CN105334901A - 一种光伏发电系统最大功率点智能跟踪方法 - Google Patents
一种光伏发电系统最大功率点智能跟踪方法 Download PDFInfo
- Publication number
- CN105334901A CN105334901A CN201510812726.XA CN201510812726A CN105334901A CN 105334901 A CN105334901 A CN 105334901A CN 201510812726 A CN201510812726 A CN 201510812726A CN 105334901 A CN105334901 A CN 105334901A
- Authority
- CN
- China
- Prior art keywords
- generation system
- maximum power
- power point
- psi
- power generation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 238000010248 power generation Methods 0.000 title claims abstract description 24
- 238000013178 mathematical model Methods 0.000 claims abstract description 7
- 108010074864 Factor XI Proteins 0.000 claims abstract description 4
- 230000005855 radiation Effects 0.000 claims description 10
- 238000005457 optimization Methods 0.000 abstract description 8
- 230000007547 defect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000004088 simulation Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000005286 illumination Methods 0.000 description 2
- 230000010355 oscillation Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Photovoltaic Devices (AREA)
Abstract
本发明公开了一种光伏发电系统最大功率点智能化跟踪方法,首先,根据光伏发电系统中光伏电池阵列数学模型构建了目标函数;其次,通过从多个电压区间进行智能搜索的方式,快速获得多个最优解;最后,通过在速度函数中引入全局比较因子ξ,实现了局部寻优及全局寻优的兼顾。本发明避免传统跟踪方法跟踪精度不高、容易在最大功率点附近振荡的缺点,可实现外界环境变化时光伏发电系统最大功率点的精确跟踪,动态响应速度快,不易陷入局部最优解,减少了系统在最大功率点振荡时的能量损失,提高光伏发电系统输出效率。
Description
技术领域
本发明涉及新能源开发及应用技术领域,特别涉及一种光伏发电系统最大功率点智能跟踪方法,该方法可实现外界环境变化时光伏发电系统最大功率点的精确跟踪。
背景技术
太阳能已成为目前应用最广泛的可利用清洁能源,光伏太阳能技术在诸多太阳能应用技术中脱颖而出。然而,光伏太阳能电池在发电的过程中具有极其强烈的非线性,并且极易受到多种环境因素的影响,很难稳定运行于系统最大功率点的位置。因此,如何使光伏发电系统能够在多变的环境下准确的运行于最大功率点的位置成为了能源有效利用的关键,对光伏发电系统进行最大功率跟踪(MPPT)显得非常重要。
为了提高光伏发电系统的效率,获得尽可能多的电能,国内外对光伏发电系统的MPPT控制算法进行了广泛的研究,提出了多种MPPT控制算法,主要有:恒定电压法、扰动观测法、电导增量法。然而,传统的最大功率点跟踪方法总存在着诸如响应速度慢,跟踪精度不够,系统工作点在最大功率点附近振荡等不足之处,在实际应用中很难取得很好地效果,对光伏发电系统所带来的优势不明显,无法实现高精度快速跟踪最大功率点的目的,很难进行大规模推广。近年来随着科学技术的不断发展,智能优化方法步入人们的视野,并不断成为各个技术领域应用的核心技术手段,利用智能优化的方法解决工程问题已成为了工程技术领域必然的发展趋势,因此智能优化方法在光伏发电系统的最大功率点跟踪领域的应用成为了可能,并且成为该领域方向的研究热点。
发明内容
为了解决现有技术中存在的问题,本发明的目的在于提出一种光伏发电系统最大功率点智能跟踪方法。当外界环境变化时,其可实现对光伏发电系统最大功率点的精确跟踪,避免传统跟踪方法在最大功率点附近振荡的缺点,提高光伏发电系统的输出效率。
为达到以上目的,本发明是采取如下技术方案予以实现的:
一种光伏发电系统最大功率点智能跟踪方法,包括下述步骤:
步骤一,构建考虑太阳辐射变化和温度影响时的光伏发电系统中光伏电池阵列数学模型如下式:
式中,U为光伏电池阵列电压,I为对应的输出电流,Ψ2=(Um/Uoc-1)/ln(1-Im/Isc),ΔU=-β·ΔT-Rs·ΔI,ΔI=α·S/Sref·ΔT+(S/Sref-1)·Isc,ΔT=Tc-Tref,Tc=Ta+tc·S;Sref为太阳辐射参考值,取1kW/m2,Tref为温度参考值,取25℃;为短路电流,为开路电压,Im、Um分别为最大功率点电流和电压,α为电流随温度变化系数,β为电压随温度变化系数,以上参数都在Sref、Tref条件下获取;Rs为光伏模块串联电阻;S为总太阳辐射,Tc为太阳电池温度,Ta为环境温度,tc为电池模块温度系数;
步骤二,构建跟踪目标函数 给定搜索分段数η=10,电压间隔λ=UOC/η,初始电压值U(1)=[λ,3λ,…,Uoc-λ]T,初始步长δ=λ/4,初始点方向因子μ=[1,-1],速度因子c1=2,c2=2,k=1,全局比较因子ξ=λ/100,终止条件ε=10-3;
步骤三,如果F(xi+μ1δ)<F(xi),令转步骤四;否则如果F(xi+μ2δ)<F(xi),令转步骤四;否则,令转步骤四;其中,为本轮比较搜索中的优异值;
步骤四,如果转步骤五;否则转步骤六;其中,为第k次迭代后的电压值;
步骤五,如果δ>ξ,令 转步骤三;否则令 转步骤三;其中,为所对应的为第k+1次迭代后的电压值;
步骤六,如果δ>ε,则令δ=δ/2,转步骤三,否则,其中,Uopt为最大功率点对应的电压值。
与现有技术相比,本发明具有以下有益的技术效果:
1、本发明所述方法不需要求解目标函数的导数,所以在解决较为复杂的光伏发电系统最大功率点优化模型时非常有效;
2、本发明所述方法同时从多个初始值开始搜索,能快速找到最大功率点位置,动态响应速度快;
3、本发明所述方法在速度函数中考虑局部寻优及全局寻优的综合因素,不易陷入局部最优解,减少了系统在最大功率点振荡的能量损失。
为了更清楚的理解本发明,以下结合附图对本发明作进一步的详细说明。
附图说明
图1为本发明方法的步骤流程图;
图2为本发明方法实施例的总体框图;
图3为本发明方法实施例的MATLAB/Simulink仿真控制模型图;
图4为本发明方法实施例的最大功率点仿真计算结果图;
图5为本发明方法实施例的最大功率点智能跟踪效果图;
具体实施方式
如图1所示(其中图1中大写的Y是YES的缩写,代表满足所属条件的情况;大写的N是NO的缩写,代表不满足所属条件的情况),一种光伏发电系统最大功率点智能跟踪方法,包括下述步骤:
步骤一,构建考虑太阳辐射变化和温度影响时的光伏发电系统中光伏电池阵列数学模型如下式:
式中,U为光伏电池阵列电压,I为对应的输出电流,Ψ2=(Um/Uoc-1)/ln(1-Im/Isc),ΔU=-β·ΔT-Rs·ΔI,ΔI=α·S/Sref·ΔT+(S/Sref-1)·Isc,ΔT=Tc-Tref,Tc=Ta+tc·S;Sref为太阳辐射参考值,取1kW/m2,Tref为温度参考值,取25℃;Isc为短路电流,Uoc为开路电压,Im、Um分别为最大功率点电流和电压,α为电流随温度变化系数,β为电压随温度变化系数,以上参数都在Sref、Tref条件下获取;Rs为光伏模块串联电阻;S为总太阳辐射,Tc为太阳电池温度,Ta为环境温度,tc为电池模块温度系数;
步骤二,构建跟踪目标函数 给定搜索分段数η=10,电压间隔初始电压值U(1)=[λ,3λ,…,Uoc-λ]T,初始步长δ=λ/4,初始点方向因子μ=[1,-1],速度因子c1=2,c2=2,k=1,全局比较因子ξ=λ/100,终止条件ε=10-3;
步骤三,如果F(xi+μ1δ)<F(xi),令转步骤四;否则如果F(xi+μ2δ)<F(xi),令转步骤四;否则,令转步骤四;其中,为本轮比较搜索中的优异值;
步骤四,如果转步骤五;否则转步骤六;其中,为第k次迭代后的电压值;
步骤五,如果δ>ξ,令 转步骤三;否则令 转步骤三;其中,为所对应的为第k+1次迭代后的电压值;
步骤六,如果δ>ε,则令δ=δ/2,转步骤三,否则,其中,Uopt为最大功率点对应的电压值。
实施例:
本实施例可以验证本发明的有效性和准确性。图2为实施例的总体框图。选取的光伏电池阵列在光辐射度为1kW/m2,温度为25℃的标准测试条件下基本参数为:Im=5.51A,、Vm=18.17V,、Voc=21.6V、,Isc=6.06A、,α=7.3×10-3A/℃,、β=0.108V/℃。基于MATLAB/Simulink工具箱,根据本发明方法构建的光伏电池仿真模型如图3所示。
假设随着天气的变化,光辐射度从1000W/m2逐渐降为800W/m2乃至500W/m2,根据仿真计算得到的理论最大功率点的结果如图4所示,而根据本发明方法得到的跟踪效果如图5所示。结合图4及图5,可以看出,基于本发明方法,当光照强度发生变化时,该系统能够快速地做出调节,使其工作在最大功率点附近,稳定性较好,而且很好的完善了恒压法当环境温度一定时光照强度发生较大改变从而使系统无法进行最大功率点跟踪的现象。
本实施例没有详细叙述的部件、工艺及字母表示属本行业的公知部件、和常用手段及常识,这里不一一叙述。
Claims (1)
1.一种光伏发电系统最大功率点智能跟踪方法,其特征在于:包括下述步骤:
步骤一,构建考虑太阳辐射变化和温度影响时的光伏发电系统中光伏电池阵列数学模型如下式:
式中,U为光伏电池阵列电压,I为对应的输出电流,Ψ2=(Um/Uoc-1)/ln(1-Im/Isc),ΔU=-β·ΔT-Rs·ΔI,ΔI=α·S/Sref·ΔT+(S/Sref-1)·Isc,ΔT=Tc-Tref,Tc=Ta+tc·S;Sref为太阳辐射参考值,取1kW/m2,Tref为温度参考值,取25℃;Isc为短路电流,Uoc为开路电压,Im、Um分别为最大功率点电流和电压,α为电流随温度变化系数,β为电压随温度变化系数,以上参数都在Sref、Tref条件下获取;Rs为光伏模块串联电阻;S为总太阳辐射,Tc为太阳电池温度,Ta为环境温度,tc为电池模块温度系数;
步骤二,构建跟踪目标函数 给定搜索分段数η=10,电压间隔λ=UOC/η,初始电压值U(1)=[λ,3λ,…,Uoc-λ]T,初始步长δ=λ/4,初始点(i=1,2,…floor(η/2)),方向因子μ=[1,-1],速度因子c1=2,c2=2,k=1,全局比较因子ξ=λ/100,终止条件ε=10-3;
步骤三,如果F(xi+μ1δ)<F(xi),令转步骤四;否则如果F(xi+μ2δ)<F(xi),令转步骤四;否则,令转步骤四;其中,为本轮比较搜索中的优异值;
步骤四,如果转步骤五;否则转步骤六;其中,为第k次迭代后的电压值;
步骤五,如果δ>ξ,令 k=k+1,转步骤三;否则令 k=k+1,转步骤三;其中,为min所对应的为第k+1次迭代后的电压值;
步骤六,如果δ>ε,则令δ=δ/2,k=k+1,转步骤三,否则,其中,Uopt为最大功率点对应的电压值。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510812726.XA CN105334901B (zh) | 2015-11-20 | 2015-11-20 | 一种光伏发电系统最大功率点智能跟踪方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510812726.XA CN105334901B (zh) | 2015-11-20 | 2015-11-20 | 一种光伏发电系统最大功率点智能跟踪方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105334901A true CN105334901A (zh) | 2016-02-17 |
CN105334901B CN105334901B (zh) | 2016-10-05 |
Family
ID=55285507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510812726.XA Active CN105334901B (zh) | 2015-11-20 | 2015-11-20 | 一种光伏发电系统最大功率点智能跟踪方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105334901B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109950899A (zh) * | 2019-03-18 | 2019-06-28 | 兰州理工大学 | 微能网中可时移设施农业电负荷的调度方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060087957A (ko) * | 2005-01-31 | 2006-08-03 | 엘지전자 주식회사 | 태양광 발전시스템의 최대전력 추종장치 및 그 방법 |
CN101599724A (zh) * | 2009-07-24 | 2009-12-09 | 中环(中国)工程有限公司 | 一种用于太阳能光伏发电系统的mppt控制装置及方法 |
CN102263527A (zh) * | 2011-08-02 | 2011-11-30 | 北京航空航天大学 | 一种光伏发电系统最大功率点跟踪方法 |
US20140266082A1 (en) * | 2013-03-14 | 2014-09-18 | Flextronics Ap, Llc | Method and implementation for eliminating random pulse during power up of digital signal controller |
CN104298297A (zh) * | 2014-10-08 | 2015-01-21 | 陕西科技大学 | 光伏发电系统中最大功率点跟踪控制方法 |
-
2015
- 2015-11-20 CN CN201510812726.XA patent/CN105334901B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060087957A (ko) * | 2005-01-31 | 2006-08-03 | 엘지전자 주식회사 | 태양광 발전시스템의 최대전력 추종장치 및 그 방법 |
CN101599724A (zh) * | 2009-07-24 | 2009-12-09 | 中环(中国)工程有限公司 | 一种用于太阳能光伏发电系统的mppt控制装置及方法 |
CN102263527A (zh) * | 2011-08-02 | 2011-11-30 | 北京航空航天大学 | 一种光伏发电系统最大功率点跟踪方法 |
US20140266082A1 (en) * | 2013-03-14 | 2014-09-18 | Flextronics Ap, Llc | Method and implementation for eliminating random pulse during power up of digital signal controller |
CN104298297A (zh) * | 2014-10-08 | 2015-01-21 | 陕西科技大学 | 光伏发电系统中最大功率点跟踪控制方法 |
Non-Patent Citations (1)
Title |
---|
魏乔: "船用光伏发电系统最大功率跟踪及自动跟踪控制研究", 《工程科技II辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109950899A (zh) * | 2019-03-18 | 2019-06-28 | 兰州理工大学 | 微能网中可时移设施农业电负荷的调度方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105334901B (zh) | 2016-10-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Global MPPT algorithm with coordinated control of PSO and INC for rooftop PV array | |
CN102902298B (zh) | 基于分段模型的光伏阵列 mppt 控制器及控制方法 | |
Safarudin et al. | Maximum power point tracking algorithm for photovoltaic system under partial shaded condition by means updating β firefly technique | |
CN103293950B (zh) | 一种基于lssvm的光伏最大功率点跟踪的控制方法 | |
Li et al. | A novel maximum power point tracking control method with variable weather parameters for photovoltaic systems | |
Ma et al. | Dem: direct estimation method for photovoltaic maximum power point tracking | |
Boutabba et al. | A new implementation of maximum power point tracking based on fuzzy logic algorithm for solar photovoltaic system | |
Ahmed et al. | PSO-SMC controller based GMPPT technique for photovoltaic panel under partial shading effect | |
CN106468935B (zh) | 一种折线拟合求太阳能电池最大功率点方法 | |
Singh et al. | Intersection Point Determination Method: A novel MPPT approach for sudden and fast changing environmental conditions | |
CN105334901B (zh) | 一种光伏发电系统最大功率点智能跟踪方法 | |
Ding et al. | Improved global maximum power point tracking method based on voltage interval for PV array under partially shaded conditions | |
CN106354190A (zh) | 一种基于多目标优化算法的光伏发电最大功率点追踪方法 | |
Cristian et al. | Performance comparison of three MPPT algorithms: aESC, mESC and P&O | |
Ou et al. | A variable step maximum power point tracking method using taylor mean value theorem | |
Chou et al. | Deep q-network based global maximum power point tracking for partially shaded pv system | |
Wu et al. | Study of the improved INC MPPT algorithm for PV systems | |
Kou et al. | Fast variable step-size maximum power point tracking method for photovoltaic systems | |
Yadav et al. | Variable step perturb and observe algorithm for standalone solar photovoltaic (pv) system | |
Chen et al. | An Improved Maximum Power Point Tracking Algorithm With Golden Section Search for Photovoltaic System | |
Li et al. | Research on integrated modeling method and maximum power point tracking control of photovoltaic systems | |
Sushma et al. | A new fuzzy based improved incremental conductance algorithm for tracking the MPP of a solar PV panel | |
Xiaoe et al. | Simulation research on the MPPT of the PV cells based on fuzzy control | |
Xue et al. | Photovoltaic cell modeling and the maximum power point tracking simulation | |
Tianhua et al. | Comparison of global maximum power point tracking methods under partial shading conditions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |