CN105349724B - Coal gas of converter mingled burning installation for hot-blast stove - Google Patents

Coal gas of converter mingled burning installation for hot-blast stove Download PDF

Info

Publication number
CN105349724B
CN105349724B CN201510875737.2A CN201510875737A CN105349724B CN 105349724 B CN105349724 B CN 105349724B CN 201510875737 A CN201510875737 A CN 201510875737A CN 105349724 B CN105349724 B CN 105349724B
Authority
CN
China
Prior art keywords
converter
coal gas
branched pipe
blast furnace
gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510875737.2A
Other languages
Chinese (zh)
Other versions
CN105349724A (en
Inventor
夏世桐
张良斌
曹兵
黄裕东
高国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lian Feng Steel (Zhangjiagang) Co., Ltd.
Original Assignee
Jiangsu Yonggang Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Yonggang Group Co Ltd filed Critical Jiangsu Yonggang Group Co Ltd
Priority to CN201510875737.2A priority Critical patent/CN105349724B/en
Publication of CN105349724A publication Critical patent/CN105349724A/en
Application granted granted Critical
Publication of CN105349724B publication Critical patent/CN105349724B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B9/00Stoves for heating the blast in blast furnaces
    • C21B9/10Other details, e.g. blast mains
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Regulation And Control Of Combustion (AREA)

Abstract

The invention discloses the coal gas of converter mingled burning installation for hot-blast stove, including:The coal gas of converter primary branch being connected with the total pipe network of coal gas of converter, coal gas of converter primary branch corresponds to every hot-blast stove and draws a coal gas of converter branched pipe respectively, every coal gas of converter branched pipe is communicated by an induction tunnel with the blast furnace gas branched pipe of corresponding hot-blast stove respectively, corresponding to every induction tunnel insertion in blast furnace gas branched pipe, the insertion position of every induction tunnel is located between the blast furnace gas branched pipe flow control valve and blast furnace gas branched pipe stop valve on corresponding blast furnace gas branched pipe, coal gas of converter branched pipe flow control valve is respectively arranged with every coal gas of converter branched pipe.It is an advantage of the invention that:It can effectively avoid blast furnace gas from pouring in down a chimney the generation of phenomenon, while often need not significantly turn down blast furnace gas primary branch imported valve, and need not frequently adjust the flow control valve on coal gas of converter primary branch, and it is safe to use.

Description

Coal gas of converter mingled burning installation for hot-blast stove
Technical field
The present invention relates to the coal gas of converter mingled burning installation for hot-blast stove.
Background technology
Hot-blast stove is one of main corollary equipment of Iron Works, and the effect of hot-blast stove is carried for blast furnace is continual For high-temperature hot-air.At present, the wind-warm syndrome for more than 1000 DEG C of high-temperature hot-air, which often improves 100 DEG C, can save 15~20kg/ of coke ratio T, the wind-warm syndrome of less than 1000 DEG C of high-temperature hot-air, which often improves 100 DEG C, can save the kg/t of coke ratio 30, therefore it is enterprise's section to improve wind-warm syndrome Can emission reduction, the important measures of cost efficiency.
Coal gas of converter is the combustible gas of caused higher thermal value in convertor steelmaking process, and the calorific value of unit coal gas of converter is about 6000KJ, and the calorific value of unit blast furnace gas is about 3000-3300KJ, the calorific value of unit coal gas of converter is about unit blast furnace gas 2 times of calorific value, thus mix in blast furnace gas that to burn coal gas of converter be a kind of effective ways for improving hot-blast stove supply wind-warm syndrome.It is existing Blast furnace gas air supply system includes used in stage:The blast furnace gas primary branch being connected with blast furnace gas main pipe net, in height Electric butterfly valve, electric blind plate valve, pressure detecting instrument, flow detector and temperature monitor are provided with producer gas primary branch, often Seat hot-blast stove is connected by a blast furnace gas branched pipe with blast furnace gas primary branch respectively, on every blast furnace gas branched pipe The flow direction for leading to burner in hot-blast stove along blast furnace gas is disposed with blast furnace gas branched pipe Flow-rate adjustment respectively Valve, blast furnace gas branched pipe stop valve and blast furnace gas branched pipe combustion valve, in blast furnace gas branched pipe stop valve and blast furnace coal Gas bleeding valve is additionally provided with blast furnace gas branched pipe between qi leel branch pipe combustion valve.Typically mixed at present by coal gas of converter Burn after device mixes coal gas of converter with blast furnace gas and be supplied to hot-blast stove.There are two kinds of coal gas of converter mingled burning installations at this stage, its A kind of structure of middle coal gas of converter mingled burning installation is:Including the coal gas of converter primary branch being connected with the total pipe network of coal gas of converter, turn Producer gas primary branch leads directly to an injection endless tube, and injection endless tube ring set is on the outside of blast furnace gas primary branch, the edge on injection endless tube It is circumferentially provided with some induction tunnels, and every induction tunnel is inserted in blast furnace gas primary branch, and coal gas of converter passes through injection endless tube On some induction tunnels enter in blast furnace gas primary branch, so as to being mixed with the blast furnace gas in blast furnace gas primary branch, reach To the purpose for mixing burning.The structure of another coal gas of converter mingled burning installation is:Including the converter being connected with the total pipe network of coal gas of converter Coal gas primary branch, the caliber of coal gas of converter primary branch are much smaller than the caliber of blast furnace gas primary branch, and coal gas of converter primary branch tilts Insert in blast furnace gas primary branch, coal gas of converter is entered by coal gas of converter primary branch in blast furnace gas primary branch, so that with Blast furnace gas mixing in blast furnace gas primary branch, reaches the purpose for mixing burning.Above two coal gas of converter mingled burning installation is all present Following shortcoming:(1)Because the pressure knot of blast furnace gas and coal gas of converter is often in factor and original pipe network characteristic factor in fluctuation, Usually need significantly to turn down the imported valve of blast furnace gas primary branch, certain potential safety hazard be present;(2)Same original When cause, particularly blast-furnace gas pressure and coal gas of converter pressure unmatched, ejection function " failure " and occur " pour in down a chimney " phenomenon, i.e., Blast furnace gas pours in down a chimney into converter gas pipeline, burns function failure so as to cause to mix;(3)Due to the characteristic of hot-blast stove operation, often Hour changes a stove, during stove is changed, has a hot-blast stove to stop burning stove in 12 ~ 15 minutes(By taking 3 hot-blast stoves as an example, heat 3 hot-blast stoves are burnt 1 and sent and are changed into 1 burning 1 and stop 1 sending from 2 when wind furnace changes stove), thus need in frequently regulation coal gas of converter primary branch Flow control valve, pressure, the stability of flow for being so easily caused whole system are poor.
The content of the invention
It is an object of the invention to provide a kind of generation that can effectively avoid blast furnace gas from pouring in down a chimney phenomenon, while need not be frequent Blast furnace gas primary branch imported valve is significantly turned down, and need not frequently adjust the Flow-rate adjustment on coal gas of converter primary branch Valve, and the coal gas of converter mingled burning installation for hot-blast stove safe to use.
To achieve the above object, present invention employs following technical scheme:The described coal gas of converter for hot-blast stove is mixed Device is burnt, including:The coal gas of converter primary branch being connected with the total pipe network of coal gas of converter, coal gas of converter primary branch correspond to every hot blast Stove draws a coal gas of converter branched pipe respectively, and every coal gas of converter branched pipe passes through an induction tunnel and corresponding hot-blast stove respectively Blast furnace gas branched pipe communicate, corresponding to the insertion of every induction tunnel in blast furnace gas branched pipe, the insertion position of every induction tunnel Setting in the blast furnace gas branched pipe flow control valve on corresponding blast furnace gas branched pipe and blast furnace gas branched pipe stop valve it Between, coal gas of converter branched pipe flow control valve is respectively arranged with every coal gas of converter branched pipe.
Further, the coal gas of converter mingled burning installation of hot-blast stove is previously described for, wherein:Every induction tunnel and corresponding height 25~40 ° of angular range between the center line of producer gas branched pipe.
Further, the coal gas of converter mingled burning installation of hot-blast stove is previously described for, wherein:It is suitable on coal gas of converter primary branch Coal gas of converter airintake direction be disposed with by Shop floor control aperture size first of coal gas of converter primary branch flow tune Save valve and the second coal gas of converter primary branch flow control valve of aperture size is adjusted by site operation personnel.
The implementation of Pass through above-mentioned technical proposal, the beneficial effects of the invention are as follows:(1)Height of the coal gas of converter in every hot-blast stove Injection on producer gas branched pipe, the gas pressure in blast furnace gas branched pipe is relatively more less than blast furnace gas primary branch, with converter Pressure in coal gas branched pipe is good with respect to matching, it is no longer necessary to uses originally from blast furnace gas primary branch during injection, often Need significantly to turn down the inlet valve on blast furnace gas primary branch(Chang Daguan to 60% valve position)Operation;(2)In blast furnace gas Injection substantially reduces the path that coal gas of converter enters burner in hot-blast stove on branched pipe, effectively reduces pressure loss, phase The few situation of smokestack and burner draft wealth to adaptive system, the relative actual effect for improving injection, has Imitate the generation for avoiding blast furnace gas from " pouring in down a chimney " phenomenon;(3)Converter is respectively arranged with the coal gas of converter branched pipe of every hot-blast stove Coal gas branched pipe flow control valve, just can be to entering by each stove coal gas of converter branched pipe flow control valve when changing-over stove The coal gas of converter usage amount for entering corresponding hot-blast stove is controlled, and is avoided when stopping burning certain stove, and this stops burning stove interference and is heating wind The occurrence of stove;It is not only easy to adjust, and regulating effect is good, is advantageous to system run all right.
Brief description of the drawings
Fig. 1 is the operation principle schematic diagram of the coal gas of converter mingled burning installation of the present invention for hot-blast stove.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
As shown in figure 1, the described coal gas of converter mingled burning installation for hot-blast stove, including:The phase of pipe network 1 total with coal gas of converter The coal gas of converter primary branch 2 of connection, the corresponding every hot-blast stove 3 of coal gas of converter primary branch 2 draw a coal gas of converter branch respectively Pipe 5, every coal gas of converter branched pipe 5 are communicated by an induction tunnel 3 with the blast furnace gas branched pipe 6 of corresponding hot-blast stove 3 respectively, Every induction tunnel 4 is inserted in corresponding blast furnace gas branched pipe 6, and the insertion position of every induction tunnel 4 is located at corresponding blast furnace gas Between blast furnace gas branched pipe flow control valve 7 and blast furnace gas branched pipe stop valve 8 on branched pipe 6, in every converter coal Coal gas of converter branched pipe flow control valve 9 is respectively arranged with qi leel branch pipe 5;In the present embodiment, every induction tunnel 4 with it is corresponding Blast furnace gas branched pipe 6 center line between 25~40 ° of angular range, and control induction tunnel insert certain depth Degree, this induction tunnel angular range and insertion depth, which are set, can meet injection requirement, further avoid blast furnace gas from pouring in down a chimney phenomenon Generation;In the present embodiment, the airintake direction along coal gas of converter on coal gas of converter primary branch 2 is disposed with by workshop Control first of coal gas of converter primary branch flow control valve 10 of aperture size and aperture size is adjusted by site operation personnel Second coal gas of converter primary branch flow control valve 11, can be protected by first of coal gas of converter primary branch flow control valve 10 The coal gas of converter total amount in coal gas of converter primary branch 2 is demonstrate,proved all the time in safe range, improves safety in utilization, is turned by second Producer gas primary branch flow control valve 11, worker can be made more easily to be adjusted according to actual conditions in coal gas of converter primary branch 2 Coal gas of converter flow;In actual use, electric blind plate valve 12 is additionally provided with coal gas of converter primary branch 2, is pneumatically cut soon Valve 13, and the instrumentation such as pressure detecting instrument, flow detector and temperature monitor, so may further ensure that operation Stability;
The operation principle of the present invention is as follows:
Blast furnace gas in blast furnace gas primary branch 14 enters the burner of each hot-blast stove 3 through each blast furnace gas branched pipe 6 In, and the coal gas of converter in coal gas of converter primary branch 2 is then entered through each coal gas of converter branched pipe 5 and corresponding induction tunnel 4 by injection In corresponding blast furnace gas branched pipe 6, into the blast furnace gas in blast furnace gas branched pipe 6 and coal gas of converter according to a certain percentage Mixing, into the burner of hot-blast stove 3.It is an advantage of the invention that:(1)Blast furnace coal qi leel of the coal gas of converter in every hot-blast stove Injection on branch pipe, the gas pressure in blast furnace gas branched pipe is relatively more less than blast furnace gas primary branch, with coal gas of converter branch Pressure in pipe is good with respect to matching, it is no longer necessary to uses originally from blast furnace gas primary branch during injection, it is often necessary to significantly Degree turns down the inlet valve on blast furnace gas primary branch(Chang Daguan to 60% valve position)Operation;(2)On blast furnace gas branched pipe Injection substantially reduces the path that coal gas of converter enters burner in hot-blast stove, effectively reduces pressure loss, relative adaptation system The few situation of the smokestack and burner draft wealth of system, the relative actual effect for improving injection, effectively avoids height Producer gas " pours in down a chimney " generation of phenomenon;(3)Coal gas of converter branch is respectively arranged with the coal gas of converter branched pipe of every hot-blast stove Pipe flow control valve, just can be to entering corresponding heat by each stove coal gas of converter branched pipe flow control valve when changing-over stove The coal gas of converter usage amount of wind furnace is controlled, and is avoided when stopping burning certain stove, and this stops burning stove interference and is heating wind furnace situation Occur;It is not only easy to adjust, and regulating effect is good, is advantageous to system run all right.

Claims (3)

1. for the coal gas of converter mingled burning installation of hot-blast stove, including:The main branch of coal gas of converter being connected with the total pipe network of coal gas of converter Pipe, it is characterised in that:Coal gas of converter primary branch corresponds to every hot-blast stove and draws a coal gas of converter branched pipe, every converter respectively Coal gas branched pipe is communicated by an induction tunnel with the blast furnace gas branched pipe of corresponding hot-blast stove respectively, every induction tunnel insertion pair In the blast furnace gas branched pipe answered, the insertion position of every induction tunnel is located at the blast furnace coal qi leel on corresponding blast furnace gas branched pipe Between branch pipe flow control valve and blast furnace gas branched pipe stop valve, converter is respectively arranged with every coal gas of converter branched pipe Coal gas branched pipe flow control valve.
2. the coal gas of converter mingled burning installation according to claim 1 for hot-blast stove, it is characterised in that:Every induction tunnel with 25~40 ° of angular range between the center line of corresponding blast furnace gas branched pipe.
3. the coal gas of converter mingled burning installation according to claim 1 for hot-blast stove, it is characterised in that:In coal gas of converter master Airintake direction on branch pipe along coal gas of converter is disposed with the main branch of first of coal gas of converter by Shop floor control aperture size Pipe flow control valve and the second coal gas of converter primary branch flow control valve that aperture size is adjusted by site operation personnel.
CN201510875737.2A 2015-12-03 2015-12-03 Coal gas of converter mingled burning installation for hot-blast stove Active CN105349724B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510875737.2A CN105349724B (en) 2015-12-03 2015-12-03 Coal gas of converter mingled burning installation for hot-blast stove

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510875737.2A CN105349724B (en) 2015-12-03 2015-12-03 Coal gas of converter mingled burning installation for hot-blast stove

Publications (2)

Publication Number Publication Date
CN105349724A CN105349724A (en) 2016-02-24
CN105349724B true CN105349724B (en) 2018-02-02

Family

ID=55325783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510875737.2A Active CN105349724B (en) 2015-12-03 2015-12-03 Coal gas of converter mingled burning installation for hot-blast stove

Country Status (1)

Country Link
CN (1) CN105349724B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107677142A (en) * 2017-10-18 2018-02-09 江苏永钢集团有限公司 Sintering ignition furnace fuel control system
CN115232903B (en) * 2022-07-07 2023-12-01 广东韶钢松山股份有限公司 Blast furnace hot blast stove system and flue gas purification method, device, equipment and medium thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201046969Y (en) * 2007-05-31 2008-04-16 上海梅山钢铁股份有限公司 Revolving furnace coal gas recovery utilizing system
CN202155156U (en) * 2011-06-17 2012-03-07 新兴铸管股份有限公司 Converter gas and blast-furnace gas mixing device
CN103451340A (en) * 2013-08-23 2013-12-18 首钢总公司 Device and method thereof for increasing air temperature of hot blast furnace by utilizing air voltage transformation to adsorb oxygen enrichment
CN104043375A (en) * 2013-03-15 2014-09-17 宝山钢铁股份有限公司 Mixing equipment for high pressure natural gas and low pressure coal gas and mixing method
CN204058506U (en) * 2014-09-02 2014-12-31 莱芜钢铁集团有限公司 A kind of blast furnace ironmaking hotblast stove device
CN205241722U (en) * 2015-12-03 2016-05-18 江苏永钢集团有限公司 A fever device is mixed to converter coal gas for hot -blast furnace

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201046969Y (en) * 2007-05-31 2008-04-16 上海梅山钢铁股份有限公司 Revolving furnace coal gas recovery utilizing system
CN202155156U (en) * 2011-06-17 2012-03-07 新兴铸管股份有限公司 Converter gas and blast-furnace gas mixing device
CN104043375A (en) * 2013-03-15 2014-09-17 宝山钢铁股份有限公司 Mixing equipment for high pressure natural gas and low pressure coal gas and mixing method
CN103451340A (en) * 2013-08-23 2013-12-18 首钢总公司 Device and method thereof for increasing air temperature of hot blast furnace by utilizing air voltage transformation to adsorb oxygen enrichment
CN204058506U (en) * 2014-09-02 2014-12-31 莱芜钢铁集团有限公司 A kind of blast furnace ironmaking hotblast stove device
CN205241722U (en) * 2015-12-03 2016-05-18 江苏永钢集团有限公司 A fever device is mixed to converter coal gas for hot -blast furnace

Also Published As

Publication number Publication date
CN105349724A (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN203869039U (en) Three-level air distribution gas burner
CN107238101A (en) A kind of wind powder mixing temperature and flow velocity secondary regulation system
CN105349724B (en) Coal gas of converter mingled burning installation for hot-blast stove
CN103148496B (en) A kind of system improving the ball type pulverizer system drying capacity when boiler changes coal
CN204058506U (en) A kind of blast furnace ironmaking hotblast stove device
CN203298342U (en) Combustion control system of heat treatment furnace
CN205241722U (en) A fever device is mixed to converter coal gas for hot -blast furnace
CN102588994B (en) Boiler-gas mixed-combustion gas supply pipe and gas supply method
CN205447730U (en) Power station feeder fire protection system
CN207600230U (en) Sintering ignition furnace fuel control system
CN107228356B (en) Automatic stable combustion system for opposite-flushing boiler
CN206157026U (en) Glass fiber kiln pure oxygen burner
CN103225820B (en) Chain grate furnace combustion optimization control system
CN209636161U (en) One drag two positive pressure furnace drying device
CN102997412A (en) Environment-friendly hot blast heater system
CN103708745B (en) Connecting adjustment device of double-hearth lime kiln burning calcium carbide furnace tail gas
CN108004359B (en) Furnace drying equipment of blast furnace gas hot blast stove
CN103162527A (en) Vertical melting furnace premix type combustion system
CN207335462U (en) A kind of carbon baking furnace heating gas thermostat
CN202506833U (en) Blast furnace gas burner for tundish dry material baking
CN205480998U (en) Gas-solid dual-combustion low-nitrogen burner
CN101748231A (en) Double-preheating system of heat accumulation type hot-blast furnace
CN202393197U (en) Premixing combustion system for vertical melting furnace
CN203320043U (en) Oxygen enrichment device for combustion air
CN205332205U (en) Use combustor of air mixture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190704

Address after: 215600 Yonglian Village, Nanfeng Town, Zhangjiagang City, Jiangsu Province

Patentee after: Lian Feng Steel (Zhangjiagang) Co., Ltd.

Address before: 215628 Yonglian Jiangsu Yonggang Group Co., Ltd., Nanfeng Town, Zhangjiagang City, Suzhou City, Jiangsu Province

Patentee before: Jiangsu Yonggang Group Co., Ltd.