CN105245296B - A kind of concentrator GPRS communication test systems and method - Google Patents
A kind of concentrator GPRS communication test systems and method Download PDFInfo
- Publication number
- CN105245296B CN105245296B CN201510621834.9A CN201510621834A CN105245296B CN 105245296 B CN105245296 B CN 105245296B CN 201510621834 A CN201510621834 A CN 201510621834A CN 105245296 B CN105245296 B CN 105245296B
- Authority
- CN
- China
- Prior art keywords
- test
- concentrator
- pallet
- plc
- electromagnetic shielding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 100
- 238000004891 communication Methods 0.000 title claims abstract description 46
- 238000000034 method Methods 0.000 title abstract description 8
- 238000001514 detection method Methods 0.000 claims abstract description 59
- 230000008878 coupling Effects 0.000 claims abstract description 22
- 238000010168 coupling process Methods 0.000 claims abstract description 22
- 238000005859 coupling reaction Methods 0.000 claims abstract description 22
- 230000005855 radiation Effects 0.000 claims description 15
- 238000001228 spectrum Methods 0.000 claims description 12
- 230000009471 action Effects 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 10
- 238000002360 preparation method Methods 0.000 claims description 9
- 238000003860 storage Methods 0.000 claims description 7
- 239000000758 substrate Substances 0.000 claims description 7
- 230000035945 sensitivity Effects 0.000 claims description 6
- 238000004088 simulation Methods 0.000 claims description 5
- 238000005259 measurement Methods 0.000 claims description 4
- 238000010998 test method Methods 0.000 claims description 4
- 239000010409 thin film Substances 0.000 claims description 4
- 238000010521 absorption reaction Methods 0.000 claims description 3
- 230000007423 decrease Effects 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 239000011358 absorbing material Substances 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000002788 crimping Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000003989 dielectric material Substances 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 230000005764 inhibitory process Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Abstract
The present invention relates to a kind of concentrator GPRS communication test systems and methods, electromagnetic shielding dark room is installed in the test box body, lower part is equipped with running track in electromagnetic shielding dark room, there is pallet by stepper motor operation in running track, pallet bottom is top-loaded with pallet jacking device, the pallet jacking device is driven by motor of plugging into, and tested concentrator can be placed in pallet;Comprehensive tester and signal interference device are fixed with above electromagnetic shielding dark room, the electromagnetic shielding dark room top below comprehensive tester is fixed with coupled antenna;Alarm lamp and display are installed on test babinet, electric unit, PLC control unit, power supply system and control unit are also equipped in test box body.This system is made of electric unit, mechanical structure unit, power supply system and control unit, unit of plugging into, jacking positioning unit, automatic delivery unit, it realizes with automatic assembly line without slot coupling, has started the precedent that GPRS communication modules realize full performance detection in concentrator complete machine.
Description
Technical field
The invention belongs to power domain, it is related to the test that concentrator communicates GPRS in intelligent power grid technology, especially one
Kind concentrator GPRS communication test systems and method.
Background technology
The desirability that intelligent grid develops as information-intensive society city intelligentization is the important energy source of intelligent city's development
Ensure basis and forerunner, and an important content of intelligent city's construction.The detection of concentrator GPRS communication qualities is current only
Functional detection is carried out in uplink communication unit producer, concentrator supplier of Guo Wang companies is not almost to concentrator before manufacture
Carry out GPRS communication tests, also neither one is complete at each province Guo Wang network metering center, comprehensive embodiment, especially for collection
The applications of wireless technology and simulation practical communication environment of middle device complete detection are detected in complete machine.
Understood by industry, the current country there is no a set of detection device to realize and realize automation intelligence to concentrator GPRS communications
It can detect, also without reference to the detection of GPRS communications on traditional concentrator calibrating assembly line, can not especially accomplish to simulate
Actual application scenarios collect the data of radiofrequency signal, analyze and judge whether to meet state's net 1374.3-2013 communication units
Technical specification and 1379.4-2013 communication unit inspection technology specifications, to which matter cannot be communicated to the GPRS of concentrator before installation
Amount is assessed, and is avoided risk from source.How in full inspection examination link, realize that the test of concentrator GPRS communication automation systems is
One urgent problem to be solved.
It is retrieved by patent document, finds following pertinent literature:
1, a kind of automatic checkout system of intelligent grid data concentrator and method (CN102540133A), the system packet
It includes:Background data base, industrial personal computer, detecting tool;Back-end data library storage detection configuration parameter and test result information;Industrial personal computer
The request being detected to measured terminal that detecting tool is sent is received, detection configuration parameter, Xiang Jian are read from background data base
It surveys tooling and sends detection message;It receives and test result information deposit backstage is obtained according to the testing result of detecting tool passback
Database concurrency is sent to detecting tool;Detecting tool sends detection request to industrial personal computer, receives detection message;If detection report
Text needs detecting tool to handle, then processing detection item message, returns testing result;If detection message needs measured terminal to test oneself
Processing, then be transmitted to measured terminal, testing result is returned to industrial personal computer by measured terminal by detecting tool by detection message;
It receives test result information and shows.
2, a kind of field integrated detection device of energy information concentrator (CN202794497U), it contains processor, described
It is defeated that processor is respectively arranged with RS458 detections interface, wireless module detection interface, power line carrier module detection interface, analog quantity
Enter output interface to connect with On-off signal output interface, also, the processor also respectively with red hair transceiver, power supply, nothing
Line communication module, Ethernet are connected with display.The power supply is the dual power supply that external mains-supplied and battery powered are constituted.Institute
It is GPRS/GPS modules to state wireless communication module.
3, a kind of intelligent grid concentrator function detecting system (CN202840692U), including single machine unit and with its phase
The one 485 interface unit even, the 2nd 485 interface unit, the 3rd 485 interface unit, 232 interface units, network card chip and aobvious
Show that unit, the one 485 interface unit are connected through 485 turn of 232 converting unit with host computer, network card chip is through router and host computer
It is connected, second, third 485 interface unit and 232 interface units and the first PWM output ends, the 2nd PWM of single machine unit are defeated
Outlet, remote signalling output end, gate node signal output end, pulse output end and active, passive switching signal output end respectively and wait for
It examines intelligent grid concentrator to be connected, active pulse, idle pulse and the clock pulses of intelligent grid concentrator and standard scale to be checked
Output end is connected with single machine unit respectively.
It is compared by technical characteristic, patent document disclosed above differs in technological architecture with the present patent application.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of achievable concentrator GPRS communication automation systems
The concentrator GPRS communication test systems and method of test.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of concentrator GPRS communication test systems, including test babinet, assembly line, test babinet are mounted on assembly line
Side, assembly line conveying are tested concentrator, it is characterised in that:Electromagnetic shielding dark room is installed, in electromagnetic screen in the test box body
It covers lower part in darkroom and running track is installed, have pallet by stepper motor operation in running track, pallet bottom top dress
There is pallet jacking device, which is driven by motor of plugging into, and tested concentrator can be placed in pallet;It is dark in electromagnetic shielding
Comprehensive tester and signal interference device are fixed with above room, the electromagnetic shielding dark room top below comprehensive tester is fixedly mounted with
There is coupled antenna;Alarm lamp and display are installed on test babinet, electric unit, PLC are also equipped in test box body
Control unit, power supply system and control unit.
Moreover, the electromagnetic shielding dark room is equipped with shield door, the inboard of shield door is fixed with plane wave absorbing thin film plate,
Top plate, side wall and access panel inboard are fixed with needle taper and inhale wave plate, which inhales wave plate and bored by the needle that it is uniformly made
Shape inhales the effective electromagnetic wave absorption in tip of wave head.
Moreover, the countermeasure set is connected to the coupled antenna in shielded box by radio frequency line and plug, the countermeasure set is logical
Gpib bus is crossed with control unit to be connected.
Moreover, the structure of the coupled antenna is, it is formed with a concentric circular coupling slots on grounding disc, is corresponding to this with one heart
Covering is fixedly mounted with a radiation patch in plane on the grounding disc of circular coupling slots, which uses circular patch, is pasted in radiation
An air dielectric layer is fixedly mounted between piece and grounding disc;It is fixedly mounted with a FR4 in grounding disc bottom surface and feeds substrate, below feed substrate
It is fixedly mounted with a microstrip feed line along the axis position of radiation patch.
Moreover, gap is equal between the slot for the circular concentric coupling slot that the grounding disc is made, microstrip feed line is connected to one heart
Circular coupling slots are radial, and the distance of open end to central point is 6 millimeters.
A kind of concentrator GPRS communication test methods, step are:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960,
Agilent signal source E4438C and station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will
It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and
Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer
Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port
Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurement works by PLC
When jacking transferring before position, PLC puts in storage request to test station transmission, test station PLC is received put in storage request after simultaneously nothing in storehouse
When detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC is sequentially completed step
It is rotated forward into belt and completes pallet warehouse entry, stepper motor advances, and completion pallet reaches horizontal checkout position, pallet is completed in pallet jacking
Reach vertical test position, clamping of plugging into completes binding post in place;
(3) GPRS is detected:The system detectio software of main control computer by control line always to PLC states in detection station into
Row detection can send concentrator to bit instruction after detection station PLC completes above-mentioned action to inspection software;At this point, test is soft
Part powers on left side terminal in shielded box by controlling line traffic control detection station PLC, while radio frequency being opened the light and switches to a left side
Side coupling plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is as simulation main website and concentrator
Carry out foundation call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst
Power over time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software disconnects shielded box by controlling line traffic control detection station PLC
Interior left side terminal supplying power simultaneously powers on right side termination, while radio frequency being opened the light and switches to right side coupling plate;Then, control peace
Prompt human relations 8960 simulate main website and complete to establish call with right side termination, transmission power, phase error, frequency error, switch frequency spectrum, adjust
The test of frequency spectrum, receiving sensitivity, burst power over time, end nine test items of call processed;After the completion of test, test
Test result can be stored in local main control computer and be sent to extraneous PLC servers by software, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software meeting
By control line request export is sent to detection station PLC;At this point, detection station PLC, which is respectively completed to plug into loosen, completes wiring
Column is withdrawn, pallet decline completion pallet arrival goes out bin location vertically, stepper motor retrogressing completion pallet arrival level goes out bin location,
Pallet export is completed in the reversion of stepping belt.
The advantages and positive effects of the present invention are:
1, this system reaches the automatic detection to test equipment by the integrated and software application of equipment, and can simulate
A variety of work of actual field, the property indices of more accurate test equipment realize GPRS communication modules and are concentrating
System test in device can also test the interference free performance of concentrator GPRS communication modules, and realize that concentrator GPRS is logical simultaneously
Believe the assessment of module communication quality.
2, this system is positioned by electric unit, mechanical structure unit, power supply system and control unit, unit of plugging into, jacking
Unit, automatic delivery unit are constituted, and are realized with automatic assembly line without slot coupling, have been started GPRS communication modules and concentrated
The precedent of full performance detection is realized in device complete machine.
3, the shielded anechoic chamber of this system, which can be realized, inhibits GPRS radio signals (working frequency and transmission power etc.), carries
For relatively pure radio dark room conditions, interference of the extraneous radio wave to test environment is reduced;All numbers of electromagnetic shielding box
It all uses electromagnetic interface filter, shield door to use stepper motor pressing mode according to port and power supply signal, ensures the performance of shielding, together
Shi Caiyong RFCD RF coupling devices are for the incoming of the concentrator GPRS signals communicated and are tested for the property, and are suitable for
The wireless signal of 300MHz-3GHz operating frequency ranges, the acicular absorbing material of inner cone are more than 20dB, can be to wireless communication
Number achieve over the inhibition of 70dB;Main control software, assembly line and detection device PLC pass through the object to concentrator GPRS communication modules
Flow control realizes remote control concentrator transfer, positioning, jacks, plugs into, the functions such as ON/OFF shielding chamber door, and concentrator is in electromagnetism
Full-automation in shielded box.
4, the coupled antenna of this system uses the feeding classification of evolved password to realize wide band characteristic, compared to same
Axis or feed microstrip line, aperture-coupled have the advantages that some are notable:Solder joint is not necessarily at feed, for impedance matching
Adjustable parameter is more;The substrate that feed structure and radiation patch use is separated from each other, and different dielectric materials can be selected independently
Meet needs of the feed structure to radiation patch with dielectric thickness;It is opened by adjusting the length or microstrip feed line in coupling gap
The length of terminal, can more easily reach impedance matching etc. than other feeding classifications with radiation patch, this antenna is exactly profit
The characteristics of being separated from each other with the substrate of its feed structure and radiation patch, the radiation base relatively low using dielectric constant, thickness is larger
Piece reduces the Q values of antenna, to achieve the purpose that broaden bandwidth.
Description of the drawings
Fig. 1 is the dimensional structure diagram of present system;
Fig. 2 is the structural front view of present system;
Fig. 3 is the left side view of Fig. 2;
Fig. 4 is the rearview of Fig. 2;
Fig. 5 is the cross-sectional view of the shielded anechoic chamber of present system;
Fig. 6 is that the siding of Fig. 5 installs the dimensional structure diagram of absorbing material;
Fig. 7 is the structural front view of the coupled antenna of present system;
Fig. 8 is the A-A of Fig. 7 to cross-sectional view;
Fig. 9 is the structural schematic diagram for removing radiation patch and dielectric layer of Fig. 7;
Figure 10 is the rearview of Fig. 7;
Figure 11 is the test method flow chart of the present invention.
Specific implementation mode
The embodiment of the present invention is further described below in conjunction with attached drawing;The present embodiment is descriptive, is not to limit
Property, it cannot thus limit protection scope of the present invention.
A kind of concentrator GPRS communication test systems, including test babinet 3, assembly line 1, test babinet are mounted on assembly line
Side, assembly line conveying is tested concentrator 6, electromagnetic shielding dark room 11 installed in test box body, in electromagnetic shielding dark room under
Portion is equipped with running track 10, has pallet 12 by the operation of stepper motor 9 in running track, and pallet bottom is top-loaded with pallet
Jacking device 13, the pallet jacking device are driven by motor 7 of plugging into, and tested concentrator can be placed in pallet;In electromagnetic shielding dark room
Top be fixed with comprehensive tester 4 and signal interference device 15, the electromagnetic shielding dark room top below comprehensive tester is solid
Equipped with coupled antenna 5;Alarm lamp 2 and display 8 are installed on test babinet, electrical list is also equipped in test box body
Member, PLC control unit, power supply system and control unit.
Assembly line connects the running track of automatic delivery unit, and the running track of the automatic delivery unit is mainly to tested whole
End carries out automatically conveying and output, tested concentrator is transported to detection zone in electromagnetic shielding dark room, after the completion of to be detected
Measured terminal is then transported to next specified region.Tested concentrator into electromagnetic shielding dark room is transported to using pallet
Position, the jacking device for jacking unit jack up pallet, are accurately positioned to tested concentrator by the motor of plugging into for unit of plugging into,
Enhance the reliability and stability of connecting device, positioning should be accurate, rapid;To tested concentrator using electric unit electricity after positioning
Pressure side, current terminal, auxiliary terminal (verification pulse, multifunctional pulse, communication port) carry out crimping of reliably plugging into, the present embodiment
It is two detection pallets shown in attached drawing, two tested concentrators can be detected simultaneously, is concentrated to tested using single phase power supply mode
Device is powered, and two concentrator connecting terminals are plugged into simultaneously, in order to evade two concentrators while power on to GPRS communication checks
It interferes with each other, PLC control system is powered on and powered off to each concentrator respectively by relay according to testing requirements;It is all
Concentrator terminals are not pressurized contracting, and wiring Compression Stability, uniformly, it is reliable;Electric unit is connect power supply with concentrator, it
It is powered afterwards to concentrator by power supply system and control unit, whole process is controlled by PLC control unit.Wait for that measured terminal enters electricity
After body is tested in magnetic screen darkroom, electromagnetic shielding dark room chamber door is closed, external environmental interference is isolated.Power supply unit mainly gives quilt
It surveys terminal and test equipment provides power supply guarantee.After the completion of test, electromagnetic shielding dark room chamber door is opened, connecting terminal with it is tested
Terminal is unclamped, and pallet puts down, measured terminal is exported automatically, and measured terminal is finally transported to next test zone.
In the present invention, the structure of the electromagnetic shielding dark room is equipped with shield door 14, in the babinet of darkroom referring to Fig. 5,6
Bottom plate on by running track operation have structure for conveying 18, jacking device is installed on the conveyor, is installed on jacking device
It plugs into unit 16, RFCD coupled antennas is fixed in the corresponding top plate for plugging into unit.The inboard of shield door is fixed with plane
Wave absorbing thin film plate, the wave absorbing thin film plate can effectively inhibit the surface electromagnetic waves such as traveling wave, Creeping Wave and guided wave;In top plate, side wall
And access panel inboard is fixed with needle taper and inhales wave plate 17, which inhales wave plate and inhales wave head by the needle taper that it is uniformly made
The 19 effective electromagnetic wave absorption in tip.
In the present invention, the countermeasure set is connected to the coupled antenna in shielded box, interference dress by radio frequency line and plug
It sets and is connected with control unit by gpib bus, the structure of the coupled antenna is made referring to Fig. 7,8,9,10 on grounding disc 20
There are a concentric circular coupling slots 24, covering is fixedly mounted with a radiation patch in plane on the grounding disc of the corresponding circular concentric coupling slot
22, which uses circular patch, R=12.8 millimeters of radius to be fixedly mounted with a thickness between radiation patch and grounding disc
For 2 millimeters of air dielectric layer 21;It is fixedly mounted with the FR4 that a dielectric constant is 4.4, thickness is 1mm in grounding disc bottom surface and feeds base
Piece 25 is fixedly mounted with a microstrip feed line 23 below feed substrate along the axis position of radiation patch, and the width of the microstrip feed line is
2mm, to ensure the input impedance of feeder line for 50 ohms.
In practical application, it is contemplated that the firmness of antenna structure and impact resistance etc., air dielectric layer can be examined
Consider and is filled using the materials such as foam similar in dielectric constant;Gap phase between the slot for the circular concentric coupling slot that grounding disc is made
It is connected to that circular concentric coupling slot is radial Deng, microstrip feed line, the distance of open end to central point is 6 millimeters, to ensure micro-strip
The input impedance of antenna obtains good matching.
The present invention operation principle be:
In concentrator GPRS communication automation system test process, when concentrator module reaches the station of GPRS communication tests,
After assembly line PLC sends out warehouse entry request, test equipment under the control action of its PLC, be gradually completing motor into, extension line into,
Fixed station liter, shield door close, terminal is into action, to realize that concentrator is successfully entered electromagnetic shielding box, then by software control
System realizes the measurement of concentrator GPRS communication performance parameters.After being measured, software sends test to test equipment PLC and completes
Signal, then export request is sent from test equipment PLC to assembly line PLC, while test equipment PLC completes terminal with this and moves back, shields
Cover chamber door is opened, extension line moves back, motor move back operation to realize that concentrator goes out the purpose of electromagnetic shielding box.
A kind of concentrator GPRS communication test methods, test flow chart is as shown in figure 11, and step is:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960,
Agilent signal source E4438C and station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will
It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and
Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer
Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port
Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurement works by PLC
When jacking transferring before position, PLC puts in storage request to test station transmission, test station PLC is received put in storage request after simultaneously nothing in storehouse
When detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC is sequentially completed step
It is rotated forward into belt and completes pallet warehouse entry, stepper motor advances, and completion pallet reaches horizontal checkout position, pallet is completed in pallet jacking
Reach vertical test position, clamping of plugging into completes binding post in place;
(3) GPRS is detected:The system detectio software of main control computer by control line always to PLC states in detection station into
Row detection can send concentrator to bit instruction after detection station PLC completes above-mentioned action to inspection software;At this point, test is soft
Part powers on left side terminal in shielded box by controlling line traffic control detection station PLC, while radio frequency being opened the light and switches to a left side
Side coupling plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is as simulation main website and concentrator
Carry out foundation call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst
Power over time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software disconnects shielded box by controlling line traffic control detection station PLC
Interior left side terminal supplying power simultaneously powers on right side termination, while radio frequency being opened the light and switches to right side coupling plate;Then, control peace
Prompt human relations 8960 simulate main website and complete to establish call with right side termination, transmission power, phase error, frequency error, switch frequency spectrum, adjust
The test of frequency spectrum, receiving sensitivity, burst power over time, end nine test items of call processed;After the completion of test, test
Test result can be stored in local main control computer and be sent to extraneous PLC servers by software, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software meeting
By control line request export is sent to detection station PLC.At this point, detection station PLC, which is respectively completed to plug into loosen, completes wiring
Column is withdrawn, pallet decline completion pallet arrival goes out bin location vertically, stepper motor retrogressing completion pallet arrival level goes out bin location,
Pallet export is completed in the reversion of stepping belt.
It is as shown in the table for the every test event and index of the present invention
Claims (1)
1. a kind of concentrator GPRS communication test methods, including test babinet, assembly line, test babinet are mounted on the side of assembly line
Side, assembly line conveying are tested concentrator, install electromagnetic shielding dark room in the test box body, lower part is pacified in electromagnetic shielding dark room
Equipped with running track, there is pallet by stepper motor operation in running track, pallet bottom is top-loaded with pallet jacking device, should
Pallet jacking device is driven by motor of plugging into, and tested concentrator can be placed in pallet;It is fixed with above electromagnetic shielding dark room
Comprehensive tester and signal interference device, the electromagnetic shielding dark room top below comprehensive tester are fixed with coupled antenna;?
Alarm lamp and display are installed on test babinet, electric unit, PLC control unit, power supply are also equipped in test box body
System and control unit;
The electromagnetic shielding dark room is equipped with shield door, and the inboard of shield door is fixed with plane wave absorbing thin film plate, in top plate, side wall
And access panel inboard is fixed with needle taper and inhales wave plate, which inhales wave plate and inhales wave head by the needle taper that it is uniformly made
The effective electromagnetic wave absorption in tip;
The countermeasure set is connected to the coupled antenna in shielded box by radio frequency line and plug, which passes through gpib bus
It is connected with control unit;
The structure of the coupled antenna is that a concentric circular coupling slots are formed on grounding disc, in corresponding circular concentric coupling
Covering is fixedly mounted with a radiation patch in plane on the grounding disc of slot, which uses circular patch, in radiation patch and ground connection
An air dielectric layer is fixedly mounted between disk;It is fixedly mounted with a FR4 in grounding disc bottom surface and feeds substrate, along radiation patch below feed substrate
The axis position of piece is fixedly mounted with a microstrip feed line;
Gap is equal between the slot for the circular concentric coupling slot that the grounding disc is made, and microstrip feed line is connected to circular concentric coupling slot
Radial, the distance of open end to central point is 6 millimeters;
It is characterized in that:Step is:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960, An Jie
Human relations signal source E4438C and test station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will
It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and
Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer
Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port
Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurements by assembly line PLC
When jacking transferring before station, assembly line PLC puts in storage request to test station transmission, test station PLC is received put in storage request after
And when in storehouse without detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC according to
Secondary completion stepping belt, which rotates forward and completes pallet warehouse entry, stepper motor advances completes pallet arrival horizontal checkout position, pallet jacking
Pallet is completed to reach vertical test position, plug into clamping completion binding post in place;
(3) GPRS is detected:The system detectio software of main control computer is always detected detection station PLC states by control line,
After detection station PLC completes above-mentioned action, concentrator can be sent to inspection software to bit instruction;At this point, test software passes through
Control line traffic control detection station PLC powers on left side terminal in shielded box, while RF switch is switched to left side coupling
Plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is built as simulation main website with concentrator
Vertical call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst power pair
Time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software is left in line traffic control detection station PLC disconnection shielded boxes by controlling
Lateral terminal power supply simultaneously powers on right side termination, while RF switch is switched to right side coupling plate;Then, Agilent is controlled
8960 simulation main websites complete to establish call, transmission power, phase error, frequency error, switch frequency spectrum, modulation frequency with right side termination
Spectrum, receiving sensitivity, burst power over time, the test for terminating nine test items of call;After the completion of test, test software
Test result can be stored in local main control computer and be sent to extraneous PLC servers, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software can pass through
Control line sends request export to detection station PLC;At this point, detection station PLC be respectively completed plug into loosen complete binding post remove
Decline from, pallet complete pallet reach go out bin location vertically, stepper motor retreats and completes pallet arrival level and go out bin location, stepping
Pallet export is completed in belt reversion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510621834.9A CN105245296B (en) | 2015-09-25 | 2015-09-25 | A kind of concentrator GPRS communication test systems and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510621834.9A CN105245296B (en) | 2015-09-25 | 2015-09-25 | A kind of concentrator GPRS communication test systems and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105245296A CN105245296A (en) | 2016-01-13 |
CN105245296B true CN105245296B (en) | 2018-11-06 |
Family
ID=55042812
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510621834.9A Active CN105245296B (en) | 2015-09-25 | 2015-09-25 | A kind of concentrator GPRS communication test systems and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105245296B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107659363B (en) * | 2017-09-28 | 2021-08-10 | 云南电网有限责任公司电力科学研究院 | Power terminal communication testing device |
CN109448056B (en) * | 2018-10-30 | 2021-12-10 | 国网北京市电力公司 | Communication module connection method and device, storage medium and electronic device |
CN110596437A (en) * | 2019-09-29 | 2019-12-20 | 杭州德创电子股份有限公司 | Automatic crimping device for crimping High Performance Liquid Chromatography (HPLC) communication module of electric energy meter |
CN113179139B (en) * | 2021-03-18 | 2023-03-31 | 深圳市酷客智能科技有限公司 | Wireless product testing device and wireless product testing method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102830298A (en) * | 2012-07-27 | 2012-12-19 | 中兴通讯股份有限公司 | Method and device for testing radio frequency index and wireless index of active antenna system |
CN102998643A (en) * | 2011-09-09 | 2013-03-27 | 华北电力科学研究院有限责任公司 | Power utilization information acquisition terminal detecting system |
CN204539154U (en) * | 2015-02-08 | 2015-08-05 | 国家电网公司 | A kind of electromagnetic shielding box for the test of concentrator GPRS communication automation system |
CN204539162U (en) * | 2015-02-08 | 2015-08-05 | 国家电网公司 | A kind of interference source device for the test of concentrator GPRS communication automation system |
CN204558645U (en) * | 2015-02-08 | 2015-08-12 | 国家电网公司 | The coupled antenna of the concentrator wireless public network communication automation system test of a kind of pair of epi-position |
-
2015
- 2015-09-25 CN CN201510621834.9A patent/CN105245296B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102998643A (en) * | 2011-09-09 | 2013-03-27 | 华北电力科学研究院有限责任公司 | Power utilization information acquisition terminal detecting system |
CN102830298A (en) * | 2012-07-27 | 2012-12-19 | 中兴通讯股份有限公司 | Method and device for testing radio frequency index and wireless index of active antenna system |
CN204539154U (en) * | 2015-02-08 | 2015-08-05 | 国家电网公司 | A kind of electromagnetic shielding box for the test of concentrator GPRS communication automation system |
CN204539162U (en) * | 2015-02-08 | 2015-08-05 | 国家电网公司 | A kind of interference source device for the test of concentrator GPRS communication automation system |
CN204558645U (en) * | 2015-02-08 | 2015-08-12 | 国家电网公司 | The coupled antenna of the concentrator wireless public network communication automation system test of a kind of pair of epi-position |
Also Published As
Publication number | Publication date |
---|---|
CN105245296A (en) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105141378B (en) | A kind of special transformer terminals wireless public network communication test system and method | |
CN105245296B (en) | A kind of concentrator GPRS communication test systems and method | |
CN103278751B (en) | Partial discharge comprehensive itinerant detector for high voltage electric power equipment | |
CN103731219B (en) | A kind of bluetooth end properties method of testing and system | |
CN105307196B (en) | A kind of acquisition terminal wireless public network communication test system and method | |
CN105141379B (en) | A kind of special transformer terminals GPRS communication test systems and method | |
CN111817795A (en) | Beidou radio frequency baseband product testing device | |
CN105022020A (en) | RF electromagnetic field and radio immunity test system and method of electric energy meter | |
CN105243834B (en) | A kind of acquisition terminal GPRS communication test systems and method | |
CN105162534B (en) | A kind of concentrator wireless public network communication test system and method | |
CN201903620U (en) | Pinpoint discharging testing system for transformer | |
CN110659711A (en) | RFID temperature measurement label for cable connector, installation method and temperature measurement method | |
CN201909828U (en) | Test system for bubble electric discharge of transformer | |
CN102033184A (en) | Voltage distribution wireless measurement system of lightning arrester | |
CN108732472A (en) | Compound field based on high-frequency method couples paper oil insulation partial discharge detecting system | |
CN106841863A (en) | Radio frequency testing seat, printed circuit board (PCB) and terminal | |
CN102735957A (en) | Method and system for monitoring antenna oscillator of base station as well as integrated monitoring equipment | |
CN107276690A (en) | A kind of WiFi coupling sensitivities deterioration test system and method for testing | |
CN206743253U (en) | A kind of wireless test and the device for being easy to convert built-in aerial | |
CN208076659U (en) | Compound field based on high-frequency method couples paper oil insulation partial discharge detecting system | |
CN103108063A (en) | Test system and method of radio frequency identification device (RFID)-subscriber identity module (SIM) card | |
CN103063939A (en) | Ground cascade system external radio frequency electromagnetic environment test method | |
CN105004980A (en) | Substation discharge signal detection device | |
CN203688769U (en) | 10KV switch cabinet residue frequency detection apparatus based on antenna array | |
CN209728057U (en) | A kind of inductance measurement device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |