CN105350932A - Gas well under-pressure induced-flow plug-removal draining technique - Google Patents

Gas well under-pressure induced-flow plug-removal draining technique Download PDF

Info

Publication number
CN105350932A
CN105350932A CN201510733145.7A CN201510733145A CN105350932A CN 105350932 A CN105350932 A CN 105350932A CN 201510733145 A CN201510733145 A CN 201510733145A CN 105350932 A CN105350932 A CN 105350932A
Authority
CN
China
Prior art keywords
pressure
preventer
well head
well
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510733145.7A
Other languages
Chinese (zh)
Other versions
CN105350932B (en
Inventor
原学玉
徐宪胜
于开斌
刘付喜
薛文礼
魏后超
王子磊
郑嵇元
郭礼
关培元
葛继伟
王元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CN201510733145.7A priority Critical patent/CN105350932B/en
Publication of CN105350932A publication Critical patent/CN105350932A/en
Application granted granted Critical
Publication of CN105350932B publication Critical patent/CN105350932B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B31/00Fishing for or freeing objects in boreholes or wells
    • E21B31/03Freeing by flushing

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid-Pressure Circuits (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to the technical field of gas production of gas wells, and especially relates to a gas well under-pressure induced-flow plug-removal draining technique. The technique comprises an under-pressure swabbing drainage construction procedure which comprises equipment installation. The equipment installation comprises site layout, vehicle arrangement and derrick erection; and connection of wellhead blowout preventers on the ground, an adapter flange, a hydraulic-drive single-ram blowout preventer, a hydraulic-drive three-ram blowout preventer, a pressure release tee joint and a blowout preventing pipe being connected in turn, the hydraulic-drive single-ram blowout preventer and the hydraulic-drive three-ram blowout preventer forming a blowout preventer group, and the hydraulic-drive three-ram blowout preventer being composed of a shear ram preventer, a blind ram preventer and a semi-sealed ram preventer. The swabbing draining technology and the under-pressure operation technology are organically combined, long-range control and operation of wellhead pressure during under-pressure swabbing operation is realized, operating risks are lowered, the technique is safe and reliable, requirements for gas well under-pressure swabbing draining construction operation are met, and technical blanks in national gas well under-pressure swabbing induced-flow plug-removal draining techniques are filled.

Description

A kind of gas well induced flow de-plugging with pressure fluid-discharge technology
Technical field:
The present invention relates to gas well production gas technology field, particularly a kind of gas well induced flow de-plugging with pressure fluid-discharge technology.
Background technology:
In gas well gas production manufacturing process, production capacity can be caused to reduce gradually because hydrops in well makes gas-bearing formation water logging block, open or end-of-life state between being even in, have a strong impact on gas well output.And gas well at present conventional comprise operation induced flow, de-plugging pressure after etc. the method for discharge opeing mainly contain coiled tubing, gas lift liquid drainage etc., long construction period, costly, and DeGrain sometimes.It is most economical effective method that gas well implements swab the well in de-plugging discharge opeing with pressure by flow string.
Current pumping discharge opeing technology is limited to oil-water well and asks product induced flow or drag in the techniques such as oil volume increase, although have developed the ancillary facility such as swab damper, liquid controlled blowout preventing box in the safe pumping technology of gas well, but because blowout preventer equipment and technology operation are relatively simple, still be limited to low-voltage and low-yield poor efficiency hydrops gas well discharge opeing construction, well head is relatively with no pressure and strata pressure is relatively little.
All the time, group company forbids strictly gas well swabbing induced flow, do not reach gas well because of the hermetic seal ability to swabbing operation wire rope, well head air pressure blowout prevention control ability and technology exactly and take out the requirements such as well control emergency disposal ability when the rear well head pressure of spray raises suddenly, once well head is out of control will cause serious consequence.
Band operation technique is ripe already, and the construction of current gas well Operating Pressure reaches more than 100Mpa to the blowout prevention control ability of well head air pressure, but its well control technique also effectively could not to be applied to gas well pumping with pressure construction technology technical.
Summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of gas well induced flow de-plugging with pressure fluid-discharge technology, pumping discharge opeing technology and Operating Pressure technology organically combine by this technique, achieve the remote control operation of swabbing operation with pressure construction to well head pressure, reduce operational risk, technology is safe and reliable, meet the requirement of oil gas field gas well pumping discharge opeing with pressure construction operation, fill up domestic gas well swab the well in de-plugging with pressure fluid-discharge technology technological gap.Overcome the deficiency that existing gas well cannot realize swab the well in de-plugging discharge opeing with pressure.
The technical solution used in the present invention is: a kind of gas well induced flow de-plugging with pressure fluid-discharge technology, and this processing step is as follows:
One, pumping discharge opeing construction sequence with pressure:
I erection equipment
1. site layout project, vehicle spot cars, erection of derrick;
2. ground connect wellhead blowout preventer: adapter flange, the single ram type perventer that surges, the triple ram preventer that surges, bleed off pressure threeway, lubricator connects in turn, the single ram type perventer that surges forms blowout preventer set with the triple ram preventer that surges, and the triple ram preventer that surges is made up of shear ram preventer, blind rams preventer and half envelope ram preventer;
3. installation check wire rope sealer, card rope socket, installs well head constructing operation platform;
4. remove former christmas tree top thread flange, install wellhead blowout preventor group and lubricator, connect blowout preventer set liquid controling pipe line, carry out system debug;
5. enter in lubricator under waterpower swab being connected rope socket, lubricator is connected with wire rope sealer;
6. in well head christmas tree side, liquid-operated flat valve is installed, liquid-operated flat valve connects gas-liquid separator, gas-liquid separator discharge opeing port closing, gas-liquid separator air exit connects choke manifold, choke manifold is connected with sleeve pipe by choke valve, choke manifold installs pressure limiting valve, and pressure limiting valve connects emptying igniting pipeline;
II hydraulic system debugging
1. the reversal valve in fluid path between swabbing operation car and well head tele-control system is switched to control system voltage supply position;
2. hydraulic system is suppressed to 21Mpa, sets blowout preventer set, wire rope sealer and greasing pump work pressure by pressure regulator valve;
3. surge single ram type perventer, shear ram preventer, blind rams preventer, half envelope ram preventer and liquid-operated flat valve of switch debugging is working properly;
4. debug hydraulic work system normal after, first close the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then check that whether each pressure meter of operating desk normal, whether operating valve is in meta;
5. in pumping process, hydraulic pump is the voltage supply of well head tele-control system always;
III pumping discharge opeing with pressure
Before every mouthful of well pumping discharge opeing first, necessary first siphunculus, scraping, verify level, tubing string situation, carries out pumping discharge opeing construction after adjustment control system works is normal;
1. open well head christmas tree and the gate valve of liquid-operated flat valve side is installed, make well head and liquid-operated flat valve, gas-liquid separator, choke manifold, sleeve pipe UNICOM;
2. the wellhead sluice valve on blind rams preventer and christmas tree center line is opened;
3. descend waterpower swab, speeds control is within 6m/s; When swab enters below liquid level, lowering velocity controls within 2m/s; In φ 73 oil pipe, maximum submergence must not more than 150m; In φ 89 oil pipe, maximum submergence must not more than 100m;
4. propose pumping discharge opeing on: under waterpower swab behind precalculated position, operation is carried, speeds control at 4m/s, swab is carried apart from well head 100m time, within upward strain speed reduces to 2m/s;
5. well head hilllock is responsible for observing fluidity, pressure and wire rope mark, the hand operation of commander's compounding practice; Operator is noted observing weight indicator, referring to the data variation deeply felt, and has recorded level, submergence, discharge opeing liquid measure supplemental characteristic;
6., after swab enters lubricator by wellhead blowout preventor group, close blind rams preventer and observe;
7. according to fluid column situation in well, need more than 30min be observed, secondary pumping discharge opeing can be carried out;
8. the fluid reservoir of gas-liquid separator enters the recovery of receipts flow container by explosion-proof oil pump after reaching and reclaiming liquid measure;
IV construction ending
1. after pumping discharge opeing terminates, waterpower swab is carried in lubricator, close well head control block valve;
2. after lubricator pressure release, wire rope sealer of dismantling, upper belt goes out waterpower swab, takes off maintenance process;
3. discharge opeing outlet gate valve and other gate valve of christmas tree is closed;
4., after hydraulic control system pressure release, the whole hydraulic control lines of wellhead blowout preventer is removed;
5. remove whole wellhead blowout preventer, recover well head original appearance;
6. remove and receive tank truck and ground gas-liquid separation device connecting line, tank car leaves well site;
7. remove well-mouth operating floor, safe folding and unfolding derrick, instrument and material are regained, and place is cleaned;
Two, well head pressure control program
I normal construction well head pressure controls
1. wire rope sealer packing tightens self-sealing borehole pressure;
2. stop-leak compound is noted: in pumping discharge opeing process, swab drives liquid to time up, well head pressure raises, and when leakage appears in wire rope sealer, first can promote greasing pump continuously to greasing in wire rope sealer until sealer packing has stop-leak compound to overflow by long-range hydraulic control platform;
3. compress packing: well head pressure continues to raise, and when greasing can not make wire rope sealer seal, promotes wire rope sealer packing pilot operated valve device continuously by long-range hydraulic control platform, compression packing is to wellhead sealing;
4. stop-leak compound and compression packing sustainable blocked operation is noted, if also blow-by, adjustable wire rope sealer and greasing pump fluid control pressure is the highest sets 10.5Mpa;
5. close half envelope: the greasing of wire rope sealer, also blow-by when being compressed to maximum pressure, close and partly seal ram preventer, make it collaborative with wire rope sealer and seal;
II promptly shears closing well program
When discovery well head pressure can not seal, and now waterpower swab cannot have been carried safely in the above lubricator of well head, can start urgent shearing closing well program:
1. stop rope operation immediately, drum brake is killed fixing;
2. close the single ram type perventer that surges, operating control handle continuous pressure 2-3 time, guarantees that S type slip flashboard is held tightly;
3. open the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then operating control handle closes shear ram preventer, cut off wire rope simultaneously shear ram preventer close shut-in well;
4. go up rope head and close blind rams preventer;
5. after the emergency cut-off of wellhead blowout preventor group, then close outlet liquid-operated flat valve, observe well head pressure;
Treatment procedures after III urgent shearing closing well
1. need to observe more than 30min after urgent closing well, well head without after pressure change, then carries out well head disposal;
If 2. well head has pressure to bleed off pressure procedure operation by well head to bleed off pressure, be zero to well head pressure;
3. surge triple ram preventer and top wellhead blowout preventer thereof is removed;
4. single ram type perventer top of surging is exposed fag end and is docked with swabbing operation car steel wire rope head and stuckly block jail;
5. operate cylinder rope, until wire rope stressed >=well in after waterpower swab and wire rope weight, operation pilot operated valve device opens the single ram type perventer that surges, and proposes wire rope and waterpower swab in well, closes well head christmas tree gate valve.
The invention has the beneficial effects as follows: pumping discharge opeing technology and Operating Pressure technology organically combine by the present invention, achieve the remote control operation of swabbing operation with pressure construction to well head pressure, reduce operational risk, technology is safe and reliable, meet the requirement of oil gas field gas well pumping discharge opeing with pressure construction operation, fill up domestic gas well swab the well in de-plugging with pressure fluid-discharge technology technological gap.
Accompanying drawing illustrates:
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Fig. 1 is wellhead blowout preventer structural representation.
Fig. 2 is discharge opeing control device of exit pressure schematic diagram.
Detailed description of the invention:
A kind of gas well induced flow de-plugging with pressure fluid-discharge technology, this processing step is as follows:
One, pumping discharge opeing construction sequence with pressure:
I erection equipment
1. site layout project, vehicle spot cars, erection of derrick;
2. ground connect wellhead blowout preventer: adapter flange 1, the single ram type perventer 2 that surges, the triple ram preventer 3 that surges, bleed off pressure threeway 4, lubricator 5 connects in turn, the single ram type perventer 2 that surges forms blowout preventer set with the triple ram preventer 3 that surges, the triple ram preventer 3 that surges is made up of shear ram preventer, blind rams preventer and half envelope ram preventer, as shown in Figure 1;
3. installation check wire rope sealer 6, card rope socket, installs well head constructing operation platform;
4. remove former christmas tree top thread flange, install wellhead blowout preventor group and lubricator 5, connect blowout preventer set liquid controling pipe line, carry out system debug;
5. enter in lubricator 5 under waterpower swab being connected rope socket, lubricator 5 is connected with wire rope sealer 6;
6. in well head christmas tree 8 side, liquid-operated flat valve 9 is installed, liquid-operated flat valve 9 connects gas-liquid separator 12, gas-liquid separator 12 discharge opeing port closing, gas-liquid separator 12 air exit connects choke manifold 15, choke manifold 15 is connected with sleeve pipe 17 by choke valve 16, choke manifold 15 installs pressure limiting valve 14, and pressure limiting valve 14 connects emptying igniting pipeline 13, as shown in Figure 2;
II hydraulic system debugging
1. the reversal valve in fluid path between swabbing operation car 7 and well head tele-control system is switched to control system voltage supply position;
2. hydraulic system is suppressed to 21Mpa, sets blowout preventer set, wire rope sealer 6 and greasing pump work pressure by pressure regulator valve;
3. surge single ram type perventer 2, shear ram preventer, blind rams preventer, half envelope ram preventer and liquid-operated flat valve 9 of switch debugging is working properly;
4. debug hydraulic work system normal after, first close the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then check that whether each pressure meter of operating desk normal, whether operating valve is in meta;
5. in pumping process, hydraulic pump is the voltage supply of well head tele-control system always;
III pumping discharge opeing with pressure
Before every mouthful of well pumping discharge opeing first, necessary first siphunculus, scraping, verify level, tubing string situation, carries out pumping discharge opeing construction after adjustment control system works is normal;
1. open the gate valve that well head christmas tree 8 installs liquid-operated flat valve 9 side, make well head and liquid-operated flat valve 9, gas-liquid separator 12, choke manifold 15, sleeve pipe 17 UNICOM;
2. the wellhead sluice valve on blind rams preventer and christmas tree center line is opened;
3. descend waterpower swab, speeds control is within 6m/s; When swab enters below liquid level, lowering velocity controls within 2m/s; In φ 73 oil pipe, maximum submergence must not more than 150m; In φ 89 oil pipe, maximum submergence must not more than 100m;
4. propose pumping discharge opeing on: under waterpower swab behind precalculated position, operation is carried, speeds control at 4m/s, swab is carried apart from well head 100m time, within upward strain speed reduces to 2m/s;
5. well head hilllock is responsible for observing fluidity, pressure and wire rope mark, the hand operation of commander's compounding practice; Operator is noted observing weight indicator, referring to the data variation deeply felt, and has recorded level, submergence, discharge opeing liquid measure supplemental characteristic;
6., after swab enters lubricator 5 by wellhead blowout preventor group, close blind rams preventer and observe;
7. according to fluid column situation in well, need more than 30min be observed, secondary pumping discharge opeing can be carried out;
8. enter receipts flow container 10 by explosion-proof oil pump 11 after the fluid reservoir of gas-liquid separator 12 reaches recovery liquid measure to reclaim;
IV construction ending
1. after pumping discharge opeing terminates, waterpower swab is carried in lubricator 5, close well head control block valve;
2. after lubricator 5 pressure release, wire rope sealer 6 of dismantling, upper belt goes out waterpower swab, takes off maintenance process;
3. discharge opeing outlet gate valve and other gate valve of christmas tree is closed;
4., after hydraulic control system pressure release, the whole hydraulic control lines of wellhead blowout preventer is removed;
5. remove whole wellhead blowout preventer, recover well head original appearance;
6. remove and receive tank truck and ground gas-liquid separation device connecting line, tank car leaves well site;
7. remove well-mouth operating floor, safe folding and unfolding derrick, instrument and material are regained, and place is cleaned;
Two, well head pressure control program
I normal construction well head pressure controls
1. wire rope sealer 6 packing tightens self-sealing borehole pressure;
2. stop-leak compound is noted: in pumping discharge opeing process, swab drives liquid to time up, well head pressure raises, and when leakage appears in wire rope sealer 6, first can promote greasing pump continuously to greasing in wire rope sealer 6 until sealer packing has stop-leak compound to overflow by long-range hydraulic control platform;
3. compress packing: well head pressure continues to raise, and when greasing can not make wire rope sealer 6 seal, promotes wire rope sealer 6 packing pilot operated valve device continuously by long-range hydraulic control platform, compression packing is to wellhead sealing;
4. note stop-leak compound and the sustainable blocked operation of compression packing, if also blow-by, adjustable wire rope sealer 6 sets 10.5Mpa with greasing pump fluid control pressure is the highest;
5. close half envelope: wire rope sealer 6 greasing, also blow-by when being compressed to maximum pressure, close and partly seal ram preventer, make it to seal with wire rope sealer 6 is collaborative;
II promptly shears closing well program
When discovery well head pressure can not seal, and now waterpower swab cannot have been carried safely in the above lubricator 5 of well head, can start urgent shearing closing well program:
1. stop rope operation immediately, drum brake is killed fixing;
2. close the single ram type perventer 2 that surges, operating control handle continuous pressure 2-3 time, guarantees that S type slip flashboard is held tightly;
3. open the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then operating control handle closes shear ram preventer, cut off wire rope simultaneously shear ram preventer close shut-in well;
4. go up rope head and close blind rams preventer;
5. after the emergency cut-off of wellhead blowout preventor group, then close outlet liquid-operated flat valve 9, observe well head pressure;
Treatment procedures after III urgent shearing closing well
1. need to observe more than 30min after urgent closing well, well head without after pressure change, then carries out well head disposal;
If 2. well head has pressure to bleed off pressure procedure operation by well head to bleed off pressure, be zero to well head pressure;
3. surge triple ram preventer 3 and top wellhead blowout preventer thereof is removed;
4. single ram type perventer 2 top of surging is exposed fag end and is docked with swabbing operation car 7 steel wire rope head and stuckly block jail;
5. operate cylinder rope, until wire rope stressed >=well in after waterpower swab and wire rope weight, operation pilot operated valve device opens the single ram type perventer 2 that surges, and proposes wire rope and waterpower swab in well, closes well head christmas tree 8 gate valve.
Be understandable that, above about specific descriptions of the present invention, the technical scheme described by the embodiment of the present invention is only not limited to for illustration of the present invention, those of ordinary skill in the art is to be understood that, still can modify to the present invention or equivalent replacement, to reach identical technique effect; Needs are used, all within protection scope of the present invention as long as meet.

Claims (1)

1. a gas well induced flow de-plugging with pressure fluid-discharge technology, is characterized in that: this processing step is as follows:
One, pumping discharge opeing construction sequence with pressure:
I erection equipment
1. site layout project, vehicle spot cars, erection of derrick;
2. ground connect wellhead blowout preventer: adapter flange (1), the single ram type perventer that surges (2), the triple ram preventer that surges (3), bleed off pressure threeway (4), lubricator (5) connects in turn, surge single ram type perventer (2) and the triple ram preventer that surges (3) composition blowout preventer set, the triple ram preventer that surges (3) is made up of shear ram preventer, blind rams preventer and half envelope ram preventer;
3. installation check wire rope sealer (6), card rope socket, installs well head constructing operation platform;
4. remove former christmas tree top thread flange, install wellhead blowout preventor group and lubricator (5), connect blowout preventer set liquid controling pipe line, carry out system debug;
5. enter in lubricator (5) under waterpower swab being connected rope socket, lubricator (5) is connected with wire rope sealer (6);
6. in well head christmas tree (8) side, liquid-operated flat valve (9) is installed, liquid-operated flat valve (9) connects gas-liquid separator (12), gas-liquid separator (12) discharge opeing port closing, gas-liquid separator (12) air exit connects choke manifold (15), choke manifold (15) is connected with sleeve pipe (17) by choke valve (16), choke manifold (15) installs pressure limiting valve (14), and pressure limiting valve (14) connects emptying igniting pipeline (13);
II hydraulic system debugging
1. the reversal valve in fluid path between swabbing operation car (7) and well head tele-control system is switched to control system voltage supply position;
2. hydraulic system is suppressed to 21Mpa, sets blowout preventer set, wire rope sealer (6) and greasing pump work pressure by pressure regulator valve;
3. surge single ram type perventer (2), shear ram preventer, blind rams preventer, half envelope ram preventer and liquid-operated flat valve (9) of switch debugging is working properly;
4. debug hydraulic work system normal after, first close the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then check that whether each pressure meter of operating desk normal, whether operating valve is in meta;
5. in pumping process, hydraulic pump is the voltage supply of well head tele-control system always;
III pumping discharge opeing with pressure
Before every mouthful of well pumping discharge opeing first, necessary first siphunculus, scraping, verify level, tubing string situation, carries out pumping discharge opeing construction after adjustment control system works is normal;
1. open well head christmas tree (8) and the gate valve of liquid-operated flat valve (9) side is installed, make well head and liquid-operated flat valve (9), gas-liquid separator (12), choke manifold (15), sleeve pipe (17) UNICOM;
2. the wellhead sluice valve on blind rams preventer and christmas tree center line is opened;
3. descend waterpower swab, speeds control is within 6m/s; When swab enters below liquid level, lowering velocity controls within 2m/s; In φ 73 oil pipe, maximum submergence must not more than 150m; In φ 89 oil pipe, maximum submergence must not more than 100m;
4. propose pumping discharge opeing on: under waterpower swab behind precalculated position, operation is carried, speeds control at 4m/s, swab is carried apart from well head 100m time, within upward strain speed reduces to 2m/s;
5. well head hilllock is responsible for observing fluidity, pressure and wire rope mark, the hand operation of commander's compounding practice; Operator is noted observing weight indicator, referring to the data variation deeply felt, and has recorded level, submergence, discharge opeing liquid measure supplemental characteristic;
6., after swab enters lubricator (5) by wellhead blowout preventor group, close blind rams preventer and observe;
7. according to fluid column situation in well, need more than 30min be observed, secondary pumping discharge opeing can be carried out;
8. the fluid reservoir of gas-liquid separator (12) enters receipts flow container (10) recovery by explosion-proof oil pump (11) after reaching and reclaiming liquid measure;
IV construction ending
1. after pumping discharge opeing terminates, waterpower swab is carried in lubricator (5), close well head control block valve;
2. after lubricator (5) pressure release, wire rope sealer (6) of dismantling, upper belt goes out waterpower swab, takes off maintenance process;
3. discharge opeing outlet gate valve and other gate valve of christmas tree is closed;
4., after hydraulic control system pressure release, the whole hydraulic control lines of wellhead blowout preventer is removed;
5. remove whole wellhead blowout preventer, recover well head original appearance;
6. remove and receive tank truck and ground gas-liquid separation device connecting line, tank car leaves well site;
7. remove well-mouth operating floor, safe folding and unfolding derrick, instrument and material are regained, and place is cleaned;
Two, well head pressure control program
I normal construction well head pressure controls
1. wire rope sealer (6) packing tightens self-sealing borehole pressure;
2. stop-leak compound is noted: in pumping discharge opeing process, swab drives liquid to time up, well head pressure raises, when leakage appears in wire rope sealer (6), first can promote greasing pump continuously to wire rope sealer (6) interior greasing until sealer packing has stop-leak compound to overflow by long-range hydraulic control platform;
3. compress packing: well head pressure continues to raise, and when greasing can not make wire rope sealer (6) seal, promotes wire rope sealer (6) packing pilot operated valve device continuously by long-range hydraulic control platform, compression packing is to wellhead sealing;
4. note stop-leak compound and the sustainable blocked operation of compression packing, if also blow-by, adjustable wire rope sealer (6) sets 10.5Mpa with greasing pump fluid control pressure is the highest;
5. close half envelope: wire rope sealer (6) greasing, also blow-by when being compressed to maximum pressure, close and partly seal ram preventer, make it collaborative with wire rope sealer (6) and seal;
II promptly shears closing well program
When discovery well head pressure can not seal, and now waterpower swab cannot have been carried safely in the above lubricator of well head (5), can start urgent shearing closing well program:
1. stop rope operation immediately, drum brake is killed fixing;
2. close the single ram type perventer (2) that surges, operating control handle continuous pressure 2-3 time, guarantees that S type slip flashboard is held tightly;
3. open the pressure stop valve controlled between shear ram preventer and accumulator in fluid path, then operating control handle closes shear ram preventer, cut off wire rope simultaneously shear ram preventer close shut-in well;
4. go up rope head and close blind rams preventer;
5. after the emergency cut-off of wellhead blowout preventor group, then close outlet liquid-operated flat valve (9), observe well head pressure;
Treatment procedures after III urgent shearing closing well
1. need to observe more than 30min after urgent closing well, well head without after pressure change, then carries out well head disposal;
If 2. well head has pressure to bleed off pressure procedure operation by well head to bleed off pressure, be zero to well head pressure;
3. surge triple ram preventer (3) and top wellhead blowout preventer thereof is removed;
4. single ram type perventer (2) top of surging is exposed fag end and is docked with swabbing operation car (7) steel wire rope head and stuckly block jail;
5. operate cylinder rope, until wire rope stressed >=well in after waterpower swab and wire rope weight, operation pilot operated valve device opens the single ram type perventer that surges (2), proposes wire rope and waterpower swab in well, closes well head christmas tree (8) gate valve.
CN201510733145.7A 2015-11-03 2015-11-03 A kind of gas well induced flow de-plugging fluid-discharge technology with pressure Expired - Fee Related CN105350932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510733145.7A CN105350932B (en) 2015-11-03 2015-11-03 A kind of gas well induced flow de-plugging fluid-discharge technology with pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510733145.7A CN105350932B (en) 2015-11-03 2015-11-03 A kind of gas well induced flow de-plugging fluid-discharge technology with pressure

Publications (2)

Publication Number Publication Date
CN105350932A true CN105350932A (en) 2016-02-24
CN105350932B CN105350932B (en) 2017-10-03

Family

ID=55326978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510733145.7A Expired - Fee Related CN105350932B (en) 2015-11-03 2015-11-03 A kind of gas well induced flow de-plugging fluid-discharge technology with pressure

Country Status (1)

Country Link
CN (1) CN105350932B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644767A (en) * 2017-01-23 2017-05-10 山东科瑞井控系统制造有限公司 Under-pressure shearing test device of ram blowout preventer
CN108625822A (en) * 2018-05-08 2018-10-09 海峰深水(天津)技术服务有限公司 Multistage sequentially triggered emergency system capable of automatically shearing tubular column and sealing well
CN112539043A (en) * 2018-05-17 2021-03-23 罗运川 Cleaning method and verification method for liquid inlet of piston of underground safety valve
CN115163001A (en) * 2022-08-01 2022-10-11 吕远 Injection-production integrated device and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3213941A (en) * 1962-02-01 1965-10-26 Nelson Norman A Method of and apparatus for releasing stuck pipe
EP0209343A2 (en) * 1985-07-15 1987-01-21 Chevron Research And Technology Company Method of avoiding a drill string becoming stuck during drilling
CN1361346A (en) * 2000-12-29 2002-07-31 中国石油天然气股份有限公司 Repeated pressurizing and depressurizing pulse blockage removal process
US20040079531A1 (en) * 2002-10-28 2004-04-29 Smith Peter V. Disconnect check valve mechanism for coiled tubing
CN102312659A (en) * 2010-07-02 2012-01-11 崔朝轩 Pollution-free well workover process for oil field
CN103790539A (en) * 2013-06-13 2014-05-14 李世銮 Process of removing blocking by positive hydraulic impact
CN204703869U (en) * 2015-06-18 2015-10-14 陈燕 Recover the oil with reacting cycle continuous flushing tubing string

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3213941A (en) * 1962-02-01 1965-10-26 Nelson Norman A Method of and apparatus for releasing stuck pipe
EP0209343A2 (en) * 1985-07-15 1987-01-21 Chevron Research And Technology Company Method of avoiding a drill string becoming stuck during drilling
CN1361346A (en) * 2000-12-29 2002-07-31 中国石油天然气股份有限公司 Repeated pressurizing and depressurizing pulse blockage removal process
US20040079531A1 (en) * 2002-10-28 2004-04-29 Smith Peter V. Disconnect check valve mechanism for coiled tubing
CN102312659A (en) * 2010-07-02 2012-01-11 崔朝轩 Pollution-free well workover process for oil field
CN103790539A (en) * 2013-06-13 2014-05-14 李世銮 Process of removing blocking by positive hydraulic impact
CN204703869U (en) * 2015-06-18 2015-10-14 陈燕 Recover the oil with reacting cycle continuous flushing tubing string

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106644767A (en) * 2017-01-23 2017-05-10 山东科瑞井控系统制造有限公司 Under-pressure shearing test device of ram blowout preventer
CN106644767B (en) * 2017-01-23 2023-06-27 威飞海洋装备制造有限公司 Ram blowout preventer under-pressure shear test device
CN108625822A (en) * 2018-05-08 2018-10-09 海峰深水(天津)技术服务有限公司 Multistage sequentially triggered emergency system capable of automatically shearing tubular column and sealing well
CN108625822B (en) * 2018-05-08 2024-04-02 海一峰深水(天津)技术服务有限公司 Multistage sequential triggering emergency system capable of automatically shearing tubular column and sealing well hole
CN112539043A (en) * 2018-05-17 2021-03-23 罗运川 Cleaning method and verification method for liquid inlet of piston of underground safety valve
CN115163001A (en) * 2022-08-01 2022-10-11 吕远 Injection-production integrated device and method thereof

Also Published As

Publication number Publication date
CN105350932B (en) 2017-10-03

Similar Documents

Publication Publication Date Title
CN103306643B (en) A kind of water drainage gas production device and method
CN104343400B (en) The controllable workover treatment equipment of no killing well and its operational method
CN105275417B (en) Method for running in and out coiled tubing production string
CN105350932A (en) Gas well under-pressure induced-flow plug-removal draining technique
CN105804680B (en) A kind of oil gas field workover operation device with pressure and method
CN110630204B (en) Under-pressure operation equipment for gas drive injection well completion and under-pressure operation method thereof
CN202266242U (en) Gas well pumping and raining device
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN106968658A (en) A kind of efficient device for fracturing wellhead
CN107859499A (en) Working device is pressed in area
CN106014370A (en) Oil-pipe under-pressure dragging fracturing device and technology
CN104863538B (en) Band pressure blocks setting blowout preventer
CN109458153A (en) A kind of oil recovery tree device suitable for setting suspension coiled tubing production forever
CN205605156U (en) Workover device is pressed in oil gas field area
CN203939477U (en) Integrated tubular column for oil testing and well completion operation
CN110219610B (en) Shale gas horizontal well high-pressure pumping bridge plug device
CN103306655B (en) A kind of dragging staged fracturing method with pressure
CN203420652U (en) Pressure-balanced and controllable workover treatment device
CN208057080U (en) A kind of controllable apparatus for work of no killing well
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN202832484U (en) Well mouth pressure testing device
CN207017955U (en) A kind of Operating Pressure maintenance of underground device
CN109763787A (en) A kind of device and its operating procedure of composite continuous oil pipe pulling submersible electric pump
CN105089524B (en) Device and process method for lifting coiled tubing out under pressure
CN203008843U (en) Blowout-preventing operation device for stripping sucker rod in oil field with pressure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171003

Termination date: 20181103