CN105290704B - It is a kind of to reinforce the method that house steward changes spray boom and ear mount - Google Patents

It is a kind of to reinforce the method that house steward changes spray boom and ear mount Download PDF

Info

Publication number
CN105290704B
CN105290704B CN201510767456.5A CN201510767456A CN105290704B CN 105290704 B CN105290704 B CN 105290704B CN 201510767456 A CN201510767456 A CN 201510767456A CN 105290704 B CN105290704 B CN 105290704B
Authority
CN
China
Prior art keywords
welded
house steward
welding
reinforcing
spray boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510767456.5A
Other languages
Chinese (zh)
Other versions
CN105290704A (en
Inventor
张革
蓝天霞
陈桂萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AECC Shenyang Liming Aero Engine Co Ltd
Original Assignee
Shenyang Liming Aero Engine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Liming Aero Engine Group Co Ltd filed Critical Shenyang Liming Aero Engine Group Co Ltd
Priority to CN201510767456.5A priority Critical patent/CN105290704B/en
Publication of CN105290704A publication Critical patent/CN105290704A/en
Application granted granted Critical
Publication of CN105290704B publication Critical patent/CN105290704B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P6/00Restoring or reconditioning objects
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups

Abstract

The present invention is a kind of to reinforce the method that house steward changes spray boom and ear mount, and step is as follows:Faulty spray boom or ear mount, and the chip cleared up on pipeline are cut along the weld seam on reinforcing main pipe;Block the two ends for welding mouth earnestly;The excess solder of otch end face is disposed, and the sharp side of otch end face is beaten blunt, the closure at the two ends of otch is released;Remove the inner chamber of the reinforcing main pipe at otch two ends;Part to be welded is cleaned with gasoline, and dries up part to be welded;It is processed by shot blasting at otch end face place to be welded, and place to be welded is cleaned;Part to be welded is inserted in otch, inner cavity of pipe, which leads to argon gas, to be protected, and in place's tack welding 2~3 point to be welded, is then circumferentially welded at place to be welded;After welding is finished, welding position is checked;Weld vacuum is heat-treated, and eliminates welding stress;Carry out flow sealing detection.The upper faulty spray boom of reinforcing house steward and ear mount are changed, the purpose of reduction engine overhaul cost has been reached.

Description

It is a kind of to reinforce the method that house steward changes spray boom and ear mount
Technical field:
The present invention relates to technical field of engine overhaul, and in particular to a kind of reinforcing house steward changes the side of spray boom and ear mount Method.
Background technology:
Engine after a period of operation, is often accompanied by reinforcing house steward's flow, is distributed exceeded phenomenon, as shown in Figure 1, Figure 2 It is shown, spray boom 2 and ear mount 3 are included on reinforcing house steward 1, and Fuel Injector Bar 5 is circumscribed with, between spray boom 2 and ear mount 3 and reinforcing house steward 1 Crackle on weld seam 4, the excessive wear of the deforming of spray boom, disconnected bar, or ear mount, weld seam etc. is produced during welding can all cause reinforcing total Pipe produces failure, and reinforces house steward as the important component of oil supply system, and its repairing quality will directly affect engine Performance level, the lighter causes host performance to decline, and severe one burns parts, and have a strong impact on engine uses safety.Therefore, improve And engine Afterburner fuel manifold service technique is improved, strong technical support is provided for the safe handling of aero-engine, is had It is of great significance.
The content of the invention:
The method that house steward changes spray boom and ear mount is reinforced it is an object of the invention to provide a kind of, reinforcing house steward is upper faulty Spray boom and ear mount changed, reduce engine overhaul cost.
To achieve the above object, the present invention uses following technical scheme:
The method that a kind of reinforcing house steward that the present invention is provided changes spray boom and ear mount, is comprised the following steps that:
Step one:Faulty spray boom or ear mount are cut along the weld seam on reinforcing main pipe, and it is total to clean out reinforcing The chip left is cut in weldering on pipeline;
Step 2:Block the two ends that mouth earnestly is welded on reinforcing main pipe;
Step 3:The excess solder of otch end face is disposed, and the sharp side of otch end face is beaten blunt, it is then that incision is clear Reason is clean, releases the closure at the two ends of otch;
Step 4:Remove the inner chamber of the reinforcing main pipe at otch two ends;
Step 5:Part to be welded is cleaned with gasoline, and dries up part to be welded;
Step 6:It is processed by shot blasting at otch end face place to be welded, and place to be welded is cleaned;
Step 7:Part to be welded is inserted in otch, inner cavity of pipe, which leads to argon gas, to be protected, in place's tack welding 2~3 to be welded Point, is then circumferentially welded at place to be welded;
Step 8:After welding is finished, welding position is checked;
Step 9:Weld vacuum is heat-treated, and eliminates welding stress;
Step 10:Carry out flow sealing detection.
The two ends that mouth earnestly is welded on reinforcing main pipe are blocked in the step 2 with rayon balls.
The metal fillings and foul of total tube cavity are cleaned in the step 4 with the method for back suction, is examined and is rinsed to nothing with silk Foul.
Place to be welded is polished with group file in the step 6 to metallic luster is presented, and reinforcing house steward's pipe thickness is not less than 0.95mm, place to be welded is cleaned with absorbent cotton and alcohol.
Allow in the step 7 after tack welding correction, weld seam be not allow for because welding arc is removed suddenly and caused by pit, Weld seam uniformly and smoothly should be transferred on pipeline, and weld answers the defects such as flawless, burn, overlap, arc crater and undercut.
Welding position is checked using X-ray in the step 8.
Reinforcing house steward is all put into vacuum heat treatment furnace in the step 9, reinforcing house steward is kept flat into stove On workbench, fire door is shut, is vacuumized, vacuum reaches negative pressure, part is aoxidized during preventing heating, is then heated up, Temperature rises to 500~600 DEG C, and a period of time is placed in heat-treatment furnace insulation, becomes to eliminate the welding stress of weldment and correct Shape.
The fuel manifold of house steward's call through test device will be reinforced in the step 10, kerosene pressure is smoothly raised to 8.826MPa, keeps 5min, to the upper all welding inspections of reinforcing house steward, is not allow for crackle, examines the close of reinforcing house steward's weld seam Feng Xing, does not allow seepage.
The same reinforcing repair welding of house steward's same position and repair welding no more than 2 times, when first time changing spray boom or ear mount Change position to be marked, when once or for the second time changing spray boom or ear mount to the position repair welding, carried out again at repair welding Mark, does not allow to carry out repair welding to this position again after second of renewal part.
The present invention is a kind of to reinforce the beneficial effect that house steward changes the method for spray boom and ear mount:
Because existing carbon removing method can not be removed totally, cause indivedual Fuel Injector Bar fuel flows, distribution unqualified, due to Afterburner fuel manifold is the weld assembly that can not be split, and the conventional method such as aperture size on adjustment Fuel Injector Bar is only relied on when repairing The repairing requirement of Afterburner fuel manifold can not be fully met, so that whole house steward's scraps.Therefore for indivedual exceeded sprays Bar, such as occurring the failures such as spray boom is deformed, disconnected bar causes house steward's flow, distribution, injection direction unqualified can be using replacing spray The method of bar repairs house steward:Flow, distribution are removed beyond the spray boom of standard, new spray boom is welded again, it is ensured that house steward's flow, It is distributed pass the test.Pass through the processing of testpieces, adjustment, experiment, endurance test examination and verify, it was demonstrated that replacing spray boom and ear The repair method of seat, which disclosure satisfy that, recovers the requirement that Afterburner fuel manifold uses function, has reached reduction engine overhaul cost Purpose;The repair method disclosure satisfy that engine use requirement, can be applied to other combustions similar to engine structure, lubricating oil system The repairing of system part, is applied to engine overhaul at present, and technical prospect is considerable.
Brief description of the drawings:
Fig. 1 is the structural representation for reinforcing house steward of the invention;
Fig. 2 is the schematic cross-section for reinforcing house steward of the invention;
1- reinforces house steward, 2- spray booms, 3- ear mounts, 4- weld seams, 5- Fuel Injector Bars.
Embodiment:
With reference to embodiment, the present invention is described in further detail.
The present invention is a kind of to reinforce the method that house steward changes spray boom and ear mount, comprises the following steps that:
Step one:Faulty spray boom or ear mount are cut along the weld seam on reinforcing main pipe, and it is total to clean out reinforcing The chip left is cut in weldering on pipeline;
Step 2:The two ends that mouth earnestly is welded on reinforcing main pipe are blocked with rayon balls, total tube cavity is protected, prevents Only foreign matter enters;
Step 3:The excess solder of otch end face is disposed, and the sharp side of otch end face is beaten blunt, does not allow the machine of damaging Body, then cleans out incision, takes out rayon balls, releases the closure at the two ends of otch;
Step 4:The inner chamber metal fillings and foul of the reinforcing main pipe at otch two ends are removed with the method for back suction, thin,tough silk is used Cloth, which is examined, to be rinsed to without foul;
Step 5:Part to be welded is cleaned with gasoline, and part to be welded is dried up with compressed air;
Step 6:With a group file polished cut end face place to be welded, metallic luster, and reinforcing is presented in scale removal to place to be welded House steward's pipe thickness is not less than 0.95mm, and place to be welded is cleaned with absorbent cotton and alcohol, reduces weld defect;
Step 7:Part to be welded is inserted in otch, inner cavity of pipe, which leads to argon gas, to be protected, in place's tack welding 2~3 to be welded Allow after point, tack welding correction, weld seam be not allow for because welding arc is removed suddenly and caused by pit, then at place to be welded circumferentially Welded, weld seam uniformly and smoothly should be transferred on pipeline, weld answers flawless, burn, overlap, arc crater and undercut etc. to lack Fall into;
Step 8:After welding is finished, welding position is checked with X-ray;
Step 9:Weld vacuum be heat-treated, fuel manifold is all put into vacuum heat treatment furnace, house steward keep flat into On the workbench of stove, fire door is shut, is vacuumized, vacuum reaches negative pressure, part is aoxidized during preventing heating, is then carried out Heating, temperature rises to 500~600 DEG C, and a period of time is placed in heat-treatment furnace insulation, to eliminate welding stress, meanwhile, weldment If any deformation, it can be corrected;
Step 10:The fuel manifold of house steward's call through test device will be reinforced, kerosene pressure is smoothly raised to 8.826MPa, protected 5min is held, does not allow seepage, the sealing of house steward's weld seam is examined, wherein kerosene cleannes are not less than 7 grades (by GJB-420A standards Perform);
When changing section repair welding, same house steward's same position repair welding, no more than 2 times, spray boom or ear is changed in first time with repair welding Position mark " I " is being changed during seat, when once or for the second time changing spray boom or ear mount to the position repair welding, is being marked at repair welding Remember " II ", do not allow after second of renewal part again to this position repair welding.
Welding is as unbroken as possible to be carried out, and forbids to allow conduit in welding by any mechanism for causing stress.
During the entire process of welding, inner cavity of pipe leads to straight argon gas shielded.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent The present invention is described in detail with reference to above-described embodiment for pipe, those of ordinary skills in the art should understand that:Still may be used Modified or equivalent substitution, and repaiied without departing from any of spirit and scope of the invention with the embodiment to the present invention Change or equivalent substitution, it all should cover among present claims scope.

Claims (7)

1. a kind of reinforce the method that house steward changes spray boom and ear mount, it is characterised in that:Comprise the following steps that:
Step one:Faulty spray boom or ear mount are cut along the weld seam on reinforcing main pipe, and cleans out reinforcing house steward's pipe The chip left is cut in weldering on road;
Step 2:Block the two ends that mouth earnestly is welded on reinforcing main pipe;
Step 3:The excess solder of otch end face is disposed, and the sharp side of otch end face is beaten blunt, incision is then cleared up dry Only, the closure at the two ends of otch is released;
Step 4:Remove the inner chamber of the reinforcing main pipe at otch two ends;
Step 5:Part to be welded is cleaned with gasoline, and dries up part to be welded;
Step 6:It is processed by shot blasting at otch end face place to be welded, and place to be welded is cleaned;
Step 7:Part to be welded is inserted in otch, inner cavity of pipe, which leads to argon gas, to be protected, in place's tack welding 2~3 point to be welded, so Circumferentially welded at place to be welded afterwards;
Step 8:After welding is finished, welding position is checked;
Step 9:Weld vacuum is heat-treated, and eliminates welding stress;
And in the step 9, reinforcing house steward is all put into vacuum heat treatment furnace, reinforcing house steward keeps flat the work into stove Make on platform, shut fire door, vacuumize, vacuum reaches negative pressure, part is aoxidized during preventing heating, is then heated up, temperature Degree rises to 500~600 DEG C, is incubated in heat-treatment furnace and places a period of time, to eliminate welding stress and the correction deformation of weldment;
Step 10:Carry out flow sealing detection;
And in the step 10, the fuel manifold of house steward's call through test device will be reinforced, kerosene pressure is smoothly raised to 8.826MPa, keeps 5min, to injection loop and all welding inspections of fuel manifold, is not allow for crackle, examines reinforcing house steward's weldering The sealing of seam, does not allow seepage.
2. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:The step The two ends that mouth earnestly is welded on reinforcing main pipe are blocked in two with rayon balls.
3. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:The step The metal fillings and foul of total tube cavity are cleaned in four with the method for back suction, is examined and is rinsed to without foul with silk.
4. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:The step Place to be welded is polished with group file in six to metallic luster is presented, and reinforcing house steward pipe thickness is not less than 0.95mm, with absorbent cotton and Alcohol cleans place to be welded.
5. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:The step Allow correction in seven after tack welding, weld seam be not allow for because welding arc is removed suddenly and caused by pit, weld seam should be uniformly and smooth It is transferred on pipeline, weld answers flawless, burn, overlap, arc crater and undercut defect.
6. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:The step Welding position is checked using X-ray in eight.
7. a kind of method for reinforcing house steward's replacing spray boom and ear mount according to claim 1, it is characterised in that:Same house steward Same position repair welding, no more than 2 times, is marked, right with repair welding when first time changing spray boom or ear mount in replacing position When the position repair welding is once or second is changed spray boom or ear mount, marked again at repair welding, in second of renewal part Do not allow to carry out repair welding to this position again afterwards.
CN201510767456.5A 2015-11-11 2015-11-11 It is a kind of to reinforce the method that house steward changes spray boom and ear mount Active CN105290704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510767456.5A CN105290704B (en) 2015-11-11 2015-11-11 It is a kind of to reinforce the method that house steward changes spray boom and ear mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510767456.5A CN105290704B (en) 2015-11-11 2015-11-11 It is a kind of to reinforce the method that house steward changes spray boom and ear mount

Publications (2)

Publication Number Publication Date
CN105290704A CN105290704A (en) 2016-02-03
CN105290704B true CN105290704B (en) 2017-09-15

Family

ID=55188885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510767456.5A Active CN105290704B (en) 2015-11-11 2015-11-11 It is a kind of to reinforce the method that house steward changes spray boom and ear mount

Country Status (1)

Country Link
CN (1) CN105290704B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106363345B (en) * 2016-11-25 2018-09-14 沈阳黎明航空发动机(集团)有限责任公司 The replacing options of bearing case crackle oil pipe
CN109648177B (en) * 2018-12-21 2021-01-08 北京动力机械研究所 Pipeline connection method suitable for oil injection device
CN110823466A (en) * 2019-11-19 2020-02-21 中国航发贵州黎阳航空动力有限公司 Hydraulic test device for thrust augmentation main pipe fuel spray rod of aircraft engine
CN113714607B (en) * 2021-08-25 2023-01-06 西安远航真空钎焊技术有限公司 Method for processing main fuel pipe of gas turbine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4134427B2 (en) * 1999-03-08 2008-08-20 株式会社Ihi Pipe material welding method and existing pipe joint repair method
CN101444863A (en) * 2008-12-26 2009-06-03 中国人民解放军第五七一九工厂 Brazing method for repairing fuel line fault
CN102218638B (en) * 2010-04-14 2012-11-28 王茂才 Process method for repairing gas turbine vanes by micro-arc deposition coating
CN103567610B (en) * 2013-10-19 2016-12-07 沈阳黎明航空发动机(集团)有限责任公司 A kind of fuel manifold technique pin leakage of oil restorative procedure
CN103586639B (en) * 2013-11-11 2016-01-13 沈阳黎明航空发动机(集团)有限责任公司 A kind of Welding Structure fuel manifold processing method with nozzle

Also Published As

Publication number Publication date
CN105290704A (en) 2016-02-03

Similar Documents

Publication Publication Date Title
CN105290704B (en) It is a kind of to reinforce the method that house steward changes spray boom and ear mount
CN103338895A (en) Gas shielding device
US20080216300A1 (en) Splitter fairing repair
CN106493507B (en) A kind of vacuum brazing repair method of aero-engine supersonic speed adjustment sheet crackle
US6502303B2 (en) Method of repairing a turbine blade tip
CN102363239B (en) Automatic narrow-gap submerged arc welding process for all-welded fixed ball valve with medium and large calibers
CN101704154B (en) Patch welding repair method for machining liner of nickle-based wrought superalloy overhaul machine
CN105328396A (en) Blade replacement and repair method for stator blade assemblies of gas compressors
CN110253206A (en) The main screw hole damage rehabilitation method of nuclear power plant's reactor pressure vessel
CN109794668B (en) Method for welding closure seam of martensite heat-resistant steel container
CA2848944A1 (en) A method of repairing rotating machine components
CN106119831A (en) The restorative procedure of Turbine Sawtooth Shroud wear-out failure
CN110328438A (en) A kind of method that cold metal transfer technology repairs aero-engine cast superalloy part
CN104439632A (en) Method for repairing abrasion defect of thin-wall lubricating oil tank shell
CN104439770A (en) Repair method for sealing groove of locomotive diesel engine air cylinder sleeve
CN102717224B (en) Method for conducting powder sintering and forming and restoring to large blade gap defects of gas turbine
CN107009003A (en) The Rework Technics of Condenser Titanium Tube
CN107971693A (en) A kind of wheel chamber casing crackle repair method of titanium alloy inlet casing
CN101920429A (en) Combustion engine crankshaft electric spark overlaying repairing process
CN105149880B (en) A kind of preparation method of the fatigue test piece of high temperature alloy thin walled welds tubing
CN107175460A (en) Tuyere cover of blast furnace renovation technique
CN103567612B (en) A kind of flame tube repair method
CN101870040A (en) Cylinder fatigue internal-crack welding and restoring process of piston type oxygen compressor
CN111922626A (en) Method for repairing surface indentation damage of thin-wall pipe fitting of aircraft engine
CN104226976B (en) A kind of Co-based alloy powder for internal-combustion engine booster gas inlet shell laser repairing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 110043 Dong TA street, Dadong District, Shenyang, Liaoning Province, No. 6

Patentee after: Chinese Hangfa Shenyang Liming Aero engine limited liability company

Address before: 110043 Dong TA street, Dadong District, Shenyang, Liaoning Province, No. 6

Patentee before: Liming Aeroplane Engine (Group) Co., Ltd., Shenyang City