CN105354934B - The implementation method of IC-card intelligent gas meter ladder valuation - Google Patents

The implementation method of IC-card intelligent gas meter ladder valuation Download PDF

Info

Publication number
CN105354934B
CN105354934B CN201510725938.4A CN201510725938A CN105354934B CN 105354934 B CN105354934 B CN 105354934B CN 201510725938 A CN201510725938 A CN 201510725938A CN 105354934 B CN105354934 B CN 105354934B
Authority
CN
China
Prior art keywords
price
ladder
time
processor
plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510725938.4A
Other languages
Chinese (zh)
Other versions
CN105354934A (en
Inventor
邵泽华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Qinchuan IoT Technology Co Ltd
Original Assignee
Chengdu Qinchuan IoT Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Qinchuan IoT Technology Co Ltd filed Critical Chengdu Qinchuan IoT Technology Co Ltd
Priority to CN201510725938.4A priority Critical patent/CN105354934B/en
Publication of CN105354934A publication Critical patent/CN105354934A/en
Application granted granted Critical
Publication of CN105354934B publication Critical patent/CN105354934B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G07CHECKING-DEVICES
    • G07FCOIN-FREED OR LIKE APPARATUS
    • G07F15/00Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity
    • G07F15/08Coin-freed apparatus with meter-controlled dispensing of liquid, gas or electricity with means for varying the tariff or changing the price

Abstract

The invention discloses a kind of implementation method of IC-card intelligent gas meter ladder valuation, belong to a kind of terminal intelligent combustion gas table management method, the price plan instruction that this method is included in IC card information Switching Module reading IC-card is transmitted to ladder gas price main control module, by the processor in ladder gas price main control module price plan is instructed in price plan store into memory, the time of the clock information of table end clock chip and control end is synchronized by processor, the step such as be consistent the system time of clock chip and the system time of control end;Table end carries out time synchronized with control end simultaneously in the process that information exchange is carried out with control end, and then is consistent time of the table end all the time with control end, it is to avoid both time of occurrence deviations, causes disunity of valuating and readjust prices;Multiple price ladders are provided with price plan, period end time that also can be in price plan judges whether that current period should be terminated, in addition to time synchronized, whole process is completed at table end.

Description

The implementation method of IC-card intelligent gas meter ladder valuation
Technical field
The present invention relates to a kind of terminal intelligent combustion gas table management method, in particular, the invention mainly relates to a kind of IC The implementation method of card intelligent gas meter ladder valuation.
Background technology
It is the respective country Committee of Development and Reform to energy prices scheme with the development of society, the use demand of combustion gas increases year by year Unified plan, Some gases company will carry out terminal gas meter, flow meter the operation way of progressive price charging, but main flow at present Intelligent gas meter does not possess the function of ladder valuation, and part similar products on the market are deposited due to the time at table end with control end In difference, the unified adjustment of price ladder and price plan adjustment can not be carried out during valuation, so as to cause gas company There is the problem of charging is inconsistent during operation, thus be necessary to be ground for the function of existing main flow intelligent gas meter Study carefully and improve.
The content of the invention
An object of the present invention is that there is provided a kind of realization of IC-card intelligent gas meter ladder valuation for above-mentioned deficiency Method, with expect to solve main flow gas meter, flow meter in the prior art do not possess ladder valuation function, the time at similar products table end with Control end has differences, and causes to valuate and the technical problem such as disunity of readjusting prices.
To solve above-mentioned technical problem, the present invention uses following technical scheme:
A kind of implementation method of IC-card intelligent gas meter ladder valuation provided by the present invention, this method comprises the following steps:
The price plan that step A, IC card information Switching Module are read in IC-card is instructed and transmitted to ladder gas price main control Module, by the processor in ladder gas price main control module price plan is instructed in price plan store into memory, It can be synchronized the time of the clock information of table end clock chip and control end by processor, when making the system of clock chip Between be consistent with the system time of control end;
Counting circuit in step B, ladder gas price main control module receives what sensing device was collected from metering device Numerical value, and transmitted count results to processor by counting circuit, by cycle duration of the processor in price plan, Accumulative gas consumption in the record period duration is simultaneously stored into memory;By processor according to the initial valency in price plan Lattice ladder carries out calculation of price to count results;And processor also read in memory in cycle duration accumulative use gas Amount, is compared with the higher limit of initial prices ladder, judges whether the accumulative gas consumption in the current period duration reaches The upper limit of initial prices ladder, such as judged result are yes, then count results are entered according to next price ladder in price plan Row calculation of price, it is on the contrary then continue according to present price ladder to count results carry out calculation of price;
The time of step C, processor in clock chip judges whether current time is tied with the cycle in price plan The beam time is identical, and such as judged result is yes, then it is assumed that current period terminates, by the accumulative use in memory in cycle duration Tolerance is reset, and resets to the initial prices ladder of price plan to count results progress calculation of price;On the contrary then continuation, which is pressed, works as Preceding price ladder carries out calculation of price to count results.
Further technical scheme is:Price plan in the step A includes present price scheme and new price side Case, the present price scheme and new price plan are stored to memory respectively by processor, and new price is read by processor The execution time of scheme, and be compared with the current time in clock chip, judge whether current time meets new price side The execution time of case, such as judged result is yes, then present price scheme is replaced with into new price plan and performed, on the contrary then continue Perform present price scheme.
Further technical scheme is:Processor is carried out according to present price ladder to count results in the step B Calculation of price, is obtained after result of calculation, and the value of result of calculation is deducted from the amount of supplementing with money the data in memory.
Further technical scheme is:Processor records all accumulative gas consumptions simultaneously and held with the cycle in the step B Continue the accumulative gas consumption in the time and store to memory, and all accumulative gas consumptions are read and all from memory by processor Accumulative gas consumption in duration phase, output to display is shown.
Further technical scheme is:Judge that the mode whether current period terminates is in the step C:Processor is first First the time in clock chip judges whether when the day before yesterday be identical with the cycle starting date in present price scheme, is such as judged As a result be it is no, then continue by present price ladder to count results carry out calculation of price, it is on the contrary then by following formula continuation judgement be The no condition for meeting the cycle starting moon:
Mod (m+12-M, T)=0
In above formula, mod is MOD function, M for present price scheme starting of any cycle moon, m for clock chip when Between in current month, T be present price scheme in cycle duration, and T be 12 approximate number, when above formula is set up, then Think end cycle, on the contrary then continuation carries out calculation of price by present price ladder to count results.
Further technical scheme is:Processor is by the clock information of clock chip and the time of control end in step A The mode synchronized is to set clock information in price plan instruction, and clock information is synchronized into clock core by processor Piece.
Further technical scheme is:Processor is by the clock information of clock chip and control end in the step A The mode that time synchronizes is:By control end by present clock synchronizing information to clock synchronizer, clock synchronizer passes through it Internal time clock feature is continued to run with using present clock information as starting point, then the synchronous IC-card of clock is inserted into clock synchronizer, by Clock synchronizer will continue to run with the synchronous IC-card of present clock information write clock, the synchronous IC-card of clock is then inserted into table The IC-card deck at end, reads the clock information in the synchronous IC-card of clock by processor and is synchronized to clock chip.
Compared with prior art, one of beneficial effects of the present invention are:Table end is carrying out the mistake of information exchange with control end Journey carries out time synchronized with control end simultaneously, and then is consistent time of the table end all the time with control end, it is to avoid both occur Time deviation, causes disunity of valuating and readjust prices;And multiple price ladders are provided with price plan, can be handled by table end Accumulative gas consumption in the device collection period duration, whether real-time judge, which starts next price ladder, carries out charging, also may be used Period end time in price plan judges whether that current period should be terminated, and in addition to time synchronized, whole process is equal Completed at table end;A kind of implementation method step of IC-card intelligent gas meter ladder valuation simultaneously provided by the present invention is simple, While realizing ladder valuation, the uniformity of time between table end and control end is also ensure that, and can be based on existing intelligence combustion Gas meter realizes that application is wide.
Brief description of the drawings
Fig. 1 is the IC-card intelligent gas meter table end structure schematic block diagram of one embodiment of the invention;
Embodiment
The present invention is further elaborated below in conjunction with the accompanying drawings.
One embodiment of the present of invention is a kind of implementation method of IC-card intelligent gas meter ladder valuation, for intelligent gas The structure of table is as shown in figure 1, the intelligent gas meter includes ladder gas price main control module, IC card information Switching Module, clock core Piece and sensing device, wherein ladder gas price main control module respectively with IC card information Switching Module, clock chip, sensing device phase Connection, the ladder gas price main control module include processor, memory and counting circuit, the processor respectively with storage Device, counting circuit are connected;And counting circuit also accesses sensing device, sensing device access metering device;In the present embodiment Method include and preferably perform in accordance with the following steps:
The price plan that step S1, IC card information Switching Module are read in IC-card is instructed and transmitted to ladder gas price main control Module, by the processor in ladder gas price main control module price plan is instructed in price plan store into memory, And can be synchronized the time of the clock information of table end clock chip and control end by processor, when making the system of clock chip Between be consistent with the system time of control end;
Counting circuit in step S2, ladder gas price main control module receives what sensing device was collected from metering device Numerical value, and transmitted count results to processor by counting circuit, by cycle duration of the processor in price plan, Accumulative gas consumption in the record period duration is simultaneously stored into memory;Foregoing metering device can be installed in table end Mechanically or electrically on counting device, such as the magnetic part on base table mechanical counter character wheel, magnetic part is with counting Circuit inductance produces pulse signal, and counting circuit can carry out primary electron counting according to setting within a pulse period;
Calculation of price is carried out to count results according to the initial prices ladder in price plan by processor;Processor is read Accumulative gas consumption in memory in cycle duration, is compared with the higher limit of initial prices ladder, judges current week Whether the accumulative gas consumption in duration phase exceeds the upper limit of initial prices ladder, and such as judged result is yes, then according to price On the contrary next price ladder in scheme carries out calculation of price to count results, then continue according to present price ladder to counting knot Fruit carries out calculation of price;The aforementioned processor general accumulative gas consumption in cycle duration reads memory when reaching integer Accumulative gas consumption in middle cycle duration;
The time of step S3, processor in clock chip judges whether current time is tied with the cycle in price plan The beam time is identical, and such as judged result is yes, then it is assumed that current period terminates, by the accumulative use in memory in cycle duration Tolerance is reset, and resets to the initial prices ladder of price plan to count results progress calculation of price;On the contrary then continuation, which is pressed, works as Preceding price ladder carries out calculation of price to count results.Foregoing period end time refers to that Period Start Time is held plus the cycle The continuous time;It is August in 2015 1 day for example at the beginning of the cycle between, after period end time is 12 months started in the cycle, i.e., The time of end cycle should be August in 2016 1, after reaching the foregoing time, that is, resets to initial price ladder Price unit price, the carry out charging used combustion gas starts the circulation of next cycle.
Above-mentioned price ladder can be regarded as in the unit price of every cubic metre of combustion gas, a price plan comprising multiple different Between at the beginning of price ladder (1 rank, 2 ranks, 3 rank ... N ranks) and invoicing periods and cycle duration, different price ranks Ladder is different combustion gas charging unit prices, and each unit price is equipped with a higher limit, in this, as the switching of multiple chargings unit price Condition, such as when the combustion gas of X members/cubic meter is using reaching 50 cubic metres, according to Y since the usage amount of 51 cubic metres of combustion gas The unit price of member/cubic meter carries out calculation of price, generally, X < Y, i.e., in cycle duration, the gas quantity used is got over Many, the unit price of combustion gas charging is higher.
Above-mentioned cycle duration is in units of the moon, and 0 represents 1 year, and the moon can be 1,2,3,4,6,12;The beginning in cycle Time includes cycle the starting moon and cycle starting date, and the cycle originates the moon and started with 0, and 0 represents January, and 1 represents 2 months, by that analogy, 11 represent December;Cycle starting date starts with 0,0 table 1 day, by that analogy, and the end of month, the end of month default value 31 can be set.
For processor in above-mentioned steps S3 to judging whether the cycle of price plan terminates, inventor considers actually to make In it is possible that cycle duration across calendar year situation, to avoid cycle duration across the situation of calendar year Cause processor None- identified, it is ensured that whether the cycle terminates the accuracy judged;Inventor has done further research to this, i.e., Inventing for solving in one embodiment that technical problem is more highly preferred to, processor judges that current period is in step s3 The step of no end is:
Time in clock chip is judged when whether the day before yesterday is identical with the cycle starting date in present price scheme; If judged result be no, then continue by present price ladder to count results progress calculation of price, it is on the contrary then continued by following formula Judge whether to meet the condition that the cycle originates the moon:
Mod (m+12-M, T)=0
In above formula, mod is MOD function, M for present price scheme starting of any cycle moon, m for clock chip when Between in current month, T is the cycle duration in present price scheme, and T for 12 approximate number (i.e. T value can only be 1, 2nd, 3,4,6,12), and in units of the moon, it is on the contrary then continue to press present price ladder when above formula is set up, then it is assumed that end cycle Calculation of price is carried out to count results.Specifically above-mentioned formula is understood as current month and plus 12 and subtract starting month in cycle Again divided by cycle duration month, if divide exactly (remainder is 0), then illustrate that formula is set up;And above-mentioned formula also may be used It is interpreted as current month and plus 12 again divided by the month of cycle duration, when obtained remainder, which is equal to the cycle, originates month, then Illustrate that formula is set up, current period should terminate;By foregoing method, even if in price plan the cycle duration across from So year, also it can accurately calculate whether current period should terminate by above-mentioned formula.
In the present embodiment, table end is simultaneously same with the control end progress time in the process that information exchange is carried out with control end Step, and then it is consistent time of the table end all the time with control end, it is to avoid both time of occurrence deviations, cause to valuate and readjust prices not It is unified;And multiple price ladders are provided with price plan, can be by table end processor according to tired in cycle duration Gas consumption is counted, whether real-time judge, which starts next price ladder, carries out charging, end cycle that also can be in price plan Time judges whether that current period should be terminated, in addition to time synchronized, and whole process is completed at table end;And the present invention is in reality While existing ladder valuation, the uniformity of time between table end and control end is also ensure that, and existing intelligent gas can be based on Table is improved, and application is wide.
In another embodiment of the invention, readjusted prices in real time for convenience of gas company, the valency in above-mentioned step S1 Many set price plans, i.e., beginning often in set price plan comprising price ladder and invoicing periods can be included in lattice scheme Time and cycle duration;Specifically, price plan includes present price scheme and new price plan, described to work as present value Lattice scheme is stored to memory respectively with new price plan by processor, when reading the execution of new price plan by processor Between, it is compared with the current time in clock chip, judges whether current time meets the execution time (example of new price plan The date for such as performing the time is identical with the date of current time, or performs days of the date in current time of time Day before situation), such as judged result be yes, then present price scheme is replaced with into new price plan and performed, it is on the contrary then after It is continuous to perform present price scheme.
Further, be also stored with the amount of supplementing with money data in above-mentioned memory, by processor according to present price ladder to meter Number result carries out calculation of price, obtains after result of calculation, the value of result of calculation is deducted from the amount of supplementing with money the data in memory. And current gas consumption and accumulative gas consumption are checked for ease of user, also display can be set up in above-mentioned intelligent gas meter, And the processor in above-mentioned ladder gas price main control module is accessed into display, all accumulative gas consumptions are recorded by processor simultaneously With the accumulative gas consumption in cycle duration and storing to memory, and read from memory by processor all accumulative use Tolerance and the accumulative gas consumption in cycle duration, output to display are shown.
As this above-described embodiment is previously mentioned, the key that ladder valuation is realized be how to ensure table end and control end when Between it is consistent, even if otherwise setting the price ladder and cycle duration of price plan and its inside as described above, it is also difficult to make combustion Intelligent gas meter ladder valuation of the gas company to terminal carries out unified effective management, therefore in above-mentioned steps S1 of the present invention The problem of table end is with control end time synchronized, inventor has done many trials, and proposes following several preferred embodiments, uses Synchronized with the time to table end and terminal:
On the one hand, the clock information of control end can be directly integrated in price plan instruction, when IC card information interchange mode When block reads the price plan instruction in IC-card, while reading the clock information in instruction, and clock information is synchronized to clock Chip.Both can be made to carry out a time synchronized.
On the other hand, control end not repeatedly sends price plan instruction in the short time to table end, such as long-term without control End processed is synchronous with the clock at table end, and deviation occurs in the time between table end and control end that easily causes, therefore in control end not to table When end sends price plan instruction, also it is necessary regularly to enter row clock synchronization to the intelligent gas meter of terminal.Therefore above-mentioned step Processor is synchronized and can also individually carried out to the clock information in clock chip and control end in rapid S1, specifically by controlling End processed is believed by present clock synchronizing information to clock synchronizer, clock synchronizer by its internal time clock feature with present clock Cease and continued to run with for starting point, then the synchronous IC-card of clock is inserted into clock synchronizer, by clock synchronizer will continue to run with work as The synchronous IC-card of preceding clock information write clock, then the synchronous IC-card of clock is inserted the IC-card deck at table end, read by processor Clock synchronization IC-card in clock information and be synchronized to clock chip.
Simultaneously to ensure the accurate of clock chip, the accuracy of clock chip is lifted by the raising of calibration frequency, and And in a manner mentioned above, clock information can be made up of year, month, day, according to the actual requirements, the clock information can be also accurate to When, minute, second, millisecond.
Than that described above, in addition it is also necessary to which explanation is " one embodiment ", " another implementation spoken of in this manual Example ", " embodiment " etc., refer to that the specific features, structure or the feature that combine embodiment description are included in the application summary Property description at least one embodiment in.It is not necessarily to refer to same reality that statement of the same race, which occur, in multiple places in the description Apply example.Furthermore, it is understood that when describing a specific features, structure or feature with reference to any embodiment, what is advocated is knot Other embodiment is closed to realize that this feature, structure or feature are also fallen within the scope of the present invention.
Although reference be made herein to invention has been described for multiple explanatory embodiments of the invention, however, it is to be understood that Those skilled in the art can be designed that a lot of other modification and embodiment, and these modifications and embodiment will fall in this Shen Please be within disclosed spirit and spirit.More specifically, can in the range of disclosure, drawings and claims A variety of variations and modifications are carried out with the building block to theme composite configuration and/or layout.Except to building block and/or layout Outside the variations and modifications of progress, to those skilled in the art, other purposes also will be apparent.

Claims (4)

1. a kind of implementation method of IC-card intelligent gas meter ladder valuation, it is characterised in that methods described comprises the following steps:
The price plan that step A, IC card information Switching Module are read in IC-card is instructed and transmitted to ladder gas price main control module, By the processor in ladder gas price main control module price plan is instructed in price plan store into memory, and can be by Processor synchronizes the time of the clock information of table end clock chip and control end, makes system time and the control of clock chip The system time at end processed is consistent;The processor synchronizes the time of the clock information of clock chip and control end Mode is to set clock information in price plan instruction, and clock information is synchronized into clock chip by processor;
Counting circuit in step B, ladder gas price main control module receives the numerical value that sensing device is collected from metering device, And transmitted count results to processor by counting circuit, by cycle duration of the processor in price plan, record Accumulative gas consumption in cycle duration is simultaneously stored into memory;By processor according to the initial prices rank in price plan Ladder carries out calculation of price to count results;And processor also reads the accumulative gas consumption in memory in cycle duration, with The higher limit of initial prices ladder is compared, and judges whether the accumulative gas consumption in the current period duration reaches initial valency The upper limit of lattice ladder, such as judged result are yes, then carry out price to count results according to next price ladder in price plan Calculate, it is on the contrary then continue according to present price ladder to count results progress calculation of price;
When whether the time of step C, processor in clock chip judges current time with end cycle in price plan Between it is identical, such as judged result be yes, then it is assumed that current period terminates, by the accumulative gas consumption in memory in cycle duration Reset, and reset to the initial prices ladder of price plan and calculation of price is carried out to count results;On the contrary then continuation, which is pressed, works as present value Lattice ladder carries out calculation of price to count results;
Judge that the mode whether current period terminates is in the step C:Time of the processor first in clock chip is sentenced Whether disconnected be identical with the cycle starting date in present price scheme when the day before yesterday, and such as judged result is no, then continues to press to work as present value On the contrary lattice ladder carries out calculation of price, condition that is then continuing to determine whether to meet the cycle starting moon by following formula to count results:
Mod (m+12-M, T)=0
In above formula, mod is MOD function, and M is starting of any cycle moon of present price scheme, and m is in the time of clock chip Current month, T be present price scheme in cycle duration, and T be 12 approximate number, when above formula is set up, then it is assumed that End cycle, on the contrary then continuation carries out calculation of price by present price ladder to count results.
2. the implementation method of IC-card intelligent gas meter ladder valuation according to claim 1, it is characterised in that:The step Price plan in A includes present price scheme and new price plan, and the present price scheme and new price plan are by place Reason device is stored to memory respectively, is read by processor the execution time of new price plan, and during with current in clock chip Between be compared, judge whether current time meets the execution time of new price plan, such as judged result is yes, then will work as present value Lattice scheme replaces with new price plan and performed, on the contrary then continue executing with present price scheme.
3. the implementation method of IC-card intelligent gas meter ladder valuation according to claim 1, it is characterised in that:The step Processor carries out calculation of price according to present price ladder to count results in B, obtains after result of calculation, by the value of result of calculation Deducted from the amount of supplementing with money the data in memory.
4. the implementation method of the IC-card intelligent gas meter ladder valuation according to claim 1 or 3, it is characterised in that:It is described Processor records the accumulative gas consumption in all accumulative gas consumptions and cycle duration and stored to storage simultaneously in step B Device, and all accumulative gas consumptions and the accumulative gas consumption in cycle duration are read from memory by processor, output is extremely Display is shown.
CN201510725938.4A 2015-10-30 2015-10-30 The implementation method of IC-card intelligent gas meter ladder valuation Active CN105354934B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510725938.4A CN105354934B (en) 2015-10-30 2015-10-30 The implementation method of IC-card intelligent gas meter ladder valuation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510725938.4A CN105354934B (en) 2015-10-30 2015-10-30 The implementation method of IC-card intelligent gas meter ladder valuation

Publications (2)

Publication Number Publication Date
CN105354934A CN105354934A (en) 2016-02-24
CN105354934B true CN105354934B (en) 2017-08-29

Family

ID=55330901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510725938.4A Active CN105354934B (en) 2015-10-30 2015-10-30 The implementation method of IC-card intelligent gas meter ladder valuation

Country Status (1)

Country Link
CN (1) CN105354934B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201251814Y (en) * 2008-09-12 2009-06-03 北京博纳电气有限公司 Staircase prepaid electric energy meter
CN201465220U (en) * 2009-07-31 2010-05-12 郑州燃星电子科技有限公司 Ic card intelligent gas meter
CN102129219A (en) * 2010-10-25 2011-07-20 上海复展照明科技有限公司 Clock calibration method of wireless meter reading system and clock calibration method of distributed system
CN103794004B (en) * 2014-03-03 2016-03-09 徐州君兴电子科技有限公司 A kind of water meter with M_bus bus data transporting function for ladder valuation
CN203910007U (en) * 2014-06-19 2014-10-29 上海真兰仪表科技股份有限公司 GSM and GPRS public network transmission date-based gas meter

Also Published As

Publication number Publication date
CN105354934A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105115548A (en) Internet of things intelligent gas meter with tiered pricing function
CN105118183B (en) Intelligent gas meter ladder pricing system
CN105303707B (en) The implementation method of intelligent gas meter ladder valuation
CN105118182B (en) IC-card intellectual water meter with ladder valuation functions
CN205156932U (en) Thing networking intelligent gas meter ladder pricing system
CN105354934B (en) The implementation method of IC-card intelligent gas meter ladder valuation
CN105225351B (en) Remote-control intelligent gas meter ladder pricing system
CN105118184B (en) Intelligent gas meter with ladder valuation functions
CN105139533B (en) Remote transmission intelligent gas meter, flow meter with ladder valuation functions
CN105261124B (en) The implementation method of IC-card intellectual water meter ladder valuation
CN105354928B (en) The implementation method of remote transmission intelligent gas meter, flow meter ladder valuation
CN105222846B (en) The implementation method of Intelligent water meter of Internet of things ladder valuation
CN105303710B (en) The implementation method of Intelligent gas meter based on internet of things ladder valuation
CN105118181B (en) IC-card intelligent gas meter with ladder valuation functions
CN105303709B (en) The implementation method of remote transmission intelligent water meter ladder valuation
CN105225354B (en) IC-card intelligent gas meter ladder pricing system
CN105184982B (en) Remote transmission intelligent water meter ladder pricing system
CN105303708B (en) The implementation method of remote-control intelligent gas meter ladder valuation
CN105139532B (en) Remote-control intelligent water meter with ladder valuation functions
CN105184980B (en) Remote transmission intelligent water meter with ladder valuation functions
CN105243750B (en) IC-card intellectual water meter ladder pricing system
CN105225352B (en) Remote transmission intelligent gas meter, flow meter ladder pricing system
CN105205933B (en) Remote-control intelligent gas meter with ladder valuation functions
CN105389895B (en) The implementation method of remote-control intelligent water meter ladder valuation
CN105139531B (en) Intelligent water meter of Internet of things with ladder valuation functions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 610000 Longquanyi, Sichuan Province Industrial Park licensing

Applicant after: Chengdu Qinchuan networking Polytron Technologies Inc

Address before: 610000 Longquanyi, Sichuan Province Industrial Park licensing

Applicant before: Chengdu Taichuan Technology Development Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant