A kind of application and design method of coke dry quenching hoister operation pre-warning management system Download PDFInfo
- Publication number
- CN105314540B CN105314540B CN201510219684.9A CN201510219684A CN105314540B CN 105314540 B CN105314540 B CN 105314540B CN 201510219684 A CN201510219684 A CN 201510219684A CN 105314540 B CN105314540 B CN 105314540B
- Authority
- CN
- China
- Prior art keywords
- encoder
- elevator
- plc control
- close
- original
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The invention discloses the applications and design method of a kind of coke dry quenching hoister operation pre-warning management system, belong to coal chemical industry dry coke quenching production equipment field.Coke dry quenching hoister operation pre-warning management system of the invention includes signal acquisition structure and automated processing system, and the signal acquisition structure includes the close limit of each position, promotes encoder, traveling encoder, promotes motor inverter communication module, running motor inverter communication module, steel wire rope of hoist roller, running motor speed reducer;The automated processing system includes industrial computer and the PLC network module that is attached thereto;The industrial computer and PLC network module passes through network connection;PLC network module is then installed in the original PLC control system of coke dry quenching hoister.The present invention uses the method that coke dry quenching hoister each position limit signal and each encoder, transducer operational parameter are compared to each other, are verified, coke dry quenching hoister operation conditions can really be reflected by reaching, and quick, the accurate early warning of energy and the purpose for recording fault message.
Description
Technical field
The present invention relates to coal chemical industry dry coke quenching equipment field, more specifically to can be carried out to coke dry quenching hoister
Run the systematic difference and design method of forewarning management.
Background technique
Coke dry quenching hoister is one of the important equipment of coal chemical industry dry coke quenching production, is needing to carry out the dry red Jiao Yun put out
It is sent to the dry special equipment for putting out slot, main function is the burnt tank by being promoted with red coke being housed on traversing burnt tank trolley, by coke oven
The red coke of the high temperature produced be fitted into it is dry put out in slot, achieve the purpose that Dry Quenching.
Coke dry quenching body and coke dry quenching hoister are respectively that two sets of different control systems control at present, between two systems
Simple control information exchange is only completed by hardwire, and the control signal and detection data of elevator part lack accordingly
Historical record, when elevator part is broken down, by the existing coke dry quenching body system directly contacted with operator,
Due to lacking the historical data about elevator part, it is difficult to judge the specific failure cause of elevator.Therefore by elevator
It is necessary that historical data participation accident analysis is added in partial key signal and data.
Existing coke dry quenching hoister control system does not have independent man-machine interface, and control system is put out by hardwire with dry
Burnt ontology control system is attached, and the command information from coke dry quenching body is received, inside hoister control system PLC
Logical program, reach automatic lifting and traversing to promoting frequency converter and traveling frequency converter and being controlled.Once elevator goes out
Existing failure then must open hoister control program by professional and be analyzed and deduced one by one, and technical requirements are higher, simultaneously
The difficulty of analysis failure is big, consuming time is long;Even if often in this way, it is also possible to can not because corresponding historical data is lacked
The failure of exact reproduction at that time, causes coke dry quenching hoister system to become a black box, can not carry out to it effectively
Management, operation early warning are even more not know where to begin.
Summary of the invention
1. technical problems to be solved by the inivention
In view of the above deficiencies, the present invention provides application and the design side of a kind of coke dry quenching hoister operation pre-warning management system
Method is diagnosed, analyzed and is recorded dedicated for the operation conditions to coke dry quenching hoister.It being capable of Real-time Feedback elevator fortune
The variation tendency of row process, and change trend curve figure is saved, monitoring easy to produce and failure quickly judge.Elevator is run
In the process the detection of any limit signal lose the failures such as failure, elevator band-type brake failure, elevator car slipping carry out actively, it is automatic real
When early warning.Real-time, automatic monitoring record, friendly interface, even if not having are carried out to the key condition in hoister control program
The programming grounding in basic skills of profession also can know to cause elevator failure cause at the first time by system interface.Meanwhile hardware is put into
Few, network structure is simple.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of coke dry quenching hoister operation pre-warning management system, including signal acquisition structure and automated processing system, signal
Acquisition structure includes the close limit of each position, promotes encoder, traveling encoder, promotes motor inverter communication module, traveling
Motor inverter communication module, steel wire rope of hoist roller, running motor speed reducer;The promotion encoder is mounted on promotion
On machine wire rope drum, the traveling encoder is mounted on running motor deceleration pusher side, promoted motor inverter communication module,
Running motor inverter communication module is then respectively arranged in that elevator is original to be promoted, in traveling frequency-charger cabinet;Motor is promoted to become
Frequency device communication module, running motor inverter communication module then pass through network and connect with the original PLC control system of elevator.Institute
The automated processing system stated includes industrial computer and the PLC network module that is attached thereto;PLC network module is installed on elevator
In original PLC control system, industrial computer and PLC network module pass through network connection;The close limit of each position,
It promotes encoder and the original PLC control system I/O module fastener of elevator is electrically connected.
Further, be respectively arranged in elevator it is original promoted, the promotion motor inverter in traveling frequency-charger cabinet it is logical
Module (4) and running motor inverter communication module (5) are interrogated, is connect by network with the original PLC control system of elevator, and
It will be promoted, the electric current of traveling frequency converter and all other real-time parameters are sent into the original PLC control system of elevator.
Using a kind of design method of coke dry quenching hoister operation pre-warning management system, the steps include:
(a), encoder (2), traveling encoder (3), frequency converter and the close limit (1) of each position will signal acquisition: be promoted
Every real-time parameter and the signals such as original related electric equipment state pass through network and be sent into the industrial computer (8)
System in, system passes through its respective state of visual moving picture display;
(b), data store: the switching value and analog signals that are acquired by network are put into the industrial computer
(8) in system history data library, and long term storage;
(c), historical data compares: providing promotion encoder (2), the traveling encoder (3), frequency conversion in historical data base
Device and each position carry out the interface platform of trend comparison close to every real-time parameter signal data of limit (1);
(d), dynamic linkage relationship interface is established: by motion graphics circle in the system of the industrial computer (8)
The form in face will promote motor and running motor operation necessary condition is shown, and pass through special interface display;
(e), logout and alarm: the key signal that can relationship elevator operate normally is put into as event form
In the logout of the system of the industrial computer (8), and when these signals are not able to satisfy elevator and operate normally, it is
System passes through the dynamic menu automatic alarm on industrial computer (8);
(f), limit real-time monitoring: typing is close on the industrial computer (8) limits corresponding promotion encoder
(2) numerical value and deviation or traveling encoder (3) numerical value and deviation, while increasing corresponding program function in PLC system
Block, system will pass through the corresponding coding of limit automatically to the real value and typing that promote encoder (2) or traveling encoder (3)
The comparison of device numerical value, come real-time monitoring close to limit signal situation;
When system detection goes out to be promoted the real value of encoder (2) or traveling encoder (3) and corresponding to close to limit for typing
It is equal to promote encoder (2) or traveling encoder (3) numerical value, but when not occurring in systems close to limit signal, then system
It can determine whether out that the limit signal has been lost;Occur when system detection goes out close to limit, but promotes encoder (2) or traveling encoder
(3) real value and typing it is unequal close to corresponding encoder (2) or traveling encoder (3) numerical value that promoted of limit, then be
System can determine whether that this interference occurs close to limit signal and flashes;To realize the original PLC control system of elevator to close limit
The real-time monitoring of position signal;
(g), holding brake action situation real-time monitoring: increasing corresponding program function block in PLC system, and system will be by certainly
Time difference and band-type brake between the time difference of dynamic relatively band-type brake folding order and position feedback, multiple band-type brake position feedbacks close
It closes feedback and promotes the consistency of encoder (2) variation, come real-time monitoring holding brake action situation, while the deterioration to Weak fault
Carry out early warning;
When the time difference between the folding order of system detection band-type brake and band-type brake position feedback exceeding a certain range, then it is
System can determine whether holding brake action time-out;When system detection goes out the transformation period difference of multiple band-type brake position feedbacks beyond a certain range
When, then system can determine whether that inconsistent mistake occurs in band-type brake group;It is under closed state and mentions entirely when system detection goes out band-type brake position
It rises encoder (2) reading but to change, then system can determine whether that car slipping failure occurs in elevator.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, there is following remarkable result:
(1) a kind of coke dry quenching hoister of the invention runs the application and design method of pre-warning management system, and use will be
System software is mainly integrated on the industrial computer being specially arranged, and is read out by special network, is recorded original dry put out
Burnt hoister control system PLC and frequency converter internal operation data, so that the operation control situation of coke dry quenching hoister is directly anti-
It reflects on the interface of industrial computer, practical effect is good;
(2) application and design method of a kind of coke dry quenching hoister of the invention operation pre-warning management system, system tool
Standby data recording function, can record prolonged elevator operation data, technical staff can very easily pass through
Operation conditions of the coke dry quenching hoister within the past period and generation are understood to the trend analysis of these record data
Failure cause;
(3) application and design method of a kind of coke dry quenching hoister of the invention operation pre-warning management system, system mention
The dynamic linkage relationship figure for having supplied the promotion motor and running motor of coke dry quenching hoister, will by way of Dynamic graphics interface
It promotes motor and running motor operation necessary condition shows that technical staff can be convenient, fast by means of the motion graphics
Recognize promoted motor and running motor operation condition whether meet, be significantly reduced the malfunction elimination time;
(4) application and design method of a kind of coke dry quenching hoister of the invention operation pre-warning management system, system tool
The key signal for causing coke dry quenching hoister failure can be changed and be remembered in the form of event by standby critical event writing function
Record, and Realtime Alerts prompting is carried out by interface;The variation of these key signals can be begun simultaneously, last time and involved
And program call the roll etc. information be all recorded in historical data base, inquire in the future easy to use;
(5) application and design method of a kind of coke dry quenching hoister of the invention operation pre-warning management system, system is also
Provide real-time diagnosis function, the elevator band-type brake diagnostic function, car slipping diagnostic function of each limit signal of coke dry quenching hoister;It is right
In running in elevator, the limit signal occurred in each stage is lost, holding brake action is inconsistent and is in the presence of that car slipping carries out
Realtime Alerts are reminded, and can uniformly be recorded in event in system database, greatly facilitate technical staff to some prominent
Send out the judgement of failure;
(6) application and design method of a kind of coke dry quenching hoister of the invention operation pre-warning management system, is directed to
Increased component is few, wherein signal acquisition structure and automated processing system, can control in original coke dry quenching hoister PLC
It is transformed in system, manufacturing cost is low.
Detailed description of the invention
Fig. 1 is limit monitoring program flow chart of the invention;
Fig. 2 is band-type brake monitoring program flow chart of the invention;
Fig. 3 is automated processing system composition schematic diagram of the invention;
Fig. 4 is signal acquisition structure schematic diagram of the invention.
Label declaration in schematic diagram:
In figure: 1, the close limit of each position;2, encoder is promoted;3, traveling encoder;4, motor inverter communication is promoted
Module;5, running motor inverter communication module;6, steel wire rope of hoist roller;7, running motor speed reducer;8, industry calculates
Machine;9, PLC network module.
Specific embodiment
With reference to the accompanying drawings of the specification and specific embodiment, the present invention is described in detail.
Embodiment 1
In conjunction with attached drawing 4, a kind of coke dry quenching hoister of the invention runs pre-warning management system, including signal acquisition structure and
Automated processing system:
In conjunction with attached drawing 3, the signal acquisition structure includes that each position is encoded close to limit 1, promotion encoder 2, traveling
Device 3 promotes motor inverter communication module 4, running motor inverter communication module 5, steel wire rope of hoist roller 6, traveling electricity
Machine speed reducer 7;The each position selected is German PEPPERL FUCHS (P+F) product, model: SJ30-A210-30VDC close to limiting 1.It should
Limit durable, signal stabilization, strong antijamming capability.The promotion encoder 2 is mounted on steel wire rope of hoist roller 6
On, the promotion encoder 2 selected is Baumer encoder, model: FGHJ4K-1024-90/20P473189.The traveling
Encoder 3 is mounted on 7 side of running motor speed reducer, the traveling encoder 3Baumer encoder of selection, model: FGHJ4K-
1024-90/20P473189 promotes motor inverter communication module 4, running motor inverter communication module 5 is then respectively arranged in
Elevator is original to be promoted, in traveling frequency-charger cabinet, and the motor inverter communication module 4 selected is Siemens's 6ES70 frequency converter
CBP communication board, model: 6SE7090-OXX84-OFF5;The running motor inverter communication module 5 selected is Siemens 6ES70
Frequency converter CBP communication board, model: 6SE7090-OXX84-OFF5;Promote motor inverter communication module 4, running motor frequency conversion
Device communication module 5 is connect by SIEMENS PROFIBUS bus network with the original PLC control system of elevator, original PLC
Control system is using 400 system of SIEMENS PLC, CPU model are as follows: CPU414-5H PN/DP6ES7414-5HM06-0AB0.
In conjunction with attached drawing 3, the automated processing system include industrial computer 8 and sequentially connected PLC network module 9,
Processor (CPU), I/O module fastener;The industrial computer 8 is connect with PLC network module 9 by Ethernet, selection
8 index of industrial computer is as follows: DellOptiplexGX280, P43.0G/1G/80GPCI-E (128M supports shuangping san)
CDROM, independent Ethernet card, keyboard, mouse external member, power panel 4 × 2 (double screen operation) (support PCI-E mainboard), selection
PLC network module 9 is Siemens's ethernet module CP443-1, model: 6GK7443-1EX11-0XE0.
In conjunction with attached drawing 1, attached drawing 2, one of the present embodiment coke dry quenching hoister runs the design side of pre-warning management system
Method the steps include:
(a), the items of encoder 2, traveling encoder 3, frequency converter and each position close to limit 1 will signal acquisition: be promoted
The system that the signals such as real-time parameter and original related electric equipment state are sent into the industrial computer 8 by network
In, for system by its respective state of visual moving picture display, the network used in the present embodiment is Industrial Ethernet, is installed on
The picture system of industrial computer 8 is Siemens wincc, and dynamic visual picture is developed by wincc;
(b), data store: the switching value and analog signals that are acquired by network are put into the industrial computer 8
System history data library in, and long term storage is to deposit in data in the historical data base of wincc in the present embodiment;
(c), historical data compares: provide by historical data base promotion encoder 2, traveling encoder 3, frequency converter and
Each position carries out the interface platform of trend comparison close to every real-time parameter signal data of limit 1, is to pass through in the present embodiment
The title bar of wincc and the comparison interface platform of historical trend Components Development;
(d), it establishes dynamic linkage relationship interface: passing through Dynamic graphics interface in the system of the industrial computer 8
Form will promote motor and running motor operation necessary condition is shown, and pass through special interface display, the present embodiment
In interface be to be developed by the screen component of wincc.
(e), logout and alarm: the key signal that can relationship elevator operate normally is put into as event form
In the logout of the system of the industrial computer (8), and when these signals are not able to satisfy elevator and operate normally, it is
System passes through the dynamic menu automatic alarm on industrial computer (8), is that its key signal is put into going through for wincc in the present embodiment
In historical event part and alarm database;
(f), limit real-time monitoring: typing is close on the industrial computer (8) limits corresponding promotion encoder 2
Numerical value and deviation or 3 numerical value of traveling encoder and deviation, while increasing corresponding program function block in PLC system, it is
System will be by promoting encoder 2 close to limit is corresponding to the real value and typing for promoting encoder 2 or traveling encoder 3 automatically
Or the comparison of 3 numerical value of traveling encoder, come the situation of real-time monitoring limit signal, increased program function block in the present embodiment
For FB101, typing is put into its exclusive data block DB (XX) close to corresponding encoder number is limited, and promotes the real-time of encoder
Value is put into MD300 unit, is I (X) close to limit signal;
Program function block FB101 compares MD300 and DB (XX) by comparing instruction CMP, when MD300 and DB (XX) are equal
But close to limit signal I (X) not be "true" when, then program function block FB101 judges that this has lost close to limit signal, together
When by dropout Reflector set;When being but "true" close to limit signal I (X), but MD300 and DB (XX) not phase
Deng then system can determine whether that limit signal I (X) interference occurs and flashes, while flashing Reflector set for signal.
(g), holding brake action situation real-time monitoring: increasing corresponding program function block in PLC system, and system will be by certainly
Time difference and band-type brake between the time difference of dynamic relatively band-type brake folding order and position feedback, multiple band-type brake position feedbacks close
Close feedback and promote the consistency of encoder variation, carry out real-time monitoring holding brake action situation, at the same to the deterioration of Weak fault into
Row early warning, increased program function block is FB102 in the present embodiment, and the real value for promoting encoder is put into MD300 unit, is embraced
The control command of lock is respectively Q14.0, Q15.0, the position feed back signal of band-type brake be respectively I15.0, I15.1, I15.2,
I15.3;
When FB102 detection folding order Q14.0, Q15.0 and band-type brake position feedback I15.0, I15.1 of band-type brake, I15.2,
When transformation period difference between I15.3 exceeds a certain range, then FB102 can determine whether holding brake action time-out, while band-type brake being moved
Make time out fault mark set;When FB102 detects the variation of band-type brake position feedback I15.0, I15.1, I15.2, I15.3
Between difference when exceeding a certain range, then FB102 can determine whether that inconsistent mistake occurs in band-type brake group, while by the inconsistent Reflector of band-type brake
Set;When FB102 detects that band-type brake position I15.0, I15.1, I15.2, I15.3 are in closed state (being all "true") entirely
Lower and promote encoder count MD300 and change, then FB102 can determine whether that car slipping failure occurs in elevator, while by car slipping
Reflector set;
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing
What is shown is also one of embodiments of the present invention, and actual structure is not limited to this.So if the common skill of this field
Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution
Similar frame mode and embodiment, are within the scope of protection of the invention.
Claims (1)
1. a kind of design method of coke dry quenching hoister operation pre-warning management system, the steps include:
(a), each of encoder (2), traveling encoder (3), frequency converter and the close limit (1) of each position will signal acquisition: be promoted
Item real-time parameter and original related electric equipment status signal are sent into the system of industrial computer (8) by network, work
The system of industry computer (8) by visual moving picture display promoted encoder (2), traveling encoder (3), frequency converter, everybody
Set close limit (1) and original related electric equipment respectively state;
(b), data store: the switching value and analog signals that are acquired by network are put into the industrial computer (8)
In system history data library, and long term storage;
(c), historical data compares: provide by historical data base promotion encoder (2), traveling encoder (3), frequency converter,
Each position carries out the interface platform of trend comparison close to limit (1) and every real-time parameter signal data;
(d), dynamic linkage relationship interface is established: by Dynamic graphics interface in the system of the industrial computer (8)
Form will promote motor and running motor operation necessary condition is shown, and pass through special interface display;
(e), logout and alarm: key signal that can relationship elevator operate normally is put into as event form described
Industrial computer (8) system logout in, and the key signal be not able to satisfy elevator operate normally when, work
The system of industry computer (8) passes through the dynamic menu automatic alarm on industrial computer (8);
(f), limit real-time monitoring: typing is counted close to corresponding promotion encoder (2) is limited on the industrial computer (8)
Value and deviation or traveling encoder (3) numerical value and deviation, while increasing accordingly in the original PLC control system of elevator
Program function block, the original PLC control system of elevator will be by automatically to promoting encoder (2) or traveling encoder (3)
Real value and typing close to the corresponding comparison for promoting encoder (2) or traveling encoder (3) numerical value of limit, carry out real-time monitoring
Close to the situation of limit signal;
When the original PLC control system of elevator detects the real value and typing of promotion encoder (2) or traveling encoder (3)
It is equal close to corresponding encoder (2) or traveling encoder (3) numerical value that promoted of limit, but close to limit signal in elevator original
When not occurring in some PLC control systems, the original PLC control system of elevator can determine whether out that this has lost close to limit signal
It loses;When the original PLC control system of elevator is detected close to limit signal appearance, but promotion encoder (2) or traveling coding
The real value of device (3) and typing it is unequal close to corresponding encoder (2) or traveling encoder (3) numerical value that promoted of limit, then
The original PLC control system of elevator can determine whether that this interference occurs close to limit signal and flashes;It is original to realize elevator
PLC control system to the real-time monitoring close to limit signal;
(g), holding brake action situation real-time monitoring: increasing corresponding program function block in the original PLC control system of elevator,
The original PLC control system of elevator will be by automatically comparing time difference, multiple of band-type brake folding order and band-type brake position feedback
The consistency of time difference and band-type brake closed feedback and promotion encoder (2) variation between band-type brake position feedback, are supervised in real time
Holding brake action situation is surveyed, while early warning is carried out to the deterioration of Weak fault;
Exceed when the time difference between the folding order and band-type brake position feedback of the original PLC control system detection band-type brake of elevator
When a certain range, then the original PLC control system of elevator can determine whether holding brake action time-out;When the original PLC control of elevator
When system detection processed goes out the transformation period difference of multiple band-type brake position feedbacks beyond a certain range, then the original PLC control of elevator
System can determine whether that inconsistent mistake occurs in band-type brake group;When the original PLC control system of elevator detects that band-type brake position is in entirely
It promotes encoder (2) reading under closed state to change, then the original PLC control system of elevator can determine whether elevator
There is car slipping failure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510219684.9A CN105314540B (en) | 2015-04-30 | 2015-04-30 | A kind of application and design method of coke dry quenching hoister operation pre-warning management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510219684.9A CN105314540B (en) | 2015-04-30 | 2015-04-30 | A kind of application and design method of coke dry quenching hoister operation pre-warning management system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105314540A CN105314540A (en) | 2016-02-10 |
CN105314540B true CN105314540B (en) | 2019-07-09 |
Family
ID=55242988
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510219684.9A Expired - Fee Related CN105314540B (en) | 2015-04-30 | 2015-04-30 | A kind of application and design method of coke dry quenching hoister operation pre-warning management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105314540B (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110794237A (en) * | 2019-11-06 | 2020-02-14 | 攀钢集团西昌钢钒有限公司 | Fault auxiliary positioning method, device and equipment for elevator |
CN113467359A (en) * | 2020-03-31 | 2021-10-01 | 上海梅山钢铁股份有限公司 | Device and method for monitoring state of coke pusher equipment |
CN112180824A (en) * | 2020-09-30 | 2021-01-05 | 兖州煤业股份有限公司 | Intelligent anti-pressure method, system and equipment for bucket elevator for coal preparation |
CN112940762B (en) * | 2021-02-09 | 2022-07-22 | 鞍钢股份有限公司 | Anti-collision method for coke quenching car |
CN113075943B (en) * | 2021-03-29 | 2022-07-01 | 马鞍山钢铁股份有限公司 | Control system for preventing dry quenching hoister from sliding tank |
CN113269953A (en) * | 2021-04-08 | 2021-08-17 | 广东韶钢松山股份有限公司 | Cable breakage prevention detection method and device for cable guide vehicle |
CN113416560B (en) * | 2021-06-24 | 2022-09-27 | 武汉钢铁有限公司 | Online hot standby system of frequency converter of coke dry quenching hoister, hot standby control method and device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201793327U (en) * | 2010-09-08 | 2011-04-13 | 鞍钢股份有限公司 | Dry quenching elevator standby position signal device |
CN102515034B (en) * | 2011-12-27 | 2014-04-16 | 北京佰能电气技术有限公司 | Dry coke quenching lifter and lifter positioning method |
CN102851042A (en) * | 2012-08-14 | 2013-01-02 | 圣火科技(河南)有限责任公司 | Dry quenching elevator control system |
CN202929421U (en) * | 2012-11-09 | 2013-05-08 | 大连宝信起重技术有限公司 | Unmanned control equipment for coke dry quenching lifting machine |
CN204897232U (en) * | 2015-04-30 | 2015-12-23 | 南京晟辉自控科技有限公司 | Dry coke quenching lifting machine operation early warning management system |
-
2015
- 2015-04-30 CN CN201510219684.9A patent/CN105314540B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105314540A (en) | 2016-02-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105314540B (en) | A kind of application and design method of coke dry quenching hoister operation pre-warning management system | |
CN204143226U (en) | A kind of production line data acquisition system (DAS) | |
CN103910288B (en) | A kind of can the sure brake PLC control system of self-identifying and control method thereof | |
CN109583783A (en) | A kind of configuration design method of plate nut production line | |
CN111017756A (en) | Distributed tower crane electric control system, equipment and storage medium for fault online diagnosis | |
CN110487327A (en) | A kind of condition monitoring system of mechanical equipment electrical system | |
CN205527118U (en) | Novel lift control cabinet intelligent detecting system , remote monitering system | |
CN204897232U (en) | Dry coke quenching lifting machine operation early warning management system | |
CN107544291B (en) | Storage yard management simulation system | |
CN103411770B (en) | A kind of automobile brake master cylinder Performance Test System and method | |
CN110794237A (en) | Fault auxiliary positioning method, device and equipment for elevator | |
CN110015117B (en) | Visual human-computer interaction vehicle power-change operation control system and vehicle-mounted battery operation system | |
CN105259880A (en) | Electrical cluster control system for port hoisting equipment | |
CN115496241A (en) | Platform screen door full life cycle health management system | |
CN108614489B (en) | Logic control system for stereoscopic warehouse and building based on matrix algorithm | |
CN202886912U (en) | Intelligent monitoring system for servo driver | |
CN202748667U (en) | Testing device based on programmable logic controller | |
CN207160685U (en) | The parking stall stop position alignment system of Vertical Circulating multi-storied garage | |
CN202272650U (en) | Online monitoring device for fault of crane | |
CN205098826U (en) | Automatic change special controlgear of stacker among stereoscopic warehouse | |
CN202676429U (en) | Lifting height limiter simulation test bench | |
CN103663023B (en) | The Long-Range Surveillance Unit of elevator | |
CN217606285U (en) | Central control system for test bed of medium-speed diesel engine | |
CN204355894U (en) | Actuator tester | |
CN103712812B (en) | A kind of method of manual stereo garage based on PLC detection fault |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
DD01 | Delivery of document by public notice |
Addressee: NANJING SHENGHUI AUTOMATIC CONTROL TECHNOLOGY Co.,Ltd. Document name: Notification of Publication and of Entering the Substantive Examination Stage of the Application for Invention |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice |
Addressee: Xia Chonggui Document name: payment instructions |
|
DD01 | Delivery of document by public notice | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190709 |
|
CF01 | Termination of patent right due to non-payment of annual fee |