CN105302926A - Data model modeling method of intelligent substation management core - Google Patents

Data model modeling method of intelligent substation management core Download PDF

Info

Publication number
CN105302926A
CN105302926A CN201410229897.5A CN201410229897A CN105302926A CN 105302926 A CN105302926 A CN 105302926A CN 201410229897 A CN201410229897 A CN 201410229897A CN 105302926 A CN105302926 A CN 105302926A
Authority
CN
China
Prior art keywords
model
configuration
file
information
modeling method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410229897.5A
Other languages
Chinese (zh)
Inventor
高正平
汤新光
黄俊辉
王庭华
杨庆刚
王朋
朱海峰
朱正希
吴蓓
李国文
王波
陈丹
刘迪
周翔
史小燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Jiangsu Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410229897.5A priority Critical patent/CN105302926A/en
Publication of CN105302926A publication Critical patent/CN105302926A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention relates to a data model modeling method of an intelligent substation management core. The modeling method comprises the following steps: (1) establishing a power transmission system model configuration file, and establishing a normalized file structure, to provide a unified template for automatic modeling; (2) loading a model configuration template; introducing a configuration parameter of substation management; providing a model configuration template editing interface; loading the unified template; and adding a mapping relationship between primary equipment and a channel; and (3) comparing the configuration parameter with a preset value of the unified template; extracting a part that does not match a preset parameter from the configuration parameter; extracting channel information from multiple stations, multiple apparatuses and multiple files by using model information according to the same system fault; and storing the channel information in a database for use of fault diagnosis and accident analysis. The invention has the beneficial effects that the method is simple in operation and high in automation degree as a model file configuration process is automatically completed by a program; technical requirements for a user are reduced; time is saved; and efficiency is improved.

Description

A kind of modeling method of data model of intelligent substation higher management
Technical field
The present invention relates to the data model of electric system, particularly relate to a kind of modeling method of data model of intelligent substation higher management.
Background technology
The continuity that database due to intelligent substation makes full use of data realizes fault-tolerance; Fault data not only can when longitudinal reflection local power system discontinuity surface information, and at transverse recprdomg analog quantity and switching value continually varying time sequence information, this time sequence information can disclose more failure message.
At grid collapses or when being disturbed, need to determine nature of trouble, failure judgement position as early as possible, to recover electric power supply as early as possible.For reaching these objects, need to carry out automatic analysis by computer system to a large amount of fault recorder datas produced during fault.Not only should comprise " data " in fault file, also need " model " that provide a description data semantic information.So-called " data semantic ", requires analog quantity, switching value passage and transforming plant primary equipment or interval to be associated exactly, or event (as trip protection) is associated with the model in device.This incidence relation characterizes the internal relation of fault recorder data and electric system first and second equipment, constitutes the model information of failure wave-recording.But the existing standard of fault recorder data does not support definition and the expression of above-mentioned model information.
Summary of the invention
The object of the invention is the deficiency overcoming above prior art, provides a kind of modeling method of data model of intelligent substation higher management, specifically has following technical scheme to realize:
The modeling method of the data model of described intelligent substation higher management, comprises the following steps:
1) electrical power transmission system model configuration file is set up, and to set up standardization file structure, for providing unified masterplate for automatic modeling;
2) stress model configuration template, import the configuration parameter of substation management, supply a model configuration template edition interface, loads described uniform template, adds primary equipment and interchannel mapping relations;
3) preset value of comparative arrangement parameter and unified template, the part be not inconsistent with parameter preset is extracted from configuration parameter, and utilize model information, press with primary system fault, channel information is extracted from multistation, many devices, multifile, stored in database, for fault diagnosis and crash analysis.
The further design of the modeling method of the data model of described intelligent substation higher management is, includes the primary equipment information of transformer station in described transformer station model storehouse, i.e. the device parameter information of transformer station, bus, circuit, transformer, mutual inductor.
The further design of the modeling method of the data model of described intelligent substation higher management is, step 1) described in model file obtain in the following manner: first utilize INF model file in IEEEC37.111-1999COMTRADE standard to set up and the model information of storage failure record ripple COMTRADE file save as COMTRADE.INF file; Then the storage format using XML as this INF model file, coded system adopts GBK or UTF-8, adopts the semantic model information of the COMTRADE model tormulation fault recorder data of three levels.
The further design of the modeling method of the data model of described intelligent substation higher management is, described step 2) be specially:
A) first import record transformer station once, the CIM file of secondary device information, and in importing process, need the device parameter information in extraction document;
B) importing comprises channel information file;
C) use configuration tool to carry out comprising the Substation parameters configuration of transformer station's configuration, line configuring, bus bar configuration, transformer configuration, oscillograph configuration, carry out the configuration of corresponding relation between transformer station and secondary device relevant device ID;
D) undertaken that analog channel in model file is arranged, digital channel is arranged by model configuration tool, containing the Equipments Setting of circuit, transformer, bus;
E) automatically completed the generation of INF model file by model configuration tool, when saving as INF model file, model configuration tool can use XMLSchema to verify to ensure the correctness of file layout to generated file.
The further design of the modeling method of the data model of described intelligent substation higher management is, described model file structure comprises: root element and lower seven daughter elements side by side thereof, that is: analog quantity channel information, digital quantity channel information, comprise the set of currents of three-phase current and zero-sequence current passage, comprise the voltage group of three-phase voltage and residual voltage passage, the bus equipment information of an association voltage group, the line facility information of maximum association two set of currents and two voltage groups, comprise maximum 4 transformers volumes and the transformer equipment of each transformer volume maximum association two set of currents and a voltage group.
Advantage of the present invention is as follows:
The modeling method of the data model of intelligent substation higher management provided by the invention overcomes COMTRADE standard and lacks the defect that failure wave-recording semantic model defines ability, establish the incidence relation of each analog quantity channel information, switching value passage and electric system first and second equipment room, for under intelligent substation application conditions, fault localization, the senior application of intelligent grid such as crash analysis and failure message retrieval of robotization provide technical foundation.This method is easy and simple to handle, and model file layoutprocedure is completed automatically by program, and automaticity is high, reduces the technical requirement to user, saves the time, improves efficiency.
Embodiment
Below the present invention program is described in detail.
The modeling method of the data model of the intelligent substation higher management that the present embodiment provides, comprises the following steps:
1) electrical power transmission system model configuration file is set up, and to set up standardization file structure, for providing unified masterplate for automatic modeling;
2) stress model configuration template, import the configuration parameter of substation management, supply a model configuration template edition interface, loads uniform template, adds primary equipment and interchannel mapping relations;
3) preset value of comparative arrangement parameter and unified template, the part be not inconsistent with parameter preset is extracted from configuration parameter, and utilize model information, press with primary system fault, channel information is extracted from multistation, many devices, multifile, stored in database, for fault diagnosis and crash analysis.
The primary equipment information of transformer station is included, i.e. the device parameter information of transformer station, bus, circuit, transformer, mutual inductor in transformer station model storehouse.
Wherein, step 1) model file obtain in the following manner: first utilize INF model file in IEEEC37.111-1999COMTRADE standard to set up and the model information of storage failure record ripple COMTRADE file save as COMTRADE.INF file; Then the storage format using XML as this INF model file, coded system adopts GBK or UTF-8, adopts the semantic model information of the COMTRADE model tormulation fault recorder data of three levels.
Further, step 2) be specially:
A) first import record transformer station once, the CIM file of secondary device information, and in importing process, need the device parameter information in extraction document.
B) importing comprises channel information file.
C) use configuration tool to carry out comprising the Substation parameters configuration of transformer station's configuration, line configuring, bus bar configuration, transformer configuration, oscillograph configuration, carry out the configuration of corresponding relation between transformer station and secondary device relevant device ID.
D) undertaken that analog channel in model file is arranged, digital channel is arranged by model configuration tool, containing the Equipments Setting of circuit, transformer, bus.
E) automatically completed the generation of INF model file by model configuration tool, when saving as INF model file, model configuration tool can use XMLSchema to verify to ensure the correctness of file layout to generated file.
Further, model file structure comprises: root element and lower seven daughter elements side by side thereof, that is: analog quantity channel information, digital quantity channel information, comprise three-phase current and zero-sequence current passage set of currents, comprise three-phase voltage and residual voltage passage voltage group, associate bus equipment information, at most association two set of currents and two voltage groups of a voltage group line facility information, comprise maximum 4 transformers volumes and each transformer volume associates at most the transformer equipment of two set of currents and a voltage group.

Claims (5)

1. a modeling method for the data model of intelligent substation higher management, is characterized in that, comprises the following steps:
1) electrical power transmission system model configuration file is set up, and to set up standardization file structure, for providing unified masterplate for automatic modeling;
2) stress model configuration template, import the configuration parameter of substation management, supply a model configuration template edition interface, loads described uniform template, adds primary equipment and interchannel mapping relations;
3) preset value of comparative arrangement parameter and unified template, the part be not inconsistent with parameter preset is extracted from configuration parameter, and utilize model information, press with primary system fault, channel information is extracted from multistation, many devices, multifile, stored in database, for fault diagnosis and crash analysis.
2. the modeling method of the data model of intelligent substation higher management according to claim 1, it is characterized in that the primary equipment information including transformer station in described transformer station model storehouse, i.e. the device parameter information of transformer station, bus, circuit, transformer, mutual inductor.
3. the modeling method of the data model of intelligent substation higher management according to claim 1, it is characterized in that, step 1) described in model file obtain in the following manner: first utilize INF model file in IEEEC37.111-1999COMTRADE standard to set up and the model information of storage failure record ripple COMTRADE file save as COMTRADE.INF file; Then the storage format using XML as this INF model file, coded system adopts GBK or UTF-8, adopts the semantic model information of the COMTRADE model tormulation fault recorder data of three levels.
4. the modeling method of the data model of intelligent substation higher management according to claim 1, is characterized in that, described step 2) be specially:
A) first import record transformer station once, the CIM file of secondary device information, and in importing process, need the device parameter information in extraction document;
B) importing comprises channel information file;
C) use configuration tool to carry out comprising the Substation parameters configuration of transformer station's configuration, line configuring, bus bar configuration, transformer configuration, oscillograph configuration, carry out the configuration of corresponding relation between transformer station and secondary device relevant device ID;
D) undertaken that analog channel in model file is arranged, digital channel is arranged by model configuration tool, containing the Equipments Setting of circuit, transformer, bus;
E) automatically completed the generation of INF model file by model configuration tool, when saving as INF model file, model configuration tool can use XMLSchema to verify to ensure the correctness of file layout to generated file.
5. the modeling method of the data model of the intelligent substation higher management according to above-mentioned arbitrary claim, it is characterized in that, described model file structure comprises: root element and lower seven daughter elements side by side thereof, that is: analog quantity channel information, digital quantity channel information, comprise the set of currents of three-phase current and zero-sequence current passage, comprise the voltage group of three-phase voltage and residual voltage passage, the bus equipment information of an association voltage group, the line facility information of maximum association two set of currents and two voltage groups, comprise maximum 4 transformers volumes and the transformer equipment of each transformer volume maximum association two set of currents and a voltage group.
CN201410229897.5A 2014-05-28 2014-05-28 Data model modeling method of intelligent substation management core Pending CN105302926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410229897.5A CN105302926A (en) 2014-05-28 2014-05-28 Data model modeling method of intelligent substation management core

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410229897.5A CN105302926A (en) 2014-05-28 2014-05-28 Data model modeling method of intelligent substation management core

Publications (1)

Publication Number Publication Date
CN105302926A true CN105302926A (en) 2016-02-03

Family

ID=55200195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410229897.5A Pending CN105302926A (en) 2014-05-28 2014-05-28 Data model modeling method of intelligent substation management core

Country Status (1)

Country Link
CN (1) CN105302926A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203890A (en) * 2016-07-27 2016-12-07 国网河南省电力公司电力科学研究院 Battalion based on CIM auxiliary tone integration data modeling method
CN107193791A (en) * 2017-05-16 2017-09-22 北京四方继保自动化股份有限公司 Action report visual presentation method based on transient data interchange general format
CN107844466A (en) * 2017-11-27 2018-03-27 海南电网有限责任公司 A kind of failure wave-recording file analysis auto-building model system and method
CN109001985A (en) * 2017-06-07 2018-12-14 许昌许继软件技术有限公司 A kind of photovoltaic plant modeling method and device based on coding
CN109978465A (en) * 2019-03-29 2019-07-05 江苏满运软件科技有限公司 Source of goods recommended method, device, electronic equipment, storage medium

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106203890A (en) * 2016-07-27 2016-12-07 国网河南省电力公司电力科学研究院 Battalion based on CIM auxiliary tone integration data modeling method
CN106203890B (en) * 2016-07-27 2017-10-13 国网河南省电力公司电力科学研究院 Battalion's auxiliary tone integration data modeling method based on CIM
CN107193791A (en) * 2017-05-16 2017-09-22 北京四方继保自动化股份有限公司 Action report visual presentation method based on transient data interchange general format
CN107193791B (en) * 2017-05-16 2020-07-10 云南电网有限责任公司保山供电局 Action report visual display method based on transient data exchange general format
CN109001985A (en) * 2017-06-07 2018-12-14 许昌许继软件技术有限公司 A kind of photovoltaic plant modeling method and device based on coding
CN109001985B (en) * 2017-06-07 2021-10-22 许昌许继软件技术有限公司 Photovoltaic power station modeling method and device based on codes
CN107844466A (en) * 2017-11-27 2018-03-27 海南电网有限责任公司 A kind of failure wave-recording file analysis auto-building model system and method
CN109978465A (en) * 2019-03-29 2019-07-05 江苏满运软件科技有限公司 Source of goods recommended method, device, electronic equipment, storage medium

Similar Documents

Publication Publication Date Title
CN102522819B (en) Record wave pattern modeling method for fault record device of intelligent transformer substation
CN104734364B (en) The method and system of relay protection device of intelligent substation SV, GOOSE input test
CN105302926A (en) Data model modeling method of intelligent substation management core
CN110795921B (en) Automatic generation and verification method for monitoring information of intelligent substation equipment
CN105022874A (en) Digital simulation automatic modeling method and system for power distribution network
CN102255389B (en) Method for implementing intensive intelligent substation based on intelligent power grid system
CN103390028B (en) A kind of protection definite value check method for novel telecontrol machine
CN104360835B (en) A kind of sequence operation ticket automatic generation method based on topological mode
CN110852023B (en) Automatic generation method and device for primary main wiring diagram of intelligent substation
CN102709894A (en) On-line checking method and system for relay protection setting value
CN110046391A (en) Transforming plant primary wiring diagram automatic generation method based on monitoring information table
CN105574291A (en) Automatic power supply loop configuration method and system
CN110569557A (en) Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN103577628A (en) Optimization method for virtual circuit design of smart substation
CN106646100A (en) Incomplete measurement and control power distribution network fault locating method
CN103700024A (en) Automatic importing method of provincial and prefectural integrated telecontrol information based on D5000 system
CN102880988B (en) Transformer station model introduction method and device based on topology comparison
CN105117840A (en) Risk assessment method of power system considering role of information system
CN104317987A (en) Error analysis method for simulating calculation of short-circuit current
Poudel et al. Admittance matrix validation for power distribution system models using a networked equipment model framework
CN204258439U (en) Intelligent electric power scheduling operation management system
CN116191344A (en) Main power grid interactive relay protection setting calculation system
CN104199663A (en) Comprehensive automated information table automatic generating method and system
CN109617025A (en) A kind of automatic generation method and device of site conservative management unit main wiring diagram
CN206292365U (en) Relay protection operation case actuating of relay characteristic tester and its automatic wire-changing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication