CN105356609A - Urban power grid accident prevention analysis and control platform system - Google Patents

Urban power grid accident prevention analysis and control platform system Download PDF

Info

Publication number
CN105356609A
CN105356609A CN201510815957.6A CN201510815957A CN105356609A CN 105356609 A CN105356609 A CN 105356609A CN 201510815957 A CN201510815957 A CN 201510815957A CN 105356609 A CN105356609 A CN 105356609A
Authority
CN
China
Prior art keywords
distribution network
urban
power grid
network control
control integration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510815957.6A
Other languages
Chinese (zh)
Inventor
郑伟彦
廖忠山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU HARMONY TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
HANGZHOU HARMONY TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HANGZHOU HARMONY TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical HANGZHOU HARMONY TECHNOLOGY Co Ltd
Priority to CN201510815957.6A priority Critical patent/CN105356609A/en
Publication of CN105356609A publication Critical patent/CN105356609A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an urban power grid accident prevention analysis and control platform system which comprises a distribution automation terminal, an urban power grid management-control integrated platform, an electronic map module, a dispatching automation system, a power distribution network on-line monitoring and intelligent fault positioning system module, a database module and a weather information system. The urban power grid management-control integrated platform is connected with the electronic map module; the urban power grid management-control integrated platform is also connected with a geologic disaster collector; the geologic disaster collector transmits the data to the urban power grid management-control integrated platform; after being processed by the urban power grid management-control integrated platform, the data is sent to the electronic map module for display; after processing of the electronic map module, the data is returned to the urban power grid management-control integrated platform; and the urban power grid management-control integrated platform transmits the data to users through a short message platform. The urban power grid management-control integrated platform combines the weather information system and the geologic disaster collector, thereby facilitating to forecast the harm of the weather calamity and geologic disasters to a power grid.

Description

A kind of urban power grid accidents Prevention analysis and parametric controller system
Technical field
Type of the present invention relates to power monitoring technical field, particularly relates to a kind of urban power grid accidents Prevention analysis and parametric controller system.
Background technology
Urban distribution network system is subject to the threat of disaster often, the such as weather of south consecutive low temperature freezing rain and snow disaster on a large scale in the last few years, the natural calamities such as the flood of Ya'an Sichuan province earthquake and Heilongjiang river, all high risks is caused to power grid security, due to the economic development that electric power system is society, the stability basis of order and public welfare, large area blackout will be caused when urban distribution network system is damaged, thus impact to the live and work of city dweller, also imponderable loss can be caused to enterprise, concrete technology natural calamity combined with electrical network is not also had in tradition, thus prevent and reduce the harm of electrical network in advance, also convenient administrative staff carry out important electrical network targetedly and carry out emphasis prevention.
Summary of the invention
For deficiency of the prior art, the invention provides a kind of urban power grid accidents Prevention analysis and parametric controller system, natural calamity is analyzed urban distribution network and is gathered by its mainly useful for, thus facilitate keeper to prevent in advance, reduce natural calamity to the harm of urban distribution network, reduce and will cause large area blackout because urban distribution network system is damaged, be conducive to reducing on the life of city dweller, work the impact caused, and reduces the loss caused to enterprise.
To achieve these goals, the technical scheme that the present invention intends taking is:
A kind of urban power grid accidents Prevention analysis and parametric controller system, comprise distribution power automation terminal, urban distribution network control integration platform, electric map module, dispatch automated system, power distribution network on-line monitoring and intelligent trouble positioning system modules, database module and Meteorological Information System, dispatch automated system, power distribution network on-line monitoring and intelligent trouble positioning system modules, database module and Meteorological Information System are connected with urban distribution network control integration platform respectively, urban distribution network control integration platform is connected with electric map module, urban distribution network control integration platform sends electric map module to after carrying out deal with data, urban distribution network control integration platform is connected with geological disaster gatherer, geological disaster gatherer transfers data to urban distribution network control integration platform, electric map module is sent to represent after urban distribution network control integration platform processes, electric map module returns to urban distribution network control integration platform after process, urban distribution network control integration platform carries out transmission user by short breath platform.
Described electric map module comprises electrical distribution line chart and goods and materials distribution map.
SOCKET communication mode by ICP/IP protocol between described urban distribution network control integration platform and SMS platform carries out UNICOM.
Beneficial effect of the present invention: compared with prior art, urban distribution network control integration platform of the present invention is in conjunction with Meteorological Information System and geological disaster gatherer, thus the data of collection are arranged, then show by being transferred to electric map module, weather disaster and geological disaster convenient to the harm that urban distribution network causes be prevented, be conducive to administrative staff to carry out targetedly managing and preventing, there is emphasis feature urban distribution network is protected, thus be conducive to the threat reducing disaster suffered by urban distribution network, reduce to the life of city dweller and the impact brought and the loss caused to enterprise of working.
Accompanying drawing explanation
Fig. 1 is system schematic of the present invention.
Embodiment
As shown in Figure 1, a kind of urban power grid accidents Prevention analysis and parametric controller system, comprise distribution power automation terminal 10, urban distribution network control integration platform 20, electric map module 30, dispatch automated system 40, power distribution network on-line monitoring and intelligent trouble positioning system modules 50, database module 60 and Meteorological Information System 70, dispatch automated system 40, power distribution network on-line monitoring and intelligent trouble positioning system modules 50, database module 60 and Meteorological Information System 70 are connected with urban distribution network control integration platform 20 respectively, urban distribution network control integration platform 20 is connected with electric map module 30, urban distribution network control integration platform 20 sends electric map module 30 to after carrying out deal with data, urban distribution network control integration platform 20 is connected with geological disaster gatherer 80, geological disaster gatherer 80 transfers data to urban distribution network control integration platform 20, electric map module 30 is sent to represent after the process of urban distribution network control integration platform 20, electric map module 30 returns to urban distribution network control integration platform 20 after process, urban distribution network control integration platform 20 carries out transmission user by short breath platform, described electric map module 30 comprises electrical distribution line chart and goods and materials distribution map, UNICOM is carried out by the SOCKET communication mode of ICP/IP protocol between described urban distribution network control integration platform 20 and SMS platform.
Urban distribution network control integration platform 20 of the present invention in conjunction with Meteorological Information System 70 (by docking with the weather information that meteorological department issues, hazard weather early warning is provided, comprise meteorological distribution map, high temperature distributes, low temperature distributed areas etc.) and geological disaster gatherer 80, thus make urban distribution network control integration platform 20 transfer data to electric map module 30, described electric map module 30 comprises electrical distribution line chart and goods and materials distribution map, thus disaster region and Disasters Type can be marked, user can carry out checking disaster distribution situation possibly, be conducive to carrying out preventing and take measures effectively to protect, such as monitor in conjunction with weather conditions the danger whether urban distribution network equipment is subject to weather conditions disaster, the harm that the path trend of such as typhoon and the size of rainfall in different regions etc. cause electrical network, shown by electric map module 30, thus be also conducive to the work that people carry out prevention in advance, reduce the loss because the impact of disaster on urban distribution network causes.
Beneficial effect of the present invention: compared with prior art, urban distribution network control integration platform of the present invention is in conjunction with Meteorological Information System and geological disaster gatherer, thus the data of collection are arranged, then show by being transferred to electric map module, weather disaster and geological disaster convenient to the harm that urban distribution network causes be prevented, be conducive to administrative staff to carry out targetedly managing and preventing, there is emphasis feature urban distribution network is protected, thus be conducive to the threat reducing disaster suffered by urban distribution network, reduce to the life of city dweller and the impact brought and the loss caused to enterprise of working.

Claims (3)

1. a urban power grid accidents Prevention analysis and parametric controller system, it is characterized in that, comprise distribution power automation terminal, urban distribution network control integration platform, electric map module, dispatch automated system, power distribution network on-line monitoring and intelligent trouble positioning system modules, database module and Meteorological Information System, dispatch automated system, power distribution network on-line monitoring and intelligent trouble positioning system modules, database module and Meteorological Information System are connected with urban distribution network control integration platform respectively, urban distribution network control integration platform is connected with electric map module, urban distribution network control integration platform sends electric map module to after carrying out deal with data, urban distribution network control integration platform is connected with geological disaster gatherer, geological disaster gatherer transfers data to urban distribution network control integration platform, electric map module is sent to represent after urban distribution network control integration platform processes, electric map module returns to urban distribution network control integration platform after process, urban distribution network control integration platform carries out transmission user by short breath platform.
2. a kind of urban power grid accidents Prevention analysis as claimed in claim 1 and parametric controller system, is characterized in that, described electric map module comprises electrical distribution line chart and goods and materials distribution map.
3. a kind of urban power grid accidents Prevention analysis as claimed in claim 1 and parametric controller system, is characterized in that, the SOCKET communication mode by ICP/IP protocol between described urban distribution network control integration platform and SMS platform carries out UNICOM.
CN201510815957.6A 2015-11-23 2015-11-23 Urban power grid accident prevention analysis and control platform system Pending CN105356609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510815957.6A CN105356609A (en) 2015-11-23 2015-11-23 Urban power grid accident prevention analysis and control platform system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510815957.6A CN105356609A (en) 2015-11-23 2015-11-23 Urban power grid accident prevention analysis and control platform system

Publications (1)

Publication Number Publication Date
CN105356609A true CN105356609A (en) 2016-02-24

Family

ID=55332512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510815957.6A Pending CN105356609A (en) 2015-11-23 2015-11-23 Urban power grid accident prevention analysis and control platform system

Country Status (1)

Country Link
CN (1) CN105356609A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403794A (en) * 2011-09-26 2012-04-04 国网信息通信有限公司 Integrated management system of intelligent power grid
CN104218485A (en) * 2014-09-23 2014-12-17 国网河南省电力公司周口供电公司 Power grid quick rush-repair control system and using method thereof
JP5727560B2 (en) * 2013-08-22 2015-06-03 日本電信電話株式会社 Power supply system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102403794A (en) * 2011-09-26 2012-04-04 国网信息通信有限公司 Integrated management system of intelligent power grid
JP5727560B2 (en) * 2013-08-22 2015-06-03 日本電信電話株式会社 Power supply system
CN104218485A (en) * 2014-09-23 2014-12-17 国网河南省电力公司周口供电公司 Power grid quick rush-repair control system and using method thereof

Similar Documents

Publication Publication Date Title
CN104574835B (en) A kind of power network disaster monitoring and early warning system and method based on GIS
CN206179189U (en) Wireless monitoring and early warning system of cable tunnel intelligence
CN203773651U (en) Manhole cover intelligent monitoring device
CN104950351B (en) The horizontal methods of exhibiting of many meteorological elements compound based on meteorology and system
CN102446390A (en) Method and system for safety detection and early warning of monitoring areas near power transmission lines
CN104600844A (en) Power grid disaster monitoring and rush repairing system and method based on geographic information system (GIS)
CN104952212A (en) Power-grid-GIS-based early warning method of geological disaster and apparatus thereof
CN104574874A (en) Urban drainage and waterlog-preventing integrated control system
CN104266681A (en) Electric cable well state safety monitoring system based on Internet of Things and GIS
CN103656950A (en) Fire hydrant monitoring system
CN104740956B (en) A kind of intelligent monitoring depositing dust controls haze device
CN205541302U (en) Control and early warning system are synthesized to geological disasters hidden danger point power supply in succession based on WEBGIS
CN205334531U (en) Intelligent early warning system is in time cleared up to transmission line corridor screen of trees
CN104833894A (en) Electrical device fault monitoring system and fault monitoring method
CN204833272U (en) Portable intelligent terminal of dispatch commander is salvageed to electric power under large tracts of land natural disasters environment
CN205608132U (en) Electric wire netting thunder and lightning early warning system based on doppler radar of a new generation
CN108961686A (en) A kind of flood online monitoring alarm system applied to city
CN105373888A (en) Transmission line physical information fusion multi-layer management and control method and system
CN204330009U (en) Based on the cable shaft status safety monitoring system of Internet of Things and GIS
CN105356609A (en) Urban power grid accident prevention analysis and control platform system
CN204230852U (en) Street lamp detection and protection apparatus for leakage
CN102915513A (en) Typhoon risk information processing method for power grid equipment
CN203840056U (en) Anti-icing monitoring system for transformer substation
CN203324425U (en) Temporary ground wire assembling and disassembling state signal extraction device
CN106301432A (en) Electric power first-aid dispatch control portable intelligent system under large area natural disaster environment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160224

RJ01 Rejection of invention patent application after publication