CN105350785A - Installation method of insulation boards used for assembly type refrigeration house - Google Patents

Installation method of insulation boards used for assembly type refrigeration house Download PDF

Info

Publication number
CN105350785A
CN105350785A CN201510613384.9A CN201510613384A CN105350785A CN 105350785 A CN105350785 A CN 105350785A CN 201510613384 A CN201510613384 A CN 201510613384A CN 105350785 A CN105350785 A CN 105350785A
Authority
CN
China
Prior art keywords
warming plate
cell body
warming
side section
fastener
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510613384.9A
Other languages
Chinese (zh)
Other versions
CN105350785B (en
Inventor
劳锦洪
刘付亚福
王剑峰
曹展标
李志文
邹启明
陈家成
蒋帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Original Assignee
GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co filed Critical GUANGZHOU THIRD CONSTRUCTION ENGINEERING Co
Priority to CN201510613384.9A priority Critical patent/CN105350785B/en
Publication of CN105350785A publication Critical patent/CN105350785A/en
Application granted granted Critical
Publication of CN105350785B publication Critical patent/CN105350785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops

Abstract

The invention relates to an installation method of insulation boards used for an assembly type refrigeration house. The installation method comprises the following steps of (1) carrying out horizontal line laying and positioning; (2) paving waterproof coiled materials; (3) installing a locating slot; (4) hoisting the insulation boards; and (5) fixing the insulation boards through pressure plates. According to the invention, good seal between the ground base and the insulation boards is achieved, bending deformation, of the insulation boards, generated during the hoisting process can be avoided, and installation and splicing requirements can be satisfied; labor intensity for splicing insulation boards is low, the width of the joint between the insulation boards can be up to the standard easily, and the air impermeability, the moisture-proof performance and the waterproof performance of the refrigeration house are good.

Description

For the mounting method of the warming plate of panel-assembled cold store
Technical field
The present invention relates to the assembling field of panel-assembled cold store, particularly relate to a kind of mounting method of the warming plate for panel-assembled cold store.
Background technology
In order to adapt to the needs of China's Cold Chain Logistics industry fast development, Cold Chain Logistics infrastructure construction need be strengthened, wherein must go into overdrive to implement freezer construction project.Panel-assembled cold store (being generally the large-scale two layers of steel work freezer of assembling) is a kind of assembled fast simple refrigerating equipment that developed recently gets up, it has good thermal insulation and moistureproof and waterproof performance compared with traditional civil engineering freezer, and its temperature applicable range is at-50 ~+100 DEG C.Assembling large cold storage generally comprises steel structure framework, and is aided with heat-insulating and heat-preserving wall, top cover and underframe, makes the performance requirements such as it reaches heat insulation, moistureproof, insulation.After the steel structure framework installation of panel-assembled cold store, need warming plate heat insulation for inside and outside wall thermal insulation is carried out assembled block by block and is fixed on steel structure framework.The emphasis that warming plate is installed is the closed processes ensureing verticality that warming plate longitudinally installs, joint gap between plate and plate and warming plate top and bottom, to ensure the tightness that freezer is good, the performances such as moistureproof and waterproof.
Existing warming plate mounting method is generally: in ground substrate, arrange locating slot, with crane, warming plate is hung vertical installation around a minor face half-twist, then be located in locating slot, realize linking by the notch of concavo-convex combination between two adjacent warming plates to be embedded in together, then complete assembled with the mode jam-packed warming plate of manual compression.Under existing warming plate mounting method, use that length reaches 20 meters, panel-assembled cold store that the warming plate of nearly 500 kilograms of weight carries out assembling exists following problem: 1, between warming plate and ground substrate, sealing is poor; 2, with crane, warming plate is hung warming plate in vertical process around a minor face half-twist and comparatively macrobending distortion occurs, splicing is installed in impact; 3, complete assembled with the mode jam-packed warming plate of manual compression, install difficulty, speed is slow, labour intensity is large, and comparatively macrobending distortion also easily occurs warming plate in installation process; Meanwhile, between warming plate, joint gap is difficult to reach standard, tightness and moistureproof and waterproof poor-performing.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of mounting method of the warming plate for panel-assembled cold store, and it can reduce the distortion of warming plate effectively, improves tightness, the moistureproof and waterproof performance of freezer.
Above-mentioned technical problem is solved by following scheme:
For a mounting method for the warming plate of panel-assembled cold store, described panel-assembled cold store comprises steel structure framework, some horizontal purlins, some pieces of warming plates, location cell body and waterproof every vapour coiled material;
Described mounting method comprises the following steps:
(1) horizontal unwrapping wire location: on ground layer, unwrapping wire is carried out to the installation site of location cell body, form position baseline;
(2) place mat waterproof is every vapour coiled material: along the installation site of location cell body, ground layer coats fluid sealant uniformly continous, and then entirely place mat waterproof is every vapour coiled material, and waterproof is bonded on ground layer every vapour coiled material by fluid sealant;
(3) install locating slot: along position baseline, location cell body is positioned at waterproof on vapour coiled material, location cell body is fixed on ground layer by the length direction compartment of terrain expansion bolt along location cell body;
(4) lift warming plate: in the groove of location cell body with the mating face continuous uniform of warming plate coat fluid sealant; Place foam cushion block along the side, long limit of warming plate kept flat, warming plate is pressed on foam cushion block around one long limit half-twist, then at a wherein short leg of warming plate, hoisting fixture is installed; After being connected by hoist cable with hoisting fixture by the suspension hook of crane, tighten be pressed on foam cushion block one jiao as rotating fulcrum using another minor face of warming plate, with crane, warming plate is slowly turned to become to hang vertical state along long limit reposefully; In rotation lifting process, control the plate face place plane of warming plate and the horizontal plane at rotating fulcrum place; By liftoff for warming plate vertical lifting, then warming plate is transferred to installation site reposefully, after adjusting the verticality of warming plate, levelness, warming plate is declined and is placed in locating slot body; Tightening device is adopted to be tightened up warming plate one end toward location cell body; Repeat aforesaid operations with by assembled for all warming plates in location cell body in;
(5) fixing warming plate: arrange some horizontal purlins in described steel structure framework, described some horizontal purlins are arranged side by side at the outside of all warming plates from top to bottom, and are fixedly connected with respectively with all warming plates.
The mounting method of the above-mentioned warming plate for panel-assembled cold store, effectively can solve the existing defective mounting of cold-storage insulation board, there is following technique effect: 1, by being provided with fluid sealant, waterproof successively every vapour coiled material and location cell body between ground layer and warming plate, realize the excellent sealing between ground layer and warming plate, tightness and moistureproof and waterproof performance good; 2, after the suspension hook of crane being connected by hoist cable with hoisting fixture, with crane warming plate is pressed on the Na Yijiao on foam cushion block around another minor face that it does not install hoisting fixture, slowly turn to reposefully to become to hang vertical state along long limit, there is less flexural deformation in warming plate, meet and splicing requirement is installed, be beneficial to bubble-tight raising; 3, use tightening device to substitute manual compression all warming plates are tightened up, reduce labour intensity, warming plate relatively can not occur in installation process comparatively macrobending distortion, between relatively easily making between plate plate, joint gap meets standard-required, tightness and moistureproof and waterproof performance good; 4, by arranging some horizontal purlins with the fixing all warming plates of one in the steel structure framework of freezer, improve the stability of all warming plates, also having consolidated tightness further.
Wherein in an embodiment, the bundling belt that described tightening device comprises fastener and is connected with described fastener, described fastener is provided with the catching groove for coordinating with cold-storage insulation board, and described bundling belt is provided with strainer.The tightening device structure of the program is simple, simple to operation, easily grasps, and existing field structure can be utilized as fulcrum force, apply very convenient, tighten up effective, efficiency is high, and labour intensity is little.
Wherein in an embodiment, described fastener comprises interlude and is vertically connected to the first side section, the tow side section of interlude both sides, described interlude, described first side section, described tow side section form described catching groove jointly, the length of described first side section is greater than the length of described tow side section, and described bundling belt is connected with the first side section of described fastener.The fastener of the program is in " 7 " font.Flexible when making fastener buckle warming plate.
Wherein in an embodiment, described interlude, described first side section, described tow side section are equal leg angle, and the back side of described interlude, described first side section, described tow side section forms the medial surface of described catching groove.Program functional performance is excellent, the more uniform equal leg angle of bearing capacity, is beneficial to and tightens up effect; Using the back side of equal leg angle as work plane, stressed contact area can be increased, reduce the damage in the course of work, external surface and the inside of warming plate caused, ensure the normal working performance of warming plate.
Wherein in an embodiment, described fastener is provided with connecting hole, and the one or both ends of described bundling belt are connected with the hook that can coordinate with described connecting hole.The program utilizes the hook and connecting hole that cooperatively interact, is convenient to the connection of bundling belt and fastener,
Wherein in an embodiment, the coupler body that described hook comprises the framework in isosceles triangle and is connected with the top corner part of framework.The uniformly distributed load of bundling belt to isosceles triangle framework can be converted to the concentrated load of coupler body by the hook of the program effectively, so that contacting piece carries out tension work, improves and tightens up effect, simultaneously not fragile bundling belt.
In described step (4), having particular application as of described tightening device: using the steel structure framework of freezer as fulcrum force, the bundling belt of described tightening device is connected on the steel structure framework of freezer, fastener is buckled in the side of cold-storage insulation board, then the strainer on bundling belt is pulled back and forth, bundling belt is inwardly strained by strainer, and bundling belt drives fastener extruding warming plate, is tightened up warming plate one end toward locating slot.
Wherein in an embodiment, in described step (4), adopt several tightening devices to act on the position, three, upper, middle and lower of warming plate simultaneously, warming plate one end toward locating slot is tightened up.The program uses tightening device to be tightened up by warming plate at a position, the upper, middle and lower of warming plate respectively simultaneously, can make warming plate uniform stressed, not fragile, mobile relatively stable, not easily deflection occurs, and ensures the verticality of insulation bag.
Wherein in an embodiment, in described step (5), the two ends up and down of horizontal purlin are respectively equipped with several briquettings corresponding with each warming plate, one end of briquetting is pressed on horizontal purlin, the other end of briquetting is pressed on warming plate, the other end of briquetting is provided with several through holes, adopts tapping screw through the through hole of briquetting and is screwed in warming plate, horizontal purlin is fixedly connected on warming plate.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of lifting warming plate;
Fig. 2 is the schematic diagram tightening up warming plate on the cell body of location;
Fig. 3 is the structural representation of tightening device;
Fig. 4 is the three-dimensional structure schematic diagram of fastener;
Fig. 5 is the front schematic view of hook;
Fig. 6 is the side schematic view of hook;
Fig. 7 is the structural representation of bundling belt;
Fig. 8 is the structural representation of strainer;
Fig. 9 is the top view tightened up warming plate;
Figure 10 is the schematic front view utilizing horizontal purlin to be fixed warming plate;
Figure 11 is the side schematic view utilizing horizontal purlin to be fixed warming plate.
Description of reference numerals: 1, fastener; 110, catching groove; 111, connecting hole; 11, interlude; 12, the first side section; 13, tow side section; 2, bundling belt; 3, strainer; 4, link up with; 80, warming plate; 81, ground layer; 82, cell body is located; 83, waterproof is every vapour coiled material; 84, foam cushion block; 85, hoisting fixture; 86, suspension hook; 87, rope; 88, tightening device; 89, horizontal purlin; 90, briquetting; 91, tapping screw; 92, steel column.
Detailed description of the invention
Composition graphs 1 to Figure 11, a kind of mounting method being used for the warming plate of panel-assembled cold store (being generally the large-scale two layers of steel work freezer of assembling), panel-assembled cold store comprises steel structure framework, some horizontal purlins, some pieces of warming plates, location cell body, waterproof every vapour coiled material;
Mounting method comprises the following steps:
1 ', material cutting plan is drawn:
According to the structural facades figure of panel-assembled cold store, draw out corresponding typesetting figure, specifically install according to typesetting figure.
1, horizontal unwrapping wire location:
Ground layer 81 carries out unwrapping wire to the installation site of location cell body 82, forms position baseline; Location cell body 82 is U-shaped location cell body.
2, place mat waterproof is every vapour coiled material:
Along the installation site of location cell body 82, ground layer 81 coats fluid sealant uniformly continous, specifically, along location cell body 82 installation site periphery uniformly continous coat fluid sealant, then entirely place mat waterproof every vapour coiled material 83, waterproof is bonded on ground layer 81 every vapour coiled material 83 by fluid sealant, and wherein, fluid sealant can butyl sealant.
3, locating slot is installed:
Along position baseline, location cell body 82 is positioned at waterproof on vapour coiled material 83, location cell body 82 is fixed on ground layer 81 every 500mm expansion bolt by the length direction along location cell body 82; Waterproof is utilized to realize being tightly connected between location cell body 82 and ground layer 81 every the elastic deformation of vapour coiled material 83.
4, warming plate is lifted:
Seriatim all warming plates 80 kept flat are placed in the cell body 82 of location from one end of location cell body 82 toward the other end, and adopt tightening device 88 to be tightened up warming plate one end toward location cell body 82; It specifically comprises the following steps:
(A) in the groove of location cell body 82 and the mating face of warming plate 80, coat fluid sealant continuous uniform;
(B) foam cushion block 84 is placed in the side, long limit along the warming plate 80 kept flat, warming plate 80 is pressed on foam cushion block 84 around the artificial half-twist in the long limit of one, now, warming plate 80 becomes edge-on state along minor face, then installs hoisting fixture 85 at a wherein minor face of warming plate 80;
The connected mode of hoisting fixture 85 and warming plate 80 is specifically: hoisting fixture 85 is provided with C type channel-section steel, the length of C type channel-section steel is consistent with the minor face of warming plate 80, the both sides of C type channel-section steel are equipped with several connecting holes, at a wherein minor face of warming plate 80, several bolts hole are set equably, the C type channel-section steel of hoisting fixture 85 is stuck in a wherein minor face of warming plate 80, utilize bolt to pass the connecting hole of C type channel-section steel, the bolt hole of warming plate 80 is connected with nut, make hoisting fixture 85 be fixed on warming plate 80.
(C) after being connected with hoisting fixture 85 by the suspension hook 86 of crane by rope 87, tighten be pressed on foam cushion block 84 one jiao as rotating fulcrum using another minor face of warming plate 80, with crane, warming plate 80 is slowly turned to become to hang vertical state along long limit reposefully; In rotation lifting process, left-right balance to be carried out at another minor face of warming plate 80 to warming plate 80, the strict control plate face place plane of warming plate 80 and the horizontal plane at rotating fulcrum place; Make full use of the flat in-plane stiffness of the two-sided steel plate of warming plate 80, ensure that warming plate 80 does not cause deformed damaged because its deadweight of lifting process is excessive, meet and splicing requirement is installed;
(D) warming plate 80 vertical lifting is liftoff, then warming plate 80 is transferred to installation site reposefully, after the verticality of adjustment warming plate 80, levelness, warming plate 80 is declined and be placed in locating slot body 82;
(E) tightening device 88 is adopted to be tightened up warming plate one end toward location cell body 82.
Warming plate one end toward location cell body 82 is tightened up by above-mentioned employing tightening device 88, specifically: adopt several tightening devices 88 to act on a position, upper, middle and lower of warming plate 80 simultaneously, warming plate 80 one end toward location cell body 82 is tightened up, so that warming plate 80 is moved to satisfactory position.Wherein, between adjacent two warming plates 80, tighten up degree, be as the criterion within critical field with the width of seam between plate plate.
Use tightening device 88 to be tightened up warming plate 80 one end toward location cell body 82 respectively at a position, the upper, middle and lower of warming plate 80 simultaneously, warming plate 80 uniform stressed can be made, not fragile and distortion, mobile relatively stable, not easily there is deflection, ensure that the verticality of warming plate 80.
Composition graphs 3 to Fig. 9, the bundling belt 2 that above-mentioned tightening device 88 comprises fastener 1 and is connected with fastener 1, fastener 1 is provided with the catching groove 110 for coordinating with cold-storage insulation board 80, and bundling belt 2 is provided with strainer 3, and strainer 3 is for tightening up bundling belt 2.
Wherein in an embodiment, fastener 1 comprises interlude 11 and is vertically connected to the first side section 12, the tow side section 13 of interlude 11 both sides, the common length forming above-mentioned catching groove 110, the first side section 12 of interlude 11, first side section 12, tow side section 13 is greater than the length of tow side section 13.Therefore, in the present embodiment, fastener 1 is in " 7 " font.This fastener 1, structure is simple, flexible when making fastener 1 buckle warming plate 80.
Wherein, interlude 11, first side section 12, tow side section 13 are equal leg angle; Functional performance is excellent, the more uniform equal leg angle of bearing capacity, is beneficial to and tightens up effect.The back side of interlude 11, first side section 12, tow side section 13 forms the medial surface of above-mentioned catching groove 110; The program, using the back side of equal leg angle as work plane, can increase stressed contact area, reduces the damage caused external surface and the inside of warming plate 80 in the course of work, ensures the normal working performance of warming plate 80.
In actual design, the width of the catching groove 110 of fastener 1 is best slightly larger than the thickness of warming plate 80.
Above-mentioned bundling belt 2 can adopt nylon bundling belt.
Above-mentioned strainer 3 can adopt straining ratchet.Bundling belt 2 can be carried out unidirectional tightening up by straining ratchet.
For the ease of connection and the dismounting of fastener 1 and bundling belt 2, fastener 1 is provided with for realizing with bundling belt 2 connecting hole 111 that is connected.Specifically, connecting hole 111 is located at the end of the first side section 12 of fastener 1.Wherein, the diameter of connecting hole 111 about 3 centimetres.The one or both ends of bundling belt 2 are connected with hook 4.This hook 4 in use can coordinate with the connecting hole 111 of fastener 1 and interlocks.In this scenario, hook 4 is hooked the connecting hole 111 in fastener 1, the connection of fastener 1 and bundling belt 2 can be realized.
The coupler body 42 that this hook 4 specifically comprises the framework 41 in isosceles triangle and is connected with the top corner part of framework 41.Framework 41 is one-body molded with coupler body 42.The framework 41 of this hook 4 design in isosceles triangle, is convenient to bundling belt 2 and is also reliably bundled in framework 41 through framework 41, thus realize the connection of bundling belt 2 and hook 4.The uniformly distributed load of bundling belt 2 pairs of isosceles triangle frameworks 41 can be converted to the concentrated load of coupler body 42 by the program effectively, so that contacting piece 1 carries out tension work, improves and tightens up effect, simultaneously not fragile bundling belt 2.
The embody rule of above-mentioned tightening device 88 comprises the following steps:
(I) select the steel structure framework (such as contrary with the assembled direction of a warming plate 80 nearest steel column 92) of freezer as fulcrum force, one end of bundling belt 2 is connected to (the general length of bundling belt 2 can reach 8-10 rice) on the steel structure framework of freezer;
(II) after warming plate 80 to be assembled is placed in location cell body 82, fastener 1 is buckled in the side of warming plate 80, warming plate 80 is placed in the catching groove 110 of fastener 1;
(III) to guarantee that fastener 1 is buckled in warming plate steadily after 80s, pull the strainer 3 on bundling belt 2 back and forth, bundling belt 2 is inwardly strained by strainer, bundling belt 2 drives fastener 1 to extrude warming plate 80, warming plate 80 one end along location cell body 82 is tightened up, tightens up by the direction of tightening up of warming plate 80 toward tightening device;
(IV) observe after when warming plate 80 moves to satisfactory position, stop pulling strainer 3, pull open strainer 3 to unclamp bundling belt 2, unload fastener 1, warming plate 80 tightens up complete.
Above-mentioned tightening device 88 tightens up effective, efficiency is high, labour intensity is little, and structure is simply easy to preparation, simple to operation, easily grasp, make warming plate that comparatively macrobending distortion relatively can not occur in tightening process, between warming plate, joint gap easily reaches standard, improves tightness and moistureproof and waterproof; And on-the-spot cage construction can be utilized as fulcrum force, apply very convenient.
5, pressing plate is fixed:
In the steel structure framework of freezer, arrange some horizontal purlins 89, some horizontal purlins 89 are arranged side by side at the outside of warming plate 80 from top to bottom, and are connected respectively with all warming plates 80 on the cell body 82 of location.Horizontal purlin 89 with the connected mode of every block warming plate 80 is: be respectively equipped with two briquettings 90 at the two ends up and down of horizontal purlin 89, one end of briquetting 90 is stuck on horizontal purlin 89, the other end of briquetting 90 is pressed on warming plate 80, the other end of briquetting 90 is provided with two through holes, pass briquetting 90 with tapping screw 91 and be screwed into warming plate 80, horizontal purlin 89 is fixedly connected with warming plate 80.This connected mode realizes horizontal purlin 89 by briquetting 90 and is connected with every block warming plate 80.Utilizing horizontal purlin 89 to make to locate the warming plate 80 that on cell body 82, all independent monolithics are installed keeps disjunctor to be fixed on the steel structure framework of freezer, thus improves overall stability, has consolidated the tightness of freezer further.The cross section of horizontal purlin 89 is H-shaped.
The installation of the warming plate 80 for panel-assembled cold store is completed by above step, make the sealing between warming plate 80 and ground layer 81 good, warming plate 80 is not impaired, indeformable in installation process, joint gap between the verticality of warming plate 80, warming plate 80 all meets standard, between warming plate 80, resistance to overturning is good, comprehensively improves the tightness of freezer, moistureproof and waterproof performance.
Each technical characteristic of the above embodiment can combine arbitrarily, for making description succinct, the all possible combination of each technical characteristic in above-described embodiment is not all described, but, as long as the combination of these technical characteristics does not exist contradiction, be all considered to be the scope that this manual is recorded.
The above embodiment only have expressed several embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be construed as limiting the scope of the patent.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (9)

1. for a mounting method for the warming plate of panel-assembled cold store, it is characterized in that, described panel-assembled cold store comprises steel structure framework, some horizontal purlins, some pieces of warming plates, location cell body and waterproof every vapour coiled material;
Described mounting method comprises the following steps:
(1) horizontal unwrapping wire location: on ground layer, unwrapping wire is carried out to the installation site of location cell body, form position baseline;
(2) place mat waterproof is every vapour coiled material: along the installation site of location cell body, ground layer coats fluid sealant uniformly continous, and then entirely place mat waterproof is every vapour coiled material, and waterproof is bonded on ground layer every vapour coiled material by fluid sealant;
(3) install locating slot: along position baseline, location cell body is positioned at waterproof on vapour coiled material, location cell body is fixed on ground layer by the length direction compartment of terrain expansion bolt along location cell body;
(4) lift warming plate: in the groove of location cell body with the mating face continuous uniform of warming plate coat fluid sealant; Place foam cushion block along the side, long limit of warming plate kept flat, warming plate is pressed on foam cushion block around one long limit half-twist, then at a wherein short leg of warming plate, hoisting fixture is installed; After being connected by hoist cable with hoisting fixture by the suspension hook of crane, tighten be pressed on foam cushion block one jiao as rotating fulcrum using another minor face of warming plate, with crane, warming plate is slowly turned to become to hang vertical state along long limit reposefully; In rotation lifting process, control the plate face place plane of warming plate and the horizontal plane at rotating fulcrum place; By liftoff for warming plate vertical lifting, then warming plate is transferred to installation site reposefully, after adjusting the verticality of warming plate, levelness, warming plate is declined and is placed in locating slot body; Tightening device is adopted to be tightened up warming plate one end toward location cell body; Repeat aforesaid operations with by assembled for all warming plates in location cell body in;
(5) fixing warming plate: arrange some horizontal purlins in described steel structure framework, described some horizontal purlins are arranged side by side at the outside of all warming plates from top to bottom, and are fixedly connected with respectively with all warming plates.
2. the mounting method of a kind of warming plate for panel-assembled cold store according to claim 1, it is characterized in that, the bundling belt that described tightening device comprises fastener and is connected with described fastener, described fastener is provided with the catching groove for coordinating with cold-storage insulation board, and described bundling belt is provided with strainer.
3. the tightening device for installing cold-storage insulation board according to claim 2, it is characterized in that, described fastener comprises interlude and is vertically connected to the first side section, the tow side section of interlude both sides, described interlude, described first side section, described tow side section form described catching groove jointly, the length of described first side section is greater than the length of described tow side section, and described bundling belt is connected with the first side section of described fastener.
4. the tightening device for installing cold-storage insulation board according to claim 3, it is characterized in that, described interlude, described first side section, described tow side section are equal leg angle, and the back side of described interlude, described first side section, described tow side section forms the medial surface of described catching groove.
5. the tightening device for installing cold-storage insulation board according to claim 4, is characterized in that, described fastener is provided with connecting hole, and the one or both ends of described bundling belt are connected with the hook that can coordinate with described connecting hole.
6. the tightening device for installing cold-storage insulation board according to claim 5, is characterized in that, the coupler body that described hook comprises the framework in isosceles triangle and is connected with the top corner part of framework.
7. the mounting method of a kind of warming plate for panel-assembled cold store according to claim 2 to 6 any one, it is characterized in that, in described step (4), having particular application as of described tightening device: using the steel structure framework of freezer as fulcrum force, the bundling belt of described tightening device is connected on the steel structure framework of freezer, fastener is buckled in the side of cold-storage insulation board, then the strainer on bundling belt is pulled back and forth, bundling belt is inwardly strained by strainer, bundling belt drives fastener extruding warming plate, is tightened up warming plate one end toward locating slot.
8. the mounting method of a kind of warming plate for panel-assembled cold store according to claim 1 to 6 any one, it is characterized in that, in described step (4), adopt several tightening devices to act on the position, three, upper, middle and lower of warming plate simultaneously, warming plate one end toward locating slot is tightened up.
9. the mounting method of a kind of warming plate for panel-assembled cold store according to claim 1 to 6 any one, it is characterized in that, in described step (5), the two ends up and down of horizontal purlin are respectively equipped with several briquettings corresponding with each warming plate, one end of briquetting is pressed on horizontal purlin, the other end of briquetting is pressed on warming plate, the other end of briquetting is provided with several through holes, adopt tapping screw through the through hole of briquetting and be screwed in warming plate, horizontal purlin is fixedly connected on warming plate.
CN201510613384.9A 2015-09-23 2015-09-23 Installation method for the warming plate of panel-assembled cold store Active CN105350785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510613384.9A CN105350785B (en) 2015-09-23 2015-09-23 Installation method for the warming plate of panel-assembled cold store

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510613384.9A CN105350785B (en) 2015-09-23 2015-09-23 Installation method for the warming plate of panel-assembled cold store

Publications (2)

Publication Number Publication Date
CN105350785A true CN105350785A (en) 2016-02-24
CN105350785B CN105350785B (en) 2017-10-24

Family

ID=55326833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510613384.9A Active CN105350785B (en) 2015-09-23 2015-09-23 Installation method for the warming plate of panel-assembled cold store

Country Status (1)

Country Link
CN (1) CN105350785B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401201A (en) * 2016-11-07 2017-02-15 深圳赤晓建筑科技有限公司 Hoisting plate splicing device for refrigeration house and hoisting plate splicing process for refrigeration house
CN110411090A (en) * 2019-07-27 2019-11-05 蚌埠淮畔精密机械有限公司 The dedicated refrigerating equipment of small-sized assembled refrigeration
CN112282365A (en) * 2020-11-24 2021-01-29 河南超诚建材科技有限公司 Construction process of single heat-insulation wall body in indoor skiing hall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082656A (en) * 1992-08-04 1994-02-23 哈尔滨铁路局齐齐哈尔科学技术研究所 Air-conditioned cold store
JP2005042298A (en) * 2003-05-27 2005-02-17 Nippon Kankyo Calcium Kenkyusho:Kk Roof facility which covers waste disposal site, and roof facility constructing method
CN101413354A (en) * 2008-09-27 2009-04-22 四川聚和生态农业发展有限公司 Air tight processing method of air regulating warehouse
CN201605683U (en) * 2009-12-07 2010-10-13 北京市京科伦冷冻设备有限公司 Connecting structure of heat insulation board
CN104120900A (en) * 2014-05-13 2014-10-29 浙江兴茂制冷食品机械有限公司 Assembling type air-conditioned cold store
CN204641526U (en) * 2015-02-12 2015-09-16 宁波旭力金属制品有限公司 Anti-skidding eccentric vehicle safety tensioning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1082656A (en) * 1992-08-04 1994-02-23 哈尔滨铁路局齐齐哈尔科学技术研究所 Air-conditioned cold store
JP2005042298A (en) * 2003-05-27 2005-02-17 Nippon Kankyo Calcium Kenkyusho:Kk Roof facility which covers waste disposal site, and roof facility constructing method
CN101413354A (en) * 2008-09-27 2009-04-22 四川聚和生态农业发展有限公司 Air tight processing method of air regulating warehouse
CN201605683U (en) * 2009-12-07 2010-10-13 北京市京科伦冷冻设备有限公司 Connecting structure of heat insulation board
CN104120900A (en) * 2014-05-13 2014-10-29 浙江兴茂制冷食品机械有限公司 Assembling type air-conditioned cold store
CN204641526U (en) * 2015-02-12 2015-09-16 宁波旭力金属制品有限公司 Anti-skidding eccentric vehicle safety tensioning device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张杭生等: "大型冷库保温板的施工新工艺研究", 《建筑施工》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106401201A (en) * 2016-11-07 2017-02-15 深圳赤晓建筑科技有限公司 Hoisting plate splicing device for refrigeration house and hoisting plate splicing process for refrigeration house
CN106401201B (en) * 2016-11-07 2018-09-21 深圳赤晓建筑科技有限公司 Freezer lifting plate splicing apparatus and freezer lifting plate splicing process
CN110411090A (en) * 2019-07-27 2019-11-05 蚌埠淮畔精密机械有限公司 The dedicated refrigerating equipment of small-sized assembled refrigeration
CN110411090B (en) * 2019-07-27 2021-06-29 芜湖市西贝克机电科技有限公司 Small-sized assembled refrigerating special-purpose refrigeration equipment
CN112282365A (en) * 2020-11-24 2021-01-29 河南超诚建材科技有限公司 Construction process of single heat-insulation wall body in indoor skiing hall

Also Published As

Publication number Publication date
CN105350785B (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN105350785A (en) Installation method of insulation boards used for assembly type refrigeration house
CN106320519A (en) Steel sheet strip and cable net structure
CN103982079B (en) A kind of construction method of anti-corrosive apparatus of thermoelectricity chimney
JP2014141842A (en) Solar battery panel installation structure and method of forming the same
CN109779119B (en) Arch enclosure structure formed by fastening box modules through stay ropes
CN101787737B (en) Structure node meeting spatial constraint requirements in different directions simultaneously
CN208039627U (en) Lower pair of installing Cable-clamp device of pre- tensile state
CN207332045U (en) A kind of twin spans Glass Rib curtain wall wind load span centre bearing
CN210798003U (en) Stone curtain wall wrapping column structure
CN214497920U (en) Novel energy-efficient building outer wall insulation construction
CN205509396U (en) An I -steel gallows
CN114059707A (en) High strength building engineering concrete wallboard
CN208168025U (en) It is a kind of with timber be buckling-restrained mechanism anti-buckling support
CN206941972U (en) One kind being capable of the support bracket fastened capping type roof boarding template of installation activity
CN207988578U (en) Mobile concrete road surface construction roof insulating
CN219491507U (en) Sealing device for airtight treatment of grain bungalow house roof board seam
CN110700406A (en) Anti-seismic profile steel structure for building
CN207080787U (en) Angle steel quickly fixes theft-prevention supporter
CN102127973B (en) Reinforcing method of beam for building
CN219697581U (en) Photovoltaic module fixing device and photovoltaic power generation equipment
CN220117649U (en) Metal facing heat preservation decorates intergral template system
CN206727610U (en) A kind of compound glass steel three-core cable fixture
CN217840378U (en) Deformation joint cover plate
CN218843540U (en) Photovoltaic metal sandwich roof panel
CN217027537U (en) Connecting node structure for building expansion joint

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant