CN105273759B - A kind of method and its design method and purposes for removing crystal salt - Google Patents

A kind of method and its design method and purposes for removing crystal salt Download PDF

Info

Publication number
CN105273759B
CN105273759B CN201510696047.0A CN201510696047A CN105273759B CN 105273759 B CN105273759 B CN 105273759B CN 201510696047 A CN201510696047 A CN 201510696047A CN 105273759 B CN105273759 B CN 105273759B
Authority
CN
China
Prior art keywords
separator
water
pipeline
temperature
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510696047.0A
Other languages
Chinese (zh)
Other versions
CN105273759A (en
Inventor
李苏安
邓清宇
王坤朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGKE CHUANGYI TECH DEVELOPMENT Co Ltd
Original Assignee
ZHONGKE CHUANGYI TECH DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGKE CHUANGYI TECH DEVELOPMENT Co Ltd filed Critical ZHONGKE CHUANGYI TECH DEVELOPMENT Co Ltd
Priority to CN201510696047.0A priority Critical patent/CN105273759B/en
Priority to PCT/CN2015/094113 priority patent/WO2017067025A1/en
Publication of CN105273759A publication Critical patent/CN105273759A/en
Application granted granted Critical
Publication of CN105273759B publication Critical patent/CN105273759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10GCRACKING HYDROCARBON OILS; PRODUCTION OF LIQUID HYDROCARBON MIXTURES, e.g. BY DESTRUCTIVE HYDROGENATION, OLIGOMERISATION, POLYMERISATION; RECOVERY OF HYDROCARBON OILS FROM OIL-SHALE, OIL-SAND, OR GASES; REFINING MIXTURES MAINLY CONSISTING OF HYDROCARBONS; REFORMING OF NAPHTHA; MINERAL WAXES
    • C10G75/00Inhibiting corrosion or fouling in apparatus for treatment or conversion of hydrocarbon oils, in general
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation

Abstract

The method and its design method and purposes of a kind of removing crystal salt of the present invention, the removal methods set at least one concentration detector in the wastewater outlet pipeline of afterbody separator, detect the concentration of tamper in the waste water converged after the location of water injection water filling is rinsed, and determine to block the species of material, then it is 50 1000 times of each tamper saturated concentration water requirement to control the water injection rate of each location of water injection according to tamper concentration and species, the pipeline between pipeline and/or separator and/or separator of the location of water injection between reactor and separator.The removal methods are applied to equipment and pipeline in slurry bed system hydrogenation technique, solve the problems, such as that the amount of the accessory substance such as crystalline material in hydrogenation products is big, monitor tamper content in real time, fall tamper in removing hydrogenation plant and pipeline in time, reduce the nitrogen in hydrogenation products and in separated fluid oil intermediate product, content of beary metal.

Description

A kind of method and its design method and purposes for removing crystal salt
Technical field
The present invention relates to a kind of method and its design method and purposes for removing crystal salt in hydrogenation plant and pipeline, at the same time The tamper such as metal salt and other accessory substances can be also removed, belongs to petrochemical industry and coal chemical technology.
Background technology
Mink cell focus (including residual oil, catalytic slurry, de-oiled asphalt and coal tar) slurry bed system hydrogen addition technology, oily coal mix in recent years Refining and the research of direct coal liquefaction technology (core process is slurry bed hydroprocessing) are in the ascendant, and main cause is slurry bed hydroprocessing Technique can efficiently use heavy oil resources and coal resources, remove the impurity such as sulphur, nitrogen and heavy metal in raw material, improve at the same time The yield and quality of light oil, and then improve the economic benefit of processing enterprise.However, since reaction mass can give birth in hydrogenation reaction Into the crystal salts such as ammonium hydrogen carbonate, ammonium sulfide, metal salt and other accessory substances, these salt can crystallize precipitation, and its in low temperature Its accessory substance deposits to together blocks pipeline, wear equipment and pump valve on tube wall, cause the adverse consequences such as shut-down.Add compared to conventional Hydrogen production device, heavy-oil slurry hydrogenation, the sulfur-bearing of DCL/Direct coal liquefaction and raw material handled by oily coal calendering process, nitrogen, amount of metal and its Its impurity is often the amount bigger of the accessory substance such as higher, the crystalline material generated after hydrogenation reaction, if these materials are not in time Removing is fallen, and causes blocking and abrasion to hydrogenation plant and pipeline, or even causes equipment to stop maintenance, seriously affects whole factory Manufacturing schedule, increase production cost.
At present, it is typically using the method in conventional hydro reaction, i.e., using desalted water to this way to solve the problem Rinse block pipeline removing crystal salt, desalted water refer to remove soft water in hydroxide ion, sodium ion, sulfate ion and make Into a kind of water quality, soft water refers to remove the calcium and magnesium ion in fresh water and the water quality that is formed.Filling pipe is generally located at position Between the heat exchanger before high-pressure separator and air-cooled phase, and a filling pipe, high-pressure separator one are usually only set As be 1~2.Backwashing manner includes continuous or irregularly arbitrarily rinses two ways, and wherein continuous flushing mode is to blocking Pipeline discharges water flushing always, the advantage of doing so is that flushing effect is preferable, but desalted water continual rinsing, serious waste water resource. Irregularly arbitrarily backwashing manner be when finding to contain more ammonium salt or metal ion in liquid oil product or discovering device or When pipeline blocks, just discharge water and be rinsed, although water resource can be saved effectively, to the blocking in the pipeline that has blocked Thing is rinsed and is not thorough, and especially to slightly soluble and material not soluble in water, equipment and pipe wear and blocking is caused, so oil plant Can often replace reactor after heat exchanger and air cooler heat exchanger tube.In addition, even if it is also what is mended the fold after the sheep is lost to be rinsed Way, intermediate products before enter next process and can not remedy containing impurity such as crystal salt and metal salts, and And an injection point is very little, removing crystal salt is caused to be not thorough.Therefore, the prior art is to crystal salt in hydrogenation plant and pipeline Processing mode is not planned reasonably, can not meet requirement of the slurry bed system hydrogenation reaction to removing tamper.
The content of the invention
Based on problems of the prior art, the present invention provides a kind of hydrogenation plant and crystal salt in pipeline of removing Method, selects suitable injection point to set filling pipe, and determines water injection rate according to the solubility of crystalline material in water, ensures Its concentration is far below saturated concentration.Effectively contained crystal in reactor outlet oil and other materials that may be blocked are separated Out, wastewater treatment equipment is sent to.
Technical scheme:
A kind of method for removing crystal salt in hydrogenation plant and pipeline, it is characterised in that at least in afterbody separator Concentration detector is set in wastewater outlet pipeline, detects the concentration of crystal salt in the waste water converged after location of water injection water filling is rinsed, Then the water injection rate of location of water injection control as 50-1500 times of crystal salt saturated concentration water requirement according to crystallization salinity, it is described Pipeline between pipeline and/or separator and/or separator of the location of water injection between reactor and separator.
The preferable separator include multiple high-pressure separators that light fraction outlet is contacted successively, temperature reduces successively and Multiple normal pressure separators that light fraction outlet corresponding with high-pressure separator is contacted successively, the restructuring of each high-pressure separator The light fraction outlet of the sub-export normal pressure separator identical with corresponding temperature communicates.
The high-temperature high-pressure separator, medium temperature high-pressure separator, room temperature that further preferred separator includes contacting successively are high Press separator, and low-voltage high-temperature separator, low pressure medium temperature separator and the low pressure normal temperature separator contacted successively, location of water injection The pipeline between pipeline, each high-pressure separator before respectively described high-temperature high-pressure separator entrance, it is described last Primary separator is normal temperature and pressure separator.
Valve and sensor are preferably set on the filling pipe, and the sensor connects with the concentration detector Connect.
The valve is preferably internally piloted valve and/or hand valve.
Preferably there is 1-8 water injecting pipeline in each location of water injection.
The injection water quality is preferably desalted water.
Preferable water filling temperature is 15-200 DEG C, pressure 1.0-25.0MPa.
The purposes of the method for crystal salt in above-mentioned removing hydrogenation plant and pipeline, it is characterised in that for heavy-oil hydrogenation work The reactor and separator of skill, direct coal liquefaction process and oily coal calendering process, the heavy oil hydrogenation process refer to residual oil, catalysis Slurry oil, de-oiled asphalt, the one or more of coal tar are combined as raw material and are processed;The oil coal calendering process refers to original One or more kinds of combinations in oil, residual oil, catalytic slurry, de-oiled asphalt and coal tar and one kind in lignite, bituminous coal or Multiple combinations are processed for raw material, and the proportion of oil and coal is 97-30:3-70.
A kind of design method for removing crystal salt in hydrogenation plant and pipeline, it is characterised in that design is at least in afterbody Concentration detector is set in the wastewater outlet pipeline of separator, detects crystal salt in the waste water converged after location of water injection water filling is rinsed Concentration, the water injection rate of each location of water injection is then controlled as each tamper saturated concentration water requirement according to tamper concentration 50-1500 times, between pipeline and/or separator and/or separator of the location of water injection between reactor and separator Pipeline.
The technique effect of the present invention:
The method of crystal salt, goes out in the waste water of afterbody separator in a kind of the removing hydrogenation plant and pipeline of the present invention Concentration detector is set on mouth pipeline, the waste strength of its discharge is detected, so as to react hydrogenation products in whole hydrogenation system The content situation of the crystal salt blocked with the possibility in the fluid oil isolated.Therefore this method can real-time online detection can The concentration for the crystal salt that can be blocked, so that more than 50 times that water injection rate is each tamper saturated concentration water requirement are controlled, one Aspect is completely dissolved the crystal in pipeline and setting, controls it not crystallize as far as possible, on the other hand, due to the complexity of system Property, the failure of change or system part of the crystal in some pipelines or reactor due to temperature and pressure may also be at certain Partially crystallizable can occur for a little positions, in addition, the possibility that other solid matters precipitate also inevitably is had in system, this The crystallization that inventing rational water injection rate can ensure to produce all is dissolved, while can also will likely produce the other of blocking Insoluble matter develops, and realizes the complete removing to each blocking material.The species of salt probably from feedstock when may determine that Come, when device is just run, for the silt, iron rust in system when tamper is less, water injection rate is 50-800 times, and water injection rate one is In view of needing the concentration by salt to fall farther below saturated concentration, to avoid the possibility of crystallization, furthermore crystallization is allowed for The ion of saline solution, such as Cl-, NO3Equipment can be caused to corrode, so its concentration is dropped to dilute enough;-When device is transported Row is more than half a year, it is necessary to which more water are rinsed out, it is necessary to inject 800-1500 times when silt, iron rust tamper are more Water.
This method real-time online understands tamper situation, continuous water filling, in time, fully removes among production phase oil Tamper in product, while the size of the situation adjusting water injection rate according to the crystal salt for being easiest to block, cost is controllable, saves Use water.Location of water injection be distributed in hydrogenation piece-rate system before, composition piece-rate system separator between so that hydrogenation products flow through The pipeline that blocks of possibility and equipment rinsed, blocking position is completely covered so that among isolated fluid oil Nitrogen, content of beary metal in product reduce.
The sensor receives the concentration signal that concentration sensor is sent and adjusts the valve to control water injection rate.
It is big in water injection rate and noted according to by the dimension scale and water injection rate of the equipment of water filling and pipeline and water injecting pipeline When water lines are smaller, more water injecting pipelines are set, with rational deployment water injecting pipeline, are mitigated to by the impact of water injecting pipeline while reality Now more preferable flushing effect.
The method of crystal salt is directed to slurry bed system hydrogenation technique in a kind of monitoring of the present invention and removing hydrogenation plant and pipeline The problem of amount of the accessory substances such as the crystalline material generated after middle hydrogenation reaction is big, designs the wastewater outlet in last separator Set concentration monitoring device to monitor crystal content in real time, and water injection rate is controlled according to concentration, multiple location of water injection are set, in time prison The tamper in hydrogenation plant and pipeline is surveyed and removed, overcomes it to deposit on tube wall and blocks pipeline, to equipment and pump valve Cause to wear, cause the adverse consequences such as shut-down, solve above-mentioned technical problem.
Brief description of the drawings
Fig. 1 is the embodiment schematic diagram of tamper in the piece-rate system in the removing slurry bed system hydrogenation technique of the present invention.
Each label lists as follows in figure:
1- high-temperature high-pressure separators, 2- medium temperature high-pressure separators, 3- normal temperature high voltage separators, 4- low-voltage high-temperature separators, 5- low pressure medium temperature separators, 6- low pressure normal temperature separators, 7- reaction products, 8- cooling agents, 9- desalted waters, 10- circulating hydrogens, 11- tail gas, 12- room temperature oil, 13- waste water, 14- medium temperatures oil, 15- high temperature oils.
Embodiment
For the technology contents that the present invention is further explained, will be illustrated with reference to the drawings and specific embodiments.
As shown in Figure 1, method of the present embodiment for the tamper in removing high pressure piece-rate system, piece-rate system belong to slurry Separating technology in bed hydroprocessing reaction process.High pressure piece-rate system is made of six different separators, is respectively high temperature and pressure Separator 1, medium temperature high-pressure separator 2, normal temperature high voltage separator 3, low-voltage high-temperature separator 4, low pressure medium temperature separator 5 and low pressure Normal temperature separator 6.The Room-temperature low-pressure separator 6 is placed for horizontal type level, remaining separator is vertical vertical placement.To reach The tampers such as the crystal salt in slurry reactor equipment and pipeline are removed, it is necessary to select suitable water quality, water temperature, hydraulic pressure, water filling Point, in addition, will also determine water injection rate according to the solubility of crystalline material in water, ensure that its concentration is dense far below saturation Degree.Pipeline of the location of water injection of the present embodiment between separator, there is provided two location of water injection, first location of water injection Filling pipe connects the pipeline between high-temperature high-pressure separator 1 and medium temperature high-pressure separator 2;The note of second location of water injection Pipeline between waterpipe connection medium temperature high-pressure separator 2 and normal temperature high voltage separator 3, with remove may contain in pipeline it is stifled Plug thing.
In order to monitor the distribution situation of the tamper such as crystal salt in the concentration of waste water and waste water, and Reasonable Regulation And Control water filling in real time Amount, waste water resource does not realize good removal effect at the same time, and the present embodiment is set in 6 wastewater outlet pipeline of Room-temperature low-pressure separator Concentration detector (DEN) is put, while sensor and valve are set on filling pipe, the concentration detector and each filling pipe On sensor connection.The concentration detector can detect that the density of crystal salt in waste water, then pass to concentration signal Sensor on filling pipe, adjusts water injection valve.
In the present embodiment, when temperature is 50 DEG C, during DEN=1.36kg/l, salt is judged for sodium chloride, potassium chloride, correspondence Concentration for 27wt%, it is necessary to by concentration dilution to 0.03wt%, corresponding DEN is 1.01kg/l at this time, when water injection rate reaches When can make DEN=1.01kg/l, water injection rate is suitable.Wet concentration desalted water is injected, temperature is 40 DEG C, pressure 20MPa, is adjusted Water injection rate is about 500 times of crystal saturated concentration in water.
So in the case where water consumption keeps less, big corrosion will not be caused to equipment.
The technique of conventional desalination:1st, water consumption is big, 2, wastewater treatment load it is excessive, it will usually more than design load, safety Hidden danger is big, and production cost is high.
The tampers such as the crystal salt in the pipeline between separator in the removing slurry bed system hydrogenation technique of the present embodiment Workflow is as follows:
Reaction product 7 enters high-temperature high-pressure separator 1 after cooling agent 8 is cooled to, and operation temperature is 420 DEG C, operation pressure Power is 18.7MPa, and the gas phase that 1 top of high-temperature high-pressure separator is isolated enters medium temperature high-pressure separator 2 after cooling, water filling, Liquid phase enters high-temperature low-pressure separator 4 after Liquid level valve regulation.Water injection rate ensures high-temperature high-pressure separator 1 and medium temperature high pressure The crystal salt in pipeline between separator 2, which is dissolved, to be taken away, while is ensured that insoluble matter is rinsed and taken away, while after ensureing water filling Gas phase media temperature be not less than 250 DEG C.2 operation temperature of medium temperature high-pressure separator is 285 DEG C, and operating pressure is 18.6MPa, on The gas phase that part separates out enters normal temperature high voltage separator 3 after cooling down, noting desalted water 9 and secondary cooling, and liquid phase is through Liquid level Enter medium temperature low pressure separator 5 after valve regulation, water injection rate used ensure medium temperature high-pressure separator 2 and normal temperature high voltage separator 3 it Between pipeline in crystal salt be dissolved and take away, while ensure that insoluble matter is rinsed and take away.3 operation temperature of normal temperature high voltage separator It it is 55 DEG C, operating pressure is 18.5MPa, and the gas phase that top is isolated is used as circulating hydrogen 10, under normal temperature high voltage separator 3 The liquid phase in portion enters Room-temperature low-pressure separator 6 after Liquid level valve regulation;4 operation temperature of high-temperature low-pressure separator is 420 DEG C, Operating pressure is 3.0MPa, and the gas phase that top is isolated enters medium temperature low pressure separator 5 after cooling, and liquid phase is through fluid level control valve Go out piece-rate system as high temperature oil 15 after adjusting;5 operation temperature of medium temperature low pressure separator is 285 DEG C, and operating pressure is 2.9MPa, Upper gaseous phase enters Room-temperature low-pressure separator 6 after cooling, and liquid phase goes out separation after Liquid level valve regulation as medium temperature oil 14 System;6 operation temperature of Room-temperature low-pressure separator is 55 DEG C, and operating pressure is 2.8MPa, and upper gaseous phase goes out separation as tail gas 11 System enters gas treatment equipment, and lower liquid phase goes out piece-rate system as room temperature oil 12, in liquid collecting bag containing crystalline material and its The waste water 13 of its accessory substance removes wastewater treatment equipment.Verified by accumulation up to 6000 pilot scales when small, nothing in each equipment and pipeline Clogging, it is possible to achieve the long period of device is continuously run.
Certainly the method for the present invention also can also be set according to actual conditions, if being blocked in separator on separator Filling pipe is put, rinses the tampers such as crystal salt in it.Or also can be before hydrogenation reaction product enters piece-rate system i.e. Filling pipe is set in pipeline before high-temperature high-pressure separator 1.
The removal methods of the present invention can also be applied in conventional hydrogenation process, remove the blocking in hydrogenation plant and pipeline Thing, dissolving crystallized thing, rinses out insoluble matter.
From above-described embodiment as can be seen that using the method for crystal salt in a kind of removing hydrogenation plant and pipeline of the invention Real time and on line monitoring waste water situation, and according to tamper concentration and species reasonably select desalted water, suitable water temperature and hydraulic pressure, Water injection rate is 50-1500 times of each crystal salt saturated concentration, sets multiple location of water injection to remove in time in hydrogenation plant and pipeline Fall tamper, it is accurate control, easy to operate and practical.Can be by there may be blocking in product after slurry bed system hydrogenation reaction Material separate, avoid block pipeline, cause to stop work.

Claims (8)

  1. A kind of 1. method for removing crystal salt in hydrogenation plant and pipeline, it is characterised in that at least in the useless of afterbody separator Concentration detector is set in water exit conduit, detects the concentration of crystal salt in the waste water converged after location of water injection water filling is rinsed, so The crystal salt element species in crystallization salinity, temperature and raw material judge crystal salt species and control location of water injection afterwards Water injection rate;Pipe between pipeline and/or separator and/or separator of the location of water injection between reactor and separator Road, when temperature be 50 DEG C, when the numerical value of concentration detector is 1.36kg/l, judge salt for sodium chloride, potassium chloride, corresponding concentration For 27wt%, it is necessary to by concentration dilution to 0.03wt%, adjust water injection rate for crystal salt in water saturated concentration water consumption 500 Times, the reactor and separator are used in heavy oil hydrogenation process, direct coal liquefaction process and oily coal calendering process, the heavy oil Hydrogenation technique refers to be combined as raw material and is processed with the one or more of residual oil, catalytic slurry, de-oiled asphalt, coal tar;Institute State oily coal calendering process refer to one or more kinds of combinations in crude oil, residual oil, catalytic slurry, de-oiled asphalt and coal tar with it is brown One or more in coal, bituminous coal are combined as raw material and are processed, and the proportion of oil and coal is 97-30:3-70.
  2. 2. according to the method described in claim 1, it is characterized in that separator contact successively including light fraction outlet, temperature successively Multiple normal pressures that the multiple high-pressure separators and light fraction outlet corresponding with high-pressure separator reduced are contacted successively separate Device, the light fraction outlet of the restructuring sub-export of each high-pressure separator normal pressure separator identical with corresponding temperature communicate.
  3. 3. according to the method described in claim 2, it is characterized in that separator include contact successively high-temperature high-pressure separator, in Warm high-pressure separator, normal temperature high voltage separator, and low-voltage high-temperature separator, low pressure medium temperature separator and the low pressure contacted successively Normal temperature separator, location of water injection be respectively the high-temperature high-pressure separator entrance before pipeline, each high-pressure separator Between pipeline, the afterbody separator is normal temperature and pressure separator.
  4. 4. according to any methods of claim 1-3, it is characterised in that set on the pipeline after water filling flushing valve and Sensor, the sensor are connected with the concentration detector.
  5. 5. according to the method described in claim 4, it is characterized in that the valve is internally piloted valve and/or hand valve.
  6. 6. according to the method described in claim 1, it is characterized in that there is 1-8 water injecting pipeline in each location of water injection.
  7. 7. according to the method described in claim 1, it is characterized in that the injection water quality is desalted water.
  8. 8. according to the method described in claim 1, it is characterized in that water filling temperature be 15-200 DEG C, pressure 1.0-25.0MPa.
CN201510696047.0A 2015-10-23 2015-10-23 A kind of method and its design method and purposes for removing crystal salt Active CN105273759B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510696047.0A CN105273759B (en) 2015-10-23 2015-10-23 A kind of method and its design method and purposes for removing crystal salt
PCT/CN2015/094113 WO2017067025A1 (en) 2015-10-23 2015-11-09 Method for removing crystalline salt, and design method and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510696047.0A CN105273759B (en) 2015-10-23 2015-10-23 A kind of method and its design method and purposes for removing crystal salt

Publications (2)

Publication Number Publication Date
CN105273759A CN105273759A (en) 2016-01-27
CN105273759B true CN105273759B (en) 2018-04-17

Family

ID=55143607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510696047.0A Active CN105273759B (en) 2015-10-23 2015-10-23 A kind of method and its design method and purposes for removing crystal salt

Country Status (2)

Country Link
CN (1) CN105273759B (en)
WO (1) WO2017067025A1 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110215742A (en) * 2018-03-01 2019-09-10 中石化广州工程有限公司 A kind of method of hydrogenation plant dechlorination
CN110218580A (en) * 2018-03-01 2019-09-10 中石化广州工程有限公司 A kind of method of hydrogenation reaction effluent dechlorination
CN108275822A (en) * 2018-03-20 2018-07-13 山东奥能电力科技有限公司 A kind of dense salt waste water atomization concentration cycles crystallization Zero discharging system and technique
CN111040815B (en) * 2019-12-18 2022-04-12 大连福佳·大化石油化工有限公司 Desalting and corrosion preventing system of depentanizer

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101880543A (en) * 2010-07-02 2010-11-10 沈阳石蜡化工有限公司 Online cleaning method of deposited salt of tower tray of normal-pressure tower
US20100292106A1 (en) * 2007-11-13 2010-11-18 Akzo Nobel N.V. Methods of minimizing sulfate scale in oil field
CN104845664A (en) * 2015-05-08 2015-08-19 北京中科诚毅科技发展有限公司 Multiple-optimizing separator combined systems as well as use method and design method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE60135162D1 (en) * 2001-10-03 2008-09-11 Pierre Descloux PROCESS FOR PREPARING CORROSION AND DEPOSITS IN A HOT WATER SYSTEM AND DEVICE FOR CARRYING OUT THE METHOD
CN101655336B (en) * 2009-07-27 2011-01-12 浙江理工大学 Optimization method of water injection for hydrogenation reaction outflow air-cooler system
CN101639688B (en) * 2009-08-17 2011-05-18 浙江理工大学 Optimization method of hydrogenation reaction effluent air cooler system for preventing erosion of NH4HS
CN104808614A (en) * 2015-03-02 2015-07-29 浙江理工大学 Hydrogenation reaction effluent air cooler system optimization method for preventing NH4Cl under-deposit corrosion

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100292106A1 (en) * 2007-11-13 2010-11-18 Akzo Nobel N.V. Methods of minimizing sulfate scale in oil field
CN101880543A (en) * 2010-07-02 2010-11-10 沈阳石蜡化工有限公司 Online cleaning method of deposited salt of tower tray of normal-pressure tower
CN104845664A (en) * 2015-05-08 2015-08-19 北京中科诚毅科技发展有限公司 Multiple-optimizing separator combined systems as well as use method and design method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"加氢处理系统NH4Cl结晶沉积预测及优化防控";金浩哲等;《石油学报(石油加工)》;20140831;第30卷(第4期);第662-667页 *

Also Published As

Publication number Publication date
CN105273759A (en) 2016-01-27
WO2017067025A1 (en) 2017-04-27

Similar Documents

Publication Publication Date Title
CN105273759B (en) A kind of method and its design method and purposes for removing crystal salt
Ramos et al. Chemical cleaning of membranes from an anaerobic membrane bioreactor treating food industry wastewater
CA2610463C (en) Integration of an in-situ recovery operation with a mining operation
CA2691151C (en) Method of produced water treatment, method of water reuse, and systems for these methods
US20110089013A1 (en) Apparatus of produced water treatment, system and method of using the apparatus, and method of water reuse by using the same
CN103517965B (en) For obtaining the closed coke slip system and method for the oil the sold coke button be made up of solidified petroleum Jiao in coke-drum unit
CA2610230C (en) Water integration between an in-situ recovery operation and a bitumen mining operation
US20140076785A1 (en) Heat and water integration process for an oil sand operation with direct steam injection of warm thickener overlfow
CN105229121A (en) Utilize supercritical water to the method for crude oil upgrading processing and desulfurization
WO2020169120A2 (en) Hydrogenation apparatus fractionation system in-line process anti-corrosion method
CN109185702A (en) A kind of process of depressurized system
WO2016197537A1 (en) Backwashing method, design method therefor, and use thereof
CN1630611B (en) Extraction, drainage and transport of petroleum coke
CN105236680A (en) Method for purifying gas liquor
CN103495293A (en) Technology for removing ash in ammonia desulphurization grout and equipment thereof
CA2838147C (en) Heat exchanger descaling system using blowdown
CN211420084U (en) Deep processing device for tar in residual ammonia water in coking production
Polischuk et al. A review of foulant sources, operational issues, and remedies during the processing of oil sand derived bitumen fractions
CN101874949A (en) Back-washing regeneration method of ceramic membrane method brine refining process filter
CN100448502C (en) Recovery and utilization method for acidic water of hydrocarbon steam conversion hydrogen production plant
CN106010620B (en) Separation recovery method and system for the heavy oil resources for handling carbonate containing mineral matter
CN205398658U (en) Manufacturing equipment that blast furnace slag handled
CN220537553U (en) Fischer-Tropsch synthesis water treatment system
CA2948419C (en) Treatment and recycle of landfill leachate into evaporators of an in situ hydrocarbon recovery operation
CN217600665U (en) System for improve coalescence dehydrator water oil separating effect

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant