CN105293601B - A kind of free control method of water processing establishment operation - Google Patents

A kind of free control method of water processing establishment operation Download PDF

Info

Publication number
CN105293601B
CN105293601B CN201510763988.1A CN201510763988A CN105293601B CN 105293601 B CN105293601 B CN 105293601B CN 201510763988 A CN201510763988 A CN 201510763988A CN 105293601 B CN105293601 B CN 105293601B
Authority
CN
China
Prior art keywords
valve
facility
water inlet
backwash
inlet pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510763988.1A
Other languages
Chinese (zh)
Other versions
CN105293601A (en
Inventor
高青
齐学斌
尚文军
赵志娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Farmland Irrigation Research Institute of CAAS
Original Assignee
Farmland Irrigation Research Institute of CAAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Farmland Irrigation Research Institute of CAAS filed Critical Farmland Irrigation Research Institute of CAAS
Priority to CN201510763988.1A priority Critical patent/CN105293601B/en
Publication of CN105293601A publication Critical patent/CN105293601A/en
Application granted granted Critical
Publication of CN105293601B publication Critical patent/CN105293601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of free control method of water processing establishment operation, specific control process includes following 4 kinds of operational modes, individual facilities operational mode, multiple facility forward mode of operation, multiple facility inverted running patterns and individual facilities backwash mode.The control method can not only realize the single operation for the treatment of facility and different order combined runnings, and can realize the backwash for the treatment of facility.

Description

A kind of free control method of water processing establishment operation
Technical field
The invention belongs to the running technology field of sewage treatment facility, and in particular to a kind of freedom of water processing establishment operation Control method.
Background technology
At present, in most cases, a problem is frequently not that single method, program and facilities and equipment can solve the problem that, Solved often by the combination of multiple methods, program and facilities and equipment or use in conjunction, especially water treatment field, it is pending Effluent sewage generally multiple water quality index exceed target water standard scope, generally require at multiple process steps or facility joint Reason, and these set of handling process facilities connections are all changeless, accessible water quality is limited in scope so that these into The handling process facility application of set has certain limitation.Therefore, it is badly in need of seeking a kind of control method, realizes in these techniques Treatment facility can it is single operation and various combination order free-running operation.
The content of the invention
The present invention is overcomes what the limitation of complete process for treating provided that a kind of water processing establishment runs freely to control Method, the control method can not only realize the single operation for the treatment of facility and different order combined runnings, and can realization processing The backwash of facility.
The present invention adopts the following technical scheme that what a kind of water processing establishment was run freely controls to solve above-mentioned technical problem Method, it is characterised in that:Water inlet manifold road branches into inlet channel and backwash inlet channel, and inlet channel is set after valve A0 Branch into the first water inlet pipe, the second water inlet pipe, the 3rd water inlet pipe and the 4th water inlet pipe, the first water inlet pipe it is another End is connected with the first facility water inlet and on the first water inlet pipe provided with valve A1, the other end of the second water inlet pipe and the Two facility water inlets are connected and on the second water inlet pipe provided with valve A3, the other end and the 3rd facility of the 3rd water inlet pipe Water inlet is connected and on the 3rd water inlet pipe provided with valve A5, the other end and the 4th facility water inlet of the 4th water inlet pipe Be connected and on the 4th water inlet pipe be provided with valve A7, backwash inlet channel on along water inlet direction be sequentially provided with valve B0, Valve C1, valve C2, valve C3, valve C4, valve C5 and valve C6, the backwash inlet channel between valve B0 and valve C1 On be connected be connected with the first facility delivery port first backwash water inlet pipe, this first backwash water inlet pipe be provided with valve The first exit branch being connected with outlet conduit is connected with door B1, the backwash inlet channel between valve B0 and valve C1, First exit branch is provided with to be connected with valve C7, the backwash inlet channel between valve C1 and valve C2 and set with first The 3rd connected reverse return branch of water inlet is applied, the 3rd reverse return branch is provided with valve B2, valve C1 and valve C2 Between backwash inlet channel on be connected with the second exit branch being connected with outlet conduit, second exit branch is provided with First be connected with the second facility water inlet is being connected with valve C8, the backwash inlet channel between valve C1 and valve C2 just To return branch, the first positive return branch is provided with valve A2, the backwash inlet channel between valve C2 and valve C3 On be connected be connected with the second facility delivery port second backwash water inlet pipe, this second backwash water inlet pipe be provided with valve It is reverse that second be connected with the second facility water inlet is connected with door B3, the backwash inlet channel between valve C3 and valve C4 Return branch, the second reverse return branch is provided with valve B4, the backwash inlet channel between valve C3 and valve C4 The 3rd exit branch being connected with outlet conduit is connected with, the 3rd exit branch is provided with valve C9, valve C3 and valve C4 Between backwash inlet channel on be connected with the positive return branch of second be connected with the 3rd facility water inlet, this is second positive Return branch is provided with connection and the 3rd facility delivery port on valve A4, the backwash inlet channel between valve C4 and valve C5 The 3rd connected backwash water inlet pipe, the 3rd backwash water inlet pipe is provided with valve B5, between valve C5 and valve C6 Backwash inlet channel on be connected with the first reverse return branch being connected with the 3rd facility water inlet, the first reverse backwater Branch pipe is provided with valve B6, and the be connected with outlet conduit is connected with the backwash inlet channel between valve C5 and valve C6 Four exit branch, the 4th exit branch, which is provided with valve C10, the backwash inlet channel between valve C5 and valve C6, to be connected The positive return branch of the 3rd be connected with the 4th facility water inlet is connected to, the 3rd positive return branch is provided with valve A6, valve Backwash inlet channel on rear side of door C6 branches into the 4th be connected with the 4th facility delivery port and backwashes water inlet pipe and with going out Be respectively equipped with the 5th connected exit branch of waterpipe, the 4th backwash water inlet pipe and the 5th exit branch valve B7 and The return branch being connected with the 4th facility water inlet is connected with valve C11, outlet conduit, the return branch is provided with valve B8, outlet conduit is summarized in outfall sewer road with return branch;Its specific control process includes following 4 kinds of operational modes,(1)It is single One facility operation pattern, Open valve A0 runs the first facility, and valve opening order is:A1-B1-C7/C1C8/C1C2C3C9/ C1C2C3C4C5C10/C1C2C3C4C5C6C11, runs the second facility, and valve opening order is:A3-B3-C2C1C7/C2C8/ C3C9/C3C4C5C10/C3C4C5C6C11, runs the 3rd facility, and valve opening order is:A5-B5-C4C9/C4C3C2C8/ C4C3C2C1C7/C5C10/C5C6C11, runs the 4th facility, and valve opening order is:A7-B7-C11/C6C10/ C6C5C4C9/C6C5C4C3C2C8/C6C5C4C3C2C1C7;(2)Multiple facility forward mode of operation, Open valve A0, operation First facility and the second facility, valve opening order be:A1-B1-C1-A2-B3-C3C9/C3C4C5C10/C3C4C5C6C11, The first facility, the second facility and the 3rd facility are run, valve opening order is:A1-B1-C1-A2-B3-C3-A4-B5-C5C10/ C5C6C11, runs the first facility, the second facility, the 3rd facility and the 4th facility, and valve opening order is:A1-B1-C1-A2- B3-C3-A4-B5-C5-A6-B7-C11;(3)Multiple facility inverted running patterns, Open valve A0, the 4th facility of operation and the Three facilities, valve opening order be:A7-B7-C6-B6-B5-C4C9/C4C3C2C8/C4C3C2C1C7, the 4th facility of operation, the Three facilities and the second facility, valve opening order be:A7-B7-C6-B6-B5-C4-B4-B3-C2C8/C2C1C7, operation the 4th Facility, the 3rd facility, the second facility and the first facility, valve opening order be:A7-B7-C6-B6-B5-C4-B4-B3-C2- B2-B1-C7;(4)Individual facilities backwash mode, Open valve B0 backwashes the first facility, and valve opening order is:B1- B2-C8/C2C3C9/C2C3C4C5C10/C2C3C4C5C6C11, backwashes the second facility, and valve opening order is:C1-C2- B3-B4-C9/C4C5C10/C4C5C6C11, backwashes the 3rd facility, and valve opening order is:C1-C2-C3-C4-B5-B6- C10/C6C11, backwashes the 4th facility, and valve opening order is:C1-C2-C3-C4-C4-C5-C6-B7-C11/B8.
Further limit, described first backwash inlet channel, the second backwash inlet channel, the 3rd backwash water inlet Reserved valve D1, reserved valve D2, reserved valve D3 and reserving valve are connected on pipeline and the 4th backwash inlet channel Door D4.
Further limit, pipeline pump, pipeline flowmeter, pressure are sequentially provided with along water inlet direction on described water inlet manifold road Table and pipe-line mixer.
Further limit, described outfall sewer road is provided with pressure gauge.
The beneficial effects of the invention are as follows, can realize treatment facility it is single operation and different order combined runnings it is same When, moreover it is possible to the backwash for the treatment of facility is realized, it is simple to operate.
Brief description of the drawings
Fig. 1 is the pipeline connecting figure of water processing establishment operation of the present invention.
Drawing explanation:1st, water inlet manifold road, 2, inlet channel, 3, backwash inlet channel, the 4, first water inlet pipe, 5, the Two water inlet pipes, the 6, the 3rd water inlet pipe, the 7, the 4th water inlet pipe, the 8, first facility, the 9, second facility, the 10, the 3rd facility, 11st, the 4th facility, the 12, first backwash water inlet pipe, the 13, second backwash water inlet pipe, the 14, the 3rd backwash water inlet branch Pipe, the 15, the 4th backwash water inlet pipe, 16, outlet conduit, the 17, first exit branch, the 18, second exit branch, the 19, the 3rd Exit branch, the 20, the 4th exit branch, the 21, the 5th exit branch, the 22, first reverse return branch, the 23, second reverse backwater Branch pipe, the 24, the 3rd reverse return branch, the 25, first positive return branch, the 26, second positive return branch, the 27, the 3rd is positive Return branch, 28, return branch, 29, pipeline pump, 30, pipeline flowmeter, 31, pressure gauge, 32, pipe-line mixer, 33, water outlet Total pipeline.
Embodiment
Technical scheme is described in detail with reference to accompanying drawing.As shown in figure 1, water inlet manifold road 1 branches into inlet channel 2 With backwash inlet channel 3, inlet channel 2 branches into the first water inlet pipe 4, the second water inlet pipe the 5, the 3rd after setting valve A0 The water inlet pipe 7 of water inlet pipe 6 and the 4th, the other end of the first water inlet pipe 4 is connected and first with the water inlet of the first facility 8 Water inlet pipe 4 is provided with valve A1, and the other end of the second water inlet pipe 5 is connected with the water inlet of the second facility 9 and entered second Water branch pipe 5 is provided with valve A3, and the other end of the 3rd water inlet pipe 6 is connected with the water inlet of the 3rd facility 10 and in the 3rd water inlet Branch pipe 6 is provided with valve A5, and the other end of the 4th water inlet pipe 7 is connected with the water inlet of the 4th facility 11 and in the 4th water inlet branch Pipe 7 is provided with valve A7, backwash inlet channel 3 and is sequentially provided with valve B0, valve C1, valve C2, valve along water inlet direction It is connected with and is set with first on C3, valve C4, valve C5 and valve C6, the backwash inlet channel 3 between valve B0 and valve C1 The first backwash water inlet pipe 12 that 8 delivery ports are connected is applied, the first backwash water inlet pipe 12 is provided with valve B1, valve B0 The first exit branch 17 being connected with outlet conduit 16 is connected with backwash inlet channel 3 between valve C1, this first Exit branch 17 is provided with valve C7, the backwash inlet channel 3 between valve C1 and valve C2 and is connected with and the first facility 8 The 3rd connected reverse return branch 24 of water inlet, the 3rd reverse return branch 24 is provided with valve B2, valve C1 and valve The second exit branch 18 being connected with outlet conduit 16 is connected with backwash inlet channel 3 between C2, the second water outlet branch Pipe 18 is provided with valve C8, the backwash inlet channel 3 between valve C1 and valve C2 and is connected with and the water inlet of the second facility 9 The positive return branch 25 of connected first, the first positive return branch 25 is provided with valve A2, between valve C2 and valve C3 Backwash inlet channel 3 on be connected with the second backwash water inlet pipe 13 being connected with the delivery port of the second facility 9, this is second anti- Water inlet pipe 13 is rinsed provided with valve B3, is connected with the backwash inlet channel 3 between valve C3 and valve C4 and second The second connected reverse return branch 23 of the water inlet of facility 9, the second reverse return branch 23 is provided with valve B4, valve C3 with The 3rd exit branch 19 being connected with outlet conduit 16 is connected with backwash inlet channel 3 between valve C4, the 3rd goes out Water branch pipe 19 is provided with valve C9, the backwash inlet channel 3 between valve C3 and valve C4 and is connected with and the 3rd facility 10 The second positive return branch 26 that water inlet is connected, the second positive return branch 26 is provided with valve A4, valve C4 and valve The 3rd backwash water inlet pipe 14 being connected with the delivery port of the 3rd facility 10 is connected on backwash inlet channel 3 between C5, should 3rd backwash water inlet pipe 14, which is provided with valve B5, the backwash inlet channel 3 between valve C5 and valve C6, to be connected with The first reverse return branch 22 being connected with the water inlet of the 3rd facility 10, the first reverse return branch 22 is provided with valve B6, The 4th exit branch 20 being connected with outlet conduit 16 is connected with backwash inlet channel 3 between valve C5 and valve C6, 4th exit branch 20 is provided with valve C10, is connected with the backwash inlet channel 3 between valve C5 and valve C6 and the The 3rd positive return branch 27 that the water inlet of four facility 11 is connected, the 3rd positive return branch 27 is provided with valve A6, valve Backwash inlet channel 3 on rear side of C6 branch into be connected with the delivery port of the 4th facility 11 the 4th backwash water inlet pipe 15 and with Set respectively on the 5th connected exit branch 21 of outlet conduit 16, the 4th backwash exit branch 21 of water inlet pipe 15 and the 5th Have and be connected with the return branch 28 being connected with the water inlet of the 4th facility 11 on valve B7 and valve C11, outlet conduit 16, the backwater Branch pipe 28 is provided with valve B8, and outlet conduit 16 is summarized in outfall sewer road 33, the first backwash water inlet branch with return branch 28 Connect respectively on the backwash backwash backwash water inlet pipe 15 of water inlet pipe 14 and the 4th of water inlet pipe the 13, the 3rd of pipe 12, second It is connected on reserved valve D1, reserved valve D2, reserved valve D3 and reserved valve D4, water inlet manifold road 1 along water inlet direction successively Provided with pipeline pump 29, pipeline flowmeter 30, pressure gauge 31 and pipe-line mixer 32, pressure gauge also is provided with outfall sewer road 33 31。
Embodiment 1
Single facility operation, in Fig. 1, Open valve A0 run the first facility, and valve opening order is:A1-B1-C7/ C1C8/C1C2C3C9/C1C2C3C4C5C10/C1C2C3C4C5C6C11;The second facility is run, valve opening order is:A3- B3-C2C1C7/C2C8/C3C9/C3C4C5C10/C3C4C5C6C11;The 3rd facility is run, valve opening order is:A5-B5- C4C9/C4C3C2C8/C4C3C2C1C7/C5C10/C5C6C11;The 4th facility is run, valve opening order is:A7-B7-C11/ C6C10/C6C5C4C9/C6C5C4C3C2C8/C6C5C4C3C2C1C7。
Embodiment 2
The positive operation of the multiple combinations of target facility, Open valve A0, the first facility of operation and the second facility, valve opening are suitable Sequence is:A1-B1-C1-A2-B3-C3C9/C3C4C5C10/C3C4C5C6C11;The first facility, the second facility and the 3rd is run to set Apply, valve opening order is:A1-B1-C1-A2-B3-C3-A4-B5-C5C10/C5C6C11;Run the first facility, second set Apply, the 3rd facility and the 4th facility, valve opening order is:A1-B1-C1-A2-B3-C3-A4-B5-C5-A6-B7-C11.
Embodiment 3
The multiple combination antikinesises of target facility, Open valve A0, the 4th facility of operation and the 3rd facility, valve opening are suitable Sequence is:A7-B7-C6-B6-B5-C4C9/C4C3C2C8/C4C3C2C1C7;The 4th facility, the 3rd facility and the second facility are run, Valve opening order be:A7-B7-C6-B6-B5-C4-B4-B3-C2C8/C2C1C7;Run the 4th facility, the 3rd facility, second Facility and the first facility, valve opening order be:A7-B7-C6-B6-B5-C4-B4-B3-C2-B2-B1-C7.
Embodiment 4
Under normal condition, backwash without combination of facilities, take single facility to backwash, Open valve B0, backwash First facility, valve opening order be:B1-B2-C8/C2C3C9/C2C3C4C5C10/C2C3C4C5C6C11;Backwash second Facility, valve opening order be:C1-C2-B3-B4-C9/C4C5C10/C4C5C6C11;Backwash the 3rd facility, valve opening Sequentially it is:C1-C2-C3-C4-B5-B6-C10/C6C11;The 4th facility is backwashed, valve opening order is:C1-C2-C3-C4- C4-C5-C6-B7-C11/B8。
Have been shown and described above the general principle of the present invention, principal character and advantage, do not depart from spirit of the invention and On the premise of scope, the present invention also has various changes and modifications, and these changes and improvements both fall within claimed invention Scope.

Claims (4)

1. a kind of free control method of water processing establishment operation, it is characterised in that:Water inlet manifold road branch into inlet channel and Inlet channel is backwashed, inlet channel, which is set, branches into the first water inlet pipe, the second water inlet pipe, the 3rd water inlet branch after valve A0 Pipe and the 4th water inlet pipe, the other end of the first water inlet pipe are connected with the first facility water inlet and on the first water inlet pipe Provided with valve A1, the other end of the second water inlet pipe is connected with the second facility water inlet and on the second water inlet pipe provided with valve Door A3, the other end of the 3rd water inlet pipe is connected with the 3rd facility water inlet and on the 3rd water inlet pipe provided with valve A5, The other end of 4th water inlet pipe is connected with the 4th facility water inlet and valve A7 is provided with the 4th water inlet pipe, backwashes On inlet channel valve B0, valve C1, valve C2, valve C3, valve C4, valve C5 and valve are sequentially provided with along water inlet direction The first backwash being connected with the first facility delivery port is connected with C6, the backwash inlet channel between valve B0 and valve C1 Water inlet pipe, the first backwash water inlet pipe is provided with valve B1, the backwash inlet channel between valve B0 and valve C1 On be connected with the first exit branch being connected with outlet conduit, first exit branch be provided with valve C7, valve C1 and valve The 3rd reverse return branch being connected with the first facility water inlet is connected with backwash inlet channel between C2, the 3rd is anti- It is provided with valve B2, the backwash inlet channel between valve C1 and valve C2 and is connected with and outlet conduit phase to return branch The second exit branch even, second exit branch is provided with valve C8, the backwash water inlet pipe between valve C1 and valve C2 The positive return branch of first be connected with the second facility water inlet is connected with road, the first positive return branch is provided with valve The second backwash being connected with the second facility delivery port is connected with A2, the backwash inlet channel between valve C2 and valve C3 Water inlet pipe, the second backwash water inlet pipe is provided with valve B3, the backwash inlet channel between valve C3 and valve C4 On be connected with the second reverse return branch being connected with the second facility water inlet, the second reverse return branch be provided with valve The 3rd exit branch being connected with outlet conduit is connected with B4, the backwash inlet channel between valve C3 and valve C4, should 3rd exit branch is provided with valve C9, the backwash inlet channel between valve C3 and valve C4 and is connected with and the 3rd facility The second positive return branch that water inlet is connected, the second positive return branch provided with valve A4, valve C4 and valve C5 it Between backwash inlet channel on connect be connected with the 3rd facility delivery port the 3rd backwash water inlet pipe, the 3rd backwash Water inlet pipe is provided with to be connected with valve B5, the backwash inlet channel between valve C5 and valve C6 and intake with the 3rd facility The first connected reverse return branch of mouth, the first reverse return branch is provided with valve B6, between valve C5 and valve C6 The 4th exit branch being connected with outlet conduit is connected with backwash inlet channel, the 4th exit branch is provided with valve The 3rd be connected with the 4th facility water inlet is connected with C10, the backwash inlet channel between valve C5 and valve C6 positive Return branch, the backwash inlet channel that the 3rd positive return branch is provided with rear side of valve A6, valve C6 is branched into and the The 4th connected backwash water inlet pipe of four facility delivery ports and the 5th exit branch being connected with outlet conduit, the 4th recoil Wash to be respectively equipped with water inlet pipe and the 5th exit branch on valve B7 and valve C11, outlet conduit and be connected with and the 4th facility The connected return branch of water inlet, the return branch is provided with valve B8, and outlet conduit is summarized in outfall sewer with return branch Road;Its specific control process includes following 4 kinds of operational modes,(1)Single facility operation pattern, Open valve A0, operation first Facility, valve opening order be:A1-B1-(C7/C1-C8/C1-C2-C3-C9/C1-C2-C3-C4-C5-C10/C1-C2-C3- C4-C5-C6-C11), the second facility is run, valve opening order is:A3-B3-(C2-C1-C7/C2-C8/C3-C9/C3-C4- C5-C10/C3-C4-C5-C6-C11), the 3rd facility is run, valve opening order is:A5-B5-(C4-C9/C4-C3-C2-C8/ C4-C3-C2-C1-C7/C5-C10/C5-C6-C11), the 4th facility is run, valve opening order is:A7-B7-(C11/C6- C10/C6-C5-C4-C9/C6-C5-C4-C3-C2-C8/C6-C5-C4-C3-C2-C1-C7);(2)Multiple facility forward direction operation moulds Formula, Open valve A0 runs the first facility and the second facility, and valve opening order is:A1-B1-C1-A2-B3-(C3-C9/C3- C4-C5-C10/C3-C4-C5-C6-C11), the first facility, the second facility and the 3rd facility are run, valve opening order is:A1- B1-C1-A2-B3-C3-A4-B5-(C5-C10/C5-C6-C11), the first facility of operation, the second facility, the 3rd facility and the 4th Facility, valve opening order be:A1-B1-C1-A2-B3-C3-A4-B5-C5-A6-B7-C11;(3)Multiple facility inverted runnings Pattern, Open valve A0 runs the 4th facility and the 3rd facility, and valve opening order is:A7-B7-C6-B6-B5-(C4-C9/ C4-C3-C2-C8/C4-C3-C2-C1-C7), the 4th facility, the 3rd facility and the second facility are run, valve opening order is: A7-B7-C6-B6-B5-C4-B4-B3-(C2-C8/C2-C1-C7), the 4th facility of operation, the 3rd facility, the second facility and first Facility, valve opening order be:A7-B7-C6-B6-B5-C4-B4-B3-C2-B2-B1-C7;(4)Individual facilities recoil mold cleaning Formula, Open valve B0 backwashes the first facility, and valve opening order is:B1-B2-(C8/C2-C3-C9/C2-C3-C4-C5- C10/C2-C3-C4-C5-C6-C11), the second facility is backwashed, valve opening order is:C1-C2-B3-B4-(C9/C4-C5- C10/C4-C5-C6-C11), the 3rd facility is backwashed, valve opening order is:C1-C2-C3-C4-B5-B6-(C10/C6- C11), the 4th facility is backwashed, valve opening order is:C1-C2-C3-C4-C4-C5-C6-B7-(C11/B8).
2. the free control method of water processing establishment operation according to claim 1, it is characterised in that:Described first is anti- Rinse on water inlet pipe, the second backwash water inlet pipe, the 3rd backwash water inlet pipe and the 4th backwash water inlet pipe respectively It is connected with reserved valve D1, reserved valve D2, reserved valve D3 and reserved valve D4.
3. the free control method of water processing establishment operation according to claim 1, it is characterised in that:Described water inlet is total On pipeline pipeline pump, pipeline flowmeter, pressure gauge and pipe-line mixer are sequentially provided with along water inlet direction.
4. the free control method of water processing establishment operation according to claim 1, it is characterised in that:Described water outlet is total Pipeline is provided with pressure gauge.
CN201510763988.1A 2015-11-11 2015-11-11 A kind of free control method of water processing establishment operation Active CN105293601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510763988.1A CN105293601B (en) 2015-11-11 2015-11-11 A kind of free control method of water processing establishment operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510763988.1A CN105293601B (en) 2015-11-11 2015-11-11 A kind of free control method of water processing establishment operation

Publications (2)

Publication Number Publication Date
CN105293601A CN105293601A (en) 2016-02-03
CN105293601B true CN105293601B (en) 2017-09-19

Family

ID=55191546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510763988.1A Active CN105293601B (en) 2015-11-11 2015-11-11 A kind of free control method of water processing establishment operation

Country Status (1)

Country Link
CN (1) CN105293601B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101842057B1 (en) * 2017-04-12 2018-03-26 한라아이엠에스 주식회사 Ballast water treatment system and Filter structure for Ballast water treatment system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001032287A1 (en) * 1997-02-27 2001-05-10 Kinetico Incorporated Filter for removing fine particles
CN2755074Y (en) * 2004-09-21 2006-02-01 沈阳戴维环保节能设备有限公司 Waste water filtering absorber set
CN101481182A (en) * 2008-12-12 2009-07-15 天津市水利科学研究所 Reverse osmosis water production apparatus, water production method, and method for cleaning and maintaining reverse osmosis water production apparatus
CN101935127A (en) * 2010-09-29 2011-01-05 南通海景船舶压载水处理系统股份有限公司 Ship ballast water comprehensive treatment system
CN102266685A (en) * 2011-06-09 2011-12-07 煤炭科学研究总院杭州环保研究院 Pressure gas and water mutual flushing filter and filtering method
CN203112576U (en) * 2013-01-30 2013-08-07 武汉市政工程设计研究院有限责任公司 High-efficient micropore aeration reactor for sewage treatment

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59154118A (en) * 1983-02-23 1984-09-03 Hitachi Ltd Filter
JPH0796087B2 (en) * 1989-12-29 1995-10-18 明雄 五十嵐 Liquid filtration device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001032287A1 (en) * 1997-02-27 2001-05-10 Kinetico Incorporated Filter for removing fine particles
CN2755074Y (en) * 2004-09-21 2006-02-01 沈阳戴维环保节能设备有限公司 Waste water filtering absorber set
CN101481182A (en) * 2008-12-12 2009-07-15 天津市水利科学研究所 Reverse osmosis water production apparatus, water production method, and method for cleaning and maintaining reverse osmosis water production apparatus
CN101935127A (en) * 2010-09-29 2011-01-05 南通海景船舶压载水处理系统股份有限公司 Ship ballast water comprehensive treatment system
CN102266685A (en) * 2011-06-09 2011-12-07 煤炭科学研究总院杭州环保研究院 Pressure gas and water mutual flushing filter and filtering method
CN203112576U (en) * 2013-01-30 2013-08-07 武汉市政工程设计研究院有限责任公司 High-efficient micropore aeration reactor for sewage treatment

Also Published As

Publication number Publication date
CN105293601A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN110282782A (en) A kind of inner pressed ultrafiltration water-purifying apparatus and its application method
CN105293601B (en) A kind of free control method of water processing establishment operation
CN204310857U (en) For purifier and the water-purifying machine of water-purifying machine
CN103551041A (en) Impulse-type reverse osmosis membrane off-line cleaning device
CN209105647U (en) Intelligent liquid manure all-in-one machine
CN205099412U (en) Reverse osmosis online cleaning water purification unit
CN2910907Y (en) Water treatment equipment able to recover total concentration water
CN207538155U (en) A kind of shunting well and its pump lifting device
CN202962281U (en) Flushing system for reverse osmosis membrane assembly in water purification machine
CN109603559A (en) A kind of the film off-line cleaning device and cleaning method of separated type MBR
CN207463002U (en) It is a kind of can way traffic reverse osmosis water purifier
CN203123677U (en) Bypass filter device
CN207845311U (en) A kind of cutting wastewater processing system
CN206780727U (en) Produce polyhexamethylene adipamide pelletizing water circulation system
CN205367920U (en) Domestic full room water treatment system
CN205642135U (en) Plate heat exchanger adds medicine backpurge system on line
CN203668095U (en) Forward and back washing system of intensive membrane biological reactor
KR100457799B1 (en) The valve unit with elbow pipe joint
CN220879837U (en) Self-cleaning and sterilizing device for pure water pipe network
CN204098194U (en) A kind of dewatering installation
CN214299422U (en) Water distribution device for centralized quality-divided water supply of hospital
CN206168060U (en) Rough filtering plate belt cleaning device of anticorrosive pressure filter
CN203564971U (en) Pulse type reverse osmosis membrane off-line washing device
CN206814404U (en) A kind of sewage treatment pipeline of back-flushing
CN203307876U (en) Centralized circulating water supply system for workshop

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant