CN105293954A - Flue gas heating circulating device - Google Patents

Flue gas heating circulating device Download PDF

Info

Publication number
CN105293954A
CN105293954A CN201410334297.5A CN201410334297A CN105293954A CN 105293954 A CN105293954 A CN 105293954A CN 201410334297 A CN201410334297 A CN 201410334297A CN 105293954 A CN105293954 A CN 105293954A
Authority
CN
China
Prior art keywords
flue gas
gas heating
circulation device
fire prevention
smoke pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410334297.5A
Other languages
Chinese (zh)
Inventor
陈伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI WEIHAO SPECIAL GLASS Co Ltd
Original Assignee
ANHUI WEIHAO SPECIAL GLASS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WEIHAO SPECIAL GLASS Co Ltd filed Critical ANHUI WEIHAO SPECIAL GLASS Co Ltd
Priority to CN201410334297.5A priority Critical patent/CN105293954A/en
Publication of CN105293954A publication Critical patent/CN105293954A/en
Pending legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The invention provides a flue gas heating circulating device which is used for heating a fireproof tank. The flue gas heating circulating device comprises a boiler and a first flue gas discharging pipe connected with the boiler, wherein at least part of the first flue gas discharging pipe is arranged in the fireproof tank; the opening part of the first flue gas discharging pipe is arranged outside the fireproof tank. Through the adoption of the manner, flue gas generated in the boiler of the flue gas heating circulating device can be used for heating a solution in the fireproof tank, the heating rate of the solution in the fireproof tank is further improved, and the solution in the fireproof tank can be heated relatively easily and uniformly.

Description

A kind of flue gas heating circulation device
Technical field
The present invention relates to a kind of glass manufacturing equipment, particularly a kind of flue gas heating circulation device.
Background technology
Flame resistant glass in the fabrication process, enter annealing furnace physical toughened before, need to carry out strengthening compressive stress layer (chemical enhanced ion-exchange method), namely in the solution of fire prevention pond, in 60 ~ 80 DEG C of situations, caesium, potassium ion are active, infiltrate glass surface, displacement, makes glass surface tiny crack reduce, makes the physical strength of glass and heat shock resistance intensity obtain larger raising.But in the prior art, only use boiler to coordinate water pump to heat fire prevention pond solution.Water pump will prevent fires pond solution extraction in boiler, put back to fire prevention pond after boiler heating again.But this kind of type of heating is comparatively slow, and not easily homogeneous heating.
Therefore for the problems referred to above, be necessary that a new flue gas heating circulation device of design is to make up above-mentioned defect.
Summary of the invention
The present invention proposes a kind of flue gas heating circulation device, to solve in prior art the heating of fire prevention pond solution slowly, the problem of not easily homogeneous heating.
Technical scheme of the present invention is achieved in that provides a kind of flue gas heating circulation device, this flue gas heating circulation device is used for for the heating of fire prevention pond, the first row smoke pipe comprising boiler and be connected with boiler, first row smoke pipe is arranged in fire prevention pond at least partly, and the opening part of first row smoke pipe is arranged at outside fire prevention pond.
Further, first row smoke pipe is arranged at the part in fire prevention pond is bending setting.
Further, boiler comprises further and is arranged at heating water tank in boiler and the inhalent siphon be connected with heating water tank and rising pipe, inhalent siphon is provided with water pump, and the open space of inhalent siphon and rising pipe is arranged in fire prevention pond, and the liquid in fire prevention pond is pumped into heating water tank by water pump.
Further, inhalent siphon is connected to the bottom of heating water tank, and rising pipe is connected to the top of heating water tank.
Further, flue gas heating circulation device comprises filtering basin further, is injected with filtered liquid in filtering basin, and the opening of first row smoke pipe is arranged in filtered liquid.
Further, flue gas heating circulation device comprises second row smoke pipe further, and filtering basin are sealed structure, and second row smoke pipe one end to be arranged in filtering basin and not to be arranged in filtered liquid, and the other end is arranged at outside filtering basin.
Further, first row smoke pipe is provided with thermofin by boiler to the part and rising pipe in fire prevention pond.
Further, first row smoke pipe is provided with vacuum fan.
By the way, the flue gas that in flue gas heating circulation device of the present invention, boiler produces also is used in and heats the solution in fire prevention pond, further increases the rate of heating of fire prevention pond solution, and the more uniform solution to preventing fires in pond heats.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the part-structure schematic diagram of the flue gas heating circulation device of one embodiment of the present invention;
Fig. 2 is another part structural representation of the flue gas heating circulation device in Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
With reference to the part-structure schematic diagram that Fig. 1, Fig. 1 are the flue gas heating circulation devices of one embodiment of the present invention.In the present embodiment, flue gas heating circulation device comprises boiler 110, first row smoke pipe 114, hot well tank 111, inhalent siphon 113, rising pipe 112, water pump 115, vacuum fan 116, filtering basin 130, second row smoke pipe 140, cooling tower 210, second inhalent siphon 211, second water pump 212, second rising pipe 213, water tank 220, water pot 230 and the 3rd rising pipe 231.
First row smoke pipe 114 is connected with boiler 110.The middle portion of first row smoke pipe 114 is arranged in fire prevention pond 120, and the opening part of first row smoke pipe 114 is arranged at outside fire prevention pond 120.First row smoke pipe 114 part be arranged in fire prevention pond 120 is bending setting.Filtering basin 130 are sealed structure, and are wherein injected with filtered liquid 131 and a certain amount of air.The opening of first row smoke pipe 114 is arranged in filtered liquid 131.Second row smoke pipe 140 one end to be arranged in filtering basin 130 and not to be arranged in filtered liquid 131, and the other end is arranged at outside filtering basin 130.
Heating water tank 111 is arranged at boiler 110, and inhalent siphon 113 is connected with heating water tank 111 with rising pipe 112.Inhalent siphon 113 is connected to the bottom of heating water tank 111, and rising pipe 112 is connected to the top of heating water tank 111.Inhalent siphon 113 is provided with water pump 115, the open space of inhalent siphon 113 and rising pipe 112 is arranged in fire prevention pond 120, and the liquid in fire prevention pond 120 is pumped into heating water tank 111 by water pump 115.
First row smoke pipe 114 is provided with thermofin, better to preserve heat by boiler 110 to the part and rising pipe 112 in fire prevention pond 120.
In order to accelerate the flowing of the hot cigarette in first row smoke pipe 114, first row smoke pipe 114 is provided with vacuum fan 116.
Being arranged by this kind, when heating the solution in fire prevention pond 120, can be heated by two kinds of type of heating.A kind of is the flue gas produced by fuel combustion in boiler 110, the part be arranged in fire prevention pond 120 by first row smoke pipe 114 is heated solution, then enter heating water tank 111 by inhalent siphon 113 in addition to heat, then flow back in fire prevention pond 120 by rising pipe 112.Through test, 10 tons of solution can be heated to 70 ° in 60 minutes.
Second inhalent siphon 211 is connected cooling tower 210 respectively with one end of the second rising pipe 213, and the other end is arranged in fire prevention pond 120 respectively.Second water pump 212 is arranged on the second inhalent siphon 211.Further, the second inhalent siphon 211 also can connect water tank 220, is stored by the solution in fire prevention pond 120 after end-of-job.3rd rising pipe 231 one end connects multiple water pot 230, and the other end is arranged in fire prevention pond 120.
The design of cooling tower 210 is to keep the solution temperature of preventing fires in pond 120 to remain on about 70 °, preventing it overheated.
By the way, the flue gas that in flue gas heating circulation device of the present invention, boiler produces also is used in and heats the solution in fire prevention pond, further increases the rate of heating of fire prevention pond solution, and the more uniform solution to preventing fires in pond heats.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (8)

1. a flue gas heating circulation device, it is characterized in that, described flue gas heating circulation device is used for for the heating of fire prevention pond, the first row smoke pipe comprising boiler and be connected with described boiler, described first row smoke pipe is arranged in described fire prevention pond at least partly, and the opening part of described first row smoke pipe is arranged at outside described fire prevention pond.
2. flue gas heating circulation device as claimed in claim 1, is characterized in that, the described first row smoke pipe part be arranged in described fire prevention pond is bending setting.
3. flue gas heating circulation device as claimed in claim 2, it is characterized in that, described boiler comprises further and is arranged at heating water tank in described boiler and the inhalent siphon be connected with described heating water tank and rising pipe, described inhalent siphon is provided with water pump, the open space of described inhalent siphon and described rising pipe is arranged in described fire prevention pond, and the liquid in described fire prevention pond is pumped into described heating water tank by described water pump.
4. flue gas heating circulation device as claimed in claim 3, it is characterized in that, described inhalent siphon is connected to the bottom of described heating water tank, and described rising pipe is connected to the top of described heating water tank.
5. flue gas heating circulation device as claimed in claim 4, it is characterized in that, described flue gas heating circulation device comprises filtering basin further, is injected with filtered liquid in described filtering basin, and the opening of described first row smoke pipe is arranged in described filtered liquid.
6. flue gas heating circulation device as claimed in claim 5, it is characterized in that, described flue gas heating circulation device comprises second row smoke pipe further, described filtering basin are sealed structure, described second row smoke pipe one end to be arranged in described filtering basin and not to be arranged in described filtered liquid, and the other end is arranged at outside described filtering basin.
7. flue gas heating circulation device as claimed in claim 2, is characterized in that, described first row smoke pipe is provided with thermofin by described boiler to the part and described rising pipe in described fire prevention pond.
8. flue gas heating circulation device as claimed in claim 1, is characterized in that, described first row smoke pipe is provided with vacuum fan.
CN201410334297.5A 2014-07-11 2014-07-11 Flue gas heating circulating device Pending CN105293954A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410334297.5A CN105293954A (en) 2014-07-11 2014-07-11 Flue gas heating circulating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410334297.5A CN105293954A (en) 2014-07-11 2014-07-11 Flue gas heating circulating device

Publications (1)

Publication Number Publication Date
CN105293954A true CN105293954A (en) 2016-02-03

Family

ID=55191894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410334297.5A Pending CN105293954A (en) 2014-07-11 2014-07-11 Flue gas heating circulating device

Country Status (1)

Country Link
CN (1) CN105293954A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017193362A1 (en) * 2016-05-13 2017-11-16 深圳市赛尔美电子科技有限公司 Filtration-type double-heating distillation atomization device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201003783Y (en) * 2007-02-05 2008-01-09 张学林 High-performance energy-saving environmental protection boiler residual heat recovering device
CN201844707U (en) * 2010-06-02 2011-05-25 北京兆泰新能源有限公司 Waste heat recovery device and waste heat recovery system of gas stove
CN202361629U (en) * 2011-11-04 2012-08-01 苏州优能节能技术有限公司 High-efficiency fume condensing waste heat recovery device
CN103574900A (en) * 2013-11-13 2014-02-12 无锡锡州机械有限公司 Condensation heat exchange system
CN204022676U (en) * 2014-07-11 2014-12-17 安徽伟豪特种玻璃有限公司 A kind of flue gas heating circulation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201003783Y (en) * 2007-02-05 2008-01-09 张学林 High-performance energy-saving environmental protection boiler residual heat recovering device
CN201844707U (en) * 2010-06-02 2011-05-25 北京兆泰新能源有限公司 Waste heat recovery device and waste heat recovery system of gas stove
CN202361629U (en) * 2011-11-04 2012-08-01 苏州优能节能技术有限公司 High-efficiency fume condensing waste heat recovery device
CN103574900A (en) * 2013-11-13 2014-02-12 无锡锡州机械有限公司 Condensation heat exchange system
CN204022676U (en) * 2014-07-11 2014-12-17 安徽伟豪特种玻璃有限公司 A kind of flue gas heating circulation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017193362A1 (en) * 2016-05-13 2017-11-16 深圳市赛尔美电子科技有限公司 Filtration-type double-heating distillation atomization device

Similar Documents

Publication Publication Date Title
CN206654836U (en) Glass furnace
CL2023000933A1 (en) Submerged combustion fusion exhaust systems
CN105293954A (en) Flue gas heating circulating device
CN104259153B (en) furnace tube cleaning process
CN204022676U (en) A kind of flue gas heating circulation device
CN105328293A (en) Energy-saving brazing furnace
CN205014845U (en) Box resistance furnace elema protection device
CN107365054A (en) A kind of kiln device for glass melting heating
CN106430941B (en) A kind of HEC optical fiber production stove water cooling gas ring device
CN103964673A (en) Cooling method for erodible part of plate glass melting furnace wall
JP5959534B2 (en) Method for performing a frit firing cycle in the manufacture of vacuum solar panels
CN202582188U (en) Fast-cooling testing heating furnace
CN207599813U (en) Large stove
CN103658630B (en) A kind of slag rake of metallurgical furnace
CN105650663A (en) Water heater conducting heating through exhaust smoke waste heat
CN105091336B (en) A kind of boiling stove
CN205825430U (en) A kind of boiler of organic heat carrier
CN204006631U (en) A kind of two courage energy-saving heating furnace
CN205188349U (en) Furnace structure of normalizing furnace
CN204629508U (en) Garbage incinerator grates cooling system
CN105240878B (en) A kind of cast iron electric furnace pan
CN103983098A (en) Vapor recovery unit and method
CN203582953U (en) Well-type high temperature carburizing furnace with down-inserted retort heat-insulation retainer ring structure
CN207585345U (en) Steel-smelting alloy oven
CN207865703U (en) A kind of oil heating furnace

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203