CN105337277B - 配电网待建项目对电压合格率影响的计算方法 - Google Patents
配电网待建项目对电压合格率影响的计算方法 Download PDFInfo
- Publication number
- CN105337277B CN105337277B CN201510831580.3A CN201510831580A CN105337277B CN 105337277 B CN105337277 B CN 105337277B CN 201510831580 A CN201510831580 A CN 201510831580A CN 105337277 B CN105337277 B CN 105337277B
- Authority
- CN
- China
- Prior art keywords
- load
- distribution network
- voltage
- power distribution
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 84
- 238000000205 computational method Methods 0.000 title claims abstract description 15
- 238000004519 manufacturing process Methods 0.000 claims description 10
- 238000011161 development Methods 0.000 claims description 7
- 238000012545 processing Methods 0.000 claims description 6
- 238000012271 agricultural production Methods 0.000 claims description 3
- 239000004020 conductor Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 claims description 3
- 238000003973 irrigation Methods 0.000 claims description 3
- 230000002262 irrigation Effects 0.000 claims description 3
- 238000005065 mining Methods 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 16
- 238000011156 evaluation Methods 0.000 abstract description 2
- 238000004364 calculation method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000004458 analytical method Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 241000282320 Panthera leo Species 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000012797 qualification Methods 0.000 description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
分支 | 负荷类别 | 最大负荷(kW) |
分支1 | 商业类 | 5.5 |
分支2 | 商业类 | 5.5 |
分支3 | 商业类 | 16.4 |
分支4 | 生活类 | 14.7 |
分支5 | 生活类 | 14.7 |
分支6 | 生活类 | 3.3 |
分支7 | 商业类 | 5.5 |
分支8 | 商业类 | 24.6 |
分支9 | 商业类 | 10.9 |
分支10 | 生活类 | 3.3 |
分支11 | 生产类 | 7.1 |
分支12 | 生产类 | 46.1 |
分支13 | 生产类 | 28.4 |
分支14 | 生产类 | 14.2 |
分支 | 本模型 | 电压损失计算法 |
分支1 | 0 | 0 |
分支2 | 0 | 0 |
分支3 | 0 | 0 |
分支4 | 0 | 0 |
分支5 | 5 | 4 |
分支6 | 1 | 1 |
分支7 | 0 | 0 |
分支8 | 0 | 0 |
分支9 | 0 | 0 |
分支10 | 0 | 0 |
分支11 | 0 | 0 |
分支12 | 8 | 6 |
分支13 | 0 | 0 |
分支14 | 4 | 4 |
合计 | 18 | 15 |
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510831580.3A CN105337277B (zh) | 2015-11-25 | 2015-11-25 | 配电网待建项目对电压合格率影响的计算方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510831580.3A CN105337277B (zh) | 2015-11-25 | 2015-11-25 | 配电网待建项目对电压合格率影响的计算方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105337277A CN105337277A (zh) | 2016-02-17 |
CN105337277B true CN105337277B (zh) | 2017-03-29 |
Family
ID=55287649
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510831580.3A Active CN105337277B (zh) | 2015-11-25 | 2015-11-25 | 配电网待建项目对电压合格率影响的计算方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105337277B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106018931B (zh) * | 2016-05-12 | 2018-11-30 | 南方电网科学研究院有限责任公司 | 电压合格率监测方法和系统 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101188359B (zh) * | 2007-11-16 | 2011-05-25 | 湖南大学 | 基于元件的故障传递特性的配电网可靠性评估方法 |
CN104396111B (zh) * | 2012-06-22 | 2017-03-29 | 艾思玛太阳能技术股份公司 | 电网图构建和运行引导 |
CN103499731B (zh) * | 2013-08-27 | 2016-08-24 | 广东电网公司电力科学研究院 | 一种供电电压合格率的综合分析方法 |
CN104992238B (zh) * | 2015-06-24 | 2018-04-06 | 国网山东省电力公司电力科学研究院 | 一种基于典型日负荷特性的电力负荷预测方法 |
-
2015
- 2015-11-25 CN CN201510831580.3A patent/CN105337277B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN105337277A (zh) | 2016-02-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103310065A (zh) | 计及分布式发电和储能单元的智能配网重构方法 | |
CN103795057B (zh) | 配电网潮流计算中基于搜索的配电网拓扑编号生成方法 | |
CN109086963B (zh) | 一种线损理论计算精益化管理方法 | |
CN104376371B (zh) | 一种基于拓扑的配网分层负荷预测方法 | |
CN108288861A (zh) | 风电场群风储系统选址定容联合优化的方法 | |
Nguyen et al. | An improved equilibrium optimizer for optimal placement of photovoltaic systems in radial distribution power networks | |
CN105048473B (zh) | 变电站自动电压控制中低压无功设备电压灵敏度统计方法 | |
CN104392397A (zh) | 一种基于熵权法的短路电流抑制方案评价方法 | |
CN106505608B (zh) | 计及短路容量约束的分布式电源准入容量计算方法 | |
CN105321050B (zh) | 智能电网中动态微网划分的假数据注入攻击危害衡量方法 | |
CN105337277B (zh) | 配电网待建项目对电压合格率影响的计算方法 | |
CN108665133A (zh) | 一种配电系统运行效率评价模型的构建方法及系统 | |
Ma et al. | Impact analysis of wind generation on voltage stability and system load margin | |
CN103745274A (zh) | 一种用于分散式风电的短期功率预测方法 | |
CN106410798A (zh) | 一种配变台区低电压预判方法 | |
Oda et al. | Optimal DGs allocation in distribution networks using modified flower pollination algorithm | |
CN102315646B (zh) | 基于最大供电能力的配电网联络有效性与联络化简方法 | |
CN103560497A (zh) | 一种基于电网拓扑调整的短路电流限制方法 | |
CN104348180B (zh) | 分布式电源并网点及接入方式选取方法 | |
CN111697607A (zh) | 一种多端柔性直流输电受端电网接入方法及系统 | |
CN105449672A (zh) | 一种评估220kv环套环网最大供电能力的方法 | |
CN102025159A (zh) | 一种静态电压稳定综合评价方法及系统 | |
CN114996635A (zh) | 一种配电网参数确定方法、装置、设备及存储介质 | |
CN104821590A (zh) | 智能电网节能优化综合测评方法 | |
CN104600743A (zh) | 考虑风电集群功率波动的系统关键变量提取方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: He Yuqing Inventor after: He Hongbin Inventor after: Su Li Inventor after: He Yuanyuan Inventor after: Xu Chao Inventor after: Jiang Zhuohan Inventor after: Liu Jingjing Inventor after: Liu Cong Inventor before: He Yuqing Inventor before: Su Li Inventor before: He Yuanyuan Inventor before: Xu Chao Inventor before: Jiang Zhuohan Inventor before: Liu Jingjing Inventor before: Liu Cong |
|
CB03 | Change of inventor or designer information |