CN105350491B - A kind of high altitude localities dam upstream face impermeable coating and its construction method - Google Patents

A kind of high altitude localities dam upstream face impermeable coating and its construction method Download PDF

Info

Publication number
CN105350491B
CN105350491B CN201510698871.XA CN201510698871A CN105350491B CN 105350491 B CN105350491 B CN 105350491B CN 201510698871 A CN201510698871 A CN 201510698871A CN 105350491 B CN105350491 B CN 105350491B
Authority
CN
China
Prior art keywords
thickness
high altitude
altitude localities
impermeable coating
upstream face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510698871.XA
Other languages
Chinese (zh)
Other versions
CN105350491A (en
Inventor
陈亮
崔同欢
肖承京
李超毅
石妍
范志勇
李家正
崔光泽
魏涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Tibet Brahmaputra Hydropower Development Investment Limited
Huaneng Group Technology Innovation Center Co Ltd
Changjiang River Scientific Research Institute Changjiang Water Resources Commission
Original Assignee
Huaneng Tibet Power Generation Co ltd
Huaneng Group Technology Innovation Center Co Ltd
Changjiang River Scientific Research Institute Changjiang Water Resources Commission
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaneng Tibet Power Generation Co ltd, Huaneng Group Technology Innovation Center Co Ltd, Changjiang River Scientific Research Institute Changjiang Water Resources Commission filed Critical Huaneng Tibet Power Generation Co ltd
Priority to CN201510698871.XA priority Critical patent/CN105350491B/en
Publication of CN105350491A publication Critical patent/CN105350491A/en
Application granted granted Critical
Publication of CN105350491B publication Critical patent/CN105350491B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/16Sealings or joints
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D163/00Coating compositions based on epoxy resins; Coating compositions based on derivatives of epoxy resins
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D7/00Features of coating compositions, not provided for in group C09D5/00; Processes for incorporating ingredients in coating compositions
    • C09D7/40Additives
    • C09D7/60Additives non-macromolecular
    • C09D7/61Additives non-macromolecular inorganic
    • CCHEMISTRY; METALLURGY
    • C09DYES; PAINTS; POLISHES; NATURAL RESINS; ADHESIVES; COMPOSITIONS NOT OTHERWISE PROVIDED FOR; APPLICATIONS OF MATERIALS NOT OTHERWISE PROVIDED FOR
    • C09DCOATING COMPOSITIONS, e.g. PAINTS, VARNISHES OR LACQUERS; FILLING PASTES; CHEMICAL PAINT OR INK REMOVERS; INKS; CORRECTING FLUIDS; WOODSTAINS; PASTES OR SOLIDS FOR COLOURING OR PRINTING; USE OF MATERIALS THEREFOR
    • C09D7/00Features of coating compositions, not provided for in group C09D5/00; Processes for incorporating ingredients in coating compositions
    • C09D7/40Additives
    • C09D7/65Additives macromolecular

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Organic Chemistry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Inorganic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Road Paving Structures (AREA)
  • Revetment (AREA)

Abstract

A kind of high altitude localities dam upstream face impermeable coating of the present invention and its construction method, it is characterised in that:It is high resiliency modified epoxy clay that the coating is used for seamless normal concrete surface, and thickness is 1mm or so;It is bottom, middle level and surface layer composition for structural joint, expansion joint, construction joint and other location of cracks impermeable coatings:Wherein described subbing is the low viscosity epoxy resin of 0.1~0.2mm of thickness or so, and the middle level is the toughness reinforcing cloth of thickness 0.5mm, and the investment precoat is the polyaspartate polyurea of the nano modification of 0.5~1.0mm of thickness.The present invention is a kind of economical and practical barrier coat material system, and with the adaptability preferably in the special adverse circumstances in high altitude localities while with good barrier performance, hydraulic engineering is on active service safely, and there play the role of to be particularly important.

Description

A kind of high altitude localities dam upstream face impermeable coating and its construction method
Technical field
The invention belongs to dam concrete surface anti-seepage paint field, one kind is specifically referred in high altitude localities particular surroundings Under the conditions of, the concrete surface impermeable coating and its construction method used in dam upstream face brushing.
Background technology
China high altitude localities, such as Tibet, Xinjiang area are richly stored with hydroelectric resources, but its utilization rate is only It is 0.45% or so, the short of electricity of solution Tibet engineering, water shortage problem, intend a large amount of moneys of input during Tibet Autonomous Region's medium-term and long-term plans Gold carries out big-and-middle-sized key water power hydraulic engineering construction, and the hydroelectric development of this area is following emphasis of China.Because these are high Altitude Regions hydraulic structure is in that low pressure, the temperature difference are big, irradiates under high special harsh climate environment, in work progress and Easily cause the positions such as distress in concrete, construction joint, structural joint, interlayer seam not reach antiseepage requirement after construction and seepage occur and show As causing totally unfavorable influence safely to hydraulic structure.
High altitude localities is dry, sunny, ultraviolet strong, day and night temperature and annual range of temperature are big, and temperature shock is frequently Numerous, this causes that concrete for hydraulic structure easily produces crack, while these areas are in the geology calamities such as geology active region, earthquake, landslide Evil takes place frequently so that the crack of concrete generation is more, and is generally seam living, and deformation is frequent, deflection is big.The water retaining structures such as dam During operation, upstream storehouse water electrode easily penetrates into crack, adds temperature cataclysm frequently, causes the freeze thawing of crack area concrete frequently, accelerates The generation of hydraulic structure freeze-thaw damage;For hydraulic reinforced concrete structure thing, the corrosion of reinforcing bar can be also accelerated due to seepage Deng.And these diseases can form chain reaction and vicious circle with seepage, so that the durability of concrete for hydraulic structure is subject to tight The influence of weight, causes the hydraulic structure life-span to be remarkably decreased, and causes totally unfavorable influence to engineering safety operation, or even have routed The extreme security incident such as dam occurs.
Therefore, a kind of economical and practical barrier coat material system is invented, is had while with good barrier performance Adaptability preferably in the special adverse circumstances in high altitude localities, hydraulic engineering is on active service safely, and there play the role of to be particularly important.
The content of the invention
The purpose of the present invention is directed to above-mentioned deficiency, there is provided one kind is adapted in the special harsh climate environment in high altitude localities Under, i.e., hypobaric hypoxia, dry, irradiation strong, day and night temperature and annual range of temperature are big, and earthquake such as takes place frequently at the geological conditions, The concrete surface impermeable coating that dam upstream face brushing is used, has preferably in height while with good barrier performance Adaptability in the special adverse circumstances in Altitude Regions, hydraulic engineering is on active service safely has particularly important effect.
The present invention provide technical scheme be:
A kind of high altitude localities dam upstream face impermeable coating, it is characterized in that:The coating is used for seamless common coagulation Native surface is high resiliency modified epoxy clay, and thickness is 1mm or so;For structural joint, expansion joint, construction joint and other split Seam position impermeable coating is bottom, middle level and surface layer composition:Wherein described subbing is the low of 0.1~0.2mm of thickness or so Viscosity epoxy, the middle level is the toughness reinforcing cloth of thickness 0.5mm, and the investment precoat changes for the nanometer of 0.5~1.0mm of thickness The polyaspartate polyurea of property;
Described high resiliency modified epoxy clay, its composition is A, B two-component composition, and wherein component A is by weight Percentage is 30~50% bisphenol A epoxide resin, 20~30% silicon powder, 10~20% diluent, and 3~5% receive Rice elastic granule mixing composition;B component is diamine or polynary amine curing agent, and wherein component A is with the weight ratio of B component 10:3。
The nano-elastic particle is elastic caoutchouc of the average grain diameter less than 1000nm prepared using nano-level grinder.Institute The subbing of location of cracks impermeable coating is stated for low viscosity epoxy resin, its viscosity is 500~1000mPas, surface drying time 1h ~2h, hardening time 0.5h~2h.The middle level toughness reinforcing cloth, is the one kind in carbon cloth, tire base fabric, nylon cloth.
A kind of construction method of high altitude localities dam upstream face impermeable coating, it is characterised in that:Comprise the following steps:
A. washing and drying treatment is carried out to dam concrete basal plane;
B. each 20cm is extended toward seam cross direction in location of cracks, brushing low viscosity epoxy resin simultaneously makes its thickness reach 0.1 ~0.2mm;
C. before bottom low viscosity epoxy resin surface drying, one layer of toughness reinforcing cloth is pasted thereon;
D. in the nano-material modified polyaspartate polyurea of toughness reinforcing cloth external coating 2~3 times, thickness up to 0.5~ 1mm;
E. on remaining normal concrete surface, brushing high resiliency modified epoxy clay brushes all areas beyond various cracks Domain, and effective overlap joint of 5~10cm is carried out with above-mentioned crack printed regions.
High altitude localities is dry, sunny, ultraviolet strong, day and night temperature and annual range of temperature are big, and temperature shock is frequently Numerous, this causes that concrete for hydraulic structure easily produces crack, while these areas are in the geology calamities such as geology active region, earthquake, landslide Evil takes place frequently so that the crack of concrete generation is more, and is generally seam living, and deformation is frequent, deflection is big.The water retaining structures such as dam During operation, upstream storehouse water electrode easily penetrates into crack, adds that there's a sudden fall in temperature frequently, causes the freeze thawing of crack area concrete frequently, accelerates The generation of hydraulic structure freeze-thaw damage;For hydraulic reinforced concrete structure thing, the corrosion of reinforcing bar can be also accelerated due to seepage Deng.And these diseases can form chain reaction and vicious circle with seepage, so that the durability of concrete for hydraulic structure is subject to tight The influence of weight, causes the hydraulic structure life-span to be remarkably decreased, and causes totally unfavorable influence to engineering safety operation, or even have routed The extreme security incident such as dam occurs.
The present invention is a kind of economical and practical barrier coat material system, while with good barrier performance have compared with The good adaptability in the special adverse circumstances in high altitude localities, hydraulic engineering is on active service safely, and there play the role of to be particularly important.
Specific embodiment
With reference to embodiment, the invention will be further described.
A kind of high altitude localities dam upstream face impermeable coating of the present invention, it is characterized in that:The coating is used for nothing The normal concrete surface of seam is high resiliency modified epoxy clay, and thickness is 1mm or so;For structural joint, expansion joint, apply Work is stitched and other location of cracks impermeable coatings are bottom, middle level and surface layer composition:Wherein described subbing be thickness 0.1~ The low viscosity epoxy resin of 0.2mm or so, the middle level for thickness 0.5mm toughness reinforcing cloth, the investment precoat be thickness 0.5~ The polyaspartate polyurea of the nano modification of 1.0mm;
Described high resiliency modified epoxy clay, its composition is A, B two-component composition, and wherein component A is by weight Percentage is 30~50% bisphenol A epoxide resin, 20~30% silicon powder, 10~20% diluent, and 3~5% receive Rice elastic granule mixing composition;B component is diamine or polynary amine curing agent, and wherein component A is with the weight ratio of B component 10:3。
The nano-elastic particle is elastic caoutchouc of the average grain diameter less than 1000nm prepared using nano-level grinder.Institute The subbing of location of cracks impermeable coating is stated for low viscosity epoxy resin, its viscosity is 500~1000mPas, surface drying time 1h ~2h, hardening time 0.5h~2h.The middle level toughness reinforcing cloth, is the one kind in carbon cloth, tire base fabric, nylon cloth.
A kind of construction method of high altitude localities dam upstream face impermeable coating, it is characterised in that:Comprise the following steps:
A. washing and drying treatment is carried out to dam concrete basal plane;
B. each 20cm is extended toward seam cross direction in location of cracks, brushing low viscosity epoxy resin simultaneously makes its thickness reach 0.1 ~0.2mm;
C. before bottom low viscosity epoxy resin surface drying, one layer of toughness reinforcing cloth is pasted thereon;
D. in the nano-material modified polyaspartate polyurea of toughness reinforcing cloth external coating 2~3 times, thickness up to 0.5~ 1mm;
E. on remaining normal concrete surface, brushing high resiliency modified epoxy clay brushes all areas beyond various cracks Domain, and effective overlap joint of 5~10cm is carried out with above-mentioned crack printed regions.
Embodiment 1, the construction of Yarlung Zangbo River middle reaches power station upstream barrier coat
Material of the invention and technique are applied in the dam face seepage of Yarlung Zangbo River middle reaches some hydropower station upstream.The water Power station is normal concrete gravity dam, engineering dam site height above sea level, dry, winter severe cold, and temperature difference per day is larger, and engineering is long-term Construction, not carrying out the winter has a rest, and concreting there may be defect.To improve the impervious level of dam water retaining structure, design requirement Barrier coat protection is carried out to the concrete in the range of the certain elevation in upstream before dam retaining.
Upstream barrier coat construction demonstration has been carried out using material of the invention and matching operation technique.For dam Structural joint, expansion joint, construction joint and other location of cracks construction processings that upstream face is present, its method is:To dam concrete Basal plane is polished, after washing and drying treatment, extend each 20cm toward seam cross direction in location of cracks first, batch scrapes low viscosity ring Oxygen tree fat 0.2mm;One layer of fibre reinforced toughness reinforcing cloth is pasted before bottom low viscosity epoxy resin surface drying;It is last to be applied on toughness reinforcing cloth surface Brush nano-material modified polyaspartate polyurea 2~3 times, 0.7~1.0mm of thickness.The construction at other positions of dam surface Method is:Polishing cleaning concrete surface, after high resiliency modified epoxy clay is scratched after dry tack free, brushes beyond various cracks All regions, and effective overlap joint of 5~10cm width is carried out with above-mentioned crack treatment region.
Site Detection finds:The vertical coat side of more than 4.0MPa water under high pressures can be resisted after barrier coat solidification to continue 10min impacts, and the breakages such as erosion, peeling and cracking does not occur;Can more than renitency 1.2MPa the impervious detection of hydrostatic pressing;Hurry up It is quick-frozen that to melt coating after cycle detection shows 200 Frozen-thawed cycleds intact, it is Nian Jie with base concrete firmly, the loss of test specimen Dynamic Elastic Module Less than 5%, massless loss.
The impervious coating demonstration construction of embodiment 2, Tibet Nyang Qu rivers upstream key water control project overflow side weir
Material of the invention and construction technology resist in Tibet Nyang Qu rivers upstream key water control project overflow side weir concrete antifreezing Ooze during repairing is protected and carried out exemplary construction.The hinge has the comprehensive benefits such as flood control, tourism, work concurrently based on irrigating, generate electricity Journey scale is big (II) type, and reservoir capacity is 1.55 hundred million m3, the m3 of utilizable capacity 0.83 hundred million, builds up rear effective irrigation area 450,000 Mu, power station installed capacity is 20,000 kW, and design average annual energy output is 0.61 hundred million degree.Engineering lock retaining hair under 1999 Electricity, dam is clay core wall rockfill dam, and crest elevation 4260m, winter severe cold, dam is on active service 15 years, and core wall rockfill dam operation is good It is good, but flood-discharge tunnel, diversion tunnel concrete structure part freeze-thaw damage are more serious, in the urgent need to carrying out antiseepage and freeze proof repairing Protection.
The concrete impervious antifreeze exemplary construction of downflow weir has been carried out using material of the invention and matching operation technique.It is right In structural joint, expansion joint, construction joint and other location of cracks construction processings that dam upstream face is present, its method is:To dam Concrete surface is polished, after washing and drying treatment, it is low in each 20cm scopes blade coating in crack both sides along fractuer direction first Viscosity epoxy 0.2mm;One layer of fibre reinforced toughness reinforcing cloth is pasted before bottom low viscosity epoxy resin surface drying;Finally in toughness reinforcing cloth The nano-material modified polyaspartate polyurea of external coating 2~3 times, 0.7~1.0mm of thickness.Other position concrete tables The construction method in face is:Polishing cleaning concrete surface, after high resiliency modified epoxy clay is scratched after dry tack free, brushes various All regions beyond crack, and effective overlap joint of 5~10cm width is carried out with above-mentioned crack treatment region.
Key water control project overflow side weir impervious coating in Tibet Nyang Qu rivers upstream is by the operation in flood season, each side detection Result shows that it works well, and coating has no damaged, comes off, and serves and anti-well blends anti-impact effect.
Embodiment 3, the anti-seepage of channels coating test construction of Tibet Man La irrigated areas
Tibet Man La irrigated areas are located at Yarlung Zangbo River upstream Nianchu river valley, and irrigated area controls completely to draw mining under reservoir to year Chu The soil that river mouth two sides in river can flow automatically with irrigation by pumping, master control area is up to 530,000 mu, 42.68 ten thousand mu of designed irrigation area.Fill Area builds together and is provided with 11 canal systems, there is a large amount of channels and water lift building.Due to height above sea level residing for irrigated area, winter severe cold, part There is different degrees of freeze injury and seepage in concrete canal, is serious harm to channel health operation.
Freeze proof and impervious protection test is carried out to channel using material of the invention and construction technology, while also to increasing canal Road concrete surface intensity and reduced water roughness and had very big benefit.The protection test method on channel surface is:Deposited for channel Structural joint and other location of cracks elder generation concrete surface polished, after washing and drying treatment, first along fractuer direction In each 15cm scopes blade coating low viscosity epoxy resin 0.2mm in crack both sides;One layer of tire is pasted before bottom low viscosity epoxy resin surface drying Base fabric;The last polyaspartate polyurea nano-material modified in tire scrim surfaces brushing 2~3 times, 0.7~1.0mm of thickness. The construction method of channel other position concrete surfaces is:Polishing cleaning concrete surface, after scratching high resiliency after dry tack free Modified epoxy clay, brushes all regions beyond various cracks, and carry out having for 5~10cm width with above-mentioned crack treatment region Effect overlap joint.
By operation more than a year, freeze proof and impervious protection effect is carried out to channel using material of the invention and construction technology Substantially, channel concrete has no freeze-thaw damage to fruit, and outward appearance is good;Structural joint closing is preferable, has no breakthrough;Other cracks are repaiied Benefit reaches design requirement, with more than concrete surface adhesive strength 3.0MPa.
High altitude localities is dry, sunny, ultraviolet strong, day and night temperature and annual range of temperature are big, and temperature shock is frequently Numerous, this causes that concrete for hydraulic structure easily produces crack, while these areas are in the geology calamities such as geology active region, earthquake, landslide Evil takes place frequently so that the crack of concrete generation is more, and is generally seam living, and deformation is frequent, deflection is big.The water retaining structures such as dam During operation, upstream storehouse water electrode easily penetrates into crack, adds that there's a sudden fall in temperature frequently, causes the freeze thawing of crack area concrete frequently, accelerates The generation of hydraulic structure freeze-thaw damage;For hydraulic reinforced concrete structure thing, the corrosion of reinforcing bar can be also accelerated due to seepage Deng.And these diseases can form chain reaction and vicious circle with seepage, so that the durability of concrete for hydraulic structure is subject to tight The influence of weight, causes the hydraulic structure life-span to be remarkably decreased, and causes totally unfavorable influence to engineering safety operation, or even have routed The extreme security incident such as dam occurs.
The present invention is a kind of economical and practical barrier coat material system, while with good barrier performance have compared with The good adaptability in the special adverse circumstances in high altitude localities, hydraulic engineering is on active service safely, and there play the role of to be particularly important.
The detailed description of specific embodiments of the present invention is the foregoing is only, the present invention is not limited with this, it is all at this Any modification, equivalent and improvement for being made in the mentality of designing of invention etc., should be included in protection scope of the present invention it It is interior.

Claims (4)

1. a kind of high altitude localities dam upstream face impermeable coating, it is characterized in that:The coating is used for seamless normal concrete Surface, is high resiliency modified epoxy clay, and thickness is 1mm or so;For structural joint, expansion joint, construction joint and other split The impermeable coating at position is stitched, is made up of subbing, middle level and investment precoat:Wherein described subbing be thickness 0.1~ The low viscosity epoxy resin of 0.2mm or so, the middle level for thickness 0.5mm toughness reinforcing cloth, the investment precoat be thickness 0.5~ The polyaspartate polyurea of the nano modification of 1.0mm;
Described high resiliency modified epoxy clay, its composition is A, B two-component composition, and wherein component A is by weight percent Number is 30~50% bisphenol A epoxide resin, 20~30% silicon powder, 10~20% diluent, 3~5% nanometer bullet Property particle mixing composition;B component is that diamine or polynary amine curing agent, wherein component A and the weight ratio of B component are 10:3.
2. a kind of high altitude localities dam upstream face impermeable coating according to claim 1, it is characterised in that:The nanometer Elastic granule is elastic caoutchouc of the average grain diameter less than 1000nm prepared using nano-level grinder.
3. a kind of high altitude localities dam upstream face impermeable coating according to claim 1, it is characterised in that:The crack The subbing of position impermeable coating be low viscosity epoxy resin, its viscosity be 500~1000mPas, surface drying time 1h~2h, Hardening time 0.5h~2h.
4. a kind of high altitude localities dam upstream face impermeable coating according to claim 1, it is characterised in that:The middle level Toughness reinforcing cloth is the one kind in carbon cloth, tire base fabric, nylon cloth.
CN201510698871.XA 2015-10-23 2015-10-23 A kind of high altitude localities dam upstream face impermeable coating and its construction method Active CN105350491B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510698871.XA CN105350491B (en) 2015-10-23 2015-10-23 A kind of high altitude localities dam upstream face impermeable coating and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510698871.XA CN105350491B (en) 2015-10-23 2015-10-23 A kind of high altitude localities dam upstream face impermeable coating and its construction method

Publications (2)

Publication Number Publication Date
CN105350491A CN105350491A (en) 2016-02-24
CN105350491B true CN105350491B (en) 2017-05-31

Family

ID=55326544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510698871.XA Active CN105350491B (en) 2015-10-23 2015-10-23 A kind of high altitude localities dam upstream face impermeable coating and its construction method

Country Status (1)

Country Link
CN (1) CN105350491B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759113A (en) * 2016-12-14 2017-05-31 中国电建集团贵阳勘测设计研究院有限公司 A kind of construction method of high-velocity flow building impact-resisting wear-resisting protective coating
CN109763503B (en) * 2019-01-29 2020-07-31 长沙理工大学 Supporting structure for seepage-proofing reinforcement of soft rock slope and reinforcement method thereof
CN110256649B (en) * 2019-06-27 2021-09-17 青岛爱尔家佳新材料股份有限公司 Polyaspartate polyurea composite material and preparation method thereof
CN112854489B (en) * 2021-03-19 2022-03-18 北京中水科海利工程技术有限公司 Dam concrete surface integral impervious layer and forming method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006314960A (en) * 2005-05-16 2006-11-24 Nippon Paint Co Ltd Automobile coating film repairing method
CN203742001U (en) * 2014-02-12 2014-07-30 广州市鲁班建筑工程技术有限公司 Waterproof and reinforcing structure based on high-toughness and high-strength epoxy resin

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006314960A (en) * 2005-05-16 2006-11-24 Nippon Paint Co Ltd Automobile coating film repairing method
CN203742001U (en) * 2014-02-12 2014-07-30 广州市鲁班建筑工程技术有限公司 Waterproof and reinforcing structure based on high-toughness and high-strength epoxy resin

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
分水江水利枢纽工程大坝缺陷处理;杨勇等;《大坝与安全》;20090430(第2期);第3节,第4节 *
探讨混凝土大坝灌浆防渗处理技术;第15期;《科技风》;20140815(第15期);第2.2节 *

Also Published As

Publication number Publication date
CN105350491A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN105350491B (en) A kind of high altitude localities dam upstream face impermeable coating and its construction method
CN207878393U (en) Hydraulic structure composite anti-penetrating system
CN202787333U (en) Concrete surface protection structure of marine construction
CN108179669B (en) Heat-proof structure of frozen earth roadbed and cooling method thereof
CN103628451A (en) Impermeable water stopping structure for hydraulic engineering
CN103046513A (en) Method for coating and sealing fracture of bed rock in uncovered heavy consolidation grouting
CN203939010U (en) A kind of steel limit self-adhering rubber waterstop
CN204715426U (en) A kind of water burst drainage system for closed deep foundation ditch exploratory hole
CN103452081B (en) A kind of construction method of flexible composite impermeable layer of upstream face of high arch dam
CN101892649A (en) Project and method for preventing and controlling flood and drought
CN104514284A (en) Waterproofing work technical process by spay-painting method
CN206457782U (en) A kind of waterproof coating structure for water resources dam dam facing
CN101824812A (en) Method for preventing seepage of dam
CN106122616A (en) A kind of long-effective corrosion etching method of lined Prestressed concrete cylinder pipe
CN204402513U (en) A kind of device solving the infiltration of underground chamber lining cutting surface and leak
CN205975597U (en) Regional transmission tower improved generation bored concrete pile basis is used for corroding
CN204386625U (en) A kind of railway tunnel hoop seam uses steel plate self-adhesion water stop band
CN103334425B (en) Joint protection structure of anti-corrosion hollow square pile
CN204023496U (en) A kind of novel ecological channel revetment
CN209523169U (en) A kind of protection slope device
CN208604594U (en) A kind of corrosion-resistant water conservancy Bridge Piles
CN203361135U (en) Adapter protection structure of corrosion-resistant hollow square pile
CN208268556U (en) Construct the composite pipe in sponge city
CN102322042A (en) Rockfill concrete dam
CN202175936U (en) Rock-mounded concrete dam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 430010 Huangpu street, Hubei, No. 23, No.

Co-patentee after: Huaneng Group Technology Innovation Center

Patentee after: Changjiang Academy of Sciences, Changjiang Water Conservancy Committee

Co-patentee after: Huaneng Tibet Brahmaputra Hydropower Development Investment Limited

Address before: 430010 Huangpu street, Hubei, No. 23, No.

Co-patentee before: Huaneng Group Technology Innovation Center

Patentee before: Changjiang Academy of Sciences, Changjiang Water Conservancy Committee

Co-patentee before: HUANENG TIBET POWER GENERATION CO., LTD.