CN105301442B - Fault detector singlephase earth fault based on worst principle determines practical method - Google Patents

Fault detector singlephase earth fault based on worst principle determines practical method Download PDF

Info

Publication number
CN105301442B
CN105301442B CN201510659214.4A CN201510659214A CN105301442B CN 105301442 B CN105301442 B CN 105301442B CN 201510659214 A CN201510659214 A CN 201510659214A CN 105301442 B CN105301442 B CN 105301442B
Authority
CN
China
Prior art keywords
fault
singlephase earth
minimum
verification region
earth fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510659214.4A
Other languages
Chinese (zh)
Other versions
CN105301442A (en
Inventor
徐士华
王军锋
梁安韬
赵晖
吴建辉
吴孝彬
赵建勋
梁丽军
许为钤
付扬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Original Assignee
FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd filed Critical FUJIAN AUTOMATION ELECTRIC POWER TECHNOLOGY Co Ltd
Priority to CN201510659214.4A priority Critical patent/CN105301442B/en
Publication of CN105301442A publication Critical patent/CN105301442A/en
Application granted granted Critical
Publication of CN105301442B publication Critical patent/CN105301442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of fault detector singlephase earth fault judgement practical method based on worst principle, include the following steps: 1, determine power distribution network minimum fault verification region, and determines that fault detector singlephase earth fault determines mathematical model according to the power distribution network minimum fault verification region;2, mathematical model is determined according to the fault detector singlephase earth fault and is based on worst principle, determine the wrong report of singlephase earth fault signal and fail to report identifiability principle;3, after determining that identifiability principle amendment singlephase earth fault signal is reported and failed to report to mathematical model and the singlephase earth fault signal by mistake according to the fault detector singlephase earth fault, singlephase earth fault decision problem is converted to the logical operation of the minimum each equipment room in fault verification region.The present invention solves the problems, such as in Practical that singlephase earth fault signal such as frequently fails to report and report by mistake at the non-fault verification perfected under information to a certain extent, and live practical application effect is good, preferable to meet live actual demand.

Description

Fault detector singlephase earth fault based on worst principle determines practical method
Technical field
The present invention relates to mining area distribution network failure indicator singlephase earth faults to determine field, and specifically one kind is based on The fault detector singlephase earth fault of worst principle determines practical method.
Background technique
With the development of economy, demand of the people to power supply reliability is continuously improved.Shorten power off time, is to improve power supply The important indicator of reliability and power supply quality.
Fault location time is the important component of power off time, and effectively reducing fault location time is when shortening to have a power failure Between important means.Especially in mining area and tunnel, hazardous gas concentration is high, and spark caused by short circuit or ground fault will Lead to catastrophic consequence, so failure quickly determines and is isolated particularly important.Fault detector is as FLU Fault Location Unit Small in size with its, price is low, all has the features such as preferable polarization extensive in the power distribution network of mining area short circuit and ground fault Using.
In practical applications, singlephase earth fault accounts for institute faulty 80% or more, effectively identification and judgement single-phase earthing Failure determines that fault section has important practical significance.But singlephase earth fault occurs frequently in practical applications, and failure is believed Number viability is poor, fault misdescription and fails to report situation and takes place frequently.So the non-fault detector localization method tool perfected under information of research It is significant.
Summary of the invention
It is an object of the invention to solve mining area distribution network failure indicator singlephase earth fault decision problem, in conjunction with distribution Net feature provides a kind of fault detector singlephase earth fault judgement practical method based on worst principle.
The present invention is implemented as follows:
A kind of fault detector singlephase earth fault judgement practical method based on worst principle, includes the following steps:
Step 1 determines power distribution network minimum fault verification region, and is determined according to the power distribution network minimum fault verification region Fault detector singlephase earth fault determines mathematical model;
Step 2 determines mathematical model according to the fault detector singlephase earth fault and is based on worst principle, determines single Identifiability principle is reported and failed to report to phase earth-fault signal by mistake;
Step 3 determines that mathematical model and the singlephase earth fault are believed according to the fault detector singlephase earth fault Number report and fail to report the singlephase earth fault signal sent on identifiability principle identification of defective indicator by mistake, by singlephase earth fault signal into After row amendment, it converts singlephase earth fault decision problem to the logical operation of the minimum each equipment room in fault verification region, according to Logical operation formula determines the whether faulty indicator singlephase earth fault in the minimum fault verification region and occurs.
Further, determine that fault detector singlephase earth fault determines that mathematical model is specific as follows in the step 1:
The closed set being made of fault detector and feeder line section is known as fault verification region, if a fault verification All endpoints in region are all fault detector and are all T contacts without interior point or all interior points, then claim the fault verification Region is minimum fault verification region;
It flows through single-phase earth fault current and flows into the fault detector in minimum fault verification region and be known as the minimum failure Determinating area enters domain fault detector, and what the singlephase earth fault signal sent thereon was known as the minimum fault verification region enters domain Singlephase earth fault signal;Flow through single-phase earth fault current and flow out minimum fault verification region fault detector be known as should Minimum fault verification region goes out domain fault detector, and the fault-signal sent thereon is known as the domain out in the minimum fault verification region Singlephase earth fault signal.
Further, it is reported by mistake in the step 2 and to fail to report identifiability principle specific as follows:
When singlephase earth fault occurs, and when fault detector fails to report singlephase earth fault signal, decision principle are as follows:
Principle 1: when a phase voltage bust in feeder line, another two-phase voltage jumps, and the faulty finger of fault detector downstream institute Show that then the fault detector reports singlephase earth fault signal when sending singlephase earth fault signal on device at least 1;
When not occurring singlephase earth fault, and when fault detector wrong report singlephase earth fault signal, decision principle are as follows:
Principle 2: when none phase voltage bust in feeder line, another two-phase voltage jumps situation, and send on fault detector single-phase When earth-fault signal, then the fault detector does not report singlephase earth fault signal.
Further, minimum fault verification region is converted by singlephase earth fault decision problem in the step 3 respectively to set Logical operation between standby, specific as follows:
The basis that singlephase earth fault determines is minimum fault verification region, and fault verification criterion is as follows:
Criterion 1: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum failure The domain singlephase earth fault signal that goes out of determinating area is not present, then there is singlephase earth fault in the minimum fault verification region;
Criterion 2: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum failure There is also then the minimum fault verification region occurs the domain singlephase earth fault signal that goes out of determinating area without singlephase earth fault;
If AR indicates that a minimum fault verification area fault logical value, logical value indicate singlephase earth fault for 1 In the minimum fault verification region, logical value is that 0 expression singlephase earth fault does not occur in the minimum fault verification region, Logic calculation expression formula are as follows:
" && " is logic and operation;What Fin indicated the minimum fault verification region enters domain singlephase earth fault signal logic Value, logical value are that the domain singlephase earth fault signal that enters in the 1 expression minimum fault verification region exists, and logical value is 0 table Show that the domain singlephase earth fault signal that enters in the minimum fault verification region is not present;It is the logical not operation of GFout, GFout indicates the singlephase earth fault signal logic value for domain fault detector group in the minimum fault verification region, logic Value indicates that the singlephase earth fault signal for domain fault detector group in the minimum fault verification region exists for 1, logical value The singlephase earth fault signal for going out domain fault detector group for the 0 expression minimum fault verification region is not present, specifically:
GFout={ Fout1||Fout2||…||Foutn}
" | | " it is logic or operation;FoutnIndicate the single-phase earthing for domain fault detector in minimum fault verification region Fault-signal logical value, logical value are the domain fault detector out in the 0 expression minimum fault verification region without single-phase earthing event Hindering signal, logical value is that going out on the fault detector of domain for the 1 expression minimum fault verification region send singlephase earth fault signal, Wherein n is the domain fault detector number out in the minimum fault verification region, if the value that n is 0, GFout is 0.
The present invention has the advantage that present invention determine that the concept in power distribution network minimum fault verification region, and based on matching Power grid minimum fault verification region has determined that fault detector singlephase earth fault determines mathematical model;Based on worst principle, really Singlephase earth fault signal recognition principle and method are determined, have solved singlephase earth fault signal to a certain extent and fail to report and report by mistake Etc. the non-fault verification problem perfected under information state;Logic-based operation method converts singlephase earth fault decision problem For the logical operation of the minimum each equipment room in fault verification region, and propose unified calculation method and formula;The present invention establishes A kind of fault detector singlephase earth fault based on worst principle determines practical method, solves mine to a certain extent Singlephase earth fault signal such as frequently fails to report and reports by mistake at the non-fault verification problem perfected under information in area's Practical, and scene is real Border application effect is good, can preferably meet live actual demand.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is typical power distribution network figure.
Specific embodiment
The present invention will be described in detail below:
A kind of fault detector singlephase earth fault based on worst principle of the invention determines practical method, this method Include the following steps:
Step 1 determines power distribution network minimum fault verification region, and true according to the described power distribution network minimum fault verification region Determine fault detector singlephase earth fault and determines mathematical model;It is specific as follows:
The closed set being made of fault detector and feeder line section is known as fault verification region, if a fault verification All endpoints in region are all fault detector and are all T contacts without interior point or all interior points, then claim the fault verification Region is minimum fault verification region;
It flows through single-phase earth fault current and flows into the fault detector in minimum fault verification region and be known as the minimum failure Determinating area enters domain fault detector, and what the singlephase earth fault signal sent thereon was known as the minimum fault verification region enters domain Singlephase earth fault signal;Flow through single-phase earth fault current and flow out minimum fault verification region fault detector be known as should Minimum fault verification region goes out domain fault detector, and the fault-signal sent thereon is known as the domain out in the minimum fault verification region Singlephase earth fault signal;
Step 2 determines mathematical model according to the fault detector singlephase earth fault and is based on worst principle, determines single Phase earth-fault signal is reported by mistake and fails to report identifiability principle, the wrong report and to fail to report identifiability principle specific as follows:
When singlephase earth fault occurs, and when fault detector fails to report singlephase earth fault signal, decision principle are as follows:
Principle 1: when a phase voltage bust in feeder line, another two-phase voltage jumps, and the faulty finger of fault detector downstream institute Show that then the fault detector reports singlephase earth fault signal when sending singlephase earth fault signal on device at least 1;
When not occurring singlephase earth fault, and when fault detector wrong report singlephase earth fault signal, decision principle are as follows:
Principle 2: when none phase voltage bust in feeder line, another two-phase voltage jumps situation, and send on fault detector single-phase When earth-fault signal, then the fault detector does not report singlephase earth fault signal;
Step 3 determines that mathematical model and the singlephase earth fault are believed according to the fault detector singlephase earth fault Number report and fail to report the singlephase earth fault signal sent on identifiability principle identification of defective indicator by mistake, by singlephase earth fault signal into After row amendment, it converts singlephase earth fault decision problem to the logical operation of the minimum each equipment room in fault verification region, according to Logical operation formula determines the whether faulty indicator singlephase earth fault in the minimum fault verification region and occurs;Specifically such as Under:
It is considered believable by data identification and modified fault-signal, fault verification can be carried out, it is single-phase The basis that ground fault determines is minimum fault verification region, and fault verification criterion is as follows:
Criterion 1: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum failure The domain singlephase earth fault signal that goes out of determinating area is not present, then there is singlephase earth fault in the minimum fault verification region;
Criterion 2: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum failure There is also then the minimum fault verification region occurs the domain singlephase earth fault signal that goes out of determinating area without singlephase earth fault;
If AR indicates that a minimum fault verification area fault logical value, logical value indicate singlephase earth fault for 1 In the minimum fault verification region, logical value is that 0 expression singlephase earth fault does not occur in the minimum fault verification region, Logic calculation expression formula are as follows:
" && " is logic and operation;What Fin indicated the minimum fault verification region enters domain singlephase earth fault signal logic Value, logical value are that the domain singlephase earth fault signal that enters in the 1 expression minimum fault verification region exists, and logical value is 0 table Show that the domain singlephase earth fault signal that enters in the minimum fault verification region is not present;It is the logical not operation of GFout, GFout indicates the singlephase earth fault signal logic value for domain fault detector group in the minimum fault verification region, logic Value indicates that the singlephase earth fault signal for domain fault detector group in the minimum fault verification region exists for 1, logical value The singlephase earth fault signal for going out domain fault detector group for the 0 expression minimum fault verification region is not present, specifically:
GFout={ Fout1||Fout2||…||Foutn}
" | | " it is logic or operation;FoutnIndicate the single-phase earthing for domain fault detector in minimum fault verification region Fault-signal logical value, logical value are the domain fault detector out in the 0 expression minimum fault verification region without single-phase earthing event Hindering signal, logical value is that going out on the fault detector of domain for the 1 expression minimum fault verification region send singlephase earth fault signal, Wherein n is the domain fault detector number out in the minimum fault verification region, if the value that n is 0, GFout is 0.
As shown in Figure 1, certain area's distribution network is made of two feeder lines, STA1, STA2 are substation;DS1, DS2 be with Power station;SP1~SP3 is switching station;#1~#7 is each substation, power distribution station and switching station's bus;S1, S9 are disconnected for substation's outlet Road device switch;S2~S8, S10~S18 are switchgear house and switching station's on-load switch, and S19 is that route high-voltage switch gear makees interconnection switch With;T1~T12 is distribution transformer;D1~D12 is overhead transmission line high-voltage switch;FI1~FI12 is fault detector;
When substation wire-outgoing breaker switch S1 and substation wire-outgoing breaker switch S9 do not trip, fault detector Singlephase earth fault signal, A phase voltage bust are sent on FI1, FI6, FI9, BC phase voltage jumps.Failure is sent on each fault detector Signal is as shown in table 1 (table 1 is fault-signal and identification result in Fig. 1):
Table 1:
Firstly, recognizing to singlephase earth fault signal, A phase voltage bust, BC phase voltage jumps, FI1, FI2, FI3 Send earth-fault signal on downstream fault indicator FI6, according to fault identification principle 1, FI1, FI2, FI3 should on send ground fault Signal.FI2, FI3 not on send earth-fault signal, belong to earth-fault signal and fail to report situation.Similarly, other fault detectors Fault-signal identification result is as shown in table 1.
Then, fault verification is carried out according to each minimum fault verification region.For region 6, ground fault is sent on FI6 Signal, FI7 not on send earth-fault signal, Fin 1, GFout 0, according to formula, the ground fault logical value AR in region 6 is 1, illustrate that singlephase earth fault occurs for the region.(table 2 is each region fault verification knot to the fault verification in other regions such as table 2 Fruit) shown in.
Table 2:
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (1)

1. a kind of fault detector singlephase earth fault based on worst principle determines practical method, it is characterised in that: including Following steps:
Step 1 determines power distribution network minimum fault verification region, and determines failure according to the power distribution network minimum fault verification region Indicator singlephase earth fault determines mathematical model;
The closed set being made of fault detector and feeder line section is known as fault verification region, if a fault verification region All endpoints be all fault detector and be all T contact without interior point or all interior points, then claim the fault verification region For minimum fault verification region;
It flows through single-phase earth fault current and flows into the fault detector in minimum fault verification region and be known as the minimum fault verification Region enters domain fault detector, the singlephase earth fault signal sent thereon be known as the minimum fault verification region to enter domain single-phase Earth-fault signal;It flows through single-phase earth fault current and flows out the fault detector in minimum fault verification region and be known as the minimum Fault verification region goes out domain fault detector, and the domain out that the fault-signal sent thereon is known as the minimum fault verification region is single-phase Earth-fault signal;
Step 2 determines mathematical model according to the fault detector singlephase earth fault and is based on worst principle, determines single-phase connect Identifiability principle is reported and failed to report to earth fault signal by mistake;The wrong report and to fail to report identifiability principle specific as follows:
When singlephase earth fault occurs, and when fault detector fails to report singlephase earth fault signal, decision principle are as follows:
Principle 1: when a phase voltage bust in feeder line, another two-phase voltage jumps, and all fault detectors in fault detector downstream When sending singlephase earth fault signal at least 1, then the fault detector reports singlephase earth fault signal;
When not occurring singlephase earth fault, and when fault detector wrong report singlephase earth fault signal, decision principle are as follows:
Principle 2: when none phase voltage bust in feeder line, another two-phase voltage jumps situation, and single-phase earthing is sent on fault detector When fault-signal, then the fault detector does not report singlephase earth fault signal;
Step 3 determines that mathematical model and the singlephase earth fault signal are missed according to the fault detector singlephase earth fault The singlephase earth fault signal sent on identifiability principle identification of defective indicator is reported and failed to report, singlephase earth fault signal is repaired After just, singlephase earth fault decision problem is converted to the logical operation of the minimum each equipment room in fault verification region, according to logic Operational formula determines the whether faulty indicator singlephase earth fault in the minimum fault verification region and occurs;
Convert singlephase earth fault decision problem to the logical operation of the minimum each equipment room in fault verification region, specific as follows:
The basis that singlephase earth fault determines is minimum fault verification region, and fault verification criterion is as follows:
Criterion 1: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum fault verification The domain singlephase earth fault signal that goes out in region is not present, then there is singlephase earth fault in the minimum fault verification region;
Criterion 2: if the domain singlephase earth fault signal that enters in the minimum fault verification region exists, and the minimum fault verification There is also then the minimum fault verification region occurs the domain singlephase earth fault signal that goes out in region without singlephase earth fault;
If AR indicates that a minimum fault verification area fault logical value, logical value are that 1 expression singlephase earth fault occurs at this Minimum fault verification region, logical value are that 0 expression singlephase earth fault does not occur in the minimum fault verification region, logic Calculation expression are as follows:
" && " is logic and operation;What Fin indicated the minimum fault verification region enters domain singlephase earth fault signal logic value, Logical value is that the domain singlephase earth fault signal that enters in the 1 expression minimum fault verification region exists, and logical value indicates this most for 0 The domain singlephase earth fault signal that enters of glitch determinating area is not present;It is the logical not operation of GFout, GFout table Show that the singlephase earth fault signal logic value for domain fault detector group in the minimum fault verification region, logical value are 1 table Show that the singlephase earth fault signal for domain fault detector group in the minimum fault verification region exists, logical value is 0 expression The singlephase earth fault signal for going out domain fault detector group in the minimum fault verification region is not present, specifically:
GFout={ Fout1||Fout2||L||Foutn}
" | | " it is logic or operation;FoutnIndicate the singlephase earth fault letter for domain fault detector in minimum fault verification region Number logical value, logical value be 0 indicate the domain fault detector out in the minimum fault verification region without singlephase earth fault signal, Its logical value is that going out on the fault detector of domain for the 1 expression minimum fault verification region send singlephase earth fault signal, and wherein n is The minimum fault verification region goes out domain fault detector number, if the value that n is 0, GFout is 0.
CN201510659214.4A 2015-10-14 2015-10-14 Fault detector singlephase earth fault based on worst principle determines practical method Active CN105301442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510659214.4A CN105301442B (en) 2015-10-14 2015-10-14 Fault detector singlephase earth fault based on worst principle determines practical method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510659214.4A CN105301442B (en) 2015-10-14 2015-10-14 Fault detector singlephase earth fault based on worst principle determines practical method

Publications (2)

Publication Number Publication Date
CN105301442A CN105301442A (en) 2016-02-03
CN105301442B true CN105301442B (en) 2019-01-04

Family

ID=55198937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510659214.4A Active CN105301442B (en) 2015-10-14 2015-10-14 Fault detector singlephase earth fault based on worst principle determines practical method

Country Status (1)

Country Link
CN (1) CN105301442B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105866630B (en) * 2016-05-17 2018-11-09 许继集团有限公司 A kind of method for diagnosing faults and system of reply whole station loss of learning
CN106443322B (en) * 2016-08-31 2018-10-19 积成电子股份有限公司 Fault detector failure judgment method based on maximum probability
CN109116181A (en) * 2017-06-22 2019-01-01 南京理工大学 A kind of fault detector failure judgment method based on maximum probability
CN112485602A (en) * 2020-12-12 2021-03-12 国网辽宁省电力有限公司铁岭供电公司 Small current grounding system fault state sensing method of wide-area synchronous time scale

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102565624B (en) * 2011-12-21 2013-11-27 陕西电力科学研究院 Fault-tolerant fault positioning method for distribution network
CN102761108B (en) * 2012-07-18 2014-10-08 积成电子股份有限公司 Logic operation-based distributed feeder automatization fault judgment method
CN102842905B (en) * 2012-08-22 2014-10-08 积成电子股份有限公司 Power distribution network state assessment method based on subnet worst principle
CN102832602B (en) * 2012-08-31 2015-01-07 积成电子股份有限公司 Method for improving fault judgment reliability of distributed type feeder automation
CN103048587B (en) * 2012-12-12 2016-01-20 深圳供电局有限公司 There is the Fault Locating Method of the power distribution network of distributed power source, Apparatus and system
CN104698342B (en) * 2015-03-24 2016-04-06 中国石油大学(华东) A kind of electrical power distribution network fault location method based on load point state and path logic computing

Also Published As

Publication number Publication date
CN105301442A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
Monadi et al. Multi‐terminal medium voltage DC grids fault location and isolation
Monadi et al. A protection strategy for fault detection and location for multi-terminal MVDC distribution systems with renewable energy systems
CN105301442B (en) Fault detector singlephase earth fault based on worst principle determines practical method
CN104267311A (en) Phase selection method for faults of double-circuit lines on same tower
Lin et al. A selective single-phase-to-ground fault protection for neutral un-effectively grounded systems
CN103384058B (en) Based on transformer station's integration failure protection method of territory, station protection
CN105356427B (en) The pilot zero sequence direction relay method of common-tower double-return transmission lines in parallel
CN109494696A (en) Power distribution network asymmetry fault section and isolation method and system based on adaptive reclosing
CN102944813A (en) Resonant grounding system fault line selection method based on reactive power flow directions
Dallas et al. Teleprotection in multi-terminal HVDC supergrids
Tiwari et al. Review on protection issues with penetration of distributed generation in distribution system
CN106501683A (en) One kind is without main website power distribution network one-way earth fault localization method
CN109116181A (en) A kind of fault detector failure judgment method based on maximum probability
CN102629755A (en) Power transmission line backup protection method based on wide area information
CN102185293B (en) Line fault tripping certainty factor analysis method
Zhang et al. A segmented network method based faulted line selection strategy for single-phase earth fault in small current grounding distribution network
CN107230970A (en) A kind of singlephase earth fault processing method of the feeder automation of type on the spot
CN108008236A (en) A kind of method for detecting electrical equipment fault
CN109193595B (en) Active power distribution network failure separation method based on current phase comparison
CN105301443B (en) Fault detector short trouble based on worst principle determines practical method
Venkata et al. Advanced and adaptive protection for active distribution grid
CN202330619U (en) Novel intelligent low-current grounded line selection device
CN104535894B (en) Earth fault line selection method and device under the double-bus method of operation
CN204046139U (en) There is the station local coordinate frame shunting switch protective device of tripping operation measuring ability
CN113884816A (en) Single-phase earth fault section positioning method, device, equipment and storage medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant