CN105333585A - Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline - Google Patents

Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline Download PDF

Info

Publication number
CN105333585A
CN105333585A CN201510875255.7A CN201510875255A CN105333585A CN 105333585 A CN105333585 A CN 105333585A CN 201510875255 A CN201510875255 A CN 201510875255A CN 105333585 A CN105333585 A CN 105333585A
Authority
CN
China
Prior art keywords
air
air conditioner
conditioning duct
conditioner pipeline
geometrical clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510875255.7A
Other languages
Chinese (zh)
Inventor
廖洪波
谢建辉
范雷云
汪超
赵飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chery Commercial Vehicle Anhui Co Ltd
Original Assignee
Chery Commercial Vehicle Anhui Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chery Commercial Vehicle Anhui Co Ltd filed Critical Chery Commercial Vehicle Anhui Co Ltd
Priority to CN201510875255.7A priority Critical patent/CN105333585A/en
Publication of CN105333585A publication Critical patent/CN105333585A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B41/00Fluid-circulation arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2500/00Problems to be solved
    • F25B2500/05Cost reduction

Abstract

The invention discloses an air conditioner pipeline facilitating assembly and fixing and a mounting method of the air conditioner pipeline. The air conditioner pipeline comprises an air conditioner pipeline part and a fixing clamp arranged on the air conditioner pipeline part, wherein the fixing clamp is welded to the air conditioner pipeline part. The mounting method of the air conditioner pipeline facilitating the assembly and fixing specifically comprises the steps that an arc mounting plate of the fixing clamp is clamped at a set position of the air conditioner pipeline part; the fixing clamp is welded to the air conditioner pipeline part; after an assembly reference surface of the fixing clamp is aligned to the set assembly position, a bolt is inserted into a fixed mounting hole and is fixed at the set assembly position, and the mounting of the air conditioner pipeline facilitating the assembly and fixing is completed. According to the air conditioner pipeline and the mounting method, the fixing clamp is welded on the air conditioner pipeline in accordance with the fixed position and angle through a welding technology, and becomes an assembly reference of the air conditioner pipeline, so that the purposes of reducing assembly errors and improving the labor efficiency can be achieved in an assembly process; and the air conditioner pipeline facilitating the assembly and fixing is simple in structure, convenient to mount, high in assembly efficiency, low in cost and good in structural reliability, is mounted firmly, and does not fall off.

Description

A kind of be convenient to be mounted with air-conditioning duct and installation method
Technical field
The present invention relates to air-conditioning duct, be specifically related to a kind of be convenient to be mounted with air-conditioning duct and installation method.
Background technology
Current air-conditioning duct fixed form simplified summary has following two kinds, and a kind of air-conditioning duct forms primarily of flexible pipe, and it is generally fixed to fixing pipeline trend on support by band.Another kind of air-conditioning duct forms primarily of aluminum pipe, and it is generally by air-conditioning duct fixed support and the air-conditioning pipe clamp trend with the use of fixing air-conditioning duct.The first air-conditioning duct fixed form is simple, but air-conditioning duct cost is higher; The low price of the second fixed form air-conditioning duct, but require very high to rigging error, and require high to the qualification of workman, efficiency of assembling is low, and assembly cost is higher.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, provide structure simple, easy for installation, the air-conditioning duct being convenient to be mounted with reduced costs and installation method thereof.
To achieve these goals, the technical solution used in the present invention is:
This kind is convenient to the air-conditioning duct be mounted with, and comprises air-conditioning duct and is located at the geometrical clamp on described air-conditioning duct, described geometrical clamp and the welding of described air-conditioning duct.
The two ends of described geometrical clamp are the arc installing plate coordinated with described air-conditioning duct, are fixed flat planar between described geometrical clamp two ends, and described fixed flat planar is provided with fixed installation hole.
The radian of described arc installing plate is greater than 180 degree.
Described fixed flat planar two ends connect with the arc installing plate on the two ends of geometrical clamp respectively; Described fixed flat planar side is assembling base plane, and described fixed flat planar is the side of assembling base plane and arc installing plate connecting position is arcuate structure.
Arc installing plate radius on described geometrical clamp one end is greater than the arc installing plate radius on the other end of described geometrical clamp.
The opening direction of the arc installing plate on described geometrical clamp two ends is identical.
This kind is convenient to the installation method of the air-conditioning duct be mounted with, and is specially: be stuck on the desired location of air-conditioning duct by the arc installing plate of geometrical clamp, geometrical clamp and air-conditioning duct welded; After the assembling base plane of geometrical clamp and the alignment of setting rigging position, in fixed installation hole, inserting bolt and setting rigging position are fixed, and complete the installation of the air-conditioning duct being convenient to be mounted with.
The invention has the advantages that: geometrical clamp is welded on air-conditioning duct by welding procedure according to fixed position and angle by the present invention, allow it become the reference for assembling of pipeline, in assembling process, reduction rigging error can be reached, improve the object of man efficiency; The air-conditioning duct structure being simultaneously convenient to be mounted with is simple, easy for installation, and efficiency of assembling is high, and cost is low, and install and firmly do not come off, structural reliability is good.
Accompanying drawing explanation
Mark in the content expressed each width accompanying drawing of description of the present invention below and figure is briefly described:
Fig. 1 is the structural representation of the air-conditioning duct that the present invention is convenient to be mounted with.
Fig. 2 is the structural representation of the geometrical clamp of the air-conditioning duct that Fig. 1 is convenient to be mounted with.
Fig. 3 is the schematic side view of the geometrical clamp of the air-conditioning duct that Fig. 1 is convenient to be mounted with.
Mark in above-mentioned figure is:
1, air-conditioning duct, 2, geometrical clamp, 3, arc installing plate, 4, fixed flat planar, 5, fixed installation hole, 6, assembling base plane.
Detailed description of the invention
Contrast accompanying drawing below, by the description to optimum embodiment, the specific embodiment of the present invention is described in further detail.
As shown in Figure 1-Figure 3, this kind is convenient to the air-conditioning duct be mounted with, and comprise air-conditioning duct 1 and be located at the geometrical clamp 2 on air-conditioning duct 1, geometrical clamp 2 and air-conditioning duct 1 weld; According to fixed position and angle, geometrical clamp 2 is welded on air-conditioning duct 1 by welding procedure, allows it become the reference for assembling of pipeline, reach reduction rigging error, improve the object of man efficiency; Structure is simple, easy for installation, reduces costs, and installs and does not firmly come off.
The two ends of geometrical clamp 2 are the arc installing plate 3 coordinated with air-conditioning duct 1, are fixed flat planar 4 between geometrical clamp 2 two ends, and fixed flat planar 4 is provided with fixed installation hole 5.Arc installing plate 3 and air-conditioning duct 1 coordinate, and can improve the structural reliability of geometrical clamp 2 and air-conditioning duct 1.
The radian of arc installing plate 3 is greater than 180 degree; The half of the about air-conditioning duct 1 of the area that such arc installing plate 3 wraps up air-conditioning duct 1, improves the structural reliability of geometrical clamp 2 and air-conditioning duct 1 further.
Fixed flat planar 4 two ends connect with the arc installing plate 3 on the two ends of geometrical clamp 2 respectively; Fixed flat planar 4 side is assembling base plane 6, and fixed flat planar 4 is the side of assembling base plane 6 and arc installing plate 3 connecting position is arcuate structure.The assembling base plane 6 that fixed flat planar 4 provides air-conditioning duct 1 to install and reference for assembling hole, thus reach reduction rigging error, improve the object of man efficiency.Fixed flat planar 4 is side and the arc installing plate 3 connecting position arc transition of assembling base plane 6, not only makes the assembling of air-conditioning duct 1 and geometrical clamp 2 efficient and convenient, and can prevent from scratching air-conditioning duct 1 surface.
Arc installing plate 3 radius on geometrical clamp 2 one end is greater than arc installing plate 3 radius on the other end of geometrical clamp 2; Geometrical clamp 2 two ends can be connected with the air-conditioning duct 1 of different-diameter, to meet the assembling demand of air-conditioning duct 1.
The opening direction of the arc installing plate 3 on geometrical clamp 2 two ends is identical; Not only be convenient to air-conditioning duct 1 move towards, and make the assembling of air-conditioning duct 1 efficient and convenient.
This kind is convenient to the installation method of the air-conditioning duct 1 be mounted with, and is specially: be stuck on the desired location of air-conditioning duct 1 by the arc installing plate 3 of geometrical clamp 2, geometrical clamp 2 and air-conditioning duct 1 is welded; After the assembling base plane 6 of geometrical clamp 2 and the alignment of setting rigging position, in fixed installation hole 5, inserting bolt and setting rigging position are fixed, and complete the installation of the air-conditioning duct 1 being convenient to be mounted with.
This kind is convenient to the installation method of the air-conditioning duct 1 be mounted with, according to fixed position and angle, geometrical clamp 2 is welded on air-conditioning duct 1 by welding procedure, allow it become the reference for assembling of pipeline, in assembling process, reduction rigging error can be reached, improve the object of man efficiency; Air-conditioning duct 1 structure being simultaneously convenient to be mounted with is simple, easy for installation, and cost is low, and install and firmly do not come off, structural reliability is good.
Obvious specific implementation of the present invention is not subject to the restrictions described above, as long as have employed the improvement of the various unsubstantialities that method of the present invention is conceived and technical scheme is carried out, all within protection scope of the present invention.

Claims (7)

1. be convenient to the air-conditioning duct be mounted with, it is characterized in that: comprise air-conditioning duct and be located at the geometrical clamp on described air-conditioning duct, described geometrical clamp and the welding of described air-conditioning duct.
2. be convenient to the air-conditioning duct be mounted with as claimed in claim 1, it is characterized in that: the two ends of described geometrical clamp are the arc installing plate coordinated with described air-conditioning duct, be fixed flat planar between described geometrical clamp two ends, described fixed flat planar is provided with fixed installation hole.
3. be convenient to the air-conditioning duct be mounted with as claimed in claim 2, it is characterized in that: the radian of described arc installing plate is greater than 180 degree.
4. be convenient to the air-conditioning duct be mounted with as claimed in claim 2, it is characterized in that: described fixed flat planar two ends connect with the arc installing plate on the two ends of geometrical clamp respectively; Described fixed flat planar side is assembling base plane, and described fixed flat planar is the side of assembling base plane and arc installing plate connecting position is arcuate structure.
5. be convenient to the air-conditioning duct be mounted with as claimed in claim 2, it is characterized in that: the arc installing plate radius on described geometrical clamp one end is greater than the arc installing plate radius on the other end of described geometrical clamp.
6. be convenient to the air-conditioning duct be mounted with as claimed in claim 2, it is characterized in that: the opening direction of the arc installing plate on described geometrical clamp two ends is identical.
7. an installation method for the air-conditioning duct that being convenient to described in any one of claim 1-6 is mounted with, is characterized in that: be specially: be stuck on the desired location of air-conditioning duct by the arc installing plate of geometrical clamp, geometrical clamp and air-conditioning duct welded; After the assembling base plane of geometrical clamp and the alignment of setting rigging position, in fixed installation hole, inserting bolt and setting rigging position are fixed, and complete the installation of the air-conditioning duct being convenient to be mounted with.
CN201510875255.7A 2015-11-30 2015-11-30 Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline Pending CN105333585A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510875255.7A CN105333585A (en) 2015-11-30 2015-11-30 Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510875255.7A CN105333585A (en) 2015-11-30 2015-11-30 Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline

Publications (1)

Publication Number Publication Date
CN105333585A true CN105333585A (en) 2016-02-17

Family

ID=55284258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510875255.7A Pending CN105333585A (en) 2015-11-30 2015-11-30 Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline

Country Status (1)

Country Link
CN (1) CN105333585A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105946507A (en) * 2016-05-28 2016-09-21 徐志勇 On-board solar cooling device and mounting method thereof
CN108194327A (en) * 2018-01-23 2018-06-22 宁波奥克斯电气股份有限公司 Pipeline fixing piece and air conditioner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105946507A (en) * 2016-05-28 2016-09-21 徐志勇 On-board solar cooling device and mounting method thereof
CN108194327A (en) * 2018-01-23 2018-06-22 宁波奥克斯电气股份有限公司 Pipeline fixing piece and air conditioner

Similar Documents

Publication Publication Date Title
CN2913772Y (en) Joint positioning structure for electronic expansion valve stator coil and valve body
CN205136834U (en) Pipe clamp is supported on vehicle air conditioner cooling tube way
CN105333585A (en) Air conditioner pipeline facilitating assembly and fixing and mounting method of air conditioner pipeline
CN104565541A (en) Pipe installing support, module of pipe installing support and micro-channel heat exchanger installing system
CN204843365U (en) Blast pipe positioner
CN204786779U (en) Air conditioner
CN204901085U (en) Pipeline installation presss from both sides
CN203927088U (en) A kind of oil filling pipe assembly fixed support
CN203797157U (en) Fixing pipe clamp for car air conditioner pipeline
CN105895219A (en) Anti-corrosion cable equipped with thermal-insulating protection cover and assembling and mounting method for anti-corrosion cable
CN202901616U (en) Connecting flange component
CN104534173A (en) Automobile air conditioner pipe clamp
CN204677932U (en) A kind of Quick-jointing flange
CN201903234U (en) Non-welding installation structure of capillary tube
CN202329353U (en) Mounting bracket of parallel flow heat exchanger
CN104913135A (en) Quick connection flange
CN207858153U (en) A kind of pipeline is welded and fixed fixture
CN204497422U (en) A kind of two-sided mutual-inserting type socket
CN204547751U (en) Inlet channel support
CN203231438U (en) Installation support and air conditioner outdoor unit
CN201253529Y (en) Fixation device of bag type dust collector blowing-tube tail
CN203463428U (en) Fixing assembly and air conditioner
CN220286713U (en) Air conditioner pipeline structure of quick butt joint installation
CN219606295U (en) Air duct splicing sealing structure
CN201856808U (en) Limit mechanism of high-pressure oil pipe connector for automobile steering pump

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160217

RJ01 Rejection of invention patent application after publication