CN105337137B - Expansion tool and the method for connecting the first and second cables - Google Patents

Expansion tool and the method for connecting the first and second cables Download PDF

Info

Publication number
CN105337137B
CN105337137B CN201410359776.2A CN201410359776A CN105337137B CN 105337137 B CN105337137 B CN 105337137B CN 201410359776 A CN201410359776 A CN 201410359776A CN 105337137 B CN105337137 B CN 105337137B
Authority
CN
China
Prior art keywords
expansion
intermediate insulation
insulation joint
cable
halfbody
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410359776.2A
Other languages
Chinese (zh)
Other versions
CN105337137A (en
Inventor
谈跃中
王恩海
杨立章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tyco Electronics Shanghai Co Ltd
Original Assignee
Tyco Electronics Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tyco Electronics Shanghai Co Ltd filed Critical Tyco Electronics Shanghai Co Ltd
Priority to CN201410359776.2A priority Critical patent/CN105337137B/en
Publication of CN105337137A publication Critical patent/CN105337137A/en
Application granted granted Critical
Publication of CN105337137B publication Critical patent/CN105337137B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cable Accessories (AREA)

Abstract

The present invention discloses a kind of expansion tool of intermediate insulation joint, including two sets of Stent assemblies and two sets of strainers.Two sets of Stent assemblies are separately positioned on the both ends of intermediate insulation joint, and often covering Stent assembly includes:One expansion part, a clamping element and a guiding piece.Two sets of strainers are separately positioned on the both sides of two sets of Stent assemblies, often cover strainer and are connected on the clamping element of two sets of Stent assemblies.In the tubular projection of the columnar projections insertion expansion part of guiding piece, and the conical nose of columnar projections is prominent from tubular projection.After the conical nose of guiding piece is inserted in endoporus to intermediate insulation joint, when two sets of strainers tense two sets of Stent assemblies towards direction close to each other, the tubular projection of expansion part is inserted in the endoporus of intermediate insulation joint under the guiding of the conical nose of guiding piece, so as to expand the endoporus of intermediate insulation joint.Therefore, expansion tool of the invention it is simple in construction, it is in light weight, be easy to carry, and can install very convenient.

Description

Expansion tool and the method for connecting the first and second cables
Technical field
The present invention relates to a kind of expansion tool for being used to expand the endoporus of intermediate insulation joint, and one kind to be used to electrically connect The method of first cable and the second cable.
Background technology
The first high-tension cable is being terminated and during the second high-tension cable, typically first with metal crimp pipe by the first high-tension cable Conductor cores and the conductor cores of the second high-tension cable are crimped together, and then, an intermediate insulation fitting sleeve are mounted in into the first high pressure At the termination of cable and the second high-tension cable, the intermediate insulation joint is contracted in metal crimp pipe and the first and second high-tension electricities On a part of insulating barrier of cable, it is achieved thereby that the insulation recovery at the termination of the first high-tension cable and the second high-tension cable, is carried Electrical security at high termination.
In order to which intermediate insulation joint is fitted snugly on the first high-tension cable and the second high-tension cable, intermediate insulation joint Endoporus be necessarily less than the diameter of metal crimp pipe or being coated in conductor cores for the first high-tension cable and the second high-tension cable The diameter of insulating barrier.Therefore, it is necessary to first be expanded to the endoporus of middle insulating joint, intermediate insulation fitting sleeve could be mounted in On first high-tension cable and the second high-tension cable.
In the prior art, the general expansion that the endoporus of intermediate insulation joint is realized using hydraulic dilatation mechanism, still, Big weight, installation difficulty, price height, easy oil leakage be present and safeguard the technical problems such as inconvenience in hydraulic dilatation mechanism.
The content of the invention
The purpose of the present invention aims to solve the problem that at least one aspect of the above-mentioned problems in the prior art and defect.
It is an object of the present invention to provide a kind of expansion tool for being used to expand the endoporus of intermediate insulation joint, its is heavy Amount is light, is easy to carry.
It is another object of the present invention to provide it is a kind of be used for expand intermediate insulation joint endoporus expansion tool, its It is easy for installation, without other auxiliary machineries.
It is another object of the present invention to provide it is a kind of be used for expand intermediate insulation joint endoporus expansion tool, its It is simple in construction, it is cheap.
It is another object of the present invention to provide it is a kind of be used for expand intermediate insulation joint endoporus expansion tool, its Hydraulic oil need not be used, thus, there is no Leakage.
It is another object of the present invention to provide it is a kind of be used for expand intermediate insulation joint endoporus expansion tool, its Part is less, easy to maintenance.
According to an aspect of the present invention, there is provided a kind of expansion tool of intermediate insulation joint, including two sets of Stent assemblies With two sets of strainers.Two sets of Stent assemblies are separately positioned on the both ends of intermediate insulation joint, and often covering Stent assembly includes:One Expansion part, have the tubular for the endoporus for being used to expand intermediate insulation joint raised;One clamping element, for clamping expansion part; With a guiding piece, it is installed on expansion part, there are columnar projections, and the columnar projections have conical nose.Two sets of tensionings Mechanism is separately positioned on the both sides of two sets of Stent assemblies, often covers strainer and is connected on the clamping element of two sets of Stent assemblies.Institute The columnar projections for stating guiding piece are inserted in the tubular projection of the expansion part, and the conical nose of columnar projections is raised from tubular Middle protrusion.In the conical nose of the guiding piece of two sets of Stent assemblies inserts endoporus to intermediate insulation joint from both ends respectively it Afterwards, when two sets of strainers tense two sets of Stent assemblies towards direction close to each other, the tubular projection of the expansion part is being drawn In the endoporus of the lower insertion intermediate insulation joint of conical nose guiding of guiding element, so as to expand the endoporus of intermediate insulation joint.
According to the embodiment of an example of the present invention, often covering strainer includes:One tension band, is connected to two sets On the clamping element of Stent assembly;With a stretcher, on the tension band, for tightening up or loosening the tension band.
According to the embodiment of another exemplary of the present invention, the expansion part includes and the raised substantially vertical and phase of tubular The disc shaped base to connect;The guiding piece includes disc shaped base that is substantially vertical with columnar projections and being connected with each other;And institute The disc shaped base for stating guiding piece is connected through a screw thread part and is connected in the disc shaped base of the expansion part.
According to the embodiment of another exemplary of the present invention, formed with cone on the raised end of the tubular of the expansion part Shape guide edge, the tubular for guiding the expansion part are protruded out into the endoporus of the intermediate insulation joint.
According to the embodiment of another exemplary of the present invention, each expansion part is by the first expansion halfbody and the second expansion half Body forms;And the first expansion halfbody and the second expansion halfbody are clamped together by the clamping element, to form one Individual complete expansion part.
According to the embodiment of another exemplary of the present invention, each clamping element includes:First annular halfbody;With Second ring halfbody, the first annular halfbody and the second annular halfbody are assembled to each other, and are clamped in expansion part On the excircle of disc shaped base.
According to the embodiment of another exemplary of the present invention, the both sides of the first annular halfbody are respectively formed with first Connection bump;The both sides of the second annular halfbody are respectively formed with the second connection bump;And the first connection bump and second Connection bump is interconnected by screw bolt and nut.
According to the embodiment of another exemplary of the present invention, in the first annular halfbody and the second annular halfbody After being assembled to each other, the part between the first connection bump and the second connection bump of the bolt is exposed; Each tension band is wrapped in the part exposed of corresponding two bolts.
According to the embodiment of another exemplary of the present invention, it is installed in expansion tool on intermediate insulation joint, and will After the interior bore expansion of intermediate insulation joint, the guiding piece is removed from the expansion part, so as to by expansion tool and centre Insulating joint set is attached on one end of the first cable so that one end of the first cable is raised and middle through the tubular of expansion tool The endoporus of insulating joint.
According to the embodiment of another exemplary of the present invention, the is attached in the expansion tool and intermediate insulation fitting sleeve After on one end of one cable, the conductor cores on one end of the first cable are with the conductor cores on one end of the second cable by being electrically connected Fitting is electrically connected to each other together.
According to the embodiment of another exemplary of the present invention, the electrical connector is metal crimp pipe, the metal pressure Adapter is crimped in the conductor cores on one end of the conductor cores on one end of the first cable and the second cable.
According to the embodiment of another exemplary of the present invention, in the conductor cores and the conductor cores of the second cable of the first cable After being electrically connected, the mobile intermediate insulation joint and expansion tool mounted thereto, until the electrical connection Part is fully received in the endoporus of intermediate insulation joint.
According to the embodiment of another exemplary of the present invention, it is fully received intermediate insulation in the electrical connector and connects After in the endoporus of head, the expansion tool is removed from the intermediate insulation joint so that intermediate insulation joint is contracted in electricity On a part of insulating barrier of connector and the first and second cables of electrical connector both sides.
According to the embodiment of another exemplary of the present invention, the external diameter of the columnar projections of the guiding piece is substantially equal to institute State the raised internal diameter of the tubular of expansion part.
According to the embodiment of another exemplary of the present invention, the first expansion halfbody of the expansion part and the clamping element First annular halfbody formed be integrated;And the second annular half of the second expansion halfbody of the expansion part and the clamping element The bodily form is integrally formed.
According to another aspect of the present invention, there is provided a kind of method for being used to connect the first cable and the second cable, including Following steps:
One intermediate insulation joint is provided;
Expansion tool according to any one foregoing embodiment is provided;
The expansion tool is installed on intermediate insulation joint, and uses expansion tool by the endoporus of intermediate insulation joint Expand;
The guiding piece is removed from the expansion part;
Expansion tool and intermediate insulation joint (40) set are attached on one end of the first cable (10) so that the first cable Tubular raised endoporus with intermediate insulation joint of the one end through expansion tool;
The conductor cores on one end of the first cable are electrically connected with the conductor cores on one end of the second cable with electrical connector Together;
The mobile intermediate insulation joint and expansion tool mounted thereto, until the electrical connector is held completely Receive into the endoporus of intermediate insulation joint;With
Remove the expansion tool from the intermediate insulation joint so that intermediate insulation joint be contracted in electrical connector with And on a part of insulating barrier of the first and second cables of electrical connector both sides.
In the expansion tool of each embodiment according to the present invention, expansion tool includes two sets of Stent assemblies and two sets Tight mechanism, often covering Stent assembly includes an expansion part, a clamping element and a guiding piece.Therefore, its simple in construction, weight Gently, it is easy to carry.In addition, whole expansion tool can be by being conveniently assembled together, without using other auxiliary machines by hand Tool device, therefore, installation are very convenient.
By the description made for the present invention of below with reference to accompanying drawing, other objects and advantages of the present invention will be aobvious and easy See, and can help that complete understanding of the invention will be obtained.
Brief description of the drawings
Fig. 1 shows the expansion tool being arranged on intermediate insulation joint of the embodiment according to an example of the present invention Schematic diagram, wherein, the tension band of expansion tool is not tensioned also completely, and the tubular projection of the expansion part of expansion tool does not have also Insert in the endoporus of intermediate insulation joint;
Fig. 2 shows the expansion part of the expansion tool shown in Fig. 1 and the schematic perspective view of clamping element, wherein, clamping element folder Hold on expansion part;
Fig. 3 shows the schematic perspective view of the expansion part of the expansion tool shown in Fig. 1;
Fig. 4 shows the schematic perspective view of the guiding piece of the expansion tool shown in Fig. 1;
Fig. 5 is shown in the tension band of expansion tool, and the tubular projection of tensioning and the expansion part of expansion tool has been completely The schematic diagram of expansion tool after in endoporus through inserting intermediate insulation joint, the guiding piece of wherein expansion tool have been torn open Remove;
Fig. 6 shows the plan view of the expansion tool and intermediate insulation joint shown in Fig. 5;
Fig. 7, which is shown, is attached to expansion tool and intermediate insulation fitting sleeve on one end of the first cable so that the first cable Schematic diagram of the one end through the raised endoporus with intermediate insulation joint of tubular of expansion tool;
Fig. 8, which is shown, will have already passed through the conductor cores of one end of the first cable of expansion tool and intermediate insulation joint and the The schematic diagram that the conductor cores of two cables are electrically connected;
Fig. 9, which will be shown in after the conductor cores of one end of the first cable are electrically connected with the conductor cores of the second cable, to be expanded The schematic diagram that Zhang Gong has and intermediate insulation joint is moved at electrical connector;With
Figure 10, which is shown in, is moved to expansion tool and intermediate insulation joint at electrical connector and from middle insulating joint The schematic diagram of first and second cables after upper dismounting expansion tool, interconnecting.
Embodiment
Below by embodiment, and with reference to accompanying drawing, technical scheme is described in further detail.Illustrating In book, same or analogous drawing reference numeral indicates same or analogous part.It is following referring to the drawings to embodiment of the present invention Illustrate to be intended to explain the present general inventive concept of the present invention, and be not construed as limiting a kind of of the present invention.
In addition, in the following detailed description, for ease of explaining, many concrete details are elaborated to provide to present disclosure The comprehensive understanding of embodiment.It should be apparent, however, that one or more embodiments can also in the case of these no details It is carried out.In other cases, known construction and device is diagrammatically embodied to simplify accompanying drawing.
According to the general plotting of the present invention, there is provided a kind of expansion tool of intermediate insulation joint, including two sets of expansions Component and two sets of strainers.Two sets of Stent assemblies are separately positioned on the both ends of intermediate insulation joint, and often covering Stent assembly includes: One expansion part, have the tubular for the endoporus for being used to expand intermediate insulation joint raised;One clamping element, for clamping expansion Part;With a guiding piece, it is installed on expansion part, there are columnar projections, and the columnar projections have conical nose.Two sets Tight mechanism is separately positioned on the both sides of two sets of Stent assemblies, often covers strainer and is connected on the clamping element of two sets of Stent assemblies. The columnar projections of the guiding piece are inserted in the tubular projection of the expansion part, and the conical nose of columnar projections is convex from tubular It is prominent in rising.In the endoporus that the conical nose of the guiding piece of two sets of Stent assemblies inserts to intermediate insulation joint from both ends respectively Afterwards, when two sets of strainers tense two sets of Stent assemblies towards direction close to each other, the tubular projection of the expansion part exists In the endoporus of the lower insertion intermediate insulation joint of conical nose guiding of guiding piece, so as to expand the endoporus of intermediate insulation joint.
Fig. 1 shows the expansion work being arranged on intermediate insulation joint 40 of the embodiment according to an example of the present invention The schematic diagram of tool, wherein, the tension band 400 of expansion tool is not tensioned also completely, and the tubular of the expansion part 100 of expansion tool is convex 110 are played also to be not inserted into the endoporus of intermediate insulation joint 40.
As shown in figure 1, in the embodiment of an example of the present invention, for expanding the endoporus of intermediate insulation joint 40 The expansion tool of (not shown) mainly includes two sets of Stent assemblies and two sets of strainers.
As shown in figure 1, in the illustrated embodiment, often cover the expansion part that Stent assembly includes being assembled to each other 100th, a clamping element 200 and a guiding piece 300.Two sets of Stent assemblies are separately positioned on the both ends of intermediate insulation joint 40.
As shown in figure 1, in the illustrated embodiment, often covering strainer includes a tension band 400 and a stretcher 500.Two sets of strainers are separately positioned on the both sides (or both sides of intermediate insulation joint 40) of two sets of Stent assemblies, often set tensioning Mechanism is connected on the clamping element of two sets of Stent assemblies, for being tensioned two sets of Stent assemblies.
Fig. 2 shows the expansion part 100 of the expansion tool shown in Fig. 1 and the schematic perspective view of clamping element 200, wherein, folder Tight part 200 is clamped on expansion part 100;Fig. 3 shows the schematic perspective view of the expansion part 100 of the expansion tool shown in Fig. 1;Figure The schematic perspective view of the guiding piece 300 of expansion tool shown in 4 display Fig. 1.
As shown in Figures 1 to 4, in the embodiment of an example of the present invention, expansion part 100, which has, to be used in expansion Between insulating joint 40 endoporus tubular projection 110.Clamping element 200 is annular in shape, for being clamped in the disc shaped base of expansion part 100 On.Guiding piece 300 is installed on expansion part 100, has columnar projections 310, and the columnar projections 310 have conical nose 311。
As Fig. 1 is clearly illustrated, each tension band 400 is connected on the clamping element 200 of two sets of Stent assemblies.Stretcher 500 are arranged on tension band 400, for tightening up or loosening tension band 400.In the present invention, stretcher 500 can be existing skill Any of art belt tightener.
Fig. 1 to Fig. 4 is referred to, in the illustrated embodiment, the columnar projections 310 of guiding piece 300 insert expansion part 100 In tubular projection 110, and the conical nose 311 of columnar projections 310 is prominent from tubular projection 110.So, in expansion tool After being installed on intermediate insulation joint 40, the conical nose 311 of the guiding piece 300 of two sets of Stent assemblies inserts from both ends respectively Into the endoporus of intermediate insulation joint 40.Now, when two sets of strainers tense two sets of Stent assemblies towards direction close to each other When, the tubular projection 110 of expansion part 100 can be smoothly inserted into intermediate insulation under the guiding of the conical nose 311 of guiding piece 300 In the endoporus of joint 40, so as to expand the endoporus of intermediate insulation joint 40.
Continuing with referring to Fig. 1 to Fig. 4, in the illustrated embodiment, expansion part 100 includes substantially hanging down with tubular projection 110 The disc shaped base that direct join is connected with each other.Guiding piece 300 includes plate-like base that is substantially vertical with columnar projections 310 and being connected with each other Portion.The disc shaped base of guiding piece 300 is connected through a screw thread part 301 and is connected in the disc shaped base of expansion part 100.
As Fig. 3 is clearly illustrated, in the embodiment of an example of the present invention, the tubular projection 110 of expansion part 100 End on formed with tapered leading edge 111, for guiding the tubular projection 110 of expansion part 100 to enter intermediate insulation joint In 40 endoporus.
As shown in Figures 2 and 3, in the illustrated embodiment, each expansion part 100 is by the first expansion halfbody 100a and second Expand halfbody 100b compositions;And the first expansion halfbody 100a and the second expansion halfbody 100b are clamped part 200 and are clamped together, To form a complete expansion part 100.
As shown in Figures 2 and 3, in the embodiment of an example of the present invention, each clamping element 200 includes:First The annular annular halfbody 200b of halfbody 200a and second.The first annular annular halfbody 200b of halfbody 200a and second are mutually assembled in one Rise, and be clamped on the excircle of the disc shaped base of expansion part 100.
As shown in Figures 2 and 3, in the embodiment of an example of the present invention, first annular halfbody 200a both sides It is respectively formed with the first connection bump 210a;Second annular halfbody 200b both sides are respectively formed with the second connection bump 210b; And the first connection bump 210a and the second connection bump 210b are interconnected by bolt 220 and nut 230.
As shown in Figure 1, Figure 2 and Figure 3, in the embodiment of an example of the present invention, in first annular halfbody 200a After being assembled to each other with the second annular halfbody 200b, bolt 220 connects positioned at the first connection bump 210a and second A part between raised 210b is exposed.Each tension band 400 is wrapped in the part exposed of corresponding two bolts 220 On.
The tension band 400 that Fig. 5 is shown in expansion tool has been tensioned completely and the tubular of the expansion part 100 of expansion tool Projection 110 be already inserted into the endoporus of intermediate insulation joint 40 after expansion tool schematic diagram, wherein expansion tool draws Guiding element 300 has been removed.Fig. 6 shows the plan view of the expansion tool and intermediate insulation joint 40 shown in Fig. 5.
As shown in Figure 5 and Figure 6, in the embodiment of an example of the present invention, it is installed in expansion tool middle exhausted On edge joint 40, and by after the interior bore expansion of intermediate insulation joint 40, guiding piece 300 is removed from expansion part 100, to incite somebody to action One end of first cable 10 is inserted in tubular projection 110 and passes through the endoporus of intermediate insulation joint 40 (referring to Fig. 7).
Fig. 7, which is shown, is attached to 40 sets of expansion tool and intermediate insulation joint on one end of the first cable 10 so that the first electricity One end of cable 10 (had carried out stripping processing, and had exposed one section of conductor cores 12 and expose one section for being coated on conductor Insulating barrier 11 on core 12) show through the tubular projection 110 of the expansion tool shown in Fig. 6 and the endoporus of intermediate insulation joint 40 It is intended to.
As shown in fig. 7, in one embodiment of the invention, after intermediate insulation joint 40 is expanded instrument expansion, And after guiding piece 300 is removed from expansion tool, 40 sets of expansion tool and intermediate insulation joint are attached to the first cable 10 One end on so that one end of the first cable 10 is through the expansion tool and intermediate insulation joint 40 shown in Fig. 6.
Fig. 8, which is shown, to have already passed through the conductor cores of one end of the first cable 10 of expansion tool and intermediate insulation joint 40 12 and second cable 20 one end the schematic diagram that is electrically connected of conductor cores 22.
As shown in figure 8, in one embodiment of the invention, had already passed through in one end of the first cable 10 shown in Fig. 6 After expansion tool and intermediate insulation joint 40, one end of the second cable 20 (stripping processing was carried out, and had exposed one Section conductor cores 22 and expose one section and be used to be coated on insulating barrier 21 in conductor cores 22) the cable 10 of conductor cores 22 and first The conductor cores 12 of one end be electrically connected to each other together by an electrical connector 30, so as to realize the first cable 10 and the second electricity Electrical connection between cable 20.
In the embodiment of an example of the present invention, electrical connector 30 can be metal crimp pipe, the metal crimp Pipe is crimped in the conductor cores 22 on one end of the cable 20 of conductor cores 12 and second on one end of the first cable 10.
Fig. 9 is shown in the conductor cores 12 of one end of the first cable 10 and the conductor cores 22 of the second cable 20 are electrically connected The schematic diagram that expansion tool and intermediate insulation joint 40 are moved at electrical connector 30 afterwards.
As shown in figure 9, in one embodiment of the invention, the electricity of conductor cores 12 and second in one end of the first cable 10 After the conductor cores 22 of one end of cable 20 are electrically connected, along the direction shown in the arrow in Fig. 8 by expansion tool and in Between insulating joint 40 be moved at electrical connector 30, until electrical connector 30 is fully received the endoporus of intermediate insulation joint 40 In.
Figure 10, which is shown in, is moved to expansion tool and intermediate insulation joint 40 at electrical connector 30 and from intermediate insulation The schematic diagram of the first and second cables 10,20 after expansion tool, interconnecting is removed on joint 40.
As shown in Figure 10, in one embodiment of the invention, moved by expansion tool and intermediate insulation joint 40 After at electrical connector 30, expansion tool is removed from middle insulating joint 40 so that the elasticity of intermediate insulation joint 40 is recovered And closely it is contracted in a part of insulating barrier of electrical connector 30 and the first and second cables 10,20 of the both sides of electrical connector 30 11st, on 21, it is achieved thereby that it is achieved thereby that insulation recovery at the termination of the first cable 10 and the second cable 20, improves end Connect the electrical security at place.
In the embodiment of an example of the present invention, the external diameter of the columnar projections 310 of guiding piece 300 is equal to, is slightly larger In or the slightly smaller than internal diameter of the tubular projection 110 of expansion part 100.So, after expansion part 100 is clamped the clamping of part 200, energy The outer surface of enough columnar projections 310 for insert the guiding piece 300 in the tubular projection 110 of expansion part 100 and expansion part 100 Tubular projection 110 inner surface be in close contact.
In the embodiment shown in Fig. 1 to Figure 10, expansion part 100 and clamping element 200 assemble by two halfbodies, and And two halfbodies 100a, 100b of expansion part 100 and two halfbodies 200a, 200b of clamping element 200 are separated from each other.But this Invention is not limited to the embodiment of diagram, for example, in the embodiment of another exemplary of the present invention, the of expansion part 100 The first annular halfbody 200a of one expansion halfbody 100a and clamping element 200, which can be formed, to be integrated;And the second of expansion part 100 Second annular halfbody 200b of expansion halfbody 100b and clamping element 200, which can also be formed, to be integrated.Below, Fig. 1 is will refer to figure 10, describe the method for electrically connecting the first cable 10 and the second cable 20 in detail, this method mainly includes the following steps that:
S101:As shown in Figure 1, there is provided an intermediate insulation joint 40;
S102:As shown in Figure 1, there is provided foregoing expansion tool;
S103:As shown in Fig. 1, Fig. 5 and Fig. 6, expansion tool is installed on intermediate insulation joint 40, and uses expansion work Tool expands the endoporus of intermediate insulation joint 40;
S104:As shown in Figure 5 and Figure 6, guiding piece 300 is removed from expansion part 100;
S105:As shown in fig. 7,40 sets of expansion tool and intermediate insulation joint will be attached on one end of the first cable 10, So that one end of the first cable 10 passes through the tubular projection 110 of expansion tool and the endoporus of intermediate insulation joint 40;
S106:As shown in figure 8, with electrical connector 30 by the cable 20 of conductor cores 12 and second on one end of the first cable 10 One end on conductor cores 22 be electrically connected;
S107:As shown in figure 9, mobile intermediate insulation joint 40 and expansion tool mounted thereto, until electrical connection Part 30 is fully received in the endoporus of intermediate insulation joint 40;With
S108:As shown in Figure 10, expansion tool is removed from middle insulating joint 40 so that intermediate insulation joint 40 shrinks On a part of insulating barrier 11,21 of the first and second cables 10,20 of electrical connector 30 and the both sides of electrical connector 30.
It will be understood to those skilled in the art that embodiment described above is all exemplary, and this area Technical staff can make improvements, the rushing in terms of not recurring structure or principle of the structure described in various embodiments Independent assortment can be carried out in the case of prominent.
Although with reference to accompanying drawing, the present invention is described, and the embodiment disclosed in accompanying drawing is intended to preferred to the present invention Embodiment is illustrative, and it is not intended that limiting a kind of of the present invention.
Although some embodiments of this present general inventive concept are shown and illustrated, those of ordinary skill in the art will manage Solution, in the case of without departing substantially from the principle of this present general inventive concept and spirit, these embodiments can be made a change, it is of the invention Scope is limited with claim and their equivalent.
It should be noted that word " comprising " is not excluded for other element or steps, word "a" or "an" is not excluded for multiple.Separately Outside, the scope that any element label of claim should not be construed as limiting the invention.

Claims (14)

  1. A kind of 1. expansion tool of intermediate insulation joint, it is characterised in that including:
    Two sets of Stent assemblies (100,200,300), are separately positioned on the both ends of intermediate insulation joint (40), often cover Stent assembly (100,200,300) include:
    One expansion part (100), have the tubular for the endoporus for being used to expand intermediate insulation joint (40) raised (110);
    One clamping element (200), for clamping expansion part (100);With
    One guiding piece (300), is installed on expansion part (100), has columnar projections (310), and the columnar projections (310) With conical nose (311), and
    Two sets of strainers (400,500), the both sides of two sets of Stent assemblies (100,200,300) are separately positioned on, often set tensioning Mechanism (400,500) is connected on the clamping element (200) of two sets of Stent assemblies (100,200,300), wherein,
    The columnar projections (310) of the guiding piece (300) are inserted in the tubular raised (110) of the expansion part (100), and post The conical nose (311) of shape projection (310) is prominent from tubular raised (110),
    Inserted respectively from both ends in the conical nose (311) of the guiding piece (300) of two sets of Stent assemblies (100,200,300) Between insulating joint (40) endoporus in after, expand when two sets of strainers (400,500) tense two sets towards direction close to each other During component (100,200,300), the conical nose of the tubular raised (110) of the expansion part (100) in guiding piece (300) (311) in the endoporus of the lower insertion intermediate insulation joint (40) of guiding, so as to expand the endoporus of intermediate insulation joint (40).
  2. 2. expansion tool according to claim 1, it is characterised in that often covering strainer (400,500) includes:
    One tension band (400), it is connected on the clamping element (200) of two sets of Stent assemblies (100,200,300);With
    One stretcher (500), on the tension band (400), for tightening up or loosening the tension band (400).
  3. 3. expansion tool according to claim 2, it is characterised in that
    The expansion part (100) includes disc shaped base that is substantially vertical with tubular raised (110) and being connected with each other;
    The guiding piece (300) includes disc shaped base that is substantially vertical with columnar projections (310) and being connected with each other;
    The disc shaped base of the guiding piece (300) is connected through a screw thread the plate-like that part (301) is connected to the expansion part (100) On base portion.
  4. 4. expansion tool according to claim 3, it is characterised in that
    Formed with tapered leading edge (111) on the end of the tubular of the expansion part (100) raised (110), for guiding The tubular raised (110) for stating expansion part (100) enters in the endoporus of the intermediate insulation joint (40).
  5. 5. expansion tool according to claim 4, it is characterised in that
    Each expansion part (100) is made up of the first expansion halfbody (100a) and the second expansion halfbody (100b);And
    The first expansion halfbody (100a) and the second expansion halfbody (100b) are clamped in one by the clamping element (200) Rise, to form a complete expansion part (100).
  6. 6. expansion tool according to claim 5, it is characterised in that
    Each clamping element (200) includes:
    First annular halfbody (200a);With
    Second annular halfbody (200b),
    The first annular halfbody (200a) and the second annular halfbody (200b) are assembled to each other, and are clamped in expansion On the excircle of the disc shaped base of part (100).
  7. 7. expansion tool according to claim 6, it is characterised in that
    The both sides of the first annular halfbody (200a) are respectively formed with the first connection bump (210a);
    The both sides of the second annular halfbody (200b) are respectively formed with the second connection bump (210b);And
    First connection bump (210a) and the second connection bump (210b) are interconnected on by bolt (220) and nut (230) Together.
  8. 8. expansion tool according to claim 7, it is characterised in that
    After the first annular halfbody (200a) and the second annular halfbody (200b) are assembled to each other, the spiral shell The part between the first connection bump (210a) and the second connection bump (210b) of bolt (220) is exposed;
    Each tension band (400) is wrapped in the part exposed of corresponding two bolts (220).
  9. 9. expansion tool according to claim 8, it is characterised in that
    After the expansion tool and intermediate insulation joint (40) set are attached on one end of the first cable (10), the first cable (10) conductor cores (12) on one end pass through electrical connector (30) phase with the conductor cores (22) on one end of the second cable (20) Mutually it is electrically connected.
  10. 10. expansion tool according to claim 9, it is characterised in that
    The electrical connector (30) is metal crimp pipe, and the metal crimp pipe is crimped on leading on one end of the first cable (10) In conductor cores (22) on one end of body core (12) and the second cable (20).
  11. 11. expansion tool according to claim 1, it is characterised in that
    The tubular that the external diameter of the columnar projections (310) of the guiding piece (300) is substantially equal to the expansion part (100) is raised (110) internal diameter.
  12. 12. expansion tool according to claim 6, it is characterised in that
    The first annular halfbody (200a) of the first expansion halfbody (100a) and the clamping element (200) of the expansion part (100) Formation is integrated;And
    Second annular halfbody (200b) of the second expansion halfbody (100b) and the clamping element (200) of the expansion part (100) Formation is integrated.
  13. 13. one kind is used for the method for connecting the first cable (10) and the second cable (20), comprise the following steps:
    One intermediate insulation joint (40) is provided;
    Expansion tool as any one of claim 1-12 is provided;
    The expansion tool is installed on intermediate insulation joint (40), and uses expansion tool by intermediate insulation joint (40) Endoporus expands;
    The guiding piece (300) is removed from the expansion part (100);
    Expansion tool and intermediate insulation joint (40) set are attached on one end of the first cable (10) so that the first cable (10) One end passes through the tubular raised (110) of expansion tool and the endoporus of intermediate insulation joint (40);
    With electrical connector (30) by one end of the conductor cores (12) on one end of the first cable (10) and the second cable (20) Conductor cores (22) are electrically connected;
    The mobile intermediate insulation joint (40) and expansion tool mounted thereto, until the electrical connector (30) is complete It is received into entirely in the endoporus of intermediate insulation joint (40);With
    The expansion tool is removed from the intermediate insulation joint (40) so that intermediate insulation joint (40) is contracted in electrical connection On a part of insulating barrier (11,21) of part (30) and first and second cables (10,20) of electrical connector (30) both sides.
  14. 14. according to the method for claim 13, it is characterised in that:
    The electrical connector (30) is metal crimp pipe, and the metal crimp pipe is crimped on leading on one end of the first cable (10) In conductor cores (22) on one end of body core (12) and the second cable (20).
CN201410359776.2A 2014-07-25 2014-07-25 Expansion tool and the method for connecting the first and second cables Expired - Fee Related CN105337137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410359776.2A CN105337137B (en) 2014-07-25 2014-07-25 Expansion tool and the method for connecting the first and second cables

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410359776.2A CN105337137B (en) 2014-07-25 2014-07-25 Expansion tool and the method for connecting the first and second cables

Publications (2)

Publication Number Publication Date
CN105337137A CN105337137A (en) 2016-02-17
CN105337137B true CN105337137B (en) 2018-01-30

Family

ID=55287512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410359776.2A Expired - Fee Related CN105337137B (en) 2014-07-25 2014-07-25 Expansion tool and the method for connecting the first and second cables

Country Status (1)

Country Link
CN (1) CN105337137B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110789111B (en) * 2018-08-01 2022-07-12 泰科电子(上海)有限公司 Expansion device for telescopic tubes and method for expanding telescopic tubes using an expansion device
CN112117714A (en) * 2020-07-03 2020-12-22 长缆电工科技股份有限公司 Cable intermediate joint installation method and expansion device
CN112186467B (en) * 2020-09-28 2022-01-11 上海满电未来智能科技有限公司 Battery terminal insulating sleeve mounting device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101310424A (en) * 2005-10-19 2008-11-19 普雷斯曼电缆及系统能源有限公司 Method and apparatus for binding a pair of cables
CN201191754Y (en) * 2008-04-29 2009-02-04 江苏安靠超高压电缆附件有限公司 Joint elastomer expanding apparatus for intermediate connecting joint of electric cable
CN201456392U (en) * 2009-08-28 2010-05-12 保定合力达应用化学有限公司 Expansion machine of cable finger sleeve
CN201656231U (en) * 2009-09-29 2010-11-24 福建省邮电工程有限公司 Feeder line connector expander
CN202957541U (en) * 2012-11-23 2013-05-29 吉唯达(上海)电气有限公司 On-site separation device for intermediate joint of expansion cable
CN204012153U (en) * 2014-07-25 2014-12-10 泰科电子(上海)有限公司 The expansion tool of intermediate insulation joint

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB0118328D0 (en) * 2001-07-27 2001-09-19 Tyco Electronics Raychem Nv Sealing method and device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101310424A (en) * 2005-10-19 2008-11-19 普雷斯曼电缆及系统能源有限公司 Method and apparatus for binding a pair of cables
CN201191754Y (en) * 2008-04-29 2009-02-04 江苏安靠超高压电缆附件有限公司 Joint elastomer expanding apparatus for intermediate connecting joint of electric cable
CN201456392U (en) * 2009-08-28 2010-05-12 保定合力达应用化学有限公司 Expansion machine of cable finger sleeve
CN201656231U (en) * 2009-09-29 2010-11-24 福建省邮电工程有限公司 Feeder line connector expander
CN202957541U (en) * 2012-11-23 2013-05-29 吉唯达(上海)电气有限公司 On-site separation device for intermediate joint of expansion cable
CN204012153U (en) * 2014-07-25 2014-12-10 泰科电子(上海)有限公司 The expansion tool of intermediate insulation joint

Also Published As

Publication number Publication date
CN105337137A (en) 2016-02-17

Similar Documents

Publication Publication Date Title
US7029326B2 (en) Compression connector for coaxial cable
CN100544146C (en) The device that is used to cover the method for elongate object and is used for covering said elongate object
CN105337137B (en) Expansion tool and the method for connecting the first and second cables
JP6140654B2 (en) Electrical connector with cold shrink parts
US8167665B2 (en) Electrical connector with collapsible coupler
TWI436530B (en) Cable interfacing protection apparatus, cables with protection apparatus, and method for fabricating the same
US9455524B2 (en) Self-supported jacket seal for high voltage cable accessories
CN103840274A (en) Coaxial cable connector capable of being repeatedly used
CN105492715A (en) Application and maintenance of tension to transmission line in pipe
CN106207937A (en) A kind of predilation shrink cable termination
CN100483849C (en) Compression connector for braided coaxial cable
CN106329460A (en) Electromagnetic compatible shielding cable joint
CN104852344B (en) Electric connection component of European-style cable branch box
CN210577719U (en) Safe electric connector convenient to installation
CN204012153U (en) The expansion tool of intermediate insulation joint
CN105680262A (en) Connection structure for aerial optical fiber composite phase line and conventional wire and circuit connection method
CN201256279Y (en) Electric cable detachable connector and stress cone positioning device thereof
CN105811315A (en) Cable erection clamp for 110KV transformer substation
KR101290689B1 (en) Cable connector with flexible sleeve
CN114759496A (en) Expansion tool and expansion tool kit
CN200950508Y (en) Connector of coaxial cable
CN205621981U (en) Connection structure of built on stilts optical phase conductor and conventional wire
WO2009029024A1 (en) Device for expanding a tubular elastic body
US9698497B2 (en) Repair sleeve
CN216794056U (en) Photoelectric composite cable connector for oil well annulus testing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20200725

CF01 Termination of patent right due to non-payment of annual fee