CN105262508B - The automatic switching method of underground logging cable - Google Patents

The automatic switching method of underground logging cable Download PDF

Info

Publication number
CN105262508B
CN105262508B CN201510691055.6A CN201510691055A CN105262508B CN 105262508 B CN105262508 B CN 105262508B CN 201510691055 A CN201510691055 A CN 201510691055A CN 105262508 B CN105262508 B CN 105262508B
Authority
CN
China
Prior art keywords
underground
communication
cable
way
cable core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510691055.6A
Other languages
Chinese (zh)
Other versions
CN105262508A (en
Inventor
李瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou AI control Intelligent Instrument Co., Ltd.
Original Assignee
Jiangsu Shandao Kai Rui Energy Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Shandao Kai Rui Energy Polytron Technologies Inc filed Critical Jiangsu Shandao Kai Rui Energy Polytron Technologies Inc
Priority to CN201510691055.6A priority Critical patent/CN105262508B/en
Publication of CN105262508A publication Critical patent/CN105262508A/en
Application granted granted Critical
Publication of CN105262508B publication Critical patent/CN105262508B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Alarm Systems (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses a kind of automatic switching method of underground logging cable, step 1, at least two-way communication set up between floor passageway and underground sensing passage;Step 2, the communication state between floor passageway and underground sensing passage is detected;Step 3, if step 2 detection communication occurs abnormal, judge communication abnormality way whether be in two-way all the way;Step 4, if the judged result of step 3 is no, i.e. two-way communication all occurs abnormal, then ground control and data processing unit control the cable core switching matrix in the unit to be polled switching, underground sensing unit controls the cable core switching matrix in the unit to be polled switching, two-way cable core is carried out new pairing;Step 5, when matching again, detect whether at least recover to communicate all the way.Any two core of cable breaks down, can be by the automatic detection and switching of ground and underground equipment so that the pairing of two other fault-free cable core is so as to recovering communication.

Description

The automatic switching method of underground logging cable
Technical field
The present invention relates to oil-gas mining technical field, and in particular to a kind of automatic switching method of underground logging cable.
Background technology
During oil and gas exploitation, underground sensing equipment can measure the numerical value of multiple physical quantitys of underground, example Such as the pressure and temperature value of underground, subsurface reservoir situation of change and underground equipment work can be preferably judged according to these measured values Condition, so that it is determined that reasonably exploitation system and inspection pump measure, the exploitation to petroleum gas has very important significance.Underground Sensing equipment is generally communicated by logging cable with floor passageway, realizes the upload of downhole data.
Work condition abnormality in diversity, the diversity of winning apparatus due to Oil/gas Well well rod structure, pit shaft is complicated, well logging Cable is highly susceptible to rub, pulls, extrudes, corroding etc. and by major injury so that ground and underground sensing equipment it Between communication interrupt.And the operating cost for changing logging cable is costly, and also result in stopping production change cable made Into production loss.In the market the overwhelming majority system ground and underground equipment between all be simplex, used for twin-core Or single armored cable, once short circuit or open circuit fault occur for a wherein core, then system is entirely ineffective.
The ground of some systems and underground equipment all employ binary channels design, employ four cores or three core armourings electricity Cable, realizes 1+1 backup, further improves the reliability of the system.But it is due to that each pair core and equipment two are led in four cores Road is fixed correspondence, once respectively there is a cable core to break down in each pair core, then during the communication of two passages can all occur It is disconnected.For example, in quad (as shown in Figure 1), the quad is tetra- core compositions of A, B, C, D, wherein AB cores composition one To core (i.e. first via communication line), CD cores constitute another pair core (i.e. No. second communication line), due to equipment passage U1 and Passage U2 correspond to two pairs of cores respectively, and when respectively there is a core to break down in each pair core, then the communication of two passages can all occur Interrupt, so result in two-way measured value and upload and fail, therefore the design of binary channels 1+1 backup is also not reaching to optimization State.
The content of the invention
Present invention generally provides a kind of automatic switching method of underground logging cable, when four core logging cables or three core armourings Any two core of cable breaks down, can be by the automatic detection and switching of ground and underground equipment so that two other is without reason Hinder cable core pairing, so as to recover the communication all the way between underground and ground.
The technical scheme for solving above-mentioned technical problem is as follows:
A kind of automatic switching method of underground logging cable, comprises the following steps:
Step 1, by ground control and data processing unit, communication cable and underground sensing unit, set up ground and lead to At least two-way communication between road and underground sensing passage;
Step 2, ground control and data processing unit and/or underground sensing unit are to floor passageway and underground sensing passage Between communication state detection;
Step 3, if step 2 detection communication occurs abnormal, ground control and data processing unit and/or underground sensing Unit judges communication abnormality way whether be in two-way all the way;
Step 4, if the judged result of step 3 is no, i.e. all there is exception in two-way communication, and it is different to be detected as communication cable Often, then ground control and data processing unit control the cable core switching matrix in the unit to be polled switching, underground sensing Unit controls the cable core switching matrix in the unit to be polled switching, two-way cable core is carried out new pairing;
Step 5, when matching again, detect whether at least recover to communicate all the way.
Preferably, the communication cable is quad or three core armored cables.
Preferably, in step 1, two-way communication is configured to:
The first via is:First subchannel of floor passageway one passes sequentially through the first son of the first cable core, underground passage one Passage is communicated with underground sensing passage one;Second subchannel of floor passageway one passes sequentially through the second cable core, underground and led to Second subchannel in road one is communicated with underground sensing passage one;
Second tunnel is:First subchannel of floor passageway two passes sequentially through the first son of the 3rd cable core, underground passage two Passage is communicated with underground sensing passage two;Second subchannel of floor passageway two passes sequentially through the 4th cable core, underground and led to First subchannel in road two is communicated with underground sensing passage two.
Preferably, in step 2, ground control and data processing unit are detecting detection communication electricity after exception occurs in communication The resistance and operating current of cable, judge whether communication cable is damaged with this.
Preferably, in step 3, if anomalous communication be in two-way all the way, the alarm letter of passage where reporting fault Breath, and report the normal data all the way of communication.
Preferably, in step 4, ground control and data processing unit control the cable core switching matrix in the unit to carry out Poll switching time, the cable core switching matrix in the unit is controlled to be polled switching time not phase with underground sensing unit Deng.
Preferably, underground sensing unit is polled switching time to the cable core switching matrix in the unit, at least Ground is controlled and data processing unit controls the cable core switching matrix in the unit to be polled 3 times of switching time.
Preferably, in the poll handoff procedure of step 4, ground control and data processing unit are sent out with cycle time to underground Send communication frame and wait the acknowledgement frame of underground sensing unit, ground control and data processing unit send downwards cycle of communication frame Time, the cable core switching matrix in the unit is controlled to be polled switching time with underground sensing unit unequal.
Preferably, ground control and data processing unit send downwards the cycle time of communication frame, are sensed less than underground single Member controls the cable core switching matrix in the unit to be polled switching time.
Preferably, cable core switching matrix is electronic switch or micro-machinery switch.
By the detection of the present invention, when communication failure only occurs all the way, the cable core switching matrix at cable two ends is not Switch over action.Whole system still can communicate normal passage by another road and carry out downhole data upload.Have simultaneously The alarm of faulty channel is indicated.When two-way communication all generation exceptions, and cable exception is detected as, then firing cable core automatic detection And matcher.If only having faulty and other two core of two cores to be good in four cores, by cable core automatic detection and match somebody with somebody It to program, can recover to communicate all the way, keep downhole data to upload.The position of the core of failure two is can indicate that simultaneously.When cable has Three cores appear above failure, then cable core automatic detection and matcher can not also recover communication, and now ground installation reports well Lower communication complete failure alarm prompt.When communication abnormality is caused at cable two ends due to wiring error, it can also pass through same side Method recovers communication automatically, so as to reduce the complexity of system operation maintenance.
In summary, by the method for the present invention, when any two core of four core logging cables (or three core armored cables) goes out Existing failure, can be by the automatic detection and switching of ground and underground equipment so that two other fault-free cable core is matched, so that extensive Multiple communication all the way between underground and ground so that downhole measurement can successfully be uploaded to ground installation, so as to significantly carry The reliability of whole system is risen.
Brief description of the drawings
Fig. 1 is the schematic diagram that existing communication cable is controlled with ground and data processing unit and underground sensing unit are connected;
It is specific that communication cable and ground controls and data processing unit and underground sensing unit of the Fig. 2 for the present invention are connected Structural representation;
Fig. 3 is the schematic diagram of the automatic switching method of logging cable of the present invention;
Cable core switching matrix when Fig. 4 is communication failure in ground control and data processing unit is polled switching and shown It is intended to;
Cable core switching matrix when Fig. 5 is communication failure under surface well in sensing unit is polled switching schematic diagram.
Embodiment
As shown in Fig. 2 the present invention on hardware include underground ground control and data processing unit, underground sensing unit with And the communication cable at connection two ends.Ground is controlled and data processing unit is connected with one end of communication cable, ground control and number Processor, the communication channel of two-way independence, cable detection unit and 1 4x4 cable core switching matrix are included according to processing unit, Cable detection unit have detection communication cable resistance and operating current function, judged with this communication cable whether by Damage.Underground sensing unit is connected with the other end of communication cable, and underground sensing unit at least includes two groups of sensings mutually backed up There are processor, underground in sense channel, and 1 4x4 cable core switching matrix, the sensing detection passage that two groups are mutually backed up Sensing unit uploads the data that two-way is detected in real time respectively by four cores or three core armored cables.Communication cable is four cores well logging electricity Cable or three core armored cables.Above-mentioned 4x4 cables core switching matrix can be electronic switch or micromechanics (MEMS) switch.
As shown in Figures 2 to 5, the automatic switching method of underground logging cable of the invention, comprises the following steps:
Step 1, program initialization, by ground control and data processing unit, communication cable and underground sensing unit, At least two-way communication set up between floor passageway and underground sensing passage, the as data transfer of 1+1 backup formula, if wherein Failure all the way, another road still can upload data.In the present invention, said so that communication cable uses quad as an example Bright, in this step, the concrete configuration of two-way communication is (the first width figure in such as Fig. 4 and Fig. 5):The first via is:Floor passageway one The first subchannel U1_A pass sequentially through the first subchannel D1_A and underground sensing passage of the first cable core A, underground passage one One is communicated;Second subchannel U1_B of floor passageway one passes sequentially through the second cable core B, the second son of underground passage one leads to Road D1_B is communicated with underground sensing passage one.
Second tunnel is:First subchannel U2_A of floor passageway two passes sequentially through the 3rd cable core C, the of underground passage two One subchannel D2_A is communicated with underground sensing passage two;Second subchannel U2_B of floor passageway two passes sequentially through the 4th electricity Cable core D, the first subchannel D2_B of underground passage two and underground sensing passage two are communicated.
Step 2, ground control and data processing unit and/or underground sensing unit are to floor passageway and underground sensing passage Between communication state detection;In step 2, ground control and data processing unit are detecting detection communication after exception occurs in communication The resistance and operating current of cable, judge whether communication cable is damaged with this.
Step 3, if step 2 detection communication occurs abnormal, ground control and data processing unit and/or underground sensing The way of unit judges communication abnormality whether be in two-way all the way.In step 3, if anomalous communication be in two-way all the way, The then warning information of passage where reporting fault, and report the normal data all the way of communication.Communication all the way in this explanation two-way When abnormal, and the communication of another road is intact, and intact all the way can be uploaded the data of detection, to the work of system not Impact.
Step 4, if the judged result of step 3 is no, i.e. all there is exception in two-way communication, and it is different to be detected as communication cable Often, illustrate in two-way communication per at least one cable core damage or failure all the way, at this moment need cable intact in two-way Core re-starts configuration, for recovering communication.Detailed process is:
Ground is controlled and data processing unit controls the cable core switching matrix in the unit to be polled switching, and underground is passed Sense unit controls the cable core switching matrix in the unit to be polled switching, two-way cable core is carried out new pairing.Lead to Ground and the respective internal cable core switching matrix of underground control are crossed, makes do not have faulty cable core and cable core switching matrix shape Cheng Xin configuration relation.
In step 4, ground control and data processing unit control the cable core switching matrix in the unit to be polled to cut The time is changed for T1, controls the cable core switching matrix in the unit to be polled switching time for T2, T1 with underground sensing unit Unequal with T2, the purpose so set is:The cable core switching matrix of cable core switching matrix and underground on ground is cut Change the cycle one fast one slowly, be to ensure that two of which fault-free cable core has an opportunity to dock.Underground sensing unit is to the unit In cable core switching matrix be polled switching time, at least ground control and data processing unit are controlled in the unit Cable core switching matrix is polled 3 times of switching time, i.e. T1 be at least T2 3 times (in turn can also, and T2 is at least 3 times of T1), it can so ensure that the cable core switching matrix on ground often switches once, the cable core switching matrix of underground is at least A different cable core connection configuration can be traveled through.
In the poll handoff procedure of step 4, ground control and data processing unit are sent to underground with cycle time and communicated Frame and the acknowledgement frame for waiting underground sensing unit, ground is controlled and data processing unit sends downwards cycle time of communication frame and is T3, controls the cable core switching matrix in the unit to be polled switching time unequal with underground sensing unit.Ground is controlled And data processing unit sends downwards the cycle time T3 of communication frame, and the cable core in the unit is controlled less than underground sensing unit Switching matrix is polled switching time T2, i.e. T3 < T2, to ensure that underground sensing unit can receive the communication that ground is sent out Frame.
Step 5, when matching again, detect whether at least recover to communicate all the way.If testing result is yes, this explanation two-way Only have faulty and other two core of two cores to be good in four cables core in communication, then pass through cable core automatic detection and pairing Program, can recover to communicate all the way, keep downhole data to upload.The position of the core of failure two is can indicate that simultaneously.
If the testing result of step 5 is no, into step 6, the alarm of downhole communication complete failure is indicated, this explanation communication There are three cores to appear above failure in cable, then cable core automatic detection and matcher can not also recover communication, and now ground is set It is standby to report downhole communication complete failure alarm prompt.
It is illustrated below by taking the two of which cable core communication abnormality in quad as an example:
Such as Fig. 4 and Fig. 5 the first width figure, step 1, communication initial configuration is that the first via is:First son of floor passageway one Passage U1_A passes sequentially through the first cable core A, the first subchannel D1_A of underground passage one and underground sensing passage one and led to News;Second subchannel U1_B of floor passageway one pass sequentially through the second cable core B, the second subchannel D1_B of underground passage one with Underground sensing passage one is communicated.
Second tunnel is:First subchannel U2_A of floor passageway two passes sequentially through the 3rd cable core C, the of underground passage two One subchannel D2_A is communicated with underground sensing passage two;Second subchannel U2_B of floor passageway two passes sequentially through the 4th electricity Cable core D, the first subchannel D2_B of underground passage two and underground sensing passage two are communicated.
Simplify explanation:Below in the later description of step 3, to the first cable core A, the second cable core B, the 3rd cable core C, the 4th cable core D, are accordingly indicated using A, B, C, D, passage one are represented with passage 1, to the table of passage 2 of passage two Show.
Step 2, when ground control and data processing unit and underground sensing unit detect ground and the communication of underground two-way All occur after exception, then cable core automatic detection and matching function is respectively started.Here with the first cable core A and the second cable core Illustrated exemplified by D failures, other core failure processing methods of AC, BC, BD two are identical
Step 3, ground control and data processing unit control the switching of the 4X4 cable core switching matrixs of this unit, and well Lower sensing unit controls the switching of the cable core switching matrix of this unit.The poll switching cycle of two cable core switching matrixs is needed Want one at a slow speed and another to be switched fast, to ensure that two of which fault-free cable core can have an opportunity docking.Such as ground The switching time of 4X4 cables core switching matrix 1 is T1, and the switching time of downhole cable core switching matrix 2 is T2, and T1 is at least big In 3T2 (can also T2 at least above 3T1).To ensure that ground matrix often switches once, underground matrix can at least travel through one time not Same cable core connection configuration.
Step 4, as shown in figure 4, ground control and data processing unit in cable core switching matrix, transfer sequence is successively For AB (passage 1), CD (passage 2) → AC (passage 1), BD (passage 2) → AD (passage 1), BC (passage 2), each switching time At intervals of T1.Surface units send communication frame to underground with cycle time T3 and wait the acknowledgement frame of underground sensing unit.T3< T2, to ensure that underground sensing unit can receive the communication frames that ground is sent out.
As shown in figure 5, the cable core switching matrix of underground sensing unit, it is (logical that transfer sequence is followed successively by AB (passage 1), CD Road 2) → AC (passage 1), BD (passage 2) → AD (passage 1), BC (passage 2), each switching time is at intervals of T2.If underground Some passage of sensing equipment receives the communication frame that ground installation is sent out within the T2 times, then keeps the matrix position constant.Together When earthward device replied acknowledgement frame.
In this example embodiment, because cable core A and D break down, after switching, make in ground control and data processing unit Cable core switching matrix is located at AD (passage 1), BC (passage 2), and the cable core switching matrix of underground sensing unit is (logical positioned at AD Road 1), BC (passage 2), ground control and the passage 2 of data processing unit and underground sensing unit can be carried out by cable core BC Normal communication, so as to complete the automatic matching of cable core and recover the communication of ground and underground.If ground and underground are exchanged Matrix still can not recover communication, then show that the logging cable at least 3 cores appear above failure by repeatedly traversal switching, Downhole communication complete failure is then reported to alert.
Embodiments of the invention are the foregoing is only, are not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow conversion that bright description is made, or directly or indirectly it is used in other related technology necks Domain, is included within the scope of the present invention.

Claims (10)

1. a kind of automatic switching method of underground logging cable, it is characterised in that comprise the following steps:
Step 1, by ground control and data processing unit, communication cable and underground sensing unit, set up floor passageway with At least two-way communication between the sensing passage of underground;
Step 2, ground control and data processing unit and/or underground sensing unit are between floor passageway and underground sensing passage Communication state is detected;
Step 3, if step 2 detection communication occurs abnormal, ground control and data processing unit and/or underground sensing unit Judge communication abnormality way whether be in two-way all the way;
Step 4, if the judged result of step 3 is no, i.e., all there is exception in two-way communication, and is detected as communication cable exception, then Ground is controlled and data processing unit controls the cable core switching matrix in the unit to be polled switching, underground sensing unit control The cable core switching matrix made in the unit is polled switching, two-way cable core is carried out new pairing;
Step 5, when matching again, detect whether at least recover to communicate all the way.
2. the automatic switching method of underground logging cable according to claim 1, it is characterised in that the communication cable is Quad or three core armored cables.
3. the automatic switching method of underground logging cable according to claim 1, it is characterised in that in step 1, two-way leads to News are configured to:
The first via is:The first subchannel (U1_A) of floor passageway one passes sequentially through the first cable core (A), the of underground passage one One subchannel (D1_A) is communicated with underground sensing passage one;The second subchannel (U1_B) of floor passageway one passes sequentially through Two cables core (B), the second subchannel (D1_B) and the underground sensing passage one of underground passage one are communicated;
Second tunnel is:The first subchannel (U2_A) of floor passageway two passes sequentially through the 3rd cable core (C), the of underground passage two One subchannel (D2_A) is communicated with underground sensing passage two;The second subchannel (U2_B) of floor passageway two passes sequentially through Four cables core (D), the second subchannel (D2_B) and the underground sensing passage two of underground passage two are communicated.
4. the automatic switching method of underground logging cable according to claim 1, it is characterised in that in step 2, ground control System and data processing unit are detecting the resistance and operating current of detection communication cable after exception occurs in communication, judge to lead to this Whether communication cable is damaged.
5. the automatic switching method of underground logging cable according to claim 1, it is characterised in that in step 3, if different Normal open news be in two-way all the way, then the warning information of passage where reporting fault, and report the normal data all the way of communication.
6. the automatic switching method of underground logging cable according to claim 1, it is characterised in that in step 4, ground control System and data processing unit control the cable core switching matrix in the unit to be polled switching time, with underground sensing unit control Making the cable core switching matrix in the unit, to be polled switching time unequal.
7. the automatic switching method of underground logging cable according to claim 6, it is characterised in that underground sensing unit pair Cable core switching matrix in the unit is polled switching time, and at least ground control and data processing unit controls the list Cable core switching matrix in member is polled 3 times of switching time.
8. the automatic switching method of underground logging cable according to claim 1, it is characterised in that the poll of step 4 is cut During changing, ground control and data processing unit send communication frame to underground with cycle time and wait underground sensing unit Acknowledgement frame, ground control and data processing unit send downwards the cycle time of communication frame, and the list is controlled with underground sensing unit It is unequal that cable core switching matrix in member is polled switching time.
9. the automatic switching method of underground logging cable according to claim 8, it is characterised in that ground is controlled and data Processing unit sends downwards the cycle time of communication frame, and the cable core switching matrix in the unit is controlled less than underground sensing unit It is polled switching time.
10. the automatic switching method of underground logging cable according to claim 1, it is characterised in that cable core exchanges square Battle array is electronic switch or micro-machinery switch.
CN201510691055.6A 2015-10-22 2015-10-22 The automatic switching method of underground logging cable Active CN105262508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510691055.6A CN105262508B (en) 2015-10-22 2015-10-22 The automatic switching method of underground logging cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510691055.6A CN105262508B (en) 2015-10-22 2015-10-22 The automatic switching method of underground logging cable

Publications (2)

Publication Number Publication Date
CN105262508A CN105262508A (en) 2016-01-20
CN105262508B true CN105262508B (en) 2017-09-15

Family

ID=55102042

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510691055.6A Active CN105262508B (en) 2015-10-22 2015-10-22 The automatic switching method of underground logging cable

Country Status (1)

Country Link
CN (1) CN105262508B (en)

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3483680B2 (en) * 1995-10-18 2004-01-06 Kddi株式会社 Optical submarine branching device
CN2641926Y (en) * 2003-07-09 2004-09-15 武汉光迅科技有限责任公司 Synchronous handover protector for dynamic optical line
CN101252393B (en) * 2008-04-01 2012-05-09 武汉光迅科技股份有限公司 Optic cable automatic monitoring system with optical fiber automatic switch unit
CN202551035U (en) * 2012-01-18 2012-11-21 徐志国 Optical link switching control apparatus and optical network protection system
US9178564B2 (en) * 2012-03-16 2015-11-03 Schneider Electric Industries Sas Communication cable breaker and method using same
CN103107840A (en) * 2013-01-30 2013-05-15 武汉普林光通科技有限公司 Method and device for optical-fiber circuit protecting
CN104505949A (en) * 2015-01-22 2015-04-08 中国矿业大学 Mine power network monitoring and guaranteeing system

Also Published As

Publication number Publication date
CN105262508A (en) 2016-01-20

Similar Documents

Publication Publication Date Title
US9599660B2 (en) Electrical interconnect status monitoring system
CN100529779C (en) Line open-short circuit tester
US9906018B2 (en) Electrical line status monitoring system
CN107257930A (en) Method and apparatus for the electric fault detecting system of cable
US20150371461A1 (en) Vehicle diagnostics apparatus and method
CN100379168C (en) Apparatus and method for diagnosis of line shunting and grounding fault
CN101493492B (en) Cable test device
CN101216543A (en) DC system earth fault detection and calibration method and its special equipment
CN205091085U (en) Intelligent dual backup pressure gauge in pit
CN105262508B (en) The automatic switching method of underground logging cable
CN103095509A (en) Method for quickly testing recommended standard 485 (RS485) bus breakdown
NO332207B1 (en) Method and apparatus for fault analysis and redundancy switching in an energy supply for an instrumented towed cable in water
CN103869243A (en) Low-voltage microcomputer protection and monitoring device operation board relay intelligent calibration method
CN106932677B (en) GIS device divide-shut brake stroke detection equipment and system
JP2008096127A (en) Terminator and multi-conductor cable inspection apparatus
CN107727988B (en) Track circuit core wire grounding detection device, system and method
CN106533739A (en) Process layer network port fault positioning method and device
CN206331593U (en) Semaphore circuit intelligent detection device
KR102283874B1 (en) Automatic testing machine for Automatic Block System
CN102435793A (en) Intelligent switching device suitable for aviation cable reflection measurement
CN108152652A (en) A kind of cable insulation test method
US9840906B2 (en) Method and device for supplying at least one electrical consumer of a drill pipe with an operating voltage
CN104569734B (en) A kind of cable system redundant line method for diagnosing faults
CN106546825A (en) Intelligent radio transmission micro-openings self-correcting drift microcomputer insulation comprehensive detection system
CN207832928U (en) Serial line interface harness failure detector

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 213000 East Taihu Road, Xinbei District, Jiangsu, Changzhou, China 9-1

Applicant after: Jiangsu Shandao Kai Rui energy Polytron Technologies Inc

Address before: 213000 East Taihu Road, Xinbei District, Jiangsu, Changzhou, China 9-1

Applicant before: CHANGZHOU KAIRUI ENERGY TECHNOLOGY CO., LTD.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190508

Address after: 213002 No. 178, Yulong South Road, Zhonglou District, Changzhou City, Jiangsu Province, 9F01

Patentee after: Changzhou AI control Intelligent Instrument Co., Ltd.

Address before: 213000 No. 9-1 East Taihu Road, Xinbei District, Changzhou City, Jiangsu Province

Patentee before: Jiangsu Shandao Kai Rui energy Polytron Technologies Inc

TR01 Transfer of patent right