building.
Such as, be: in the application documents of CN201320705360.2 that disclose a kind of full prefabricated hollow floor, comprise floor main body, floor main body comprises bottom, hollow device and top layer, is hollow device between bottom and top layer at number of patent application; Bottom is that the baseplate reinforcing bar of layer of concrete and top colligation thereof is formed; Top layer is roof steel bar, and concreting layer is formed.This full prefabricated hollow floor is owing to forming cavity at intralamellar part, and alleviate the weight of floor self, comparing laminated floor slab does not also need second pouring, environmental protection and save the duration, but the hollow device of this floor is overall structure, takies larger space during transport, and cost of transportation is higher.
Summary of the invention
The technical problem to be solved in the present invention is: provide a kind of precast hollow slab to bury core pore-forming pipe, takies larger space, the problem that cost of transportation is higher, thus reduce costs when it can solve the hollow device transport in precast hollow slab.
Solution of the present invention is achieved in that a kind of precast hollow slab buries core pore-forming pipe, comprises body, and described body is through hollow section, and described body is assembled by some plates.So, when body is through hollow section, when hollow section is applied in precast hollow slab, its end is through, through hollow section advantageously produces precast hollow slab in formwork erection, to loose core mould, if also arrange support in hollow section after pouring concrete completes, mould of support being loosed core is extracted out, so, significantly can reduce pore-forming tube wall thickness, pore-forming pipe also can not be caused to be out of shape, and then the situation that precast hollow slab hole wall can not be caused uneven occurs.Similarly, if when hollow section tube wall rigidity is enough to support pouring concrete load, does not then need to arrange support and to loose core mould, can reach the uniform effect of hollowcore slab hole wall yet.In addition, described body is assembled by some plates, the transport of pore-forming pipe is deposited conveniently, deposit with split state and transport and can save large quantity space, meanwhile, it is extensive that pore-forming pipe makes material source, pore-forming pipe is connected into nail again after can adopting discarded construction bamboo wooden form cutting, or can also be used as the assembled pore-forming pipe that connects into after this cheap plate cutting such as calcium silicate board with microporous, gypsum plank, be conducive to reducing pore-forming pipe cost, be easy to apply.
Another technical scheme of the present invention is, on above-mentioned basis, outer surface of tube body to be provided with at least one fin, and described fin is longitudinally arranged at tube surfaces.So, also fin is provided with at the external surface of body, in the process making precast hollow slab, fin can play the effect of supporting and location, the situation preventing hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.In addition, when fin is longitudinally arranged at tube surfaces, in the process making precast hollow slab, the fin longitudinally arranged can also play and block shaping effect, prevent the concrete of precast hollow slab both sides completely through, serve the effect cutting off concrete heat bridge, increase the hollow rate of precast hollow slab further.
Another technical scheme of the present invention is on above-mentioned basis, and described body cross section is rectangle.So, when body cross section is rectangle, described pore-forming pipe is applied to after in precast hollow slab, correspondingly can form through rectangle duct in hollowcore slab inside, cross section is the hollow rate that the pore-forming pipe of rectangle can increase substantially precast hollow slab, saves material, reduces precast hollow slab own wt.
Another technical scheme of the present invention is, on above-mentioned basis, described tube wall to be provided with at least one transverse concave groove.So, when tube wall being provided with at least one transverse concave groove, transverse concave groove improves the side direction bearing capacity of pore-forming pipe, make it not yielding in application process, simultaneously, cast-in-situ concrete also can form concrete structure in transverse concave groove, improves the bonding strength between precast hollow slab two plate faces, prevents its dislocation in lifting and installation process from damaging.
Another technical scheme of the present invention is, on above-mentioned basis, described body to be provided with at least one align member.So, when body being provided with at least one align member, described pore-forming pipe is in application process, align member can be supported on precast hollow board forming die, pore-forming pipe can be fixed in precast hollow board forming die, prevent it from swinging, fully can ensure that the thickness of precast hollow slab both sides plate body is consistent with design thickness.
Another technical scheme of the present invention is, on above-mentioned basis, described fin to be provided with positioner.So, when fin is provided with positioner, in application process, positioner on described fin can coordinate screens to fix with reinforcing bar or steel wire, fin can play longitudinal bracing positioning action, the situation preventing hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.
Another technical scheme of the present invention is on above-mentioned basis, and described positioner is groove.So, when positioner is groove, in application process, the situation that positioner can coordinate screens fixedly to prevent hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift with reinforcing bar or steel wire very easily occurs, fully ensure that the quality of precast hollow slab.
Another technical scheme of the present invention is on above-mentioned basis, and described groove is into the large groove of young endoporus.So, when groove is into the large groove of young endoporus, in application process, reinforcing bar or steel wire snap in after in groove, in the process of building cast-in-situ concrete, enter the effect that the large groove of young endoporus can play snap close, thus make reinforcing bar or steel wire be not easy to eject.
Another technical scheme of the present invention is on above-mentioned basis, and at least one end of described body is provided with enclosing cover, and body is closed into blind pipe or closed hollow pipe by described enclosing cover.So, when at least one end of body is provided with enclosing cover, body is closed into blind pipe or closed hollow pipe by described enclosing cover, described pore-forming pipe is applied to after in precast hollow slab, as end also concreting, then can form semiclosed or totally enclosed precast hollow slab, globality, the sound-insulating heat-insulation property of this precast hollow slab are good, in particular improve the bonding strength between precast hollow slab two plate faces, prevent its dislocation in lifting and installation process from damaging.
Another technical scheme of the present invention is on above-mentioned basis, and described enclosing cover end is provided with keeper, and described keeper is arranged at enclosing cover edge or cover bottom portion.So, when enclosing cover end is provided with keeper, described keeper is arranged at enclosing cover edge or cover bottom portion, in application process, pore-forming pipe can be fixed in the moulding form of precast hollow slab by keeper, the situation preventing pore-forming tube end from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.
Another technical scheme of the present invention is on above-mentioned basis, and described fin is arranged on two relative faces of body.So, fin is arranged on two relative faces of body, in application process, fin can be arranged at the reinforcing bar of its both sides or steel wire or precast hollow board forming die supporting and location, and after multiple pore-forming pipe arrangement, fin cooperatively interacts, and can play shaping effect of blocking, prevent the concrete of precast hollow slab both sides completely through, serve the effect cutting off concrete heat bridge.
Another technical scheme of the present invention is on above-mentioned basis, and described fin is arranged on four faces of body.So, when on four faces that fin is arranged at body, fin can be arranged at the reinforcing bar of its both sides or steel wire or precast hollow board forming die supporting and location, simultaneously, after multiple pore-forming pipe arrangement, fin cooperatively interacts, and can play and block shaping effect, prevent the concrete of precast hollow slab both sides completely through, serve the effect cutting off concrete heat bridge.
Another technical scheme of the present invention is on above-mentioned basis, and the material of described body is plastics, the fin global formation that described body and external surface thereof are arranged.So, when the material of body is plastics, during the fin global formation that described body and external surface thereof are arranged, pore-forming pipe is manufactured convenient and simple, and pipe thickness can strictly control, and, bonding strength between fin and body is good, is not easy damage and comes off, and fully ensure that the quality of pore-forming pipe.
Another technical scheme of the present invention is on above-mentioned basis, and described fin shifts to install on relative two faces of body.So, when fin shifts to install on relative two faces of body, in application process, after multiple pore-forming pipe arrangement, the fin shifted to install complements each other to form and blocks, and can reduce producting process difficulty, is conducive to reducing costs, raises the efficiency.
Another technical scheme of the present invention is on above-mentioned basis, and described packing material is fire proofing material, heat insulating material and/or sound insulation materials.Fireproof performance, insulation newly energy and/or sound insulation value that described precast hollow slab buries core pore-forming pipe can be improved like this, thus improve the total quality of precast hollow slab.
Another technical scheme of the present invention is on above-mentioned basis, and described packing material is at least one in haydite concrete, foam concrete and slag foamed concrete.So, at least one in haydite concrete, foam concrete and slag foamed concrete selected by packing material, described like this precast hollow slab bury the fireproof performance of core pore-forming pipe, insulation newly can and sound insulation value good, and cost is also lower.
Another technical scheme of the present invention is on above-mentioned basis, spraying or brush one deck or multiple-layer heat insulation material or fire proofing material or composite coating material on described inboard wall of tube body.So, heat insulation, the fireproof performance of body can be improved, thus improve the total quality of precast hollow slab.
Another technical scheme of the present invention is, on above-mentioned basis, described plate to be provided with slot, assembled fixing by slot between described plate.So.Plate is provided with slot, by slot, plate quick-assembling can be fixed, improve efficiency of construction.
Another technical scheme of the present invention is, on above-mentioned basis, described plate to be provided with buckle, assembled fixing by buckle between described plate.So.Plate is provided with buckle, by buckle, plate quick-assembling can be fixed, improve efficiency of construction.
Another technical scheme of the present invention is, on above-mentioned basis, described plate to be provided with fixing hole, between described plate by screw or screw assembled fixing.So.Plate is provided with fixing hole, by screw or screw, plate quick-assembling can be fixed, improve efficiency of construction.
Another technical scheme of the present invention is on above-mentioned basis, and at least one end of described body is provided with guiding gutter.So, by guiding gutter, the hydrops between body can be discharged.
Another technical scheme of the present invention is on above-mentioned basis, and described guiding gutter is ring-type, and described tube body wall is also provided with pod apertures, and described pod apertures is communicated with guiding gutter.So, guiding gutter can be communicated with by pod apertures, the hydrops between body is discharged fast.
Another technical scheme of the present invention is, on above-mentioned basis, described body to be provided with suspension ring, and described suspension ring are fixed on tube body wall by suspension ring drag-line, and described suspension ring drag-line one end through tube body wall, and forms anchored end in the outside of tube body wall.So, by being provided with suspension ring on body, carrying and the installation of body can be facilitated on the one hand, on the other hand, suspension ring drag-line one end forms anchored end, after application through tube body wall, anchored end is embedded in the concrete on hollow unit two sides, can play good support and booster action to pore-forming pipe.
Accompanying drawing explanation
The accompanying drawing forming a part of the present invention is used to provide a further understanding of the present invention, and schematic description and description of the present invention, for explaining the present invention, does not form inappropriate limitation of the present invention.
Fig. 1 is that the precast hollow slab that a kind of embodiment of this programme relates to buries core pore-forming duct ligation composition;
Fig. 2 and Fig. 3 is that the precast hollow slab that the another two kinds of embodiments of this programme relate to buries core pore-forming duct ligation composition;
Fig. 4 to Fig. 6 is that the precast hollow slab that the another two kinds of embodiments of this programme relate to buries core pore-forming pipe local structural graph.
In figure:
1 body 2 fin 20 positioner 3 transverse concave groove
4 enclosing cover 40 keeper 100 guiding gutter 200 suspension ring
Detailed description of the invention
Describe the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, should not have any restriction to protection scope of the present invention.In addition, those skilled in the art, according to the description of presents, can carry out respective combination to the feature in embodiment in presents and in different embodiment.
The embodiment of the present invention is as follows, refers to Fig. 1 to Fig. 5, and a kind of precast hollow slab buries core pore-forming pipe, comprises body 1, and described body 1 is through hollow section, and described body 1 is assembled by some plates.So, when body 1 is through hollow section, when hollow section is applied in precast hollow slab, its end is through, if also arrange support to loose core mould in hollow section, after pouring concrete completes, mould of support being loosed core is extracted out, so, significantly can reduce pore-forming tube wall thickness, also pore-forming pipe can not be caused to be out of shape, and then the situation that precast hollow slab hole wall can not be caused uneven occur.Similarly, if when hollow section tube wall rigidity is enough to support pouring concrete load, does not then need to arrange support and to loose core mould, can reach the uniform effect of hollowcore slab hole wall yet.In addition, described body 1 is assembled by some plates, the transport of pore-forming pipe is deposited conveniently, deposit with split state and transport and can save large quantity space, meanwhile, it is extensive that pore-forming pipe makes material source, pore-forming pipe is connected into nail again after can adopting discarded construction bamboo wooden form cutting, or can also be used as the assembled pore-forming pipe that connects into after this cheap plate cutting such as calcium silicate board with microporous, gypsum plank, be conducive to reducing pore-forming pipe cost, be easy to apply.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figures 1 to 5, described body 1 external surface is provided with at least one fin 2, described fin 2 longitudinally can be arranged at body 1 surface.So, fin 2 is also provided with at the external surface of body 1, in the process making precast hollow slab, fin 2 can play the effect of supporting and location, the situation preventing hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.In addition, when fin 2 is longitudinally arranged at body 1 surface, in the process making precast hollow slab, the fin 2 longitudinally arranged can play and block shaping effect, prevents the concrete of precast hollow slab both sides completely through, serves the effect cutting off concrete heat bridge.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figures 1 to 5, described body 1 cross section can be rectangle.So, when body 1 cross section is rectangle, described pore-forming pipe is applied to after in precast hollow slab, correspondingly can form through rectangle duct in hollowcore slab inside, cross section is the hollow rate that the pore-forming pipe of rectangle can increase substantially precast hollow slab, saves material, reduces precast hollow slab own wt.Certainly, in other designs, described body 1 cross section also can be circular or ellipse or other polygons etc., and these also all belong to equivalent technologies and replace, and belong to the protection domain of this patent.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 4, described body 1 outer wall can be provided with at least one transverse concave groove 3.So, when body 1 outer wall is provided with at least one transverse concave groove 3, transverse concave groove 3 improves the side direction bearing capacity of pore-forming pipe, make it not yielding in application process, simultaneously, cast-in-situ concrete also can form concrete structure in transverse concave groove 3, improves the bonding strength between precast hollow slab two plate faces, prevents its dislocation in lifting and installation process from damaging.In addition, guiding gutter 100 can also be provided with in one end of described body 1, the hydrops between body can be discharged like this.
On the basis of above-described embodiment, in another embodiment of the present invention, described body 1 can be provided with at least one align member.So, when body 1 is provided with at least one align member, described pore-forming pipe is in application process, align member can be supported on precast hollow board forming die, pore-forming pipe can be fixed in precast hollow board forming die, prevent it from swinging, fully can ensure that the thickness of precast hollow slab both sides plate body is consistent with design thickness.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 5, described fin 2 can be provided with positioner 20.So, when fin 2 is provided with positioner 20, in application process, positioner 20 on described fin 2 can coordinate screens to fix with reinforcing bar or steel wire, fin 2 can play longitudinal bracing positioning action, the situation preventing hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 5, described positioner 20 can be groove.So, when positioner 20 is groove, in application process, the situation that positioner 20 can coordinate screens fixedly to prevent hollow section from causing hollowcore slab internal construction and project organization not to conform at mould internal shift with reinforcing bar or steel wire very easily occurs, fully ensure that the quality of precast hollow slab.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 5, described groove can be the groove that the little endoporus of entrance is large.So, when groove is into the large groove of young endoporus, in application process, reinforcing bar or steel wire snap in after in groove, in the process of building cast-in-situ concrete, enter the effect that the large groove of young endoporus can play snap close, thus make reinforcing bar or steel wire be not easy to eject.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 5, at least one end of described body 1 can be provided with enclosing cover 4, and body 1 is closed into blind pipe or closed hollow pipe by described enclosing cover 4.So, when at least one end of body 1 is provided with enclosing cover 4, body 1 is closed into blind pipe or closed hollow pipe by described enclosing cover 4, described pore-forming pipe is applied to after in precast hollow slab, as end also concreting, then can form semiclosed or totally enclosed precast hollow slab, globality, the sound-insulating heat-insulation property of this precast hollow slab are good, in particular improve the bonding strength between precast hollow slab two plate faces, prevent its dislocation in lifting and installation process from damaging.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 5, described enclosing cover 4 end can be provided with keeper 40, and described keeper 40 is arranged at bottom enclosing cover 4 edge or enclosing cover 4.So, when enclosing cover 4 end is provided with keeper 40, described keeper 40 is arranged at bottom enclosing cover 4 edge or enclosing cover 4, in application process, pore-forming pipe can be fixed in the moulding form of precast hollow slab by keeper 40, the situation preventing pore-forming tube end from causing hollowcore slab internal construction and project organization not to conform at mould internal shift occurs, fully ensure that the quality of precast hollow slab.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 1, described fin 2 can be arranged on two relative faces of body 1.So, fin 2 is arranged on two relative faces of body 1, in application process, fin 2 can be arranged at the reinforcing bar of its both sides or steel wire or precast hollow board forming die supporting and location, and after multiple pore-forming pipe arrangement, fin 2 cooperatively interacts, and can play shaping effect of blocking, prevent the concrete of precast hollow slab both sides completely through, serve the effect cutting off concrete heat bridge.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 2, described fin 2 can be arranged on four faces of body 1.So, when on four faces that fin 2 is arranged at body 1, fin 2 can be arranged at the reinforcing bar of its both sides or steel wire or precast hollow board forming die supporting and location, simultaneously, after multiple pore-forming pipe arrangement, fin 2 cooperatively interacts, and can play and block shaping effect, prevent the concrete of precast hollow slab both sides completely through, serve the effect cutting off concrete heat bridge.
On the basis of above-described embodiment, in another embodiment of the present invention, the material of described body 1 is plastics, fin 2 global formation that described body 1 and external surface thereof are arranged.So, when the material of body 1 is plastics, during fin 2 global formation that described body 1 and external surface thereof are arranged, pore-forming pipe is manufactured convenient and simple, pipe thickness can strictly control, and the bonding strength between fin 2 and body 1 is good, be not easy damage to come off, fully ensure that the quality of pore-forming pipe.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 3, described fin 2 shifts to install on relative two faces of body 1.So, when fin 2 shifts to install on relative two faces of body 1, in application process, after multiple pore-forming pipe arrangement, the fin 2 shifted to install complements each other to form and blocks, and can reduce producting process difficulty, is conducive to reducing costs, raises the efficiency.
On the basis of above-described embodiment, in another embodiment of the present invention, described packing material is fire proofing material, heat insulating material and/or sound insulation materials.Fireproof performance, insulation newly energy and/or sound insulation value that described precast hollow slab buries core pore-forming pipe can be improved like this, thus improve the total quality of precast hollow slab.
On the basis of above-described embodiment, in another embodiment of the present invention, described packing material is at least one in haydite concrete, foam concrete and slag foamed concrete.So, at least one in haydite concrete, foam concrete and slag foamed concrete selected by packing material, described like this precast hollow slab bury the fireproof performance of core pore-forming pipe, insulation newly can and sound insulation value good, and cost is also lower.
On the basis of above-described embodiment, in another embodiment of the present invention, spraying or brush one deck or multiple-layer heat insulation material or fire proofing material or composite coating material on described inboard wall of tube body.So, heat insulation, the fireproof performance of body can be improved, thus improve the total quality of precast hollow slab.
On the basis of above-described embodiment, in another embodiment of the present invention, described plate is provided with slot, assembled fixing by slot between described plate.So.Plate is provided with slot, by slot, plate quick-assembling can be fixed, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, described plate is provided with buckle, assembled fixing by buckle between described plate.So.Plate is provided with buckle, by buckle, plate quick-assembling can be fixed, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, described plate is provided with fixing hole, between described plate by screw or screw assembled fixing.So.Plate is provided with fixing hole, by screw or screw, plate quick-assembling can be fixed, improve efficiency of construction.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 4, at least one end of described body is provided with guiding gutter 100.So, by guiding gutter 100, the hydrops between body can be discharged.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 4, described guiding gutter 100 is ring-type, and described tube body wall is also provided with pod apertures, and described pod apertures is communicated with guiding gutter 100.So, guiding gutter 100 can be communicated with by pod apertures, the hydrops between body is discharged fast.
On the basis of above-described embodiment, in another embodiment of the present invention, as shown in Figure 6, described body is provided with suspension ring 200, described suspension ring 200 are fixed on tube body wall by suspension ring drag-line, and described suspension ring drag-line one end through tube body wall, and forms anchored end in the outside of tube body wall.So, by being provided with suspension ring on body, carrying and the installation of body can be facilitated on the one hand, on the other hand, suspension ring drag-line one end forms anchored end, after application through tube body wall, anchored end is embedded in the concrete on hollow unit two sides, can play good support and booster action to pore-forming pipe.
The above is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (10)

1. precast hollow slab buries a core pore-forming pipe, comprises body, it is characterized in that, described body is through hollow section, and described body is assembled by some plates.
2. precast hollow slab according to claim 1 buries core pore-forming pipe, it is characterized in that, the external surface of described body is provided with at least one fin, and described fin is longitudinally arranged at tube surfaces.
3. precast hollow slab according to claim 1 buries core pore-forming pipe, it is characterized in that, described body cross section is rectangle.
4. precast hollow slab according to claim 3 buries core pore-forming pipe, it is characterized in that, described tube wall is provided with at least one transverse concave groove.
5. precast hollow slab according to claim 3 buries core pore-forming pipe, it is characterized in that, described body is provided with at least one align member.
6. precast hollow slab according to any one of claim 1 to 5 buries core pore-forming pipe, it is characterized in that, described fin is provided with positioner.
7. precast hollow slab according to claim 6 buries core pore-forming pipe, it is characterized in that, described positioner is groove.
8. precast hollow slab according to claim 7 buries core pore-forming pipe, it is characterized in that, described groove is into the large groove of young endoporus.
9. precast hollow slab according to claim 6 buries core pore-forming pipe, it is characterized in that, at least one end of described body is provided with enclosing cover, and body is closed into blind pipe or closed hollow pipe by described enclosing cover; Or described enclosing cover end is provided with keeper, described keeper is arranged at enclosing cover edge or cover bottom portion.
10. precast hollow slab according to any one of claim 1 to 5 buries core pore-forming pipe, it is characterized in that, described fin is arranged on two relative faces of body; Or described fin is arranged on four faces of body; Or the material of described body is plastics, the fin global formation that described body and external surface thereof are arranged; Or
Described fin shifts to install on relative two faces of body; Or described plate is provided with slot, assembled fixing by slot between described plate; Or described plate is provided with buckle, assembled fixing by buckle between described plate; Or described plate is provided with fixing hole, between described plate by screw or screw assembled fixing; Or it is characterized in that, at least one end of described body is provided with guiding gutter; Or described guiding gutter is ring-type, and described tube body wall is also provided with pod apertures, described pod apertures is communicated with guiding gutter; Or described body is provided with suspension ring, described suspension ring are fixed on tube body wall by suspension ring drag-line, and described suspension ring drag-line one end through tube body wall, and forms anchored end in the outside of tube body wall.
CN201510641525.8A 2015-09-30 2015-09-30 prefabricated hollow slab core-buried pore-forming tube Pending CN105369974A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510641525.8A CN105369974A (en) 2015-09-30 2015-09-30 prefabricated hollow slab core-buried pore-forming tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510641525.8A CN105369974A (en) 2015-09-30 2015-09-30 prefabricated hollow slab core-buried pore-forming tube

Publications (1)

Publication Number Publication Date
CN105369974A true CN105369974A (en) 2016-03-02

Family

ID=55372556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510641525.8A Pending CN105369974A (en) 2015-09-30 2015-09-30 prefabricated hollow slab core-buried pore-forming tube

Country Status (1)

Country Link
CN (1) CN105369974A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT362917B (en) * 1979-10-22 1981-06-25 Katzenberger Helmut PANEL, ESPECIALLY CEILING PANEL
CN2403840Y (en) * 1999-11-22 2000-11-01 邱则有 Preset hollow hard thin-wall member type cast-in-place reinforced concrete hollow slab
CN1521375A (en) * 2003-01-30 2004-08-18 邱则功 Thin-wall pipe for concrete filling
CN1525025A (en) * 2003-02-26 2004-09-01 邱则有 Cast-in-situ reinforced concrete hollow storey top
CN101408056A (en) * 2004-09-02 2009-04-15 邱则有 Hollow carcass for filling cast-in-situ concrete
KR20110118872A (en) * 2010-04-26 2011-11-02 극동건설주식회사 A light weight structure and void concrete slab using thereof and construction method
CN204626770U (en) * 2015-05-20 2015-09-09 中民筑友有限公司 A kind of prefabricated panel with liner plate
CN205153286U (en) * 2015-09-30 2016-04-13 中民筑友有限公司 Hollow core slab buries core pore -forming pipe

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT362917B (en) * 1979-10-22 1981-06-25 Katzenberger Helmut PANEL, ESPECIALLY CEILING PANEL
CN2403840Y (en) * 1999-11-22 2000-11-01 邱则有 Preset hollow hard thin-wall member type cast-in-place reinforced concrete hollow slab
CN1521375A (en) * 2003-01-30 2004-08-18 邱则功 Thin-wall pipe for concrete filling
CN1525025A (en) * 2003-02-26 2004-09-01 邱则有 Cast-in-situ reinforced concrete hollow storey top
CN101408056A (en) * 2004-09-02 2009-04-15 邱则有 Hollow carcass for filling cast-in-situ concrete
KR20110118872A (en) * 2010-04-26 2011-11-02 극동건설주식회사 A light weight structure and void concrete slab using thereof and construction method
CN204626770U (en) * 2015-05-20 2015-09-09 中民筑友有限公司 A kind of prefabricated panel with liner plate
CN205153286U (en) * 2015-09-30 2016-04-13 中民筑友有限公司 Hollow core slab buries core pore -forming pipe

Similar Documents

Publication Publication Date Title
CN107288256A (en) Light composite heat insulation outer wall plate, particular manufacturing craft and preparation method thereof
CN202990200U (en) Cast-in-situ hollow floor
CN2351493Y (en) Thermal insulation sound-proof composite flooring
CN205153286U (en) Hollow core slab buries core pore -forming pipe
CN204983382U (en) Prefabricated hollow slab
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN204983307U (en) Prefabricated hollow slab
CN205153285U (en) Hollow core slab buries core pore -forming pipe
CN105369974A (en) prefabricated hollow slab core-buried pore-forming tube
CN113585579A (en) Few-support steel wire mesh reinforced microporous concrete disassembly-free bottom formwork and construction method thereof
CN105155770A (en) Prefabricated hollow slab
CN205153272U (en) Prefabricated hollow slab
CN205153267U (en) Prefabricated hollow slab
CN205153288U (en) Hollow core slab buries core pore -forming pipe
CN205153266U (en) Prefabricated hollow slab
CN205369699U (en) Hollow core slab buries core pore -forming pipe
CN105155746A (en) Prefabricated hollow slab core-buried pore-forming pipe
CN205369698U (en) Hollow core slab buries core pore -forming pipe
CN205153287U (en) Prefabricated hollow slab
CN205153293U (en) Hollow core slab buries core pore -forming pipe
CN105155769A (en) Prefabricated hollow slab core-buried pore-forming pipe
CN205153236U (en) Prefabricated hollow slab
CN205153233U (en) Prefabricated hollow slab
CN205153301U (en) Prefabricated hollow slab
CN205153291U (en) Prefabricated hollow slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160302

RJ01 Rejection of invention patent application after publication