CN105257061B - 一种单回路变呼高杆塔 - Google Patents

一种单回路变呼高杆塔 Download PDF

Info

Publication number
CN105257061B
CN105257061B CN201510562160.XA CN201510562160A CN105257061B CN 105257061 B CN105257061 B CN 105257061B CN 201510562160 A CN201510562160 A CN 201510562160A CN 105257061 B CN105257061 B CN 105257061B
Authority
CN
China
Prior art keywords
arm
cross
line direction
newly
ground wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510562160.XA
Other languages
English (en)
Other versions
CN105257061A (zh
Inventor
王力
赵晖
罗正帮
于永洋
葛娜
刘西民
陈曦鸣
罗义华
刘勇
计策
吴松
丁波
汪晓光
陈彦焰
夏威
郑少将
梁东跃
周转
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
State Grid Anhui Electric Power Co Ltd
Anhui Huadian Engineering Consulting and Design Co Ltd
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Anhui Electric Power Co Ltd, Anhui Huadian Engineering Consulting and Design Co Ltd, Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Anhui Electric Power Co Ltd
Priority to CN201510562160.XA priority Critical patent/CN105257061B/zh
Publication of CN105257061A publication Critical patent/CN105257061A/zh
Application granted granted Critical
Publication of CN105257061B publication Critical patent/CN105257061B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

一种单回路变呼高杆塔,它包括塔身、顶层地线横担、支柱绝缘子,所述顶层地线横担由垂直于线路方向的两边横担组成,所述上层跨越横担由垂直于新建线路方向的一层两边横担和一层单边横担组成,所述中层辅助横担由垂直于新建线路方向的多层两边横担组成,所述下层钻越横担由垂直于新建线路方向的一层两边横担组成。本发明降低了先跨后钻(或先钻后跨)工程中交叉线路改造和电缆入地的几率,避免了交叉线路的停电,增加了电网可靠性,缩减了建设成本,进一步压缩了钻越档的导地线对地距离。

Description

一种单回路变呼高杆塔
技术领域:
本发明涉及高压输电线路技术领域,尤其涉及一种单回路变呼高杆塔。
背景技术:
输电线路工程建设是电网建设中的重要组成部分,在电力系统中担当着传输、分配、调压的作用。鉴于输电线路对传输走廊的择优原则相同,出于降低成本、减少占地的考虑,输电线路通常选择平行走线。受变电站落点位置的影响,新建线路经常与已建线路交叉,根据规程要求,电压较高的线路一般架设在电压较低线路的上方,同一等级电压的电网公用线应架设在专用线上方,故输电线路先跨后钻(或先钻后跨)的情况屡有发生。
在实际工程中,对于输电线路先跨后钻(或先钻后跨)的情况,受地形与现场环境影响,仅采用一基杆塔往往难以直接实现,通常需要采取以下几种手段:
1)通过升高电压等级较高线路或者降低电压等级较低线路,但导致线路停电,增加线路建设成本。
2)采用架空跨越、电缆钻越的方式,但电缆入地成本较高,同时线路建成后不易于巡检。
综上所述,上述方案施工困难且综合造价较高,不利于工程实施。
发明内容:
本发明的目的是提供一种单回路变呼高杆塔,该杆塔的线路跨越侧导线呈上字型布置,与常规线路布置方式相同,避免了对邻塔导线布置的影响;该杆塔的钻越侧采用紧凑型排列方式,压缩了导、地线对地高度,进一步优化了钻越方案,降低了老线路改造、电缆入地的可能。
为了解决背景技术中存在的问题,本发明采用以下技术方案:它包括塔身、顶层地线横担、支柱绝缘子,顶层地线横担下方设置有上层跨越导线横担,上层跨越导线横担下方设置有中层辅助横担,中层辅助横担下方设置下层钻越导线横担,所述顶层地线横担由垂直于线路方向的两边横担组成,所述上层跨越横担由垂直于新建线路方向的一层两边横担和一层单边横担组成,所述中层辅助横担由垂直于新建线路方向的多层两边横担组成,所述下层钻越横担由垂直于新建线路方向的一层两边横担组成,所述支柱绝缘子固定在中层辅助横担各横担梢部及塔身钻越侧线路上方,固定在横担梢部的支柱绝缘子垂直于新建线路方向,固定在塔身钻越侧线路上方的支柱绝缘子平行于新建线路方向,所述顶层地线横担处悬挂带支撑管的跳线串。
本发明通过一基杆塔实现了单回路变呼高钻跨越,降低了先跨后钻(或先钻后跨)工程中交叉线路改造和电缆入地的几率,避免了交叉线路的停电,增加了电网可靠性,缩减了建设成本,进一步压缩了钻越档的导地线对地距离。
附图说明:
图1为本发明的结构示意图;
图2为本发明的接线示意图。
具体实施方式:
参照图1-2,它包括塔身1、顶层地线横担2、支柱绝缘子6,顶层地线横担2下方设置有上层跨越导线横担3,上层跨越导线横担3下方设置有中层辅助横担4,中层辅助横担4下方设置下层钻越导线横担5,所述顶层地线横担2由垂直于新建线路方向的两边横担组成,所述上层跨越横担3由垂直于新建线路方向的一层两边横担和一层单边横担组成,横担长度及横担层间距由前后接入线路导线布置形式决定,所述中层辅助横担4由垂直于新建线路方向的多层两边横担组成,所述下层钻越横担5由垂直于新建线路方向的一层两边横担组成,上层跨越横担3、中层辅助横担4、下层钻越横担5的长度及间距需满足电气要求,同时上层跨越横担3长度及间距还需参照由跨越侧线路导线布置形式,所述中层辅助横担4的层数由钻越点与跨越点之间的高差决定,高差越高中层辅助横担的层数越多,所述支柱绝缘子6固定在中层辅助横担4各横担梢部及塔身1钻越侧线路上方,固定在横担梢部的支柱绝缘子垂直于新建线路方向,固定在塔身1钻越侧线路上方的支柱绝缘子平行于新建线路方向,所述支柱绝缘子6带电点间距、带电点与导线、地线间距,带电点与塔身的间距,应满足电气要求,所述顶层地线横担2处悬挂带支撑管的跳线串7,跨越侧地线悬挂于顶层地线横担上,钻越侧地线根据实际情况可悬挂于中层辅助横担、上层跨越横担上,特殊时可取消地线,跨越侧地线的根数根据规范要求决定。
参照图2,在进行输电线路先跨后钻(或先钻后跨)作业时,新建一基本发明单回路变呼高钻跨越杆,将跨越侧导线悬挂在上层导线横担3处,将跨越侧地线悬挂在顶层地线横担2处,钻越侧导线悬挂在下层导线横担5处,钻越侧地线悬挂在中层辅助横担4或上层导线横担3处,跨越侧上相导线利用带支撑管的跳线串7和位于塔身1钻越侧的支柱绝缘子6接至钻越侧上相导线,跨越侧边相导线利用位于中层辅助横担4横担梢部的支柱绝缘子6接至钻越侧下层边相导线。本发明通过一基杆塔实现了单回路变呼高钻跨越,降低了先跨后钻(或先钻后跨)工程中交叉线路改造、电缆入地的几率,避免了交叉线路的停电,增加了电网可靠性,缩减了建设成本,进一步压缩了钻越档的导地线对地距离。

Claims (1)

1.一种单回路变呼高杆塔,其特征在于,它包括塔身、顶层地线横担、支柱绝缘子,顶层地线横担下方设置有上层跨越导线横担,上层跨越导线横担下方设置有中层辅助横担,中层辅助横担下方设置下层钻越导线横担,所述顶层地线横担由垂直于线路方向的两边横担组成,所述上层跨越横担由垂直于新建线路方向的一层两边横担和一层单边横担组成,所述中层辅助横担由垂直于新建线路方向的多层两边横担组成,所述下层钻越横担由垂直于新建线路方向的一层两边横担组成,所述支柱绝缘子固定在中层辅助横担各横担梢部及塔身钻越侧线路上方,固定在横担梢部的支柱绝缘子垂直于新建线路方向,固定在塔身钻越侧线路上方的支柱绝缘子平行于新建线路方向,所述顶层地线横担处悬挂带支撑管的跳线串。
CN201510562160.XA 2015-09-07 2015-09-07 一种单回路变呼高杆塔 Active CN105257061B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510562160.XA CN105257061B (zh) 2015-09-07 2015-09-07 一种单回路变呼高杆塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510562160.XA CN105257061B (zh) 2015-09-07 2015-09-07 一种单回路变呼高杆塔

Publications (2)

Publication Number Publication Date
CN105257061A CN105257061A (zh) 2016-01-20
CN105257061B true CN105257061B (zh) 2018-01-23

Family

ID=55096961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510562160.XA Active CN105257061B (zh) 2015-09-07 2015-09-07 一种单回路变呼高杆塔

Country Status (1)

Country Link
CN (1) CN105257061B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173346A (zh) * 2019-12-28 2020-05-19 国网安徽省电力有限公司经济技术研究院 一种单回路钻跨钢管杆

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105257061B (zh) * 2015-09-07 2018-01-23 安徽华电工程咨询设计有限公司 一种单回路变呼高杆塔
CN106245975A (zh) * 2016-08-02 2016-12-21 成都城电电力工程设计有限公司 钻跨异型钢管杆
CN106567597A (zh) * 2016-09-26 2017-04-19 安徽华电工程咨询设计有限公司 一种新型双回路变呼高塔
CN109469399A (zh) * 2018-12-14 2019-03-15 贵阳电力设计院有限公司 一种同时解决钻越和跨越需求的单回路铁塔

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202017375U (zh) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220kV鹰嘴蝶形钻越塔
CN202882514U (zh) * 2012-08-17 2013-04-17 岳阳电力勘测设计院有限公司 220kv全角度单回路钻越塔
CN203452435U (zh) * 2013-08-28 2014-02-26 内蒙古电力勘测设计院 双回路钻跨式钢管杆
CN105257061A (zh) * 2015-09-07 2016-01-20 安徽华电工程咨询设计有限公司 一种单回路变呼高杆塔

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202073353U (zh) * 2011-06-01 2011-12-14 内蒙古电力勘测设计院 单回路钻跨式钢管杆

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202017375U (zh) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220kV鹰嘴蝶形钻越塔
CN202882514U (zh) * 2012-08-17 2013-04-17 岳阳电力勘测设计院有限公司 220kv全角度单回路钻越塔
CN203452435U (zh) * 2013-08-28 2014-02-26 内蒙古电力勘测设计院 双回路钻跨式钢管杆
CN105257061A (zh) * 2015-09-07 2016-01-20 安徽华电工程咨询设计有限公司 一种单回路变呼高杆塔

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173346A (zh) * 2019-12-28 2020-05-19 国网安徽省电力有限公司经济技术研究院 一种单回路钻跨钢管杆

Also Published As

Publication number Publication date
CN105257061A (zh) 2016-01-20

Similar Documents

Publication Publication Date Title
CN105257061B (zh) 一种单回路变呼高杆塔
CN105155902B (zh) 一种紧凑型双回路变呼高杆塔
CN202520040U (zh) 一种实现双回路输电线双t接用的分歧杆塔
CN105298201A (zh) 输电线路电缆终端立体引下装置
CN106567597A (zh) 一种新型双回路变呼高塔
CN101958519B (zh) 一种双回路双分裂输电线路直线塔带电异地升高改造方法
CN206272192U (zh) 一种高海拔地区新型330kV配电装置
CN205036145U (zh) 一种单回路变呼高杆塔
CN105155903B (zh) 一种双回路变呼高杆塔
CN205046908U (zh) 一种紧凑型双回路变呼高杆塔
CN203452435U (zh) 双回路钻跨式钢管杆
CN205577567U (zh) 一种双回路双t接钢管杆
CN210622429U (zh) 一种110千伏钻跨两用耐张塔
CN106639489A (zh) 500kV大角度阶梯式地线单回路钻越塔
CN204927814U (zh) 330kV配电装置的双层出线结构
CN206128797U (zh) 一种新型双回路变呼高塔
CN206894191U (zh) 一种单回路钻跨输电线路
CN204983860U (zh) 一种双回路变呼高杆塔
CN103806740B (zh) 插入式带电立杆方法
CN203729648U (zh) 一种66千伏同塔四回路双t接分歧塔
CN110453959A (zh) 一种双回路钻越钢管杆及输电系统
CN206242955U (zh) 一种绝缘复合式接触网支持装置
CN110259252A (zh) 一种110千伏钻跨两用耐张塔
CN104453334A (zh) 输电线路三回路铁塔
CN103532052A (zh) 一种adss光缆带电架设简易跨越架及实施方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant