CN105317079A - Water supply and drainage construction method - Google Patents

Water supply and drainage construction method Download PDF

Info

Publication number
CN105317079A
CN105317079A CN201410233679.9A CN201410233679A CN105317079A CN 105317079 A CN105317079 A CN 105317079A CN 201410233679 A CN201410233679 A CN 201410233679A CN 105317079 A CN105317079 A CN 105317079A
Authority
CN
China
Prior art keywords
pipeline
pipe
water supply
construction method
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410233679.9A
Other languages
Chinese (zh)
Inventor
江海滢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410233679.9A priority Critical patent/CN105317079A/en
Publication of CN105317079A publication Critical patent/CN105317079A/en
Pending legal-status Critical Current

Links

Abstract

The present invention discloses a water supply and drainage construction method, which comprises water supply equipment installation, pipeline arrangement and pipeline installation. The water supply and drainage construction method of the present invention has characteristics of rational distribution, time saving, and construction safety providing.

Description

A kind of water supply and drainage construction method
Technical field
The invention belongs to building field, particularly relate to a kind of water supply and drainage construction method.
Background technology
Hydropower installation, is the important component part in construction work, directly has influence on the life of people.But in construction work hydropower installation, still there is various problem, such as Rig up error, cause the inconvenience in people's daily life, even potential safety hazard.The hydropower installation technology of self must be strengthened based on these relevant departments and relevant technician, carry out construction work hydropower installation, improve the quality of building, improve the quality of life of people.
Summary of the invention
The object of this invention is to provide a kind of water supply and drainage construction method, solve the problems of the prior art.
For achieving the above object, the present invention is by the following technical solutions:
A kind of water supply and drainage construction method, is characterized in that: comprise water supply facilities installation, pipe arrangement and Pipe installing.
Further, described Pipe installing comprises the measure of anti-tubing giving sufficient strength seepage, control measure fixed by pipeline and pipeline anti-clogging control measure.
Further, described anti-tubing giving sufficient strength seepage measure: whether the maximum settlement conscientiously will checking conduit slope on drawing and building before A Pipe installing is contradictory, pinpoints the problems and proposes to design in time; B conduit slope should be even, must not occur adverse slope; C forbids to be laid on undressed weak soil for register one's residence buried pipeline and bearing; D, through the pipeline of floor, wall, basis, roofing, all should add tubing protection, must not have pipe joint in sleeve pipe; E should have waterproofing course, civil engineering flashing and tarpaulin through the pipeline of roofing, and the gap between pipeline and sleeve pipe should be clogged with incombustible material; When E pipeline connects, not handy powerful counterpart, also not handy heating tube and add the methods such as partially pad to eliminate the defects such as the space deviation of interface end face, mismatch or bias.
Further, control measure fixed by described pipeline: A pipeline needs repetition measurement pipeline trench, and whether support meets the absolute altitude of Pipe installing, the gradient and slope aspect, and whether set spacing meets the requirement of drawing and relevant specification; B strictly controls sanitary apparatus, the installed height mark of water supply and sewerage pipeline accessory and distance, constant spacing, the level altitude equidimension of fixture and body of wall; C pipe clamp is installed, the many riser clamp absolute altitudes with room should be consistent, and the length of short tube is greater than 200cm and pipe clamp must be established to fix at the l00mm place of corner, water meter, faucet conduit end, and pipe clamp should be installed firmly, not handy timber wedge plug is filled out, also not handy mortar mending hole; D fire main enters fire water box and answers " smooth vertical and horizontal ", and must not tilt to enter, the short tube length of inlet is greater than 500mm or the two-tube support that should have entered is fixed.
Further, described pipeline anti-clogging control measure: after A pipeline blank installs, the rubber stopper of application specific or timber wedge block up the Chao Tiankou in strict control road, also should to use the same method blocking, prevent the foreign material such as building waste from entering drainage to reserved outfall such as water closet, bathtub, floor drains; B drainage pipe should be constructed in strict accordance with standard, etc. does not occur adverse slope; When C pipe laying, sanitary apparatus, first should clear up foreign material in pipeline, in reserved opening, ensure unimpeded.
Beneficial effect of the present invention: adopt water supply and drainage construction method of the present invention, reasonable layout, saves time and can provide the safety of construction.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with embodiment, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
A kind of water supply and drainage construction method, is characterized in that: comprise water supply facilities installation, pipe arrangement and Pipe installing.
Equipment tackles its interrelated data before installing and quality certification file carries out checking inspection.Equipment does not have Short Item, damage and corrosion, and rotating part should fluent, stuck phenomenon and abnormal sound flexibly.Be according to water pump assembly model, the number of units of unit and the length dimension of unit determined to the installation of equipment unit, satisfied design tube pass basis is reasonably planned its installation site in pump house and spread pattern in length and breadth.Unit arrange pipeline should be made the shortest, elbow is minimum, pipeline be convenient to connect and leave certain aisle and space so that management, Operation and maintenance.
Indoor Pipeline be laid with bright dress or concealed installation two kinds of forms.During bright dress, pipeline is along place's parallel lay-ups such as wall, beam column, ceiling, floors.During concealed installation, feedwater piping is laid in furred ceiling, technological layer, pipe trench and vertical shaft.Sanitary installation arm can be laid within the walls.Should consider the installation of pipeline and annex, maintenance possibility during concealed installation, as furred ceiling stays movable access hole, vertical shaft stays access door, also will consider to avoid horizontal laying as far as possible and adopt and vertically lay, prevent the fail in shear to body of wall during pipeline concealed installation.
Described Pipe installing comprises the measure of anti-tubing giving sufficient strength seepage, control measure fixed by pipeline and pipeline anti-clogging control measure.
If water supply and sewerage pipeline construction quality is bad, there will be pipe leakage water, the problem such as insecure, line clogging fixed by pipeline, these problems are also the Important Problems of many customer complaints.
Described anti-tubing giving sufficient strength seepage measure: whether the maximum settlement conscientiously will checking conduit slope on drawing and building before A Pipe installing is contradictory, pinpoints the problems and proposes to design in time; B conduit slope should be even, must not occur adverse slope; C forbids to be laid on undressed weak soil for register one's residence buried pipeline and bearing; D, through the pipeline of floor, wall, basis, roofing, all should add tubing protection, must not have pipe joint in sleeve pipe; E should have waterproofing course, civil engineering flashing and tarpaulin through the pipeline of roofing, and the gap between pipeline and sleeve pipe should be clogged with incombustible material; When E pipeline connects, not handy powerful counterpart, also not handy heating tube and add the methods such as partially pad to eliminate the defects such as the space deviation of interface end face, mismatch or bias.
Further, control measure fixed by described pipeline: A pipeline needs repetition measurement pipeline trench, and whether support meets the absolute altitude of Pipe installing, the gradient and slope aspect, and whether set spacing meets the requirement of drawing and relevant specification; B strictly controls sanitary apparatus, the installed height mark of water supply and sewerage pipeline accessory and distance, constant spacing, the level altitude equidimension of fixture and body of wall; C pipe clamp is installed, the many riser clamp absolute altitudes with room should be consistent, and the length of short tube is greater than 200cm and pipe clamp must be established to fix at the l00mm place of corner, water meter, faucet conduit end, and pipe clamp should be installed firmly, not handy timber wedge plug is filled out, also not handy mortar mending hole; D fire main enters fire water box and answers " smooth vertical and horizontal ", and must not tilt to enter, the short tube length of inlet is greater than 500mm or the two-tube support that should have entered is fixed.
Further, described pipeline anti-clogging control measure: after A pipeline blank installs, the rubber stopper of application specific or timber wedge block up the Chao Tiankou in strict control road, also should to use the same method blocking, prevent the foreign material such as building waste from entering drainage to reserved outfall such as water closet, bathtub, floor drains; B drainage pipe should be constructed in strict accordance with standard, etc. does not occur adverse slope; When C pipe laying, sanitary apparatus, first should clear up foreign material in pipeline, in reserved opening, ensure unimpeded.
The specific embodiment of the present invention is described although above-mentioned in conjunction with the embodiments; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendment or distortion that performing creative labour can make still within protection scope of the present invention.

Claims (5)

1. a water supply and drainage construction method, is characterized in that: comprise water supply facilities installation, pipe arrangement and Pipe installing.
2. water supply and drainage construction method according to claim 1, is characterized in that: described Pipe installing comprises the measure of anti-tubing giving sufficient strength seepage, control measure fixed by pipeline and pipeline anti-clogging control measure.
3. water supply and drainage construction method according to claim 2, it is characterized in that: the measure of described anti-tubing giving sufficient strength seepage: whether the maximum settlement conscientiously will checking conduit slope on drawing and building before A Pipe installing is contradictory, pinpoint the problems and propose to design in time; B conduit slope should be even, must not occur adverse slope; C forbids to be laid on undressed weak soil for register one's residence buried pipeline and bearing; D, through the pipeline of floor, wall, basis, roofing, all should add tubing protection, must not have pipe joint in sleeve pipe; E should have waterproofing course, civil engineering flashing and tarpaulin through the pipeline of roofing, and the gap between pipeline and sleeve pipe should be clogged with incombustible material; When E pipeline connects, not handy powerful counterpart, also not handy heating tube and add the methods such as partially pad to eliminate the defects such as the space deviation of interface end face, mismatch or bias.
4. water supply and drainage construction method according to claim 2, it is characterized in that: control measure fixed by described pipeline: A pipeline needs repetition measurement pipeline trench, whether support meets the absolute altitude of Pipe installing, the gradient and slope aspect, and whether set spacing meets the requirement of drawing and relevant specification; B strictly controls sanitary apparatus, the installed height mark of water supply and sewerage pipeline accessory and distance, constant spacing, the level altitude equidimension of fixture and body of wall; C pipe clamp is installed, the many riser clamp absolute altitudes with room should be consistent, and the length of short tube is greater than 200cm and pipe clamp must be established to fix at the l00mm place of corner, water meter, faucet conduit end, and pipe clamp should be installed firmly, not handy timber wedge plug is filled out, also not handy mortar mending hole; D fire main enters fire water box and answers " smooth vertical and horizontal ", and must not tilt to enter, the short tube length of inlet is greater than 500mm or the two-tube support that should have entered is fixed.
5. water supply and drainage construction method according to claim 2, it is characterized in that: described pipeline anti-clogging control measure: after A pipeline blank installs, the rubber stopper of application specific or timber wedge block up the Chao Tiankou in strict control road, also should to use the same method blocking to reserved outfall such as water closet, bathtub, floor drains, prevent the foreign material such as building waste from entering drainage; B drainage pipe should be constructed in strict accordance with standard, etc. does not occur adverse slope; When C pipe laying, sanitary apparatus, first should clear up foreign material in pipeline, in reserved opening, ensure unimpeded.
CN201410233679.9A 2014-05-30 2014-05-30 Water supply and drainage construction method Pending CN105317079A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410233679.9A CN105317079A (en) 2014-05-30 2014-05-30 Water supply and drainage construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410233679.9A CN105317079A (en) 2014-05-30 2014-05-30 Water supply and drainage construction method

Publications (1)

Publication Number Publication Date
CN105317079A true CN105317079A (en) 2016-02-10

Family

ID=55245317

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410233679.9A Pending CN105317079A (en) 2014-05-30 2014-05-30 Water supply and drainage construction method

Country Status (1)

Country Link
CN (1) CN105317079A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105465486A (en) * 2015-12-31 2016-04-06 四川航天建筑工程有限公司 Slope control structure for pipeline on basement roof
CN113090826A (en) * 2021-03-24 2021-07-09 鹏图建设有限公司 Node and process for sewage treatment plant construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105465486A (en) * 2015-12-31 2016-04-06 四川航天建筑工程有限公司 Slope control structure for pipeline on basement roof
CN113090826A (en) * 2021-03-24 2021-07-09 鹏图建设有限公司 Node and process for sewage treatment plant construction

Similar Documents

Publication Publication Date Title
CN105317079A (en) Water supply and drainage construction method
CN104599045A (en) Project real scene acceptance inspection method
US11389033B2 (en) Bathtub installation aide
CN103410318A (en) Construction method for preventing leakage of restroom tubular well
CN201250958Y (en) Leak-proof built-in pipe joint
CN103836257A (en) W-type flexible anti-seismic cast iron drainage pipe construction method
RU2645315C1 (en) Engineering module and method of its installation
CN108798031B (en) Construction method of PVC waterproof embedded sleeve of main stand pipe close to wall in kitchen and toilet
CN104455757A (en) Downcomer assembly and installation method thereof
CN114319678A (en) Water stopping structure and water stopping construction method for water-containing room
CN109487864A (en) A kind of architectural engineering basement anti-leakage structure
Schmid Building inspection manual: A guide for building professionals for maintenance, safety, and assessment
CN111623172A (en) Anti-leakage structure for pipeline penetrating floor slab
CN208456124U (en) A kind of drainage pipeline passes through the pre-embedded device of floor
CN102213006A (en) UPVC (Unplasticized Polyvinyl Chloride) sleeve direct burying method
CN206036410U (en) Pre -buried leak protection water is direct
CN105350784B (en) Utilize skirt location technology one-shot forming service sleeve installation method
CN208293726U (en) A kind of shower house antiseep floor drain and built-in pipe
CN207934166U (en) A kind of structure of superstructure of the outdoor drainage Pipeline Crossing Program without basement
CN110284714A (en) Five wildcard part of co-layer draining and captation combined type construction method
CN109340451B (en) Installation method of groove type high-density polyethylene super-silent drain pipe
CN110565752A (en) Same-layer drainage construction method for toilet in engineering
CN108411989A (en) A kind of device keeping drainage pipeline internal pressure balance to prevent foul smell from overflowing
CN211548452U (en) Detachable roof waterproof component
CN220100103U (en) Buried treatment plant upper cover building pipeline pollution protection structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160210

WD01 Invention patent application deemed withdrawn after publication