Prior art keywords
hydraulic
control
oil
oil cylinder
adopt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510404787.2A
Other languages
Chinese (zh)
Other versions
CN105257610B (en
Inventor
陈建军
孟锦华
刘鹏鑫
刘华
周鹏
周小卫
施昇
吴赵禄
周培培
张鹏
孙辉
顾金林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Gangzha Shipbuilding Co Ltd
Original Assignee
Nantong Gangzha Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Gangzha Shipbuilding Co Ltd filed Critical Nantong Gangzha Shipbuilding Co Ltd
Priority to CN201510404787.2A priority Critical patent/CN105257610B/en
Publication of CN105257610A publication Critical patent/CN105257610A/en
Application granted granted Critical
Publication of CN105257610B publication Critical patent/CN105257610B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Pressure Circuits (AREA)

Abstract

The invention discloses an easy-to-operate hydraulic system of a self-propulsion steel rake grab dredger. The easy-to-operate hydraulic system of the self-propulsion steel rake grab dredger comprises a hydraulic actuating mechanism, a hydraulic pump station, a hydraulic control system, a hydraulic pipeline and a hydraulic electrical control system. The hydraulic system of the self-propulsion steel rake grab dredger is reasonable in structure, good in working performance, safe during usage and easy to operate.

Description

Easy-operating from boat steel rake grab boat hydraulic system
Technical field
The present invention relates to a kind of from boat steel rake grab boat hydraulic system.
Background technique
Existing exist certain defect, inefficiency from boat steel rake grab boat hydraulic system in service behaviour, structural type etc., needs to be improved further.
Summary of the invention
The object of the present invention is to provide the easy-operating from boat steel rake grab boat hydraulic system of a kind of favorable working performance.
Technical solution of the present invention is:
A kind of from boat steel rake grab boat hydraulic system, comprise hydraulic actuator, hydraulic power unit, hydraulic control system, hydraulic pipe line, hydraulic electric control system, it is characterized in that:
(1) hydraulic actuator comprises spud gantry lifting device four cover, chassis walking oil cylinder two, steel rake hauling winch one, four, windlass capstan winch;
(2) system dynamic pump group configuration is as follows:
Often overlap lowering or hoisting gear and join the electric-motor pump group fuel feeding in parallel of 2 22KW to hoist cylinder, when separate unit runs, motion speed reduces by half, and namely meets an urgent need each other for two, and improve the reliability of system, full ship is totally 8 electric-motor pump groups;
Full ship adjusts two 4KW electric-motor pump groups to be plugging pin oil cylinder fuel feeding, and open one for one or two and with meeting an urgent need each other depending on actual conditions, the feature because of plugging pin oil cylinder is that working time is short, moment flow greatly, in pump discharge oil circuit, therefore establish the accumulator of 2 volume 40L;
The lifting pumping source of 1# lowering or hoisting gear is held concurrently for 1# chassis oil cylinder; the lifting pump of 2# lowering or hoisting gear is held concurrently for 2# chassis oil cylinder; the lifting pumping source of 3# lowering or hoisting gear is held concurrently for hauling winch, and the lifting pumping source of 4# lowering or hoisting gear is held concurrently for 4 windlass capstan winches, and plugging pin oil cylinder pumping source is simultaneously for 8 main pump variablees provide power oil sources;
8 main oil pumps select constant voltage, invariable power proportional variable pump, wherein the input signal of rate variable is set as that two fixed values realize low pressure huge discharge and high-pressure small-displacement two kinds of working condition requirements, the electromagnetism overflow relief valve of fuel pump outlet is also set as height two grades of working pressures, and preliminary settlement data are 125ml/r-6MPa or 30ml/r-27.5MPa; Motor in synchrony rotating speed 1500rpm;
The constant pressure variable displacement pump of 16ml/r selected by consignment oil cylinder, and reduce the heating of system, variable pressure is set as 8.5MPa;
Back pressure one-way valve is established, return filter and cooler in total return line of pumping plant;
(3) hydraulic control system
The control mode of chassis oil cylinder, hauling winch, windlass capstan winch is comparatively simple, and wherein four windlass capstan winches adopt the other manually operated valve of machine to control, and chassis oil cylinder and hauling winch adopt electric hydraulic control;
The control of lowering or hoisting gear:
Total hoist cylinder four in every covering device, and four oil need synchronization lifting, from the structure of lowering or hoisting gear, four hoist cylinders are actually mechanism synchronously, and therefore four oil cylinders can in parallelly adopt 1 way reversing valve to control to commutate; Due to dowel pile decline and hull to decline for oil cylinder be that two different oil pockets control by back-pressure balance, therefore, all need one-way balance valve is set in the total oil circuit of A, B of selector valve and make back pressure control and hydraulic lock;
Mounting type due to hoist cylinder is two joint shaft bearing, the swing of certain amplitude is there is when oil cylinder runs, therefore the AB hydraulic fluid port of every root oil cylinder is connected with house steward AB and need uses high pressure hose transition, consider the Security of system, therefore every root oil cylinder all needs to arrange hydraulic lock, there is the back pressure of one-way balance valve in the oil return of this hydraulic lock, so the product that this hydraulic lock need adopt external control to leak;
In the flexible pipe anti-explosion safety item of hoist cylinder AB hydraulic fluid port, also have another kind of scheme available, all establish fixing damping hole at the A mouth of four hoist cylinders and B mouth exactly, cancel the hydraulic lock on single oil cylinder; Work under such four oil cylinders are in parallel connection all the time, even if explosion appears in a certain flexible pipe, hull is the steady stroke that declines lentamente at most just;
Upper and lower two groups of totally four plugging pin oil cylinder are had in lowering or hoisting gear, often organize two simultaneous retractables in parallel, for guaranteeing the Security of system, two group oil cylinders adopt " P " type selector valve to control, such reset condition two groups of latches are all in extended position, only have one group of latch to extract during commutation, therefore have at least one group of latch to be in the state of stretching out under any operating mode all the time, ensure that the Security of system;
(4) hydraulic pipe line and hydraulic oil
Full ship hydraulic pipe line is made by hydraulic system principle figure requirement by shipyard, for improving the net synchronization capability of four oil cylinders, house steward AB and the arm of four oil cylinders need to adopt " Central Symmetry " stringing to be connected, make the hydraulic fluid port of every root oil cylinder identical to the oil channel structures of house steward, effectively can improve the synchronous of oil cylinder further like this; Adopt No. 68 antiwear hydraulic oils, oil cleanliness is NAS8 ~ 9 grade;
(5) hydraulic electric control system
Full ship hydraulic electric control system is made up of other control box four part of Electric Machine at Pumping Station control box, PLC centralized-control box, operator cabin centralized control panel and stake, and each several part establishes following functions:
The automatically controlled control box of pumping plant: the star triangle on off control of 8 22KW, and directly starting of 2 4KW motors controls, and establish the Remote Control Interface of operator cabin, security level IP22, be arranged in pumping plant cabin;
PLC control cabinet: PLC control cabinet realizes system-wide accurate control, alarm signal controls and interlocking, and power switch established by panel, and security level is IP22, can be arranged in pumping plant cabin or drive indoor;
Operator cabin centralized control panel comprises:
Control power switch; The remote control of motor is opened and is run instruction; Hydraulic system concentrates acoustooptic alarm; The operation oil pressure display of each pumping source; Leveling instrument; 2 cover chassis oil cylinders control and run instruction; 1 cover hauling winch controls and runs instruction; Main oil pump two kinds of mode enable switch; The display of hoist cylinder extension and contraction control, stroke, limit position instruction, four cover lifting synchronizations of jacking up; Plugging pin oil cylinder is pulled pin and is controlled and snibbing position display; " audition ", " noise reduction " switch; Running state and alarm indication adopt HMI display;
The other control box of stake
Often overlapping dowel pile side sets a set of control box security level as IP56, if control content below
Control throw over switch; Two kinds of operating modes are run and are selected; Hoist cylinder extension and contraction control; Plugging pin oil cylinder extracts control and snibbing position display.
Oil cleanliness is NAS8 level.
Oil cleanliness is NAS9 level.
In cooler, cooling water flow is 20 ~ 30m 3/ h.
The present invention is rational in infrastructure, favorable working performance, use safety, easy to operate.
Below in conjunction with embodiment, the invention will be further described.
Embodiment
Embodiment 1:
A kind of from boat steel rake grab boat hydraulic system, comprise hydraulic actuator, hydraulic power unit, hydraulic control system, hydraulic pipe line, hydraulic electric control system, it is characterized in that:
(1) hydraulic actuator comprises spud gantry lifting device four cover, chassis walking oil cylinder two, steel rake hauling winch one, four, windlass capstan winch;
(2) system dynamic pump group configuration is as follows:
Often overlap lowering or hoisting gear and join the electric-motor pump group fuel feeding in parallel of 2 22KW to hoist cylinder, when separate unit runs, motion speed reduces by half, and namely meets an urgent need each other for two, and improve the reliability of system, full ship is totally 8 electric-motor pump groups;
Full ship adjusts two 4KW electric-motor pump groups to be plugging pin oil cylinder fuel feeding, and open one for one or two and with meeting an urgent need each other depending on actual conditions, the feature because of plugging pin oil cylinder is that working time is short, moment flow greatly, in pump discharge oil circuit, therefore establish the accumulator of 2 volume 40L;
The lifting pumping source of 1# lowering or hoisting gear is held concurrently for 1# chassis oil cylinder; the lifting pump of 2# lowering or hoisting gear is held concurrently for 2# chassis oil cylinder; the lifting pumping source of 3# lowering or hoisting gear is held concurrently for hauling winch, and the lifting pumping source of 4# lowering or hoisting gear is held concurrently for 4 windlass capstan winches, and plugging pin oil cylinder pumping source is simultaneously for 8 main pump variablees provide power oil sources;
8 main oil pumps select constant voltage, invariable power proportional variable pump, wherein the input signal of rate variable is set as that two fixed values realize low pressure huge discharge and high-pressure small-displacement two kinds of working condition requirements, the electromagnetism overflow relief valve of fuel pump outlet is also set as height two grades of working pressures, and preliminary settlement data are 125ml/r-6MPa or 30ml/r-27.5MPa; Motor in synchrony rotating speed 1500rpm;
The constant pressure variable displacement pump of 16ml/r selected by consignment oil cylinder, and reduce the heating of system, variable pressure is set as 8.5MPa;
Back pressure one-way valve is established, return filter and cooler in total return line of pumping plant;
(3) hydraulic control system
The control mode of chassis oil cylinder, hauling winch, windlass capstan winch is comparatively simple, and wherein four windlass capstan winches adopt the other manually operated valve of machine to control, and chassis oil cylinder and hauling winch adopt electric hydraulic control;
The control of lowering or hoisting gear:
Total hoist cylinder four in every covering device, and four oil need synchronization lifting, from the structure of lowering or hoisting gear, four hoist cylinders are actually mechanism synchronously, and therefore four oil cylinders can in parallelly adopt 1 way reversing valve to control to commutate; Due to dowel pile decline and hull to decline for oil cylinder be that two different oil pockets control by back-pressure balance, therefore, all need one-way balance valve is set in the total oil circuit of A, B of selector valve and make back pressure control and hydraulic lock;
Mounting type due to hoist cylinder is two joint shaft bearing, the swing of certain amplitude is there is when oil cylinder runs, therefore the AB hydraulic fluid port of every root oil cylinder is connected with house steward AB and need uses high pressure hose transition, consider the Security of system, therefore every root oil cylinder all needs to arrange hydraulic lock, there is the back pressure of one-way balance valve in the oil return of this hydraulic lock, so the product that this hydraulic lock need adopt external control to leak;
In the flexible pipe anti-explosion safety item of hoist cylinder AB hydraulic fluid port, also have another kind of scheme available, all establish fixing damping hole at the A mouth of four hoist cylinders and B mouth exactly, cancel the hydraulic lock on single oil cylinder; Work under such four oil cylinders are in parallel connection all the time, even if explosion appears in a certain flexible pipe, hull is the steady stroke that declines lentamente at most just;
Upper and lower two groups of totally four plugging pin oil cylinder are had in lowering or hoisting gear, often organize two simultaneous retractables in parallel, for guaranteeing the Security of system, two group oil cylinders adopt " P " type selector valve to control, such reset condition two groups of latches are all in extended position, only have one group of latch to extract during commutation, therefore have at least one group of latch to be in the state of stretching out under any operating mode all the time, ensure that the Security of system;
(4) hydraulic pipe line and hydraulic oil
Full ship hydraulic pipe line is made by hydraulic system principle figure requirement by shipyard, for improving the net synchronization capability of four oil cylinders, house steward AB and the arm of four oil cylinders need to adopt " Central Symmetry " stringing to be connected, make the hydraulic fluid port of every root oil cylinder identical to the oil channel structures of house steward, effectively can improve the synchronous of oil cylinder further like this; Adopt No. 68 antiwear hydraulic oils, oil cleanliness is NAS8 ~ 9 grade;
(5) hydraulic electric control system
Full ship hydraulic electric control system is made up of other control box four part of Electric Machine at Pumping Station control box, PLC centralized-control box, operator cabin centralized control panel and stake, and each several part establishes following functions:
The automatically controlled control box of pumping plant: the star triangle on off control of 8 22KW, and directly starting of 2 4KW motors controls, and establish the Remote Control Interface of operator cabin, security level IP22, be arranged in pumping plant cabin;
PLC control cabinet: PLC control cabinet realizes system-wide accurate control, alarm signal controls and interlocking, and power switch established by panel, and security level is IP22, can be arranged in pumping plant cabin or drive indoor;
Operator cabin centralized control panel comprises:
Control power switch; The remote control of motor is opened and is run instruction; Hydraulic system concentrates acoustooptic alarm; The operation oil pressure display of each pumping source; Leveling instrument; 2 cover chassis oil cylinders control and run instruction; 1 cover hauling winch controls and runs instruction; Main oil pump two kinds of mode enable switch; The display of hoist cylinder extension and contraction control, stroke, limit position instruction, four cover lifting synchronizations of jacking up; Plugging pin oil cylinder is pulled pin and is controlled and snibbing position display; " audition ", " noise reduction " switch; Running state and alarm indication adopt HMI display;
The other control box of stake
Often overlapping dowel pile side sets a set of control box security level as IP56, if control content below
Control throw over switch; Two kinds of operating modes are run and are selected; Hoist cylinder extension and contraction control; Plugging pin oil cylinder extracts control and snibbing position display.
Oil cleanliness is NAS8 level.
In cooler, cooling water flow is 30m 3/ h.
Embodiment 2:
A kind of from boat steel rake grab boat hydraulic system, comprise hydraulic actuator, hydraulic power unit, hydraulic control system, hydraulic pipe line, hydraulic electric control system, it is characterized in that:
(1) hydraulic actuator comprises spud gantry lifting device four cover, chassis walking oil cylinder two, steel rake hauling winch one, four, windlass capstan winch;
(2) system dynamic pump group configuration is as follows:
Often overlap lowering or hoisting gear and join the electric-motor pump group fuel feeding in parallel of 2 22KW to hoist cylinder, when separate unit runs, motion speed reduces by half, and namely meets an urgent need each other for two, and improve the reliability of system, full ship is totally 8 electric-motor pump groups;
Full ship adjusts two 4KW electric-motor pump groups to be plugging pin oil cylinder fuel feeding, and open one for one or two and with meeting an urgent need each other depending on actual conditions, the feature because of plugging pin oil cylinder is that working time is short, moment flow greatly, in pump discharge oil circuit, therefore establish the accumulator of 2 volume 40L;
The lifting pumping source of 1# lowering or hoisting gear is held concurrently for 1# chassis oil cylinder; the lifting pump of 2# lowering or hoisting gear is held concurrently for 2# chassis oil cylinder; the lifting pumping source of 3# lowering or hoisting gear is held concurrently for hauling winch, and the lifting pumping source of 4# lowering or hoisting gear is held concurrently for 4 windlass capstan winches, and plugging pin oil cylinder pumping source is simultaneously for 8 main pump variablees provide power oil sources;
8 main oil pumps select constant voltage, invariable power proportional variable pump, wherein the input signal of rate variable is set as that two fixed values realize low pressure huge discharge and high-pressure small-displacement two kinds of working condition requirements, the electromagnetism overflow relief valve of fuel pump outlet is also set as height two grades of working pressures, and preliminary settlement data are 125ml/r-6MPa or 30ml/r-27.5MPa; Motor in synchrony rotating speed 1500rpm;
The constant pressure variable displacement pump of 16ml/r selected by consignment oil cylinder, and reduce the heating of system, variable pressure is set as 8.5MPa;
Back pressure one-way valve is established, return filter and cooler in total return line of pumping plant;
(3) hydraulic control system
The control mode of chassis oil cylinder, hauling winch, windlass capstan winch is comparatively simple, and wherein four windlass capstan winches adopt the other manually operated valve of machine to control, and chassis oil cylinder and hauling winch adopt electric hydraulic control;
The control of lowering or hoisting gear:
Total hoist cylinder four in every covering device, and four oil need synchronization lifting, from the structure of lowering or hoisting gear, four hoist cylinders are actually mechanism synchronously, and therefore four oil cylinders can in parallelly adopt 1 way reversing valve to control to commutate; Due to dowel pile decline and hull to decline for oil cylinder be that two different oil pockets control by back-pressure balance, therefore, all need one-way balance valve is set in the total oil circuit of A, B of selector valve and make back pressure control and hydraulic lock;
Mounting type due to hoist cylinder is two joint shaft bearing, the swing of certain amplitude is there is when oil cylinder runs, therefore the AB hydraulic fluid port of every root oil cylinder is connected with house steward AB and need uses high pressure hose transition, consider the Security of system, therefore every root oil cylinder all needs to arrange hydraulic lock, there is the back pressure of one-way balance valve in the oil return of this hydraulic lock, so the product that this hydraulic lock need adopt external control to leak;
In the flexible pipe anti-explosion safety item of hoist cylinder AB hydraulic fluid port, also have another kind of scheme available, all establish fixing damping hole at the A mouth of four hoist cylinders and B mouth exactly, cancel the hydraulic lock on single oil cylinder; Work under such four oil cylinders are in parallel connection all the time, even if explosion appears in a certain flexible pipe, hull is the steady stroke that declines lentamente at most just;
Upper and lower two groups of totally four plugging pin oil cylinder are had in lowering or hoisting gear, often organize two simultaneous retractables in parallel, for guaranteeing the Security of system, two group oil cylinders adopt " P " type selector valve to control, such reset condition two groups of latches are all in extended position, only have one group of latch to extract during commutation, therefore have at least one group of latch to be in the state of stretching out under any operating mode all the time, ensure that the Security of system;
(4) hydraulic pipe line and hydraulic oil
Full ship hydraulic pipe line is made by hydraulic system principle figure requirement by shipyard, for improving the net synchronization capability of four oil cylinders, house steward AB and the arm of four oil cylinders need to adopt " Central Symmetry " stringing to be connected, make the hydraulic fluid port of every root oil cylinder identical to the oil channel structures of house steward, effectively can improve the synchronous of oil cylinder further like this; Adopt No. 68 antiwear hydraulic oils, oil cleanliness is NAS8 ~ 9 grade;
(5) hydraulic electric control system
Full ship hydraulic electric control system is made up of other control box four part of Electric Machine at Pumping Station control box, PLC centralized-control box, operator cabin centralized control panel and stake, and each several part establishes following functions:
The automatically controlled control box of pumping plant: the star triangle on off control of 8 22KW, and directly starting of 2 4KW motors controls, and establish the Remote Control Interface of operator cabin, security level IP22, be arranged in pumping plant cabin;
PLC control cabinet: PLC control cabinet realizes system-wide accurate control, alarm signal controls and interlocking, and power switch established by panel, and security level is IP22, can be arranged in pumping plant cabin or drive indoor;
Operator cabin centralized control panel comprises:
Control power switch; The remote control of motor is opened and is run instruction; Hydraulic system concentrates acoustooptic alarm; The operation oil pressure display of each pumping source; Leveling instrument; 2 cover chassis oil cylinders control and run instruction; 1 cover hauling winch controls and runs instruction; Main oil pump two kinds of mode enable switch; The display of hoist cylinder extension and contraction control, stroke, limit position instruction, four cover lifting synchronizations of jacking up; Plugging pin oil cylinder is pulled pin and is controlled and snibbing position display; " audition ", " noise reduction " switch; Running state and alarm indication adopt HMI display;
The other control box of stake
Often overlapping dowel pile side sets a set of control box security level as IP56, if control content below
Control throw over switch; Two kinds of operating modes are run and are selected; Hoist cylinder extension and contraction control; Plugging pin oil cylinder extracts control and snibbing position display.
Oil cleanliness is NAS9 level.
In cooler, cooling water flow is 25m 3/ h.
Embodiment 3:
A kind of from boat steel rake grab boat hydraulic system, comprise hydraulic actuator, hydraulic power unit, hydraulic control system, hydraulic pipe line, hydraulic electric control system, it is characterized in that:
(1) hydraulic actuator comprises spud gantry lifting device four cover, chassis walking oil cylinder two, steel rake hauling winch one, four, windlass capstan winch;
(2) system dynamic pump group configuration is as follows:
Often overlap lowering or hoisting gear and join the electric-motor pump group fuel feeding in parallel of 2 22KW to hoist cylinder, when separate unit runs, motion speed reduces by half, and namely meets an urgent need each other for two, and improve the reliability of system, full ship is totally 8 electric-motor pump groups;
Full ship adjusts two 4KW electric-motor pump groups to be plugging pin oil cylinder fuel feeding, and open one for one or two and with meeting an urgent need each other depending on actual conditions, the feature because of plugging pin oil cylinder is that working time is short, moment flow greatly, in pump discharge oil circuit, therefore establish the accumulator of 2 volume 40L;
The lifting pumping source of 1# lowering or hoisting gear is held concurrently for 1# chassis oil cylinder; the lifting pump of 2# lowering or hoisting gear is held concurrently for 2# chassis oil cylinder; the lifting pumping source of 3# lowering or hoisting gear is held concurrently for hauling winch, and the lifting pumping source of 4# lowering or hoisting gear is held concurrently for 4 windlass capstan winches, and plugging pin oil cylinder pumping source is simultaneously for 8 main pump variablees provide power oil sources;
8 main oil pumps select constant voltage, invariable power proportional variable pump, wherein the input signal of rate variable is set as that two fixed values realize low pressure huge discharge and high-pressure small-displacement two kinds of working condition requirements, the electromagnetism overflow relief valve of fuel pump outlet is also set as height two grades of working pressures, and preliminary settlement data are 125ml/r-6MPa or 30ml/r-27.5MPa; Motor in synchrony rotating speed 1500rpm;
The constant pressure variable displacement pump of 16ml/r selected by consignment oil cylinder, and reduce the heating of system, variable pressure is set as 8.5MPa;
Back pressure one-way valve is established, return filter and cooler in total return line of pumping plant;
(3) hydraulic control system
The control mode of chassis oil cylinder, hauling winch, windlass capstan winch is comparatively simple, and wherein four windlass capstan winches adopt the other manually operated valve of machine to control, and chassis oil cylinder and hauling winch adopt electric hydraulic control;
The control of lowering or hoisting gear:
Total hoist cylinder four in every covering device, and four oil need synchronization lifting, from the structure of lowering or hoisting gear, four hoist cylinders are actually mechanism synchronously, and therefore four oil cylinders can in parallelly adopt 1 way reversing valve to control to commutate; Due to dowel pile decline and hull to decline for oil cylinder be that two different oil pockets control by back-pressure balance, therefore, all need one-way balance valve is set in the total oil circuit of A, B of selector valve and make back pressure control and hydraulic lock;
Mounting type due to hoist cylinder is two joint shaft bearing, the swing of certain amplitude is there is when oil cylinder runs, therefore the AB hydraulic fluid port of every root oil cylinder is connected with house steward AB and need uses high pressure hose transition, consider the Security of system, therefore every root oil cylinder all needs to arrange hydraulic lock, there is the back pressure of one-way balance valve in the oil return of this hydraulic lock, so the product that this hydraulic lock need adopt external control to leak;
In the flexible pipe anti-explosion safety item of hoist cylinder AB hydraulic fluid port, also have another kind of scheme available, all establish fixing damping hole at the A mouth of four hoist cylinders and B mouth exactly, cancel the hydraulic lock on single oil cylinder; Work under such four oil cylinders are in parallel connection all the time, even if explosion appears in a certain flexible pipe, hull is the steady stroke that declines lentamente at most just;
Upper and lower two groups of totally four plugging pin oil cylinder are had in lowering or hoisting gear, often organize two simultaneous retractables in parallel, for guaranteeing the Security of system, two group oil cylinders adopt " P " type selector valve to control, such reset condition two groups of latches are all in extended position, only have one group of latch to extract during commutation, therefore have at least one group of latch to be in the state of stretching out under any operating mode all the time, ensure that the Security of system;
(4) hydraulic pipe line and hydraulic oil
Full ship hydraulic pipe line is made by hydraulic system principle figure requirement by shipyard, for improving the net synchronization capability of four oil cylinders, house steward AB and the arm of four oil cylinders need to adopt " Central Symmetry " stringing to be connected, make the hydraulic fluid port of every root oil cylinder identical to the oil channel structures of house steward, effectively can improve the synchronous of oil cylinder further like this; Adopt No. 68 antiwear hydraulic oils, oil cleanliness is NAS8 ~ 9 grade;
(5) hydraulic electric control system
Full ship hydraulic electric control system is made up of other control box four part of Electric Machine at Pumping Station control box, PLC centralized-control box, operator cabin centralized control panel and stake, and each several part establishes following functions:
The automatically controlled control box of pumping plant: the star triangle on off control of 8 22KW, and directly starting of 2 4KW motors controls, and establish the Remote Control Interface of operator cabin, security level IP22, be arranged in pumping plant cabin;
PLC control cabinet: PLC control cabinet realizes system-wide accurate control, alarm signal controls and interlocking, and power switch established by panel, and security level is IP22, can be arranged in pumping plant cabin or drive indoor;
Operator cabin centralized control panel comprises:
Control power switch; The remote control of motor is opened and is run instruction; Hydraulic system concentrates acoustooptic alarm; The operation oil pressure display of each pumping source; Leveling instrument; 2 cover chassis oil cylinders control and run instruction; 1 cover hauling winch controls and runs instruction; Main oil pump two kinds of mode enable switch; The display of hoist cylinder extension and contraction control, stroke, limit position instruction, four cover lifting synchronizations of jacking up; Plugging pin oil cylinder is pulled pin and is controlled and snibbing position display; " audition ", " noise reduction " switch; Running state and alarm indication adopt HMI display;
The other control box of stake
Often overlapping dowel pile side sets a set of control box security level as IP56, if control content below
Control throw over switch; Two kinds of operating modes are run and are selected; Hoist cylinder extension and contraction control; Plugging pin oil cylinder extracts control and snibbing position display.
Oil cleanliness is NAS8 level.
In cooler, cooling water flow is 20m 3/ h.

Claims (4)

1. easy-operating from a boat steel rake grab boat hydraulic system, comprise hydraulic actuator, hydraulic power unit, hydraulic control system, hydraulic pipe line, hydraulic electric control system, it is characterized in that:
(1) hydraulic actuator comprises spud gantry lifting device four cover, chassis walking oil cylinder two, steel rake hauling winch one, four, windlass capstan winch;
(2) hydraulic control system
The control mode of chassis oil cylinder, hauling winch, windlass capstan winch is comparatively simple, and wherein four windlass capstan winches adopt the other manually operated valve of machine to control, and chassis oil cylinder and hauling winch adopt electric hydraulic control;
The control of lowering or hoisting gear:
Total hoist cylinder four in every covering device, and four oil need synchronization lifting, from the structure of lowering or hoisting gear, four hoist cylinders are actually mechanism synchronously, and therefore four oil cylinders can in parallelly adopt 1 way reversing valve to control to commutate; Due to dowel pile decline and hull to decline for oil cylinder be that two different oil pockets control by back-pressure balance, therefore, all need one-way balance valve is set in the total oil circuit of A, B of selector valve and make back pressure control and hydraulic lock;
Mounting type due to hoist cylinder is two joint shaft bearing, the swing of certain amplitude is there is when oil cylinder runs, therefore the AB hydraulic fluid port of every root oil cylinder is connected with house steward AB and need uses high pressure hose transition, consider the Security of system, therefore every root oil cylinder all needs to arrange hydraulic lock, there is the back pressure of one-way balance valve in the oil return of this hydraulic lock, so the product that this hydraulic lock need adopt external control to leak;
In the flexible pipe anti-explosion safety item of hoist cylinder AB hydraulic fluid port, also have another kind of scheme available, all establish fixing damping hole at the A mouth of four hoist cylinders and B mouth exactly, cancel the hydraulic lock on single oil cylinder; Work under such four oil cylinders are in parallel connection all the time, even if explosion appears in a certain flexible pipe, hull is the steady stroke that declines lentamente at most just;
Upper and lower two groups of totally four plugging pin oil cylinder are had in lowering or hoisting gear, often organize two simultaneous retractables in parallel, for guaranteeing the Security of system, two group oil cylinders adopt " P " type selector valve to control, such reset condition two groups of latches are all in extended position, only have one group of latch to extract during commutation, therefore have at least one group of latch to be in the state of stretching out under any operating mode all the time, ensure that the Security of system.
2. according to claim 1 easy-operating from boat steel rake grab boat hydraulic system, it is characterized in that: oil cleanliness is NAS8 level.
3. according to claim 1 easy-operating from boat steel rake grab boat hydraulic system, it is characterized in that: oil cleanliness is NAS9 level.
4. according to claim 1 easy-operating from boat steel rake grab boat hydraulic system, it is characterized in that: in cooler, cooling water flow is 20 ~ 30m 3/ h.
CN201510404787.2A 2015-07-13 2015-07-13 The easy-operating steel rake grab boat hydraulic system of boat certainly Expired - Fee Related CN105257610B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510404787.2A CN105257610B (en) 2015-07-13 2015-07-13 The easy-operating steel rake grab boat hydraulic system of boat certainly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510404787.2A CN105257610B (en) 2015-07-13 2015-07-13 The easy-operating steel rake grab boat hydraulic system of boat certainly

Publications (2)

Publication Number Publication Date
CN105257610A true CN105257610A (en) 2016-01-20
CN105257610B CN105257610B (en) 2017-03-01

Family

ID=55097476

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510404787.2A Expired - Fee Related CN105257610B (en) 2015-07-13 2015-07-13 The easy-operating steel rake grab boat hydraulic system of boat certainly

Country Status (1)

Country Link
CN (1) CN105257610B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672952A (en) * 2016-04-14 2016-06-15 麦格瑞科技(北京)有限公司 Intelligent non-beam hydraulic oil pumping technology and hydraulic oil pumping machine
CN108518387A (en) * 2018-03-27 2018-09-11 上海朗畏机电科技有限公司 A kind of hydraulic interlock control system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0256304B1 (en) * 1986-07-18 1990-03-07 Serge Vuistiner Soil-working machine
JP2008274585A (en) * 2007-04-26 2008-11-13 Toa Harbor Works Co Ltd Dredging support system
CN101811558A (en) * 2010-03-05 2010-08-25 南通港闸船舶制造有限公司 Dredger hydraulic system manufacturing and installation technology
CN102226346A (en) * 2011-04-07 2011-10-26 上海交通大学 Extrusion grab bucket for continuous desilting
CN102277887A (en) * 2010-06-11 2011-12-14 鲁国庆 Fully submerged dredge boat

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0256304B1 (en) * 1986-07-18 1990-03-07 Serge Vuistiner Soil-working machine
JP2008274585A (en) * 2007-04-26 2008-11-13 Toa Harbor Works Co Ltd Dredging support system
CN101811558A (en) * 2010-03-05 2010-08-25 南通港闸船舶制造有限公司 Dredger hydraulic system manufacturing and installation technology
CN102277887A (en) * 2010-06-11 2011-12-14 鲁国庆 Fully submerged dredge boat
CN102226346A (en) * 2011-04-07 2011-10-26 上海交通大学 Extrusion grab bucket for continuous desilting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105672952A (en) * 2016-04-14 2016-06-15 麦格瑞科技(北京)有限公司 Intelligent non-beam hydraulic oil pumping technology and hydraulic oil pumping machine
CN108518387A (en) * 2018-03-27 2018-09-11 上海朗畏机电科技有限公司 A kind of hydraulic interlock control system

Also Published As

Publication number Publication date
CN105257610B (en) 2017-03-01

Similar Documents

Publication Publication Date Title
CN102912821B (en) Hydraulic excavating energy saving system
NO329688B1 (en) Lift system device
CN201554009U (en) Piston-type double hanging point hydraulic headstock gear
CN107542121A (en) A kind of hybrid excavator movable arm potential energy recovery system
CN108223499A (en) A kind of motor-direct-drive type swing arm energy-recuperation system
CN107447803A (en) The mechanical mining excavator of combination drive
CN203612864U (en) Hydraulic winch constant-tension control device
CN105257610A (en) Easy-to-operate hydraulic system of self-propulsion steel rake grab dredger
CN210440005U (en) Hydraulically-driven split type well cementing pry
CN102392840B (en) Ascending and descending control system for main elevator of rotary drilling machine
CN105256856A (en) Easy-to-operate hydraulic system of self-propulsion steel rake grab dredger
CN103031957A (en) Control system and method for concrete machine
CN105035959B (en) Use the safe steel rake grab boat hydraulic system of boat certainly
CN201952826U (en) Grab excavator for ship
CN202054561U (en) Hydraulic closed-type constant tension device
CN108953309B (en) Energy recovery and recycling hydraulic system
CN107956228A (en) A kind of seabed twists imbibition pressure control system
CN201963219U (en) Multi-hydraulic cylinder electric energy-accumulating workover rig with energy accumulator
CN105256857A (en) Reasonable-structure hydraulic system of self-propulsion steel rake grab dredger
CN105064443A (en) Self-propulsion steel rake grab dredger hydraulic system with good work performance
KR101328847B1 (en) Negative Flow Control System for Mini Excavator
CN106480926A (en) A kind of electric hydraulic excavating machine
CN202914810U (en) Confluence multi-way valve and crane hydraulic system
CN206069234U (en) Multi-functional crawler crane
CN205446286U (en) Novel two accuses of variable plunger -type fuel pump device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170301

Termination date: 20210713