CN105271019A - Connecting structure of main chords and web members of tower crane - Google Patents

Connecting structure of main chords and web members of tower crane Download PDF

Info

Publication number
CN105271019A
CN105271019A CN201510642913.8A CN201510642913A CN105271019A CN 105271019 A CN105271019 A CN 105271019A CN 201510642913 A CN201510642913 A CN 201510642913A CN 105271019 A CN105271019 A CN 105271019A
Authority
CN
China
Prior art keywords
web member
web members
main string
crossbeam
otic placode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510642913.8A
Other languages
Chinese (zh)
Inventor
王建军
米成宏
周忍
朱斌
郭崇嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN201510642913.8A priority Critical patent/CN105271019A/en
Publication of CN105271019A publication Critical patent/CN105271019A/en
Pending legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention discloses a connecting structure of main chords and web members of a tower crane. The connecting structure comprises the main chords (1) and the web members. The web members comprise inclined web members (2) and beam web members (3). The two ends of the beam web members (3) are connected with the main chords (1) on the two sides. One ends of the inclined web members (2) are connected with the main chords (1). The main chords (1) are detachably connected with the inclined web members (2) and the beam web members (3). The overall connecting manner of the main chords and the web members is changed into pin shaft connection from welding, the installing of the web members is facilitated, the difficulty degree in the installing process is lowered, and installing is flexible. Meanwhile, during loading delivery, all connecting pin shafts between the main chords and the web members can be dismounted, the web members serve as single objects to be bundled and delivered, a large amount of occupied space is saved, the delivery car using cost is saved, and the delivery efficiency is improved. By means of the application of the technology, safety and convenience in the installing process can be well improved, and meanwhile the delivery and transportation cost is reduced to a great extent.

Description

The connection structure of the main string of a kind of tower crane and web member
Technical field
The present invention relates to the type of attachment of a kind of main string and web member, specifically the connection structure of the main string of a kind of tower crane and web member, belong to the main string of tower crane and web member interconnection technique field.
Background technology
At present, tower crane stock, as the truss structure bearing vertical power and moment of flexure when tower machine upper is increased or reduced, forms primarily of main string, crossbeam and web member, wherein, web member, as the tubular structure increasing stock load-bearing, is connected with adopting the mode of welding between main string.As shown in Figure 1, web member comprises diagonal web member 2 and crossbeam web member 3, and one end of diagonal web member 2 is welded on main string 1, and the other end is welded on gusset plate A; Crossbeam web member 3 horizontal arrangement, and two ends are directly welded on main string 1.There are the following problems in actual mechanical process for this structure:
1, web member directly welds with main string, and welding processing amount is large, and form is stiff, installs dumb;
2, this structure cannot be dismantled, inconvenient disassembled for transport, and take up an area space during transport greatly, traffic cost is high.
Summary of the invention
For above-mentioned prior art Problems existing, the invention provides the connection structure of the main string of a kind of tower crane and web member, be convenient to the connection of web member, the degree-of-difficulty factor in installation process can be reduced, flexible for installation, detachably transport simultaneously, save delivery car cost, reduce and take up an area space, improve Dispatching efficiency.
To achieve these goals, the connection structure of the main string of a kind of tower crane that the present invention adopts and web member, comprise main string and web member, web member comprises diagonal web member and crossbeam web member, the two ends of crossbeam web member are connected with the main string of both sides, one end of diagonal web member is connected with main string, removably connects between described main string and diagonal web member, crossbeam web member.
Preferably, the two ends of described diagonal web member and crossbeam web member are pinned connection form, the two ends of main string and middle part are welded with otic placode I, otic placode II respectively, and the end utilizing bearing pin to pass otic placode I or otic placode II and diagonal web member or crossbeam web member realizes the connection of main string and diagonal web member, crossbeam web member.
Preferably, otic placode I at least has two connecting bores, the end utilizing bearing pin to pass one of them connecting bore and crossbeam web member realizes the connection between main string and crossbeam web member; The end utilizing bearing pin to pass another connecting bore and diagonal web member realizes the connection between main string and diagonal web member; As required, remaining connecting bore is for adjusting the installation site of diagonal web member or crossbeam web member.
Preferably, otic placode II has a connecting bore, the end utilizing bearing pin to pass this connecting bore and crossbeam web member realizes the connection in the middle part of main string and between crossbeam web member.
Preferably, the other end of diagonal web member is connected with the otic placode on gusset plate by bearing pin.
Compared with prior art, the present invention changes main string into pinned connection with web member integrated connection mode by welding, as being welded to connect otic placode on main string, and pinned connection form is made at web member two ends, the two ends of crossbeam web member or one end of diagonal web member and main string upper ear plate pass through pinned connection, be convenient to the installation of web member, reduce the degree-of-difficulty factor in installation process, flexible for installation.During simultaneously entrucking delivery, can by main string be connected bearing pin between web member and all pull down, make web member as single object, binding delivery, saves in a large number and takes up room, saved delivery car cost, improve Dispatching efficiency.By the application of this technology, the safety in installation process and convenience can be improved preferably, reduce delivery traffic cost to a great extent simultaneously.
Accompanying drawing explanation
Fig. 1 is the connection structure schematic diagram of the main string of existing tower crane and web member;
Fig. 2 is structural representation of the present invention.
In figure: 1, main string, 2, diagonal web member, 3, crossbeam web member, 4, connect orifice plate, 5, attaching parts I, 6, attaching parts II, 7, cat ladder mounting rail, 8, otic placode, 9, bending plate, 10, otic placode, 11, flange, 12, otic placode, 13, otic placode, A, gusset plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 2, the connection structure of the main string of a kind of tower crane and web member, comprise main string 1 and web member, web member comprises diagonal web member 2 and crossbeam web member 3, the two ends of crossbeam web member 3 are connected with the main string 1 of both sides, one end of diagonal web member 2 is connected with main string 1, removably connects between described main string 1 and diagonal web member 2, crossbeam web member 3.
Preferably, the two ends of described diagonal web member 2 and crossbeam web member 3 are pinned connection form, the two ends of main string 1 and middle part are welded with otic placode IB, otic placode IIC respectively, and the end utilizing bearing pin to pass otic placode IB or otic placode IIC and diagonal web member 2 or crossbeam web member 3 realizes the connection of main string 1 and diagonal web member 2, crossbeam web member 3.
Preferably, otic placode IB at least has two connecting bores, the end utilizing bearing pin to pass one of them connecting bore and crossbeam web member 3 realizes the connection between main string 1 and crossbeam web member 3; The end utilizing bearing pin to pass another connecting bore and diagonal web member 2 realizes the connection between main string 1 and diagonal web member 2; As required, remaining connecting bore is for adjusting the installation site of diagonal web member 2 or crossbeam web member 3.
Preferably, otic placode IIC has a connecting bore, the end utilizing bearing pin to pass this connecting bore and crossbeam web member 3 realizes the connection in the middle part of main string 1 and between crossbeam web member 3.
Preferably, the other end of diagonal web member 2 is connected with the otic placode on gusset plate A by bearing pin.
From said structure, the present invention changes main string into pinned connection with web member integrated connection mode by welding, as being welded to connect otic placode on main string, and pinned connection form is made at web member two ends, the two ends of crossbeam web member or one end of diagonal web member and main string upper ear plate pass through pinned connection, be convenient to the installation of web member, reduce the degree-of-difficulty factor in installation process, flexible for installation.During simultaneously entrucking delivery, can by main string be connected bearing pin between web member and all pull down, make web member as single object, binding delivery, saves in a large number and takes up room, saved delivery car cost, improve Dispatching efficiency.By the application of this technology, the safety in installation process and convenience can be improved preferably, reduce delivery traffic cost to a great extent simultaneously.

Claims (5)

1. the connection structure of the main string of tower crane and web member, comprise main string (1) and web member, web member comprises diagonal web member (2) and crossbeam web member (3), the two ends of crossbeam web member (3) are connected with the main string (1) of both sides, one end of diagonal web member (2) is connected with main string (1), it is characterized in that, described main string (1) and diagonal web member (2), crossbeam web member removably connect between (3).
2. the connection structure of the main string of a kind of tower crane according to claim 1 and web member, it is characterized in that, the two ends of described diagonal web member (2) and crossbeam web member (3) are pinned connection form, the two ends of main string (1) and middle part are welded with otic placode I (B), otic placode II (C) respectively, and the end utilizing bearing pin to pass otic placode I (B) or otic placode II (C) and diagonal web member (2) or crossbeam web member (3) realizes the connection of main string (1) and diagonal web member (2), crossbeam web member (3).
3. the connection structure of the main string of a kind of tower crane according to claim 2 and web member, it is characterized in that, otic placode I (B) at least has two connecting bores, the end utilizing bearing pin to pass one of them connecting bore and crossbeam web member (3) realizes the connection between main string (1) and crossbeam web member (3); The end utilizing bearing pin to pass another connecting bore and diagonal web member (2) realizes the connection between main string (1) and diagonal web member (2); As required, remaining connecting bore is for adjusting the installation site of diagonal web member (2) or crossbeam web member (3).
4. the connection structure of the main string of a kind of tower crane according to claim 2 and web member, it is characterized in that, otic placode II (C) has a connecting bore, the end utilizing bearing pin to pass this connecting bore and crossbeam web member (3) realizes the connection between main string (1) middle part and crossbeam web member (3).
5. the connection structure of the main string of a kind of tower crane according to claim 2 and web member, is characterized in that, the other end of diagonal web member (2) is connected with the otic placode on gusset plate (A) by bearing pin.
CN201510642913.8A 2015-09-30 2015-09-30 Connecting structure of main chords and web members of tower crane Pending CN105271019A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510642913.8A CN105271019A (en) 2015-09-30 2015-09-30 Connecting structure of main chords and web members of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510642913.8A CN105271019A (en) 2015-09-30 2015-09-30 Connecting structure of main chords and web members of tower crane

Publications (1)

Publication Number Publication Date
CN105271019A true CN105271019A (en) 2016-01-27

Family

ID=55140971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510642913.8A Pending CN105271019A (en) 2015-09-30 2015-09-30 Connecting structure of main chords and web members of tower crane

Country Status (1)

Country Link
CN (1) CN105271019A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2885810Y (en) * 2006-04-13 2007-04-04 山东丰汇设备技术有限公司 K-shape web-member assembling type rapid-installation tower section
CN202785388U (en) * 2012-08-13 2013-03-13 唐山建设集团有限责任公司 Tower crane suspended connection stabilizing mechanism emergently used in tower crane up-lifting process
CN202924630U (en) * 2012-11-26 2013-05-08 徐州重型机械有限公司 Tower crane and standard knot thereof
CN103991802A (en) * 2014-05-22 2014-08-20 甘肃建投装备制造有限公司 Large tower crane capable of carrying driver
CN203959699U (en) * 2014-04-16 2014-11-26 浙江虎霸建设机械有限公司 The compound type attached-frame device of tower crane
AU2014271325A1 (en) * 2013-12-11 2015-06-25 Manitowoc Crane Group France A fish-plating device for connecting two structural elements of a tower crane
CN204434123U (en) * 2014-12-31 2015-07-01 徐州建机工程机械有限公司 Tower body in tower crane resistance to deformation
CN205132982U (en) * 2015-09-30 2016-04-06 徐州建机工程机械有限公司 Connection structure of tower crane owner's string and web member

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2885810Y (en) * 2006-04-13 2007-04-04 山东丰汇设备技术有限公司 K-shape web-member assembling type rapid-installation tower section
CN202785388U (en) * 2012-08-13 2013-03-13 唐山建设集团有限责任公司 Tower crane suspended connection stabilizing mechanism emergently used in tower crane up-lifting process
CN202924630U (en) * 2012-11-26 2013-05-08 徐州重型机械有限公司 Tower crane and standard knot thereof
AU2014271325A1 (en) * 2013-12-11 2015-06-25 Manitowoc Crane Group France A fish-plating device for connecting two structural elements of a tower crane
CN203959699U (en) * 2014-04-16 2014-11-26 浙江虎霸建设机械有限公司 The compound type attached-frame device of tower crane
CN103991802A (en) * 2014-05-22 2014-08-20 甘肃建投装备制造有限公司 Large tower crane capable of carrying driver
CN204434123U (en) * 2014-12-31 2015-07-01 徐州建机工程机械有限公司 Tower body in tower crane resistance to deformation
CN205132982U (en) * 2015-09-30 2016-04-06 徐州建机工程机械有限公司 Connection structure of tower crane owner's string and web member

Similar Documents

Publication Publication Date Title
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN101224840A (en) Sectionalizing device for girders of passenger conveying equipment
CN102616683B (en) Tower crane climbing frame and tower crane comprising same
CN102431906A (en) Self-adaptive crane external climbing support structure
CN205132982U (en) Connection structure of tower crane owner's string and web member
CN105271019A (en) Connecting structure of main chords and web members of tower crane
CN201605111U (en) Combined type gantry crane
CN105271018A (en) Detachable tower crane wrap frame
CN204126297U (en) A kind of temporary support of steel truss roof
CN203144882U (en) Assembly type composite material metal truss bridge
CN203497966U (en) Compound adhesion rod of tower crane
CN202967874U (en) Overall girder transporting vehicle lifting spreader
CN102942092B (en) A kind of guide rail bracket
CN202401573U (en) Structure of batter brace serving as purline bolt
CN202755982U (en) Hinged type needle beam
CN205222516U (en) Stand and track crossbeam connection structure between assembled maintenance
CN101920913A (en) Self-propelled wide-span tower crane
CN205132975U (en) Six pole web member connection plate connection structure on tower crane plane
CN205132970U (en) Removable stock structure of tower machine
CN210366509U (en) Construction elevator capable of being integrally hoisted and installed
CN205132979U (en) Removable tower crane stock
CN102996368B (en) Engine room truss of wind generation set
CN202226576U (en) Draw bar system of luffing jib tower crane and luffing jib tower crane
CN203960748U (en) Steel bridge king-tower closes up uses auxiliary body
CN102733610A (en) Arm section, arm support and concrete distribution equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160127

WD01 Invention patent application deemed withdrawn after publication