CN105354179A - Coke dry quenching report generation method - Google Patents

Coke dry quenching report generation method Download PDF

Info

Publication number
CN105354179A
CN105354179A CN201510733990.4A CN201510733990A CN105354179A CN 105354179 A CN105354179 A CN 105354179A CN 201510733990 A CN201510733990 A CN 201510733990A CN 105354179 A CN105354179 A CN 105354179A
Authority
CN
China
Prior art keywords
coke quenching
dry coke
data
file
generation method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510733990.4A
Other languages
Chinese (zh)
Inventor
曾攀
梁巍
江琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Group Corp
Original Assignee
Wuhan Iron and Steel Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Group Corp filed Critical Wuhan Iron and Steel Group Corp
Priority to CN201510733990.4A priority Critical patent/CN105354179A/en
Publication of CN105354179A publication Critical patent/CN105354179A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/12Use of codes for handling textual entities
    • G06F40/137Hierarchical processing, e.g. outlines

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Coke Industry (AREA)

Abstract

The present invention discloses a coke dry quenching report generation method. The method comprises the following steps: acquiring the system time of a coke dry quenching control system; judging whether the current system time is equal to the preset time or not; and if so, exporting online form data configured according to an item in an online form control into a CSV file named after the current date; at an interval of a first duration after exporting online form data into the CSV file, updating a start-stop position of the online form control so as to restore the automatic refresh of the online form; and and by calling a subprogram, importing the online form data in the CSV file into a first worksheet of an Excel template file to generate a coke dry quenching report of the current day. The coke dry quenching report generation method can avoid manual meter reading, thereby effectively solving the technical problems in the prior art that a way of manually making a coke dry quenching report be low in efficiency, and is difficult to avoid errors. The technical effect of automatic generation of a coke dry quenching report is realized, and the production efficiency and the accuracy of a coke dry quenching report are improved.

Description

A kind of dry coke quenching report form generation method
Technical field
The present invention relates to industrial automation, particularly relate to a kind of dry coke quenching report form generation method.
Background technology
So-called dry coke quenching is relative coke wet quenching, refers to and adopts inert gas by a kind of coke quenching method of red burnt cooling down.In dry coke quenching process, red Jiao of 1000 DEG C loads from dry furnace roof portion of putting out, the cryogenic inert recyclegas of 130 DEG C is blasted by circulating fan and dryly puts out in the red focus layer of stove cooling section, absorb red burnt sensible heat, cooled coke (lower than 200 DEG C) is discharged from the dry furnace bottom that puts out, flow through coke dry quenching boiler carry out heat interchange from dry annular flue high temperature inert gas out of putting out, boiler develops steam vapor, cooled inert gas is again blasted by circulating fan and dryly puts out stove, and inert gas uses at the system Inner eycle closed.
Form carrys out Dynamic Announce data with the form such as form, chart exactly, can be formulated as: " form+dynamic data of form=various ".In the industrial production, form occupies very main status always, the technological parameter at its general record scene and statistical information.For the slip-stick artist of industry control industry, the form how developing applicable user's request is a difficult problem always.
In prior art, the human interface software self of dry coke quenching control system is with report capability, but some simple forms can only be made, current dry coke quenching form completes mainly through manual metering, and the mode efficiency of this manual manufacture dry coke quenching form is low, and is difficult to avoid makeing mistakes.
Summary of the invention
The embodiment of the present invention is by providing a kind of dry coke quenching report form generation method, and the mode efficiency solving manual manufacture dry coke quenching form in prior art is low, and is difficult to the technical matters avoiding makeing mistakes.
Embodiments provide a kind of dry coke quenching report form generation method, be applied to dry coke quenching control system, described dry coke quenching report form generation method comprises the steps:
Obtain the system time of described dry coke quenching control system;
Judge whether current described system time equals Preset Time, if then export to in the csv file of current date name by the online list data in online grid control good for foundation project configuration;
Upgrade the start-stop bit of described online grid control during interval the first duration after exporting in described csv file by described online list data, make to recover automatically to refresh online form;
By call subroutine the described online list data in described csv file imported in the first worksheet of Excel template file and be generated as dry coke quenching form on the same day.
Preferably, described being imported to by described online list data in described csv file by call subroutine in the first worksheet of Excel template file is generated as dry coke quenching form on the same day, comprising:
Obtain the path of VBS file place file;
Create the described csv file that Excel application carrys out implicit opening generation on the same day;
Automatically described csv file is closed after copying the described online list data in described csv file;
The data in described first worksheet are emptied after Excel template file described in implicit opening;
Carry out apportion in online list data to described first worksheet described in automatic adhesion;
Very first time data after apportion are divided and is classified as date and concrete time;
Described online list data process is generated as dry coke quenching form on described same day based on the data-mapping in described Excel template file and computing formula.
Preferably, described based on the data-mapping in described Excel template file and computing formula described online list data process to be generated as dry coke quenching form on described same day after, described method also comprises:
Obtain system data;
When current described system data is the default date monthly, all copies to needing the data into monthly magazine in described first worksheet of every day in appointment month lattice and obtain a moon dry coke quenching form.
Preferably, described by after needing the data into monthly magazine all to copy to specify in month lattice to obtain moon dry coke quenching form in described first worksheet of every day, described method also comprises:
Be nested with calculating formula by what call described Excel template file, the described moon dry coke quenching form of 12 every months in the middle of the month carried out total and obtains a year dry coke quenching form.
Preferably, before the system time of the described dry coke quenching control system of described acquisition, described method also comprises:
The collection period arranging each variable in described online list data is very first time interval;
Arranging the filing displaying cycle was second time interval.
Preferably, before the system time of the described dry coke quenching control system of described acquisition, described method also comprises:
The start time in described filing displaying cycle is set;
The displaying number that each filing is shown is set.
Preferably, described first duration is specially 5s.
The one or more technical schemes provided in the embodiment of the present invention, at least have following technique effect or advantage:
The embodiment of the present invention adopt dry coke quenching control system with online data grid control online list data needed for dry coke quenching form is derived the csv file saved as with the name of date on the same day, realize dry coke quenching control system and automatically generate dry coke quenching form on the same day every day.Thus avoid manual metering, therefore the mode efficiency efficiently solving manual manufacture dry coke quenching form in prior art is low, and be difficult to the technical matters avoiding makeing mistakes, achieve the technique effect automatically dissolving dry coke quenching form, improve production efficiency and the accuracy of dry coke quenching form.
Further, the embodiment of the present invention by csv file as middle layer, the data of dry coke quenching form and form are made and has clearly divided, dry coke quenching control system with human interface software be responsible for the acquisition of online list data, the establishment of Excel then only responsible form, reduce the degree of coupling of system, improve efficiency, be also convenient to the maintenance in later stage.
Further, generate based on dry coke quenching form automated periodic on the same day, so automatically generate moon dry coke quenching report form and year dry coke quenching form.Achieve monthly, annual dry coke quenching form automatically generates, and further increases production efficiency and the accuracy of dry coke quenching form.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments of the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the accompanying drawing provided.
Fig. 1 be in the embodiment of the present invention same day dry coke quenching report form generation method process flow diagram;
Fig. 2 is the flowchart of embodiment of the present invention sub-routine;
Fig. 3 is the refinement flowchart of master routine in the embodiment of the present invention.
Embodiment
For making the object of the embodiment of the present invention, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
A kind of dry coke quenching report form generation method that the embodiment of the present invention provides, is applied in a dry coke quenching control system, and shown in figure 1, this dry coke quenching report form generation method comprises the steps:
The system time of S101, acquisition dry coke quenching control system;
Concrete, the dry coke quenching human interface software of dry coke quenching control system is the software platform that the quenching report form generation method in the embodiment of the present invention is implemented, inside the overall script of WINCC (WindowsControlCenter, form control center), arrange separately the overall script of a scan period scan system time.In specific implementation process, the scan period can be set as 1S.
S102, judge whether current system time equals Preset Time, if then export to according to the online list data in the good online grid control of project configuration with in the csv file of current date name.
Concrete, can write master routine in overall VBS (VisualBasicScript), the activation period arranging master routine is 1 second.Concrete, take Preset Time as 05:30 be example, then get system time be current hour H, minute M and second S, judge whether hour H equals 5 and whether minute M equals 30, equal 05:30 at system time then to continue to judge second, whether S equaled 0, if second, S equaled 0, the online list data in online grid control good for foundation project configuration is exported to in CSV (Comma-SeparatedValues, the comma separated value) file of current date name.
Concrete, the csv file that acquiescence is preserved is the clear data file with CSV.The file " year-month-day .csv " by name of csv file, the file path of csv file is path, project place “ Export OnlineTableControl ".
In specific implementation process, the control name of the online data grid control called is set to Control4, online data grid control comprises whole variablees of dry coke quenching process, in specific implementation process, whole variablees that online data grid control comprises have following variable: air circulation flow FI-213, prestore chamber pressure PICA-109, boiler inlet gaseous tension PIA-119, boiler export gaseous tension PI-122, circulating fan inlet pressure PIA-125, circulating fan top hole pressure PIA-126, prestore room temperature TI-106, main steam flow FQ-208, 67 variablees such as low-pressure steam flow FQ-310, wherein, online data grid control comprises 4 cumulative variations.
Concrete, the collection period arranging each variable in online list data before the system time obtaining dry coke quenching control system is very first time interval; Arranging the filing displaying cycle was second time interval.The start time in filing displaying cycle was set before the system time obtaining dry coke quenching control system and the displaying number of filing at every turn and showing is set.
Such as, the collection period that can arrange variable is set to 1 minute, and can arrange the filing displaying cycle is 1 hour, and arranging each displaying number is 25.Then dry coke quenching control system is from integral point, once gathers each variable according to set collection period at interval of 1 minute, shows that the cycle showed 25 at interval of 1 hour according to the filing arranged.
Upgrade the start-stop bit of online grid control when S103, interval the first duration after exporting in csv file by online list data, make to recover automatically to refresh online form.
Because online form can stop automatic refreshing when deriving online list data, then execute at S102 the automatic refreshing that interval first duration recovers online form, thus continue to derive online list data.
Such as, in specific implementation process, preferably the first duration can be set as 5S, but is not limited to 5S.Online list data then in online grid control exports to the automatic refreshing to recover online form after in the csv file of current date name after 5S.
S104, by call subroutine the online list data in csv file imported to Excel template file the first worksheet in be generated as dry coke quenching form on the same day.
Concrete, shown in figure 2, by call subroutine the online list data in csv file imported in the first worksheet of Excel template file and be generated as dry coke quenching form on the same day, specifically comprise the steps S1041 ~ S1047:
S1041: the path obtaining VBS file place file.
S1042: create the csv file that Excel application carrys out implicit opening generation on the same day.
S1043: close csv file after automatically copying the online list data in csv file.
S1044: empty the data in the first worksheet after implicit opening Excel template file.
S1045: carry out apportion in the online list data of automatic adhesion to the first worksheet, concrete, apportion action is undertaken by the macros called in template file.
S1046: the very first time data after apportion are divided and is classified as date and concrete time, in specific implementation process, first row time data is divided automatically further be classified as " ' year-month-day '+' time: point: second '+' time zone ' ".
S1047: online list data process is generated as dry coke quenching form on the same day based on the data-mapping in Excel template file and computing formula.Carry out calculating by the data-mapping in Excel template and nested calculating formula and complete dry coke quenching form on the same day.C3 ", cell is set to numerical value, and decimal digits is set to 1.
Further, after execution S104, the dry coke quenching report form generation method that the embodiment of the present invention provides also comprises the steps: to obtain system data; When current system data is the default date monthly, all automatically copies to needing the data into monthly magazine in first worksheet of every day in appointment month lattice and obtain a moon dry coke quenching form.Such as, the default date can be monthly first day.Then when system data is " moon=1 " and " day=1 " time automatically copy " BJ26:BM26 " of Sheet1, " B2:E2 " that paste Sheet10 of not tape format, thus obtain the instantaneous value of a semi-invariant.Perform the instantaneous value that similar operations obtains 11 semi-invariants of the 2-12 month correspondence 2-12 month.Then the instantaneous value that the instantaneous value in February deducts January just obtains single month to date value in February, carries out the single month to date value obtaining every month successively, and wherein single month to date value in January is the instantaneous value that the instantaneous value in January in this year deducts last Dec.By " B16:E16 " of Sheet10 not tape format copy the moon dry coke quenching form that " B9:E9 " that paste moon dry coke quenching form obtains January, 2-12 all obtains the moon dry coke quenching form in corresponding 2-12 month afterwards.
Further, by after needing the data into monthly magazine all to copy in first worksheet of every day to specify in month lattice, the dry coke quenching report form generation method that the embodiment of the present invention provides also comprises the steps:
Be nested with calculating formula by calling excel template file, the moon dry coke quenching form of 12 every months in the middle of the month carried out total and obtains a year dry coke quenching form.Concrete, year dry coke quenching form by 12 single month to date values of Sheet10 and obtain a year dry coke quenching form.
Below, with reference to figure 3, example that to take Preset Time as 5:30 be to the execution flow process of the carrying out citing subroutine of dry coke quenching report form generation method provided by the invention, but is not used in restriction the present invention:
S1, interval scanning in 1 second obtain system time.
S2, H equals 5 and judge whether that a minute M equals 30 when judging that whether the system time of current acquisition is little, if a hour H equals 5 and minute equal 30, triggers and obtains online list data, export to file and be called in the csv file of current date name.
S3, judge whether S second of the system time of current acquisition equals 5, if the start-stop bit then upgrading online grid control continues to refresh by data.
S4, judge second, whether S equaled 10, if then create " WScript.Shell " object, by the subroutine under this " WScript.Shell " object reference csv file folder.Then then continue the step of the S1041 ~ S1047 of execution subroutine, the action performing a master routine so far terminates.
By one or more technical schemes that the invention described above embodiment provides, the present invention at least achieves technique effect or advantage:
The one or more technical schemes provided in the embodiment of the present invention, at least have following technique effect or advantage:
The embodiment of the present invention adopt dry coke quenching control system with online data grid control online list data needed for dry coke quenching form is derived the csv file saved as with the name of date on the same day, realize dry coke quenching control system and automatically generate dry coke quenching form on the same day every day.Thus avoid manual metering, therefore the mode efficiency efficiently solving manual manufacture dry coke quenching form in prior art is low, and be difficult to the technical matters avoiding makeing mistakes, achieve the technique effect automatically dissolving dry coke quenching form, improve production efficiency and the accuracy of dry coke quenching form.
Further, the embodiment of the present invention by csv file as middle layer, the data of dry coke quenching form and form are made and has clearly divided, dry coke quenching control system with human interface software be responsible for the acquisition of online list data, the establishment of Excel then only responsible form, reduce the degree of coupling of system, improve efficiency, be also convenient to the maintenance in later stage.
Further, generate based on dry coke quenching form automated periodic on the same day, so automatically generate moon dry coke quenching report form and year dry coke quenching form.Achieve monthly, annual dry coke quenching form automatically generates, and further increases production efficiency and the accuracy of dry coke quenching form.
Although describe the preferred embodiments of the present invention, those skilled in the art once obtain the basic creative concept of cicada, then can make other change and amendment to these embodiments.So claims are intended to be interpreted as comprising preferred embodiment and falling into all changes and the amendment of the scope of the invention.
Obviously, those skilled in the art can carry out various change and modification to the present invention and not depart from the spirit and scope of the present invention.Like this, if these amendments of the present invention and modification belong within the scope of the claims in the present invention and equivalent technologies thereof, then the present invention is also intended to comprise these change and modification.

Claims (7)

1. a dry coke quenching report form generation method, is applied to dry coke quenching control system, it is characterized in that, described dry coke quenching report form generation method comprises the steps:
Obtain the system time of described dry coke quenching control system;
Judge whether current described system time equals Preset Time, if then export to in the csv file of current date name by the online list data in online grid control good for foundation project configuration;
Upgrade the start-stop bit of described online grid control during interval the first duration after exporting in described csv file by described online list data, make to recover automatically to refresh online form;
By call subroutine the described online list data in described csv file imported in the first worksheet of Excel template file and be generated as dry coke quenching form on the same day.
2. dry coke quenching report form generation method as claimed in claim 1, it is characterized in that, described being imported to by described online list data in described csv file by call subroutine in the first worksheet of Excel template file is generated as dry coke quenching form on the same day, comprising:
Obtain the path of VBS file place file;
Create the described csv file that Excel application carrys out implicit opening generation on the same day;
Automatically described csv file is closed after copying the described online list data in described csv file;
The data in described first worksheet are emptied after Excel template file described in implicit opening;
Carry out apportion in online list data to described first worksheet described in automatic adhesion;
Very first time data after apportion are divided and is classified as date and concrete time;
Described online list data process is generated as dry coke quenching form on described same day based on the data-mapping in described Excel template file and computing formula.
3. dry coke quenching report form generation method as claimed in claim 2, it is characterized in that, described based on the data-mapping in described Excel template file and computing formula described online list data process to be generated as dry coke quenching form on described same day after, described method also comprises:
Obtain system data;
When current described system data is the default date monthly, all copies to needing the data into monthly magazine in described first worksheet of every day in appointment month lattice and obtain a moon dry coke quenching form.
4. dry coke quenching report form generation method as claimed in claim 3, is characterized in that, described by after needing the data into monthly magazine all to copy to specify in month lattice to obtain moon dry coke quenching form in described first worksheet of every day, described method also comprises:
Be nested with calculating formula by what call described Excel template file, the described moon dry coke quenching form of 12 every months in the middle of the month carried out total and obtains a year dry coke quenching form.
5. dry coke quenching report form generation method as claimed in claim 1, it is characterized in that, before the system time of the described dry coke quenching control system of described acquisition, described method also comprises:
The collection period arranging each variable in described online list data is very first time interval;
Arranging the filing displaying cycle was second time interval.
6. dry coke quenching report form generation method as claimed in claim 5, it is characterized in that, before the system time of the described dry coke quenching control system of described acquisition, described method also comprises:
The start time in described filing displaying cycle is set;
The displaying number that each filing is shown is set.
7. dry coke quenching report form generation method as claimed in claim 1, it is characterized in that, described first duration is specially 5s.
CN201510733990.4A 2015-11-02 2015-11-02 Coke dry quenching report generation method Pending CN105354179A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510733990.4A CN105354179A (en) 2015-11-02 2015-11-02 Coke dry quenching report generation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510733990.4A CN105354179A (en) 2015-11-02 2015-11-02 Coke dry quenching report generation method

Publications (1)

Publication Number Publication Date
CN105354179A true CN105354179A (en) 2016-02-24

Family

ID=55330153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510733990.4A Pending CN105354179A (en) 2015-11-02 2015-11-02 Coke dry quenching report generation method

Country Status (1)

Country Link
CN (1) CN105354179A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291793A (en) * 2016-04-13 2017-10-24 三菱电机大楼技术服务株式会社 PLC system specification generates servicing unit
CN108009190A (en) * 2017-08-17 2018-05-08 北京车和家信息技术有限责任公司 A kind of data export method, data guiding system and computer installation
CN108549624A (en) * 2018-04-18 2018-09-18 宁夏通信规划设计院(有限责任公司) Engineeing design for communication budget and illustrate text automation generate system and method
CN108710602A (en) * 2018-05-15 2018-10-26 深圳市继尧信息技术有限公司 Processing method, device, computer equipment and the storage medium of achievement data
CN112162953A (en) * 2020-07-14 2021-01-01 三诺生物传感股份有限公司 Current data processing method and device, current data processing equipment and storage medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201884070U (en) * 2010-11-08 2011-06-29 秦皇岛天业通联重工股份有限公司 Preceding geology predictor applied to tunnel fast drilling rig
CN102184631A (en) * 2011-03-08 2011-09-14 西安交通大学 Household energy consumption data acquisition and real-time display system and using method thereof
US20130139046A1 (en) * 2011-11-25 2013-05-30 Chih-Kuang Chang Computing device and method for generating measurement report of objects
CN104503744A (en) * 2014-12-08 2015-04-08 金川集团股份有限公司 Automatic report form generating method for mine filling technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201884070U (en) * 2010-11-08 2011-06-29 秦皇岛天业通联重工股份有限公司 Preceding geology predictor applied to tunnel fast drilling rig
CN102184631A (en) * 2011-03-08 2011-09-14 西安交通大学 Household energy consumption data acquisition and real-time display system and using method thereof
US20130139046A1 (en) * 2011-11-25 2013-05-30 Chih-Kuang Chang Computing device and method for generating measurement report of objects
CN104503744A (en) * 2014-12-08 2015-04-08 金川集团股份有限公司 Automatic report form generating method for mine filling technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
梁巍: "干熄焦自动控制系统的设计与应用", 《中国优秀硕士论文全文数据库》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107291793A (en) * 2016-04-13 2017-10-24 三菱电机大楼技术服务株式会社 PLC system specification generates servicing unit
CN107291793B (en) * 2016-04-13 2022-01-11 三菱电机大楼技术服务株式会社 PLC system specification generation assisting device
CN108009190A (en) * 2017-08-17 2018-05-08 北京车和家信息技术有限责任公司 A kind of data export method, data guiding system and computer installation
CN108009190B (en) * 2017-08-17 2020-09-29 北京车和家信息技术有限责任公司 Data export method, data export system and computer device
CN108549624A (en) * 2018-04-18 2018-09-18 宁夏通信规划设计院(有限责任公司) Engineeing design for communication budget and illustrate text automation generate system and method
CN108549624B (en) * 2018-04-18 2021-08-27 宁夏通信规划设计院(有限责任公司) Automatic generation system and method for communication engineering design budget and description text
CN108710602A (en) * 2018-05-15 2018-10-26 深圳市继尧信息技术有限公司 Processing method, device, computer equipment and the storage medium of achievement data
CN112162953A (en) * 2020-07-14 2021-01-01 三诺生物传感股份有限公司 Current data processing method and device, current data processing equipment and storage medium
CN112162953B (en) * 2020-07-14 2022-10-21 三诺生物传感股份有限公司 Current data processing method and device, current data processing equipment and storage medium

Similar Documents

Publication Publication Date Title
CN105354179A (en) Coke dry quenching report generation method
CN104778124A (en) Automatic testing method for software application
CN104484269A (en) Method for automatically generating testing script
CN108304327A (en) Static code scanning result treating method and apparatus
Van den Bergh et al. A mixed-integer linear formulation of the unit commitment problem
CN102508660A (en) Generation method and device of executable file
US8965746B2 (en) System and method for validating an electrical network model
CN102360331A (en) Test program automatic generation method based on formal description
CN111369279B (en) Engineering settlement method, system, device and storage medium based on Revit
CN102789401B (en) Test process control method and device on basis of flexible testing technology
CN115563924A (en) Integrated circuit layout process information transplanting method, device, medium and terminal
US20180260494A1 (en) Systems and methods for adjusting properties of objects depicted in computer-aid design applications
CN104537150A (en) Statistical method for pipe support materials in PDMS
US20190063332A1 (en) Systems and methods for nox prediction in a power plant
CN109918363B (en) Method for carrying out data model consistency management based on view cross-database type
US9239720B2 (en) Device and method for generating application model based on layered structure
JP7207989B2 (en) Simulation device and simulation method
Pavičević et al. Bi-directional soft-linking between a whole energy system model and a power systems model
CN110222385A (en) A kind of cock fast modeling method peculiar to vessel based on parametrization
CN109635032B (en) Data conversion method and terminal
CN104063232B (en) A kind of method of the system development utilizing based on database parameter
CN113807773A (en) Method, device and equipment for generating steel structure industry manufacturing list and storage medium
CN109241571B (en) CRDT-based real-time collaborative editing method for CAD model supporting features
JP5649004B2 (en) Set value management apparatus, set value management method and program
CN111125956B (en) Automobile finite element model assembling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160224

WD01 Invention patent application deemed withdrawn after publication