CN105318517A - Overhead air conditioner - Google Patents

Overhead air conditioner Download PDF

Info

Publication number
CN105318517A
CN105318517A CN201410360302.XA CN201410360302A CN105318517A CN 105318517 A CN105318517 A CN 105318517A CN 201410360302 A CN201410360302 A CN 201410360302A CN 105318517 A CN105318517 A CN 105318517A
Authority
CN
China
Prior art keywords
lifting panel
air conditioner
air
panel
conditioning equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410360302.XA
Other languages
Chinese (zh)
Other versions
CN105318517B (en
Inventor
寇晖
文旷瑜
吴少波
刘明
周智昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201410360302.XA priority Critical patent/CN105318517B/en
Publication of CN105318517A publication Critical patent/CN105318517A/en
Application granted granted Critical
Publication of CN105318517B publication Critical patent/CN105318517B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)

Abstract

The invention discloses an overhead air conditioner. The overhead air conditioner comprises a main body, a lifting panel and a lifting mechanism; the main body is provided with an air suction port and an air exhaust port, air conditioning equipment is arranged in the main body, the lifting panel can move from the installation position covering the air suction port, and the lifting mechanism enables the lifting panel to rise and fall; when the lifting panel is located at the installation position and the air conditioner receives an instruction of enabling the lifting panel to fall during operation of the air conditioning equipment, the air conditioner controls the lifting panel to fall to a first assigned height from the installation position or controls the operation time T1 of the lifting mechanism. According to the overhead air conditioner, when the air conditioning equipment is operated, the lifting panel can fall to the first assigned position, and therefore the air intake amount is increased.

Description

Top air conditioner
Technical field
The present invention relates to one and can increase air inlet in operation of air conditioner process, the top air conditioner of the lifting panel of position that the hand that can move to user gets at such as to there is when keeping in repair simultaneously.
Background technology
In the field of top air conditioner, air inlet faceplate (panel with air suction inlet) is that in the air conditioner main body that is fixedly installed, incoming air area can not change, and therefore can not regulate intake.
Therefore, how expanding incoming air area, improve intake, is the art personnel technical problems urgently to be resolved hurrily.
Summary of the invention
In view of this, the invention provides a kind of top air conditioner, can increase air inlet when operation of air-conditioner, improve intake, air-inlet grille can be dropped to a certain position automatically, convenient for maintaining personnel take out screen pack and clean simultaneously.
To achieve these goals, the invention provides following technical scheme:
A kind of top air conditioner, comprise main body, this main body has air suction inlet and air outlet, and inside is provided with air-conditioning equipment; Lifting panel, described lifting panel can move from the installation site covering described suction inlet; Elevating mechanism, described elevating mechanism makes described lifting panel be elevated;
When described lifting panel is positioned at described installation site, during described air-conditioning equipment carries out operating, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the first specified altitude assignment from installation site or control elevating mechanism running time T 1.
In view of technique scheme, air-conditioning equipment operationally, if user needs to increase intake, the order that lifting panel declines can be sent, after air conditioner receives order, control described lifting panel and drop to the first specified altitude assignment from installation site or control elevating mechanism running time T 1, at this moment suction inlet is opened completely, relative to the air inlet faceplate be fixedly installed, can intake be improved, improve air conditioner efficiency.
Preferably, when described lifting panel is positioned at described installation site, during described air-conditioning equipment shuts down, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the second specified altitude assignment, and described second specified altitude assignment is the height of distance ground 1-1.5m.At this moment be elevated panel and drop to lower height, service worker just can be cleaned the screen pack be attached on lifting panel by climbing-up equipment.
Preferably, also comprise input part, this input part is used for the instruction that input control lifting panel declines; Judge module, when judging the instruction declined at input control lifting panel, the state of air-conditioning equipment; Audio output unit, according to the judged result of judge module, exports the operation indicating sound relating to operation, consumer can be allowed like this to know clearly the mode of operation of air-conditioner.
Preferably, the distance of described first specified altitude assignment and installation site is 2-10cm, can meet the demand increasing air quantity, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.
Preferably, described T1 is 2-5 second, elevating mechanism work 2-5 second, is equivalent to lifting panel decline 2-10cm, can meets the demand increasing air quantity, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.
Preferably, described lifting panel can rotate, opens described suction inlet and close the flat plate panel of described suction inlet when air-conditioning equipment running stops in air-conditioning equipment running.
Preferably, described lifting panel is the grid panel being provided with air-inlet grille.
Preferably, in described lifting panel decline process, or when lifting panel drops to the first assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.The object of such design is to be realized the control being elevated panel rising and decline by a button, and avoid establishing a button, simplicity of design, easily operates more.
Preferably, in described lifting panel decline process, or when lifting panel drops to the second assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.
Preferably, described air conditioner also comprises filter, and described filter is collected the dust comprised from described suction inlet leaked-in air; Disposal box, described disposal box is used for reclaiming the dust being attached to described filter, and described disposal box is loaded into described lifting panel, with the lifting of described lifting panel one, is convenient to clean disposal box.
Can certainly be only that lifting back side of panel is provided with screen pack, screen pack can along with lifting panel together downwards and move upward.
Preferably, described air conditioner also comprises controller, this controller has the timer reservation function running of described air-conditioning equipment being started or stops, drop in the second specified altitude assignment process at described lifting panel, when reaching the reservation moment making the running of described air-conditioning equipment start, lifting panel is lifting mechanism lifts to installation site.
Preferably, when air-conditioning equipment add up shutdown reach T3 time, when operation instruction received by air conditioner; control described lifting panel and drop to the second specified altitude assignment from installation site; in time again receiving operation instruction, lifting panel rises to installation site, then starts to run well.
As can be seen from above-mentioned technical scheme, top air conditioner of the present invention, when air-conditioning equipment operates, can carry out step-down operation to the first assigned address to lifting panel, thus increase intake; More preferably, when air-conditioning equipment shuts down, as needs clean screen pack, step-down operation to the second assigned address can be carried out to lifting panel simultaneously, facilitate user or maintenance personal to take out screen pack and clean.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in the embodiment of the present invention or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the elevating control flow chart of the lifting panel of the air conditioner of first embodiment of the invention;
Fig. 2 is the elevating control flow chart of the lifting panel of the air conditioner of second embodiment of the invention;
Fig. 3 is the elevating control flow chart of the lifting panel of the air conditioner of third embodiment of the invention.
Detailed description of the invention
The invention discloses a kind of top air conditioner, a kind of top air conditioner, comprises main body, and this main body has air suction inlet and air outlet, and inside is provided with air-conditioning equipment; Lifting panel, described lifting panel can move from the installation site covering described suction inlet; Elevating mechanism, described elevating mechanism makes described lifting panel be elevated;
When described lifting panel is positioned at described installation site, during described air-conditioning equipment carries out operating, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the first specified altitude assignment from installation site or control elevating mechanism running time T 1.
When described lifting panel is positioned at described installation site, during described air-conditioning equipment shuts down, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the second specified altitude assignment, and described second specified altitude assignment is the height of distance ground 1-1.5m.
Described air conditioner also comprises input part, and this input part is used for the instruction that input control lifting panel declines; Judge module, when judging the instruction declined at input control lifting panel, the state of air-conditioning equipment; Audio output unit, according to the judged result of judge module, exports the operation indicating sound relating to operation.
The distance of described first assigned address and installation site is 2-10cm, both can meet the demand increasing air quantity, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.
Described T1 is 2-5 second, elevating mechanism work 2-5 second, is equivalent to lifting panel decline 2-10cm, can meets the demand increasing air quantity, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.
Described lifting panel can rotate, opens described suction inlet and close the flat plate panel of described suction inlet when air-conditioning equipment running stops or described lifting panel is the grid panel being provided with air-inlet grille in air-conditioning equipment running.
When air-conditioning equipment runs, in described lifting panel decline process, or when lifting panel drops to the first assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.
When air-conditioning equipment is out of service, in described lifting panel decline process, or when lifting panel drops to the second assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.
Described air conditioner also comprises filter, and described filter is collected the dust comprised from described suction inlet leaked-in air; Disposal box, described disposal box is used for reclaiming the dust being attached to described filter, and described disposal box is loaded into described lifting panel, with the lifting of described lifting panel one.
Apply air conditioner of the present invention when operation, lifting panel can be dropped to the first specified altitude assignment, can intake be improved; Simultaneously when air conditioner is out of service, lifting panel can be dropped to the second specified altitude assignment, conveniently dismounting cleaning be carried out to screen pack.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment 1:
Please refer to Fig. 1, Fig. 1 is the elevating control flow chart of the lifting panel of the air conditioner of first embodiment of the invention.
Use top air conditioner of the present invention, when air conditioner receives the instruction making described lifting panel decline, judge that air-conditioning equipment is in running status or is in stopped status.
If air-conditioning equipment is in running status, then control described lifting panel drop to the first specified altitude assignment from installation site or control elevating mechanism running time T 1, audio output unit exports corresponding prompt tone simultaneously, the distance of the first specified altitude assignment and installation site is 2-10cm, the demand increasing air quantity can be met, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.Preferably, described T1 is 2-5 second, elevating mechanism work 2-5 second, is equivalent to lifting panel decline 2-10cm, can meets the demand increasing air quantity, can not be down to again very low simultaneously, cause user to touch lifting panel, avoid the damage causing air conditioner.As being elevated panel in the process dropping to the first specified altitude assignment or dropped to the first specified altitude assignment, when now air conditioner receives the instruction that described lifting panel is declined again, lifting panel rises to installation site.Circulation like this, until shut down.
If air-conditioning equipment is in stopped status, then controls described lifting panel and drop to the second specified altitude assignment from installation site, described second specified altitude assignment is the height of distance ground 1-1.5m, and audio output unit exports corresponding prompt tone simultaneously.Now convenient for maintaining personnel take out and are positioned at screen pack on lifting panel or disposal box, convenient clean screen pack or disposal box.As being elevated panel in the process dropping to the second specified altitude assignment or dropped to the second specified altitude assignment, when now air conditioner receives the instruction that described lifting panel is declined again, lifting panel rises to installation site.
Embodiment 2:
The present embodiment is on the basis of embodiment 1, air conditioner increases timing controller, this controller has the timer reservation function running of described air-conditioning equipment being started or stops, drop in the process of the second specified altitude assignment at described lifting panel, reach the situation in the reservation moment that the running of described air-conditioning equipment is started, lifting panel is lifting mechanism lifts to installation site.
That is; when air-conditioning equipment is in stopped status; when being elevated the instruction of panel decline as described in making as received; then control described lifting panel and drop to the second specified altitude assignment from installation site; as in decline process or after having declined; when reaching the reservation moment making the running of described air-conditioning equipment start, lifting panel is lifting mechanism's automatic lifting to installation site, and then air-conditioning equipment starts running.
Embodiment 3:
Present embodiment is on the basis of embodiment 2; also increase by a function; that is: when air-conditioning equipment add up shutdown reach T3 time; when operation instruction received by air conditioner; control described lifting panel and drop to the second specified altitude assignment from installation site; in time again receiving operation instruction, lifting panel rises to installation site, then starts to run well.
Like this, after air conditioner does not use for a long time, as received startup command, first lifting panel can be fallen and remind the cleaned filter screen of consumer, to be cleaned complete after again by startup command, lifting panel is lifting mechanism and is pulled up to installation site, and air-conditioning equipment runs well, and produces peculiar smell when avoiding air-conditioning through enabling after a while.If consumer not thinks need cleaned filter screen, also can directly again by starting running order, lifting panel is lifting mechanism and is pulled up to installation site, and air-conditioning equipment runs well.
Above courtyard machine provided by the present invention is described in detail.Apply specific case herein to set forth principle of the present invention and embodiment, the explanation of above embodiment just understands method of the present invention and core concept thereof for helping.It should be pointed out that for those skilled in the art, under the premise without departing from the principles of the invention, can also carry out some improvement and modification to the present invention, these improve and modify and also fall in the protection domain of the claims in the present invention.

Claims (12)

1. a top air conditioner, comprises main body, and this main body has air suction inlet and air outlet, and inside is provided with air-conditioning equipment; Lifting panel, and can move from the installation site covering described air suction inlet; Elevating mechanism, described elevating mechanism makes described lifting panel be elevated;
It is characterized in that: when described lifting panel is positioned at described installation site, during described air-conditioning equipment carries out operating, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the first specified altitude assignment from installation site or control elevating mechanism running time T 1.
2. top air conditioner according to claim 1, it is characterized in that: when described lifting panel is positioned at described installation site, during described air-conditioning equipment shuts down, when air conditioner receives the instruction that described lifting panel is declined, air conditioner controls described lifting panel and drops to the second specified altitude assignment, and described second specified altitude assignment is the height of distance ground 1-1.5m.
3. top air conditioner according to claim 1 and 2, is characterized in that: also comprise input part, and this input part is used for the instruction that input control lifting panel declines; Judge module, when judging the instruction declined at input control lifting panel, the state of air-conditioning equipment; Audio output unit, according to the judged result of judge module, exports the operation indicating sound relating to operation.
4. top air conditioner according to claim 1, is characterized in that: the distance of described first specified altitude assignment and installation site is 2-10cm.
5. top air conditioner according to claim 1, is characterized in that: described T1 is 2-5 second.
6. top air conditioner according to claim 1, is characterized in that: described lifting panel can rotate, opens described suction inlet and close the flat plate panel of described suction inlet when air-conditioning equipment running stops in air-conditioning equipment running.
7. top air conditioner according to claim 1, is characterized in that: described lifting panel is the grid panel being provided with air-inlet grille.
8. top air conditioner according to claim 1, it is characterized in that: in described lifting panel decline process, or, when lifting panel drops to the first assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.
9. top air conditioner according to claim 2, it is characterized in that: in described lifting panel decline process, or, when lifting panel drops to the second assigned address, when again receiving the instruction that described lifting panel is declined, lifting panel rises to installation site.
10. top air conditioner according to claim 1, is characterized in that: described air conditioner also comprises filter, and described filter is collected the dust comprised from described suction inlet leaked-in air; Disposal box, described disposal box is used for reclaiming the dust being attached to described filter, and described disposal box is loaded into described lifting panel, with the lifting of described lifting panel one.
11. top air conditioners according to claim 2, it is characterized in that: described air conditioner also comprises controller, this controller has the timer reservation function running of described air-conditioning equipment being started or stops, drop in the process of the second specified altitude assignment at described lifting panel, when reaching the reservation moment making the running of described air-conditioning equipment start, lifting panel is lifting mechanism lifts to installation site.
12. top air conditioners according to claim 11; it is characterized in that: when air-conditioning equipment add up shutdown reach T3 time; when operation instruction received by air conditioner; control described lifting panel and drop to the second specified altitude assignment from installation site; in time again receiving operation instruction; lifting panel rises to installation site, and then air-conditioning equipment starts to run well.
CN201410360302.XA 2014-07-25 2014-07-25 Top air conditioner Active CN105318517B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410360302.XA CN105318517B (en) 2014-07-25 2014-07-25 Top air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410360302.XA CN105318517B (en) 2014-07-25 2014-07-25 Top air conditioner

Publications (2)

Publication Number Publication Date
CN105318517A true CN105318517A (en) 2016-02-10
CN105318517B CN105318517B (en) 2019-04-30

Family

ID=55246461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410360302.XA Active CN105318517B (en) 2014-07-25 2014-07-25 Top air conditioner

Country Status (1)

Country Link
CN (1) CN105318517B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0972569A (en) * 1995-07-04 1997-03-18 Konami Kk Embedded-in-ceiling type air conditioner
CN101493249A (en) * 2008-01-21 2009-07-29 Lg电子株式会社 Indoor unit of air conditioner and method for controlling the same
CN102099634A (en) * 2008-07-18 2011-06-15 大金工业株式会社 Ceiling-mounted type air-conditioner
CN102099632A (en) * 2008-07-18 2011-06-15 大金工业株式会社 Ceiling-mounted air conditioner
CN102099633B (en) * 2008-07-18 2013-08-28 大金工业株式会社 Indoor unit of air conditioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0972569A (en) * 1995-07-04 1997-03-18 Konami Kk Embedded-in-ceiling type air conditioner
CN101493249A (en) * 2008-01-21 2009-07-29 Lg电子株式会社 Indoor unit of air conditioner and method for controlling the same
CN102099634A (en) * 2008-07-18 2011-06-15 大金工业株式会社 Ceiling-mounted type air-conditioner
CN102099632A (en) * 2008-07-18 2011-06-15 大金工业株式会社 Ceiling-mounted air conditioner
CN102099633B (en) * 2008-07-18 2013-08-28 大金工业株式会社 Indoor unit of air conditioner

Also Published As

Publication number Publication date
CN105318517B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
CN101504175B (en) Fresh air introducing apparatus with self-cleaning function and its self-cleaning method
CN103551338A (en) Dedusting device for intelligent electric meter
CN208324929U (en) A kind of charging pile cabinet with heat radiation protection function
CN105723159A (en) An air conditioning system capable of rapidly exhausting smoke
CN105318517A (en) Overhead air conditioner
CN102829517A (en) Fresh air energy-saving system for small communication machine room
CN202883397U (en) Portable hot and cold leafless fan
CN207035404U (en) A kind of VMC
CN105371379A (en) Indoor air purifying device
CN204485825U (en) A kind of self-purifying system for confined reaction room
CN115696862A (en) Variable air volume self-cleaning air supply system
CN205628789U (en) Be applied to automatic dust collector of communication computer lab new trend machine
CN208269338U (en) A kind of dedicated exhaust equipment in laboratory
CN202860970U (en) Smoke ventilator for laboratory
CN211174508U (en) Frequency conversion air compressor machine that production copper line was used
CN210866927U (en) Electric power automation safety device
CN114194052A (en) Heat dissipation and dehumidification integrated charging pile and control method thereof
CN211548308U (en) Integrated ceiling with lighting device
CN2521502Y (en) Central exhausting device for environment protection kitchen
CN207584841U (en) A kind of Split type box body kitchen ventilator
CN206673426U (en) A kind of low-voltage distribution cabinet
CN204735046U (en) Gas tank pulsating collection ware
CN105689333A (en) Automatic dedusting device applied to communication machine room fresh air machine and fresh air machine system
CN205316600U (en) Movable air -conditioner
CN216204090U (en) Fan filter unit and clean system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant