CN105275213A - An eggshell-shaped unbounded prestress angle-changing tensioning construction method - Google Patents

An eggshell-shaped unbounded prestress angle-changing tensioning construction method Download PDF

Info

Publication number
CN105275213A
CN105275213A CN201410303606.2A CN201410303606A CN105275213A CN 105275213 A CN105275213 A CN 105275213A CN 201410303606 A CN201410303606 A CN 201410303606A CN 105275213 A CN105275213 A CN 105275213A
Authority
CN
China
Prior art keywords
stretch
draw
tensioning
prestressing
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410303606.2A
Other languages
Chinese (zh)
Inventor
赵海莲
黄菊华
黄轶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN201410303606.2A priority Critical patent/CN105275213A/en
Publication of CN105275213A publication Critical patent/CN105275213A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides an eggshell-shaped unbounded prestress angle-changing tensioning construction method. The method comprises the steps of arranging bidirectional unbounded prestress tendons in the horizontal direction and the vertical direction of a digestion tank; designing an original annular prestress tendon rebar support into S-shaped prestress tendons, each having one end arranged on an outer side vertical rebar through spot welding and the other end provided with a groove used for lifting up one prestress rebar; employing the process of circular two-times over-tensioning of a single tendon, using jacks and tensioning oil pumps to synchronously tension four tensioning ends arranged in each layer of annular prestress tendons and then performing anchoring, wherein the first tensioning reaches 70% of control stress and the second tensioning reaches 1.03 times of the tensioning control stress; using angled wedge-shaped alloy steel cushion blocks to perform smooth shear conversion on steel strand bundles recessed in shell walls and realizing shell wall outside tensioning. The method is convenient to implement and low in cost and solves the problem of the difficulty in deflection tensioning in grooves. After the prestress of tensioning grooves is finished, the joints between the tensioning grooves and the surface of the tank body are smooth without bumps through anchor sealing.

Description

Eggshell shape prestressing without bondn angle-changing extension construction method
Technical field
The present invention relates to cast-in-situ concrete construction technical field, be specifically related to a kind of eggshell shape prestressing without bondn angle-changing extension construction method.
Background technology
Sludge digestion tank mainly contains toroidal and eggshell shape, and eggshell shape digester is a new technology of recent year municipal sludge process, and its planform is unique.Presstressed reinforcing steel plays an important role in egg shell construction, and it by prestressed stretch-draw, forms compressive pre-stress on the one hand in Quan, anti-only Quan cracking; Prestressed reinforcement is also the main steel bar stress of structure on the other hand, is effective guarantee that structural strength is met design requirement.
Be generally group anchor whole bundle angle-changing extension construction technology for eggshell shape digester binding prestress stretch-draw design, this construction technology difficulty is large, and process costs is higher.
In order to reduce difficulty of construction, through testing and verification before construction, work out and group's anchor entire beam tension is changed to single tendon stretch, this is conducive to greatly improving stretch-draw effect, adopt " single circulation twice ultra stretching " construction technology, the problem of groove intrinsic deflection stretch-draw difficulty can be solved.
Summary of the invention
Technical problem to be solved by this invention is the deficiency for above-mentioned existence, there is provided a kind of easy to operate, with low cost, solve the problem of groove intrinsic deflection stretch-draw difficulty, stretch-draw groove is after prestressing force of having constructed, pass through sealing off and covering anchorage, make stretch-draw groove be connected smooth-going with surface, pond, do not have irregular eggshell shape prestressing without bondn angle-changing extension construction method.
The technical solution adopted for the present invention to solve the technical problems is:
Eggshell shape prestressing without bondn angle-changing extension construction method, is characterized in that, include following construction sequence:
Two-way unbonded prestressing tendon is all arranged in digester level and vertical direction;
Former ring orientation prestress rib Steel bar rack is designed to S shape presstressed reinforcing steel support, one end points is welded on the vertical reinforcement of outside, and the groove of the other end is for holding up prestressed reinforcement;
Tensioning process: the technique adopting " single circulation twice ultra stretching ", ring orientation prestress rib every layer is provided with four stretching ends, and four ends adopt jack to coordinate stretching oil pump synchronous tension, and first time is stretched to 70% of proof stress, second time is stretched to the control stress for prestressing of 1.03 times, then anchoring; Vertical prestressing bar adopts orthogonal four direction synchronous tension techniques in plane, also equally adopts twice circulation ultra stretching with hoop.
Prestressing force angle-changing extension construction technology technology: adopt the angled wedge alloy steel cushion block of band, the steel wire bundle be recessed in shell wall is carried out smooth shear conversion, transfer to the outer stretch-draw of shell wall, prestressed Path of Force Transfer is made not have component, namely by angulator, limiting plate, retainer plate, the conversion of anchor slab angle, realize at housing external by specification Shi Hanzhang.
Tension sequence: first time stretch-draw hoop odd number layer (as the HJ1 → HJ3 →...→ HJ103) from the bottom up → first time stretch-draw hoop even numbers layer → first time stretch-draw vertical prestressing bar → second time stretch-draw vertical prestressing bar from the bottom up → hoop of the second time stretch-draw from top to bottom odd number layer → hoop of second time stretch-draw from top to bottom even numbers layer.
In hoop stretching process, stretching end should use Walkie talkie to keep in touch, when one end starts stretch-draw, the other end someone should observe the situation of change of Partner anchor clipper, as found intermediate plate slippage, whole stretch-draw should be suspended, after waiting the other end to adjust the tensioning equipment such as angulator, stretch-draw jack, then start four end synchronous tensions together.Every root presstressed reinforcing steel is numbered sequentially, and records stretch value by number.
Adopt stress control method, check the stretch value of unbonded prestressing tendon simultaneously, when being greater than or less than 6% of calculated extension value as actual elongation value, should stretch-draw being stopped, ascertaining the reason, after taking measures to be adjusted, can stretch-draw be continued.
In such scheme, described unbonded prestressing tendon arranges two bundle ring orientation prestress ribs along structure outward flange hoop in the horizontal direction, and four anchored end of ring orientation prestress rib intermesh overlap joint, and lap length is 1300 ~ 1600mm; The presstressed reinforcing steel of vertical direction is C30, more than 6.800m concrete label along the digester border following concrete label of layout digester absolute altitude 6.800m is C45, and concrete seepage-resistant grade is P10.
In such scheme, described ring orientation prestress rib is by manually penetrating in pool wall cage of reinforcement; Overlap a plastic flexible pipe outward again at ring orientation prestress rib sheath before wearing muscle, after ring orientation prestress rib laying is in place, plastic pipe is released, then with Plastic Bandage, ring orientation prestress rib is fixed on Steel bar rack; After vertical prestressing bar installs, overlap a plastic flexible pipe outward again, along with the rising of construction section, constantly moved up by plastic flexible pipe at vertical prestressing bar, protection vertical prestressing bar outer protective sleeve is not damaged; The prestress wire of vertical direction is arranged along digester border, and bottom is P type anchored end, and top is stretching end.
In such scheme, the installation steps of described anchor slab are, make groove shapes be fixed on outboard template with wooden form, hole on wooden form by the prestressed position of working drawing regulation, adopt nail to be fixed on wooden form by anchor slab; To ensure during installation the tangent line of presstressed reinforcing steel end and anchor slab perpendicular, wooden form formed groove planted agent filled and process or other material, in case concrete or mortar enter, anchor slab end and presstressed reinforcing steel intersection adopt foaming agent to fill, and prevent concrete from entering in anchor slab.
In such scheme, described tensioning process adopts following control program: initial tensioning 0 → 20% δ k(amount initial value) → 40% δ k→ 70% δ k(amount stretch value, anchoring) → mend stretch-draw 0 → 70% δ k(amount initial value) → 100% δ k→ 103% δ k(holding lotus 2 minutes, amount stretch value, anchoring).
Technical advantage of the present invention is:
By former ring orientation prestress rib Steel bar rack optimal design shape in "S" shape, spot welding, on the vertical reinforcement of outside, is saved a large amount of support reinforcing bars, is reduced construction cost.Adopt plastic pipe to presstressed reinforcing steel outsourcing protection when wearing muscle, avoid presstressed reinforcing steel and damage, cause added cost.Adopt " single circulation twice ultra stretching " construction technology, solve the problem of groove intrinsic deflection stretch-draw difficulty.Namely improve tensioning speed, shorten the duration, again save equipment cost expense.
Accompanying drawing explanation
Fig. 1 is the structural profile schematic diagram of embodiment of the present invention digester
Fig. 2 is embodiment of the present invention ring orientation prestress Steel bar rack schematic diagram
Fig. 3 embodiment of the present invention hoop four end synchronously deflects stretch-draw signal
Fig. 4 embodiment of the present invention angle-changing extension schematic diagram
1-ring orientation prestress rib in figure, 2-eggshell structural walls, 3-stretch-draw jack, 4-S shape presstressed reinforcing steel support, 5-outside vertical reinforcement, 6-former ring orientation prestress rib support, 7-angulator, 8-limiting plate, 9-retainer plate, 10-stretching end instrument ground tackle and anchor slab, 11-stretching end work ground tackle and anchor slab, 12-fixed end work ground tackle and anchor slab, 13-lengthen cylinder
14-vertical prestressing bar.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the present invention is further illustrated:
Eggshell shape prestressing without bondn angle-changing extension construction method as shown in Fig. 1 Fig. 2 Fig. 3 Fig. 4, includes following construction sequence:
Digester eggshell structural walls 2 level and vertical direction are furnished with two-way unbonded prestressing tendon.The following concrete label of digester absolute altitude 6.800m is C30, more than 6.800m concrete label is C45, and concrete seepage-resistant grade is P10.
Former ring orientation prestress rib Steel bar rack 6 optimal design become S shape presstressed reinforcing steel support 4, S shape presstressed reinforcing steel support 4 to make one end spot welding of S shape on outside vertical reinforcement 5 with Φ 10 garden steel, other end groove is for holding up ring orientation prestress rib 1.
Ring orientation prestress rib 1 is by manually penetrating in pool wall cage of reinforcement.Overlap a plastic flexible pipe outward again at ring orientation prestress rib 1 sheath before wearing muscle, ring orientation prestress rib 1 lay in place after, plastic pipe is released, then with Plastic Bandage, ring orientation prestress rib 1 is fixed on S shape presstressed reinforcing steel support 4; After vertical prestressing bar 14 installs, overlap the plastic flexible pipe of 4 meters long at vertical prestressing bar 14 outward again, along with the rising of construction section, constantly moved up by plastic flexible pipe, protection vertical prestressing bar 14 outer protective sleeve is not impaired.The presstressed reinforcing steel of vertical direction is arranged along digester border, and bottom is P type anchored end, and top is stretching end.
The installation of anchor slab: make groove shapes with wooden form and be fixed on outboard template, holes on wooden form by the prestressed position of working drawing regulation, adopts nail to be fixed on wooden form by anchor slab.To ensure during installation the tangent line of presstressed reinforcing steel end and anchor slab perpendicular, wooden form formed groove planted agent filled and process or other material, in case concrete or mortar enter, anchor slab end and presstressed reinforcing steel intersection adopt foaming agent to fill, and prevent concrete from entering in anchor slab.
Tensioning process: the technique adopting " single circulation twice ultra stretching ".Ring orientation prestress rib 1 every layer of four end adopt 270KN stretch-draw jack 3 to coordinate stretching oil pump synchronous tension, and first time is stretched to 70% of proof stress, and second time is stretched to the control stress for prestressing of 1.03 times, then anchoring.Vertical prestressing bar adopts orthogonal four direction synchronous tension techniques in plane, also equally adopts twice circulation ultra stretching with hoop.
Prestressing force angle-changing extension construction technology technology: angle-changing extension technology is according to prestressing force loading characteristic, because of by the space constraint of structure appearance and modeling, when stretch-draw mouth can not be arranged on the external direct stretch-draw of structure, the space transforming technology taked.Adopt the angled wedge alloy steel cushion block of band, the steel wire bundle be recessed in shell wall is carried out smooth shear conversion, transfer to the outer stretch-draw of shell wall, prestressed Path of Force Transfer is made not have component, namely carrying out angle conversion by lengthening cylinder 13, angulator 7, limiting plate 8, retainer plate 9, stretching end instrument ground tackle and anchor slab 10, stretching end work ground tackle and anchor slab 11, fixed end work ground tackle and anchor slab 12, realizing at housing external by specification Shi Hanzhang.
Tension sequence: first time stretch-draw hoop odd number layer (as the HJ1 → HJ3 →...→ HJ103) from the bottom up → first time stretch-draw hoop even numbers layer → first time stretch-draw vertical prestressing bar → second time stretch-draw vertical prestressing bar from the bottom up → hoop of the second time stretch-draw from top to bottom odd number layer → hoop of second time stretch-draw from top to bottom even numbers layer.
Cable tensios control program: initial tensioning 0 → 20% δ k(amount initial value) → 40% δ k→ 70% δ k→ (amount stretch value, anchoring), mends stretch-draw 0 → 70% δ k(amount initial value) → 100% δ k→ 103% δ k(holding lotus 2 minutes, amount stretch value, anchoring).
In hoop stretching process, stretching end should use Walkie talkie to keep in touch, when one end starts stretch-draw, the other end someone should observe the situation of change of Partner anchor clipper, as found intermediate plate slippage, whole stretch-draw should be suspended, after waiting the other end to adjust the tensioning equipment such as angulator 7, stretch-draw jack 3, then start four end synchronous tensions together.Every root presstressed reinforcing steel is numbered sequentially, and records stretch value by number.
Adopt stress control method, check the stretch value of unbonded prestressing tendon simultaneously, when being greater than or less than 6% of calculated extension value as actual elongation value, should stretch-draw being stopped, ascertaining the reason, after taking measures to be adjusted, can stretch-draw be continued.
More than illustrate and be only Application Example of the present invention, certainly can not limit the interest field of the present invention with this, therefore according to the equivalence change that the present patent application the scope of the claims is done, still belong to protection scope of the present invention.

Claims (4)

1. eggshell shape prestressing without bondn angle-changing extension construction method, is characterized in that, includes following construction sequence:
Two-way unbonded prestressing tendon is all arranged in digester level and vertical direction;
Former ring orientation prestress rib Steel bar rack is designed to S shape presstressed reinforcing steel support, one end points is welded on the vertical reinforcement of outside, and the groove of the other end is for holding up prestressed reinforcement;
Tensioning process: the technique adopting " single circulation twice ultra stretching ", ring orientation prestress rib every layer is provided with four stretching ends, and four ends adopt jack to coordinate stretching oil pump synchronous tension, and first time is stretched to 70% of proof stress, second time is stretched to the control stress for prestressing of 1.03 times, then anchoring; Vertical prestressing bar adopts orthogonal four direction synchronous tension techniques in plane, also equally adopts twice circulation ultra stretching with hoop;
Prestressing force angle-changing extension construction technology technology: adopt the angled wedge alloy steel cushion block of band, the steel wire bundle be recessed in shell wall is carried out smooth shear conversion, transfer to the outer stretch-draw of shell wall, prestressed Path of Force Transfer is made not have component, namely by angulator, limiting plate, retainer plate, the conversion of anchor slab angle, realize at housing external by specification Shi Hanzhang;
Tension sequence: the first time stretch-draw hoop odd number layer from the bottom up → first time stretch-draw hoop even numbers layer → first time stretch-draw vertical prestressing bar → second time stretch-draw vertical prestressing bar from the bottom up → hoop of the second time stretch-draw from top to bottom odd number layer → hoop of second time stretch-draw from top to bottom even numbers layer;
In hoop stretching process, stretching end should use Walkie talkie to keep in touch, when one end starts stretch-draw, the other end someone should observe the situation of change of Partner anchor clipper, as found intermediate plate slippage, whole stretch-draw should be suspended, after waiting the other end to adjust the tensioning equipment such as angulator, stretch-draw jack, then start four end synchronous tensions together;
Every root presstressed reinforcing steel is numbered sequentially, and records stretch value by number;
Adopt stress control method, check the stretch value of unbonded prestressing tendon simultaneously, when being greater than or less than 6% of calculated extension value as actual elongation value, should stretch-draw being stopped, ascertaining the reason, after taking measures to be adjusted, can stretch-draw be continued.
2. eggshell shape prestressing without bondn angle-changing extension construction method as claimed in claim 1, it is characterized in that, described unbonded prestressing tendon arranges two bundle ring orientation prestress ribs along structure outward flange hoop in the horizontal direction, four anchored end of ring orientation prestress rib intermesh overlap joint, and lap length is 1300 ~ 1600mm; The presstressed reinforcing steel of vertical direction is C30, more than 6.800m concrete label along the digester border following concrete label of layout digester absolute altitude 6.800m is C45, and concrete seepage-resistant grade is P10.
3. eggshell shape prestressing without bondn angle-changing extension construction method as claimed in claim 1, it is characterized in that, described ring orientation prestress rib is by manually penetrating in pool wall cage of reinforcement; Overlap a plastic flexible pipe outward again at ring orientation prestress rib sheath before wearing muscle, after ring orientation prestress rib laying is in place, plastic pipe is released, then with Plastic Bandage, ring orientation prestress rib is fixed on Steel bar rack; After vertical prestressing bar installs, overlap a plastic flexible pipe outward again, along with the rising of construction section, constantly moved up by plastic flexible pipe at vertical prestressing bar, protection vertical prestressing bar outer protective sleeve is not damaged; The prestress wire of vertical direction is arranged along digester border, and bottom is P type anchored end, and top is stretching end.
4. eggshell shape prestressing without bondn angle-changing extension construction method as claimed in claim 1, it is characterized in that, the installation steps of described anchor slab are, making groove shapes with wooden form is fixed on outboard template, hole on wooden form by the prestressed position of working drawing regulation, adopt nail to be fixed on wooden form by anchor slab; To ensure during installation the tangent line of presstressed reinforcing steel end and anchor slab perpendicular, wooden form formed groove planted agent filled and process or other material, in case concrete or mortar enter, anchor slab end and presstressed reinforcing steel intersection adopt foaming agent to fill, and prevent concrete from entering in anchor slab.
CN201410303606.2A 2014-06-30 2014-06-30 An eggshell-shaped unbounded prestress angle-changing tensioning construction method Pending CN105275213A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410303606.2A CN105275213A (en) 2014-06-30 2014-06-30 An eggshell-shaped unbounded prestress angle-changing tensioning construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410303606.2A CN105275213A (en) 2014-06-30 2014-06-30 An eggshell-shaped unbounded prestress angle-changing tensioning construction method

Publications (1)

Publication Number Publication Date
CN105275213A true CN105275213A (en) 2016-01-27

Family

ID=55144963

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410303606.2A Pending CN105275213A (en) 2014-06-30 2014-06-30 An eggshell-shaped unbounded prestress angle-changing tensioning construction method

Country Status (1)

Country Link
CN (1) CN105275213A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419833A (en) * 2016-06-24 2017-12-01 中建六局建设发展有限公司 A kind of annular two-way double helix prestressing without bondn cored slab track construction method
CN112663774A (en) * 2021-01-18 2021-04-16 中铁八局集团有限公司 Construction method of unbonded prestressed large-diameter reinforced concrete thin-wall circular water tank

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200652A (en) * 2000-01-17 2001-07-27 Ps Corp Prestressing method for egg-shaped concrete vessel structure
CN1480595A (en) * 2003-07-21 2004-03-10 上海市政工程设计研究院 Egg-shaped digestion tank and its construction method
US20100284749A1 (en) * 2007-11-13 2010-11-11 Capron Mark E Systems and methods for off-shore energy production and carbon dioxide sequestration
CN103628496A (en) * 2013-11-27 2014-03-12 上海市政工程设计研究总院(集团)有限公司 Egg-shaped digestion tank and construction method of vertical prestressed tendons at bottom of egg-shaped digestion tank

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001200652A (en) * 2000-01-17 2001-07-27 Ps Corp Prestressing method for egg-shaped concrete vessel structure
CN1480595A (en) * 2003-07-21 2004-03-10 上海市政工程设计研究院 Egg-shaped digestion tank and its construction method
US20100284749A1 (en) * 2007-11-13 2010-11-11 Capron Mark E Systems and methods for off-shore energy production and carbon dioxide sequestration
CN103628496A (en) * 2013-11-27 2014-03-12 上海市政工程设计研究总院(集团)有限公司 Egg-shaped digestion tank and construction method of vertical prestressed tendons at bottom of egg-shaped digestion tank

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
万玉生等: "无粘结预应力卵形消化池结构设计与施工", 《特种结构》 *
佚名: "蛋壳形消化池无粘结预应力施工", 《百度文库》 *
刘军进等: "宜昌预应力卵形消化池摩阻损失及张拉伸长值实测", 《特种结构》 *
刘跃良: "无粘结预应力蛋形消化池的施工技术", 《特种结构》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107419833A (en) * 2016-06-24 2017-12-01 中建六局建设发展有限公司 A kind of annular two-way double helix prestressing without bondn cored slab track construction method
CN112663774A (en) * 2021-01-18 2021-04-16 中铁八局集团有限公司 Construction method of unbonded prestressed large-diameter reinforced concrete thin-wall circular water tank

Similar Documents

Publication Publication Date Title
CN106522561B (en) Stretch-draw construction method in large-span concrete Vierendeel girder bonded prestress post-cast strip
WO2018006558A1 (en) Confined high-strength concrete support system applicable to underground tunnel
CN103966953B (en) Based on the post-tensioned prestressed large-span concrete beam construction method of non-bending steel cable
CN101672007A (en) Constructing method of precast pier footing for bridge
CN104976424B (en) Anchor cable construction method for rectangular top pipe joint connecting and strengthening
CN102505636A (en) Construction method of No.0 block of continuous rigid frame bridge of double-thin-wall pier
CN106988477A (en) Assembled two dimension prestressing cored slab and preparation method thereof
CN103726586A (en) H-shaped steel and steel plate framework assembly shear wall with interfaces with grooves and manufacturing method
CN105649217A (en) Profiled steel structure beam column joint for reverse construction of stiffened structure and construction method
CN102363957B (en) A kind of post-tensioned prestressing composite uplift pile
CN105275213A (en) An eggshell-shaped unbounded prestress angle-changing tensioning construction method
CN205223839U (en) Bridge prefabrication stand and prefabricated bent cap slot -in type connection structure
CN205296209U (en) Prestressed anchorage cable assembled stake siding wall protective structure
JP2012097433A (en) Reinforcement body of concrete structure, reinforcement structure of concrete structure, and reinforcement method of concrete structure
JP2014151926A (en) Aboveground tank and construction method for the same
CN201372441Y (en) Bonded and unbonded prestressed concrete basement structure
CN105568856A (en) Synchronous construction method for sparse-cable-stayed bridge cable beam
CN202194131U (en) Partially prestressed cantilever soldier pile
CN209837372U (en) Wall structure member built by cutting barred rocks by prestress machine
CN107724241B (en) Construction method for cable-stayed bridge deck auxiliary structure through counterweight construction
CN103850259A (en) Horizontal inner support at capping beam elevation of foundation pit supporting and protecting system and construction method thereof
JP5562715B2 (en) Underwater foundation construction method and outer shell structure
CN102162224B (en) Top reaching one-time casting process of concrete check gate seam pier
CN202055338U (en) Horizontal haunching and variable-angle stretching prestressed concrete structure
CN202194144U (en) Ground pit inclined tension pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160127