CN105260305A - 嵌入式程序运行时cpu监控调试方法 - Google Patents
嵌入式程序运行时cpu监控调试方法 Download PDFInfo
- Publication number
- CN105260305A CN105260305A CN201510677140.7A CN201510677140A CN105260305A CN 105260305 A CN105260305 A CN 105260305A CN 201510677140 A CN201510677140 A CN 201510677140A CN 105260305 A CN105260305 A CN 105260305A
- Authority
- CN
- China
- Prior art keywords
- code segment
- operational efficiency
- embedded program
- program operation
- insertion code
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 238000012544 monitoring process Methods 0.000 title abstract 3
- 238000003780 insertion Methods 0.000 claims description 17
- 230000037431 insertion Effects 0.000 claims description 17
- 238000009434 installation Methods 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Stored Programmes (AREA)
- Debugging And Monitoring (AREA)
Abstract
本发明公开一种嵌入式程序运行时CPU监控调试方法,其包括以下步骤:(a)在程序运行前,首先通过编译器自动把写好的参考代码段编译到项目工程中;(b)启动插件程序,在QT?SDK中的项目工程目录下插入要考核运行效率的插入代码段,其中QT?SDK是QT运行环境下的集成安装程序包;(c)运行程序,根据每次计算获得的系统时间,获得插入代码段的单次运行效率,统计并输出插入代码段的运行效率平均值。采用这种嵌入式程序运行时CPU监控调试方法,能够使程序开发或调试人员能够更加方便地在嵌入式环境下查看代码的运行效率。
Description
技术领域
本发明涉及控制领域,特别地涉及嵌入式程序运行时CPU监控调试方法。
背景技术
目前嵌入式ARM平台上显示CPU资源占用时间只能显示最近5分钟、10分钟和15分钟的CPU平均资源占用情况。此外,如果打开资源监视器实时查看当前CPU使用百分率曲线,由于系统上运行的程序较多,无法把程序分开以分别监控,系统某一时间段的数据仅代表当时的资源占用情况,而这些情况可以是系统中其它应用所造成的。这种技术无法满足在嵌入式平台上应用开发的需要。
发明内容
本发明实施例中提供一种嵌入式程序运行时CPU监控调试方法,能够使程序开发或调试人员能够更加方便地在嵌入式环境下查看代码的运行效率。
为了达到上述目的,本发明提供一种嵌入式程序运行时CPU监控调试方法,其包括以下步骤:
(a)在嵌入式程序运行前,首先通过编译器自动把写好的参考代码段编译到项目工程中;
(b)启动插件程序,在QTSDK中项目工程的目录下插入要考核运行效率的插入代码段,其中QTSDK是QT运行环境下的集成安装程序包;
(c)运行嵌入式程序,根据每次计算获得的系统时间,获得插入代码段的单次运行效率,统计并输出插入代码段的运行效率平均值。
作为优选,在步骤(c)中,统计并输出该插入代码段的运行效率平均值的具体步骤如下:
S1,指定插入代码段,进入S2;
S2,运行嵌入式程序,根据任意两个参考代码段,计算插入代码段的单次运行效率,进入S3;
S3,判断是否获得足够的运行效率统计数据,如果判断没有获得足够的运行效率统计数据则返回S2,继续进行嵌入式程序运行,如果判断已经获得足够的运行效率统计数据则进入S4;
S4,计算并输出插入代码段的运行效率统计平均值,流程结束。
作为优选,在步骤S2中,按照以下方法计算插入代码段的单次运行效率:在应用中任意选取第一参考代码段和第二参考代码段,通过第二参考代码段获取的系统时间减去通过第一参考代码段获取的系统时间,通过计算系统时间差得到应用的运行时间,然后插入要考核运行效率的插入代码段,从而通过应用的运行时间计算得到插入代码段的单次运行效率。
作为优选,通过单独的计数器获得系统时间。
采用上述嵌入式程序运行时CPU监控调试方法,使嵌入式程序开发或调试人员能够更加方便地在嵌入式环境下查看代码的运行效率。
附图说明
图1是本发明涉及的嵌入式程序运行时CPU监控调试方法中代码段运行效率平均值的计算方法的流程图;
具体实施方式
为了更好地说明本发明的意图,下面结合附图对本发明内容做进一步说明。
本实施例涉及一种嵌入式程序运行时CPU监控调试方法,其主要用于在嵌入式程序运行时获取代码的运行效率,具体包括以下步骤:
(a)在嵌入式程序运行前,首先通过编译器自动把写好的参考代码段编译到项目工程中;
(b)启动插件程序,允许开发或调试人员在QTSDK中的项目工程目录下插入要考核运行效率的插入代码段,其中QTSDK是QT运行环境下的集成安装程序包;
(c)运行嵌入式程序,根据每次计算获得的系统时间,获得插入代码段的单次运行效率,统计并输出该插入代码段的运行效率平均值。
其中,参考图1,针对上述步骤(c),统计并输出该插入代码段的运行效率平均值的具体步骤如下:
S1,指定插入代码段,进入S2;
S2,运行嵌入式程序,根据任意两个参考代码段,计算插入代码段的单次运行效率,进入S3;
S3,判断是否获得足够的运行效率统计数据,如果判断没有获得足够的运行效率统计数据则返回S2,继续进行嵌入式程序运行,如果判断已经获得足够的运行效率统计数据则进入S4;
S4,计算并输出插入代码段的运行效率统计平均值,流程结束。
在上述步骤S2中,按照以下方法计算插入代码段的单次运行效率:
在同一个应用中,通过不同的参考代码段以获取系统时间的函数,或使用单独的技术器获得系统时间;任意选取第一参考代码段和第二参考代码段,通过第二参考代码段获取的系统时间减去通过第一参考代码段获取的系统时间,通过计算系统时间差得到应用的运行时间,然后插入要考核运行效率的插入代码段,从而通过应用的运行时间计算得到插入代码段的单次运行效率。
本发明的实施例仅是对本发明的优选实施方式进行的描述,并非对本发明构思和范围进行限定,在不脱离本发明设计思想的前提下,本领域中工程技术人员对本发明的技术方案做出的各种变型和改进,均应落入本发明的保护范围,本发明请求保护的技术内容,已经全部记载在权利要求书中。
Claims (4)
1.一种嵌入式程序运行时CPU监控调试方法,其包括以下步骤:
(a)在所述嵌入式程序运行前,首先通过编译器自动把写好的参考代码段编译到项目工程中;
(b)启动插件程序,在QTSDK中所述项目工程的目录下插入要考核运行效率的插入代码段,其中所述QTSDK是QT运行环境下的集成安装程序包;
(c)运行所述嵌入式程序,根据每次计算获得的系统时间,获得所述插入代码段的单次运行效率,统计并输出所述插入代码段的运行效率平均值。
2.根据权利要求1所述的嵌入式程序运行时CPU监控调试方法,其特征在于:在所述步骤(c)中,所述统计并输出该插入代码段的运行效率平均值的具体步骤如下:
S1,指定所述插入代码段,进入S2;
S2,运行所述嵌入式程序,根据任意两个所述参考代码段,计算所述插入代码段的所述单次运行效率,进入S3;
S3,判断是否获得足够的运行效率统计数据,如果判断没有获得足够的所述运行效率统计数据则返回S2,继续进行嵌入式程序运行,如果判断已经获得足够的所述运行效率统计数据则进入S4;
S4,计算并输出所述插入代码段的运行效率统计平均值,流程结束。
3.根据权利要求2所述的嵌入式程序运行时CPU监控调试方法,其特征在于:在所述步骤S2中,按照以下方法计算所述插入代码段的所述单次运行效率:
在应用中任意选取第一参考代码段和第二参考代码段,通过第二参考代码段获取的系统时间减去通过第一参考代码段获取的系统时间,通过计算系统时间差得到所述应用的运行时间,然后插入要考核运行效率的所述插入代码段,从而通过所述应用的运行时间计算得到所述插入代码段的所述单次运行效率。
4.根据权利要求3所述的嵌入式程序运行时CPU监控调试方法,其特征在于:通过单独的计数器获得所述系统时间。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510677140.7A CN105260305B (zh) | 2015-10-15 | 2015-10-15 | 嵌入式程序运行时cpu监控调试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510677140.7A CN105260305B (zh) | 2015-10-15 | 2015-10-15 | 嵌入式程序运行时cpu监控调试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105260305A true CN105260305A (zh) | 2016-01-20 |
CN105260305B CN105260305B (zh) | 2018-09-07 |
Family
ID=55100005
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510677140.7A Expired - Fee Related CN105260305B (zh) | 2015-10-15 | 2015-10-15 | 嵌入式程序运行时cpu监控调试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105260305B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108546952A (zh) * | 2018-04-20 | 2018-09-18 | 上海银帆信息科技有限公司 | 一种低功耗埋地管道阴极保护远程监测终端 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1979422A (zh) * | 2005-12-02 | 2007-06-13 | 凌阳科技股份有限公司 | 用以获得应用程序代码执行率的仿真装置及其方法 |
CN101118514A (zh) * | 2007-09-14 | 2008-02-06 | 中兴通讯股份有限公司 | 一种用于分析软件系统cpu占用率的方法及存储器 |
CN101408862A (zh) * | 2007-10-12 | 2009-04-15 | 李周 | 一种嵌入式系统测试方法 |
CN102243609A (zh) * | 2011-06-15 | 2011-11-16 | 惠州运通信息技术有限公司 | 一种基于嵌入式软件的测试分析方法及系统 |
-
2015
- 2015-10-15 CN CN201510677140.7A patent/CN105260305B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1979422A (zh) * | 2005-12-02 | 2007-06-13 | 凌阳科技股份有限公司 | 用以获得应用程序代码执行率的仿真装置及其方法 |
CN101118514A (zh) * | 2007-09-14 | 2008-02-06 | 中兴通讯股份有限公司 | 一种用于分析软件系统cpu占用率的方法及存储器 |
CN101408862A (zh) * | 2007-10-12 | 2009-04-15 | 李周 | 一种嵌入式系统测试方法 |
CN102243609A (zh) * | 2011-06-15 | 2011-11-16 | 惠州运通信息技术有限公司 | 一种基于嵌入式软件的测试分析方法及系统 |
Non-Patent Citations (2)
Title |
---|
ONLYLEEK: "TI DSP代码运行效率测试方法", 《百度文库》 * |
杜晓东: "面向嵌入式系统的测试工具研究", 《中国优秀硕士论文全文数据库 信息科技辑》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108546952A (zh) * | 2018-04-20 | 2018-09-18 | 上海银帆信息科技有限公司 | 一种低功耗埋地管道阴极保护远程监测终端 |
Also Published As
Publication number | Publication date |
---|---|
CN105260305B (zh) | 2018-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107943469B (zh) | 一种智能合约的发布方法及装置 | |
CN104932905A (zh) | 一种aadl到c语言的代码自动生成方法 | |
CN103425565B (zh) | 获取程序运行信息的方法及系统 | |
CN105528225A (zh) | 应用程序的加载方法及加载装置 | |
BR112015025513A8 (pt) | método para compilar uma cadeia de transformação de uma interface de usuário para recálculo, produto de programa de computador e sistema de computador | |
CN105204913A (zh) | 一种在Android操作系统上运行Linux应用程序的方法及系统 | |
CN104536898A (zh) | C程序并行区域的检测方法 | |
CN105607937B (zh) | 一种热补丁方法及设备 | |
CN110609689A (zh) | 一种应用的安装运行方法及装置 | |
CN104462943A (zh) | 业务系统中非侵入式性能监控装置和方法 | |
IN2013CH01239A (zh) | ||
Falcone et al. | Weave droid: aspect-oriented programming on android devices: fully embedded or in the cloud | |
CN105630563A (zh) | 基于xml的继电保护装置规约的动态模型配置方法 | |
CN105260305A (zh) | 嵌入式程序运行时cpu监控调试方法 | |
CN107291487A (zh) | 系统配置文件修改方法和系统 | |
CN105117329A (zh) | 一种应用程序自动上线方法及系统 | |
TW200705185A (en) | Program initiation methods and embedded systems utilizing the same | |
CN102004660A (zh) | 一种业务流程的实现方法及装置 | |
CN109901887A (zh) | 插件化模型部署方法、电子装置及计算机可读存储介质 | |
CN105183507A (zh) | 一种应用程序间版本的匹配方法及系统 | |
CN106611125A (zh) | 一种验证编译器安全性的方法 | |
Cheung et al. | Speeding up database applications with pyxis | |
CN105426211A (zh) | 网站运行环境的配置方法及系统 | |
CN110764784B (zh) | 一种识别三方so文件的方法、智能终端及存储介质 | |
CN106276447B (zh) | 电梯运行数据收集方法及装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180907 |
|
CF01 | Termination of patent right due to non-payment of annual fee |