CN105245296B - A kind of concentrator GPRS communication test systems and method - Google Patents

A kind of concentrator GPRS communication test systems and method Download PDF

Info

Publication number
CN105245296B
CN105245296B CN201510621834.9A CN201510621834A CN105245296B CN 105245296 B CN105245296 B CN 105245296B CN 201510621834 A CN201510621834 A CN 201510621834A CN 105245296 B CN105245296 B CN 105245296B
Authority
CN
China
Prior art keywords
test
concentrator
pallet
plc
electromagnetic shielding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510621834.9A
Other languages
Chinese (zh)
Other versions
CN105245296A (en
Inventor
李野
于学均
滕永兴
朱逸群
曹国瑞
陈刚
孙广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510621834.9A priority Critical patent/CN105245296B/en
Publication of CN105245296A publication Critical patent/CN105245296A/en
Application granted granted Critical
Publication of CN105245296B publication Critical patent/CN105245296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of concentrator GPRS communication test systems and methods, electromagnetic shielding dark room is installed in the test box body, lower part is equipped with running track in electromagnetic shielding dark room, there is pallet by stepper motor operation in running track, pallet bottom is top-loaded with pallet jacking device, the pallet jacking device is driven by motor of plugging into, and tested concentrator can be placed in pallet;Comprehensive tester and signal interference device are fixed with above electromagnetic shielding dark room, the electromagnetic shielding dark room top below comprehensive tester is fixed with coupled antenna;Alarm lamp and display are installed on test babinet, electric unit, PLC control unit, power supply system and control unit are also equipped in test box body.This system is made of electric unit, mechanical structure unit, power supply system and control unit, unit of plugging into, jacking positioning unit, automatic delivery unit, it realizes with automatic assembly line without slot coupling, has started the precedent that GPRS communication modules realize full performance detection in concentrator complete machine.

Description

A kind of concentrator GPRS communication test systems and method
Technical field
The invention belongs to power domain, it is related to the test that concentrator communicates GPRS in intelligent power grid technology, especially one Kind concentrator GPRS communication test systems and method.
Background technology
The desirability that intelligent grid develops as information-intensive society city intelligentization is the important energy source of intelligent city's development Ensure basis and forerunner, and an important content of intelligent city's construction.The detection of concentrator GPRS communication qualities is current only Functional detection is carried out in uplink communication unit producer, concentrator supplier of Guo Wang companies is not almost to concentrator before manufacture Carry out GPRS communication tests, also neither one is complete at each province Guo Wang network metering center, comprehensive embodiment, especially for collection The applications of wireless technology and simulation practical communication environment of middle device complete detection are detected in complete machine.
Understood by industry, the current country there is no a set of detection device to realize and realize automation intelligence to concentrator GPRS communications It can detect, also without reference to the detection of GPRS communications on traditional concentrator calibrating assembly line, can not especially accomplish to simulate Actual application scenarios collect the data of radiofrequency signal, analyze and judge whether to meet state's net 1374.3-2013 communication units Technical specification and 1379.4-2013 communication unit inspection technology specifications, to which matter cannot be communicated to the GPRS of concentrator before installation Amount is assessed, and is avoided risk from source.How in full inspection examination link, realize that the test of concentrator GPRS communication automation systems is One urgent problem to be solved.
It is retrieved by patent document, finds following pertinent literature:
1, a kind of automatic checkout system of intelligent grid data concentrator and method (CN102540133A), the system packet It includes:Background data base, industrial personal computer, detecting tool;Back-end data library storage detection configuration parameter and test result information;Industrial personal computer The request being detected to measured terminal that detecting tool is sent is received, detection configuration parameter, Xiang Jian are read from background data base It surveys tooling and sends detection message;It receives and test result information deposit backstage is obtained according to the testing result of detecting tool passback Database concurrency is sent to detecting tool;Detecting tool sends detection request to industrial personal computer, receives detection message;If detection report Text needs detecting tool to handle, then processing detection item message, returns testing result;If detection message needs measured terminal to test oneself Processing, then be transmitted to measured terminal, testing result is returned to industrial personal computer by measured terminal by detecting tool by detection message; It receives test result information and shows.
2, a kind of field integrated detection device of energy information concentrator (CN202794497U), it contains processor, described It is defeated that processor is respectively arranged with RS458 detections interface, wireless module detection interface, power line carrier module detection interface, analog quantity Enter output interface to connect with On-off signal output interface, also, the processor also respectively with red hair transceiver, power supply, nothing Line communication module, Ethernet are connected with display.The power supply is the dual power supply that external mains-supplied and battery powered are constituted.Institute It is GPRS/GPS modules to state wireless communication module.
3, a kind of intelligent grid concentrator function detecting system (CN202840692U), including single machine unit and with its phase The one 485 interface unit even, the 2nd 485 interface unit, the 3rd 485 interface unit, 232 interface units, network card chip and aobvious Show that unit, the one 485 interface unit are connected through 485 turn of 232 converting unit with host computer, network card chip is through router and host computer It is connected, second, third 485 interface unit and 232 interface units and the first PWM output ends, the 2nd PWM of single machine unit are defeated Outlet, remote signalling output end, gate node signal output end, pulse output end and active, passive switching signal output end respectively and wait for It examines intelligent grid concentrator to be connected, active pulse, idle pulse and the clock pulses of intelligent grid concentrator and standard scale to be checked Output end is connected with single machine unit respectively.
It is compared by technical characteristic, patent document disclosed above differs in technological architecture with the present patent application.
Invention content
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of achievable concentrator GPRS communication automation systems The concentrator GPRS communication test systems and method of test.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of concentrator GPRS communication test systems, including test babinet, assembly line, test babinet are mounted on assembly line Side, assembly line conveying are tested concentrator, it is characterised in that:Electromagnetic shielding dark room is installed, in electromagnetic screen in the test box body It covers lower part in darkroom and running track is installed, have pallet by stepper motor operation in running track, pallet bottom top dress There is pallet jacking device, which is driven by motor of plugging into, and tested concentrator can be placed in pallet;It is dark in electromagnetic shielding Comprehensive tester and signal interference device are fixed with above room, the electromagnetic shielding dark room top below comprehensive tester is fixedly mounted with There is coupled antenna;Alarm lamp and display are installed on test babinet, electric unit, PLC are also equipped in test box body Control unit, power supply system and control unit.
Moreover, the electromagnetic shielding dark room is equipped with shield door, the inboard of shield door is fixed with plane wave absorbing thin film plate, Top plate, side wall and access panel inboard are fixed with needle taper and inhale wave plate, which inhales wave plate and bored by the needle that it is uniformly made Shape inhales the effective electromagnetic wave absorption in tip of wave head.
Moreover, the countermeasure set is connected to the coupled antenna in shielded box by radio frequency line and plug, the countermeasure set is logical Gpib bus is crossed with control unit to be connected.
Moreover, the structure of the coupled antenna is, it is formed with a concentric circular coupling slots on grounding disc, is corresponding to this with one heart Covering is fixedly mounted with a radiation patch in plane on the grounding disc of circular coupling slots, which uses circular patch, is pasted in radiation An air dielectric layer is fixedly mounted between piece and grounding disc;It is fixedly mounted with a FR4 in grounding disc bottom surface and feeds substrate, below feed substrate It is fixedly mounted with a microstrip feed line along the axis position of radiation patch.
Moreover, gap is equal between the slot for the circular concentric coupling slot that the grounding disc is made, microstrip feed line is connected to one heart Circular coupling slots are radial, and the distance of open end to central point is 6 millimeters.
A kind of concentrator GPRS communication test methods, step are:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960, Agilent signal source E4438C and station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurement works by PLC When jacking transferring before position, PLC puts in storage request to test station transmission, test station PLC is received put in storage request after simultaneously nothing in storehouse When detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC is sequentially completed step It is rotated forward into belt and completes pallet warehouse entry, stepper motor advances, and completion pallet reaches horizontal checkout position, pallet is completed in pallet jacking Reach vertical test position, clamping of plugging into completes binding post in place;
(3) GPRS is detected:The system detectio software of main control computer by control line always to PLC states in detection station into Row detection can send concentrator to bit instruction after detection station PLC completes above-mentioned action to inspection software;At this point, test is soft Part powers on left side terminal in shielded box by controlling line traffic control detection station PLC, while radio frequency being opened the light and switches to a left side Side coupling plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is as simulation main website and concentrator Carry out foundation call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst Power over time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software disconnects shielded box by controlling line traffic control detection station PLC Interior left side terminal supplying power simultaneously powers on right side termination, while radio frequency being opened the light and switches to right side coupling plate;Then, control peace Prompt human relations 8960 simulate main website and complete to establish call with right side termination, transmission power, phase error, frequency error, switch frequency spectrum, adjust The test of frequency spectrum, receiving sensitivity, burst power over time, end nine test items of call processed;After the completion of test, test Test result can be stored in local main control computer and be sent to extraneous PLC servers by software, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software meeting By control line request export is sent to detection station PLC;At this point, detection station PLC, which is respectively completed to plug into loosen, completes wiring Column is withdrawn, pallet decline completion pallet arrival goes out bin location vertically, stepper motor retrogressing completion pallet arrival level goes out bin location, Pallet export is completed in the reversion of stepping belt.
The advantages and positive effects of the present invention are:
1, this system reaches the automatic detection to test equipment by the integrated and software application of equipment, and can simulate A variety of work of actual field, the property indices of more accurate test equipment realize GPRS communication modules and are concentrating System test in device can also test the interference free performance of concentrator GPRS communication modules, and realize that concentrator GPRS is logical simultaneously Believe the assessment of module communication quality.
2, this system is positioned by electric unit, mechanical structure unit, power supply system and control unit, unit of plugging into, jacking Unit, automatic delivery unit are constituted, and are realized with automatic assembly line without slot coupling, have been started GPRS communication modules and concentrated The precedent of full performance detection is realized in device complete machine.
3, the shielded anechoic chamber of this system, which can be realized, inhibits GPRS radio signals (working frequency and transmission power etc.), carries For relatively pure radio dark room conditions, interference of the extraneous radio wave to test environment is reduced;All numbers of electromagnetic shielding box It all uses electromagnetic interface filter, shield door to use stepper motor pressing mode according to port and power supply signal, ensures the performance of shielding, together Shi Caiyong RFCD RF coupling devices are for the incoming of the concentrator GPRS signals communicated and are tested for the property, and are suitable for The wireless signal of 300MHz-3GHz operating frequency ranges, the acicular absorbing material of inner cone are more than 20dB, can be to wireless communication Number achieve over the inhibition of 70dB;Main control software, assembly line and detection device PLC pass through the object to concentrator GPRS communication modules Flow control realizes remote control concentrator transfer, positioning, jacks, plugs into, the functions such as ON/OFF shielding chamber door, and concentrator is in electromagnetism Full-automation in shielded box.
4, the coupled antenna of this system uses the feeding classification of evolved password to realize wide band characteristic, compared to same Axis or feed microstrip line, aperture-coupled have the advantages that some are notable:Solder joint is not necessarily at feed, for impedance matching Adjustable parameter is more;The substrate that feed structure and radiation patch use is separated from each other, and different dielectric materials can be selected independently Meet needs of the feed structure to radiation patch with dielectric thickness;It is opened by adjusting the length or microstrip feed line in coupling gap The length of terminal, can more easily reach impedance matching etc. than other feeding classifications with radiation patch, this antenna is exactly profit The characteristics of being separated from each other with the substrate of its feed structure and radiation patch, the radiation base relatively low using dielectric constant, thickness is larger Piece reduces the Q values of antenna, to achieve the purpose that broaden bandwidth.
Description of the drawings
Fig. 1 is the dimensional structure diagram of present system;
Fig. 2 is the structural front view of present system;
Fig. 3 is the left side view of Fig. 2;
Fig. 4 is the rearview of Fig. 2;
Fig. 5 is the cross-sectional view of the shielded anechoic chamber of present system;
Fig. 6 is that the siding of Fig. 5 installs the dimensional structure diagram of absorbing material;
Fig. 7 is the structural front view of the coupled antenna of present system;
Fig. 8 is the A-A of Fig. 7 to cross-sectional view;
Fig. 9 is the structural schematic diagram for removing radiation patch and dielectric layer of Fig. 7;
Figure 10 is the rearview of Fig. 7;
Figure 11 is the test method flow chart of the present invention.
Specific implementation mode
The embodiment of the present invention is further described below in conjunction with attached drawing;The present embodiment is descriptive, is not to limit Property, it cannot thus limit protection scope of the present invention.
A kind of concentrator GPRS communication test systems, including test babinet 3, assembly line 1, test babinet are mounted on assembly line Side, assembly line conveying is tested concentrator 6, electromagnetic shielding dark room 11 installed in test box body, in electromagnetic shielding dark room under Portion is equipped with running track 10, has pallet 12 by the operation of stepper motor 9 in running track, and pallet bottom is top-loaded with pallet Jacking device 13, the pallet jacking device are driven by motor 7 of plugging into, and tested concentrator can be placed in pallet;In electromagnetic shielding dark room Top be fixed with comprehensive tester 4 and signal interference device 15, the electromagnetic shielding dark room top below comprehensive tester is solid Equipped with coupled antenna 5;Alarm lamp 2 and display 8 are installed on test babinet, electrical list is also equipped in test box body Member, PLC control unit, power supply system and control unit.
Assembly line connects the running track of automatic delivery unit, and the running track of the automatic delivery unit is mainly to tested whole End carries out automatically conveying and output, tested concentrator is transported to detection zone in electromagnetic shielding dark room, after the completion of to be detected Measured terminal is then transported to next specified region.Tested concentrator into electromagnetic shielding dark room is transported to using pallet Position, the jacking device for jacking unit jack up pallet, are accurately positioned to tested concentrator by the motor of plugging into for unit of plugging into, Enhance the reliability and stability of connecting device, positioning should be accurate, rapid;To tested concentrator using electric unit electricity after positioning Pressure side, current terminal, auxiliary terminal (verification pulse, multifunctional pulse, communication port) carry out crimping of reliably plugging into, the present embodiment It is two detection pallets shown in attached drawing, two tested concentrators can be detected simultaneously, is concentrated to tested using single phase power supply mode Device is powered, and two concentrator connecting terminals are plugged into simultaneously, in order to evade two concentrators while power on to GPRS communication checks It interferes with each other, PLC control system is powered on and powered off to each concentrator respectively by relay according to testing requirements;It is all Concentrator terminals are not pressurized contracting, and wiring Compression Stability, uniformly, it is reliable;Electric unit is connect power supply with concentrator, it It is powered afterwards to concentrator by power supply system and control unit, whole process is controlled by PLC control unit.Wait for that measured terminal enters electricity After body is tested in magnetic screen darkroom, electromagnetic shielding dark room chamber door is closed, external environmental interference is isolated.Power supply unit mainly gives quilt It surveys terminal and test equipment provides power supply guarantee.After the completion of test, electromagnetic shielding dark room chamber door is opened, connecting terminal with it is tested Terminal is unclamped, and pallet puts down, measured terminal is exported automatically, and measured terminal is finally transported to next test zone.
In the present invention, the structure of the electromagnetic shielding dark room is equipped with shield door 14, in the babinet of darkroom referring to Fig. 5,6 Bottom plate on by running track operation have structure for conveying 18, jacking device is installed on the conveyor, is installed on jacking device It plugs into unit 16, RFCD coupled antennas is fixed in the corresponding top plate for plugging into unit.The inboard of shield door is fixed with plane Wave absorbing thin film plate, the wave absorbing thin film plate can effectively inhibit the surface electromagnetic waves such as traveling wave, Creeping Wave and guided wave;In top plate, side wall And access panel inboard is fixed with needle taper and inhales wave plate 17, which inhales wave plate and inhales wave head by the needle taper that it is uniformly made The 19 effective electromagnetic wave absorption in tip.
In the present invention, the countermeasure set is connected to the coupled antenna in shielded box, interference dress by radio frequency line and plug It sets and is connected with control unit by gpib bus, the structure of the coupled antenna is made referring to Fig. 7,8,9,10 on grounding disc 20 There are a concentric circular coupling slots 24, covering is fixedly mounted with a radiation patch in plane on the grounding disc of the corresponding circular concentric coupling slot 22, which uses circular patch, R=12.8 millimeters of radius to be fixedly mounted with a thickness between radiation patch and grounding disc For 2 millimeters of air dielectric layer 21;It is fixedly mounted with the FR4 that a dielectric constant is 4.4, thickness is 1mm in grounding disc bottom surface and feeds base Piece 25 is fixedly mounted with a microstrip feed line 23 below feed substrate along the axis position of radiation patch, and the width of the microstrip feed line is 2mm, to ensure the input impedance of feeder line for 50 ohms.
In practical application, it is contemplated that the firmness of antenna structure and impact resistance etc., air dielectric layer can be examined Consider and is filled using the materials such as foam similar in dielectric constant;Gap phase between the slot for the circular concentric coupling slot that grounding disc is made It is connected to that circular concentric coupling slot is radial Deng, microstrip feed line, the distance of open end to central point is 6 millimeters, to ensure micro-strip The input impedance of antenna obtains good matching.
The present invention operation principle be:
In concentrator GPRS communication automation system test process, when concentrator module reaches the station of GPRS communication tests, After assembly line PLC sends out warehouse entry request, test equipment under the control action of its PLC, be gradually completing motor into, extension line into, Fixed station liter, shield door close, terminal is into action, to realize that concentrator is successfully entered electromagnetic shielding box, then by software control System realizes the measurement of concentrator GPRS communication performance parameters.After being measured, software sends test to test equipment PLC and completes Signal, then export request is sent from test equipment PLC to assembly line PLC, while test equipment PLC completes terminal with this and moves back, shields Cover chamber door is opened, extension line moves back, motor move back operation to realize that concentrator goes out the purpose of electromagnetic shielding box.
A kind of concentrator GPRS communication test methods, test flow chart is as shown in figure 11, and step is:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960, Agilent signal source E4438C and station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurement works by PLC When jacking transferring before position, PLC puts in storage request to test station transmission, test station PLC is received put in storage request after simultaneously nothing in storehouse When detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC is sequentially completed step It is rotated forward into belt and completes pallet warehouse entry, stepper motor advances, and completion pallet reaches horizontal checkout position, pallet is completed in pallet jacking Reach vertical test position, clamping of plugging into completes binding post in place;
(3) GPRS is detected:The system detectio software of main control computer by control line always to PLC states in detection station into Row detection can send concentrator to bit instruction after detection station PLC completes above-mentioned action to inspection software;At this point, test is soft Part powers on left side terminal in shielded box by controlling line traffic control detection station PLC, while radio frequency being opened the light and switches to a left side Side coupling plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is as simulation main website and concentrator Carry out foundation call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst Power over time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software disconnects shielded box by controlling line traffic control detection station PLC Interior left side terminal supplying power simultaneously powers on right side termination, while radio frequency being opened the light and switches to right side coupling plate;Then, control peace Prompt human relations 8960 simulate main website and complete to establish call with right side termination, transmission power, phase error, frequency error, switch frequency spectrum, adjust The test of frequency spectrum, receiving sensitivity, burst power over time, end nine test items of call processed;After the completion of test, test Test result can be stored in local main control computer and be sent to extraneous PLC servers by software, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software meeting By control line request export is sent to detection station PLC.At this point, detection station PLC, which is respectively completed to plug into loosen, completes wiring Column is withdrawn, pallet decline completion pallet arrival goes out bin location vertically, stepper motor retrogressing completion pallet arrival level goes out bin location, Pallet export is completed in the reversion of stepping belt.
It is as shown in the table for the every test event and index of the present invention

Claims (1)

1. a kind of concentrator GPRS communication test methods, including test babinet, assembly line, test babinet are mounted on the side of assembly line Side, assembly line conveying are tested concentrator, install electromagnetic shielding dark room in the test box body, lower part is pacified in electromagnetic shielding dark room Equipped with running track, there is pallet by stepper motor operation in running track, pallet bottom is top-loaded with pallet jacking device, should Pallet jacking device is driven by motor of plugging into, and tested concentrator can be placed in pallet;It is fixed with above electromagnetic shielding dark room Comprehensive tester and signal interference device, the electromagnetic shielding dark room top below comprehensive tester are fixed with coupled antenna;? Alarm lamp and display are installed on test babinet, electric unit, PLC control unit, power supply are also equipped in test box body System and control unit;
The electromagnetic shielding dark room is equipped with shield door, and the inboard of shield door is fixed with plane wave absorbing thin film plate, in top plate, side wall And access panel inboard is fixed with needle taper and inhales wave plate, which inhales wave plate and inhales wave head by the needle taper that it is uniformly made The effective electromagnetic wave absorption in tip;
The countermeasure set is connected to the coupled antenna in shielded box by radio frequency line and plug, which passes through gpib bus It is connected with control unit;
The structure of the coupled antenna is that a concentric circular coupling slots are formed on grounding disc, in corresponding circular concentric coupling Covering is fixedly mounted with a radiation patch in plane on the grounding disc of slot, which uses circular patch, in radiation patch and ground connection An air dielectric layer is fixedly mounted between disk;It is fixedly mounted with a FR4 in grounding disc bottom surface and feeds substrate, along radiation patch below feed substrate The axis position of piece is fixedly mounted with a microstrip feed line;
Gap is equal between the slot for the circular concentric coupling slot that the grounding disc is made, and microstrip feed line is connected to circular concentric coupling slot Radial, the distance of open end to central point is 6 millimeters;
It is characterized in that:Step is:
(1) preparation is powered on:Concentrator GPRS intelligent checking systems are powered on, at this point, industrial PC, Agilent 8960, An Jie Human relations signal source E4438C and test station PLC can complete to power on and be switched on;It is completed when industrial PC is switched on, system detectio software will It can start automatically, after start completion, the initial setting up to Agilent 8960, Agilent signal source E4438C can be sequentially completed, and Open successively test software and test station plc communication port, test station and RF switch communication port, test software with it is outer Boundary PLC server communications port, and then it is automatically performed test system electrification, a series of preparations of initial setting up and open communication port Work;
(2) concentrator enters detection station PLC actions:When concentrator controls logistics to concentrator GPRS intelligent measurements by assembly line PLC When jacking transferring before station, assembly line PLC puts in storage request to test station transmission, test station PLC is received put in storage request after And when in storehouse without detection terminal, test station PLC is sent to assembly line PLC allows warehouse entry to instruct;At this point, detection station PLC according to Secondary completion stepping belt, which rotates forward and completes pallet warehouse entry, stepper motor advances completes pallet arrival horizontal checkout position, pallet jacking Pallet is completed to reach vertical test position, plug into clamping completion binding post in place;
(3) GPRS is detected:The system detectio software of main control computer is always detected detection station PLC states by control line, After detection station PLC completes above-mentioned action, concentrator can be sent to inspection software to bit instruction;At this point, test software passes through Control line traffic control detection station PLC powers on left side terminal in shielded box, while RF switch is switched to left side coupling Plate completes the preparation before testing left side concentrator;Then, Agilent 8960 is built as simulation main website with concentrator Vertical call, transmission power, phase error, frequency error, switch frequency spectrum, modulation spectrum, receiving sensitivity, burst power pair Time, end nine test items of call are tested;
(4) after completing left side concentrator test, test software is left in line traffic control detection station PLC disconnection shielded boxes by controlling Lateral terminal power supply simultaneously powers on right side termination, while RF switch is switched to right side coupling plate;Then, Agilent is controlled 8960 simulation main websites complete to establish call, transmission power, phase error, frequency error, switch frequency spectrum, modulation frequency with right side termination Spectrum, receiving sensitivity, burst power over time, the test for terminating nine test items of call;After the completion of test, test software Test result can be stored in local main control computer and be sent to extraneous PLC servers, and notify server export;
(5) concentrator goes out detection station PLC actions:After being respectively completed concentrator detection in left and right in pallet, test software can pass through Control line sends request export to detection station PLC;At this point, detection station PLC be respectively completed plug into loosen complete binding post remove Decline from, pallet complete pallet reach go out bin location vertically, stepper motor retreats and completes pallet arrival level and go out bin location, stepping Pallet export is completed in belt reversion.
CN201510621834.9A 2015-09-25 2015-09-25 A kind of concentrator GPRS communication test systems and method Active CN105245296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510621834.9A CN105245296B (en) 2015-09-25 2015-09-25 A kind of concentrator GPRS communication test systems and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510621834.9A CN105245296B (en) 2015-09-25 2015-09-25 A kind of concentrator GPRS communication test systems and method

Publications (2)

Publication Number Publication Date
CN105245296A CN105245296A (en) 2016-01-13
CN105245296B true CN105245296B (en) 2018-11-06

Family

ID=55042812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510621834.9A Active CN105245296B (en) 2015-09-25 2015-09-25 A kind of concentrator GPRS communication test systems and method

Country Status (1)

Country Link
CN (1) CN105245296B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107659363B (en) * 2017-09-28 2021-08-10 云南电网有限责任公司电力科学研究院 Power terminal communication testing device
CN109448056B (en) * 2018-10-30 2021-12-10 国网北京市电力公司 Communication module connection method and device, storage medium and electronic device
CN110596437A (en) * 2019-09-29 2019-12-20 杭州德创电子股份有限公司 Automatic crimping device for crimping High Performance Liquid Chromatography (HPLC) communication module of electric energy meter
CN113179139B (en) * 2021-03-18 2023-03-31 深圳市酷客智能科技有限公司 Wireless product testing device and wireless product testing method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102830298A (en) * 2012-07-27 2012-12-19 中兴通讯股份有限公司 Method and device for testing radio frequency index and wireless index of active antenna system
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN204539154U (en) * 2015-02-08 2015-08-05 国家电网公司 A kind of electromagnetic shielding box for the test of concentrator GPRS communication automation system
CN204539162U (en) * 2015-02-08 2015-08-05 国家电网公司 A kind of interference source device for the test of concentrator GPRS communication automation system
CN204558645U (en) * 2015-02-08 2015-08-12 国家电网公司 The coupled antenna of the concentrator wireless public network communication automation system test of a kind of pair of epi-position

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102998643A (en) * 2011-09-09 2013-03-27 华北电力科学研究院有限责任公司 Power utilization information acquisition terminal detecting system
CN102830298A (en) * 2012-07-27 2012-12-19 中兴通讯股份有限公司 Method and device for testing radio frequency index and wireless index of active antenna system
CN204539154U (en) * 2015-02-08 2015-08-05 国家电网公司 A kind of electromagnetic shielding box for the test of concentrator GPRS communication automation system
CN204539162U (en) * 2015-02-08 2015-08-05 国家电网公司 A kind of interference source device for the test of concentrator GPRS communication automation system
CN204558645U (en) * 2015-02-08 2015-08-12 国家电网公司 The coupled antenna of the concentrator wireless public network communication automation system test of a kind of pair of epi-position

Also Published As

Publication number Publication date
CN105245296A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN105141378B (en) A kind of special transformer terminals wireless public network communication test system and method
CN105245296B (en) A kind of concentrator GPRS communication test systems and method
CN103278751B (en) Partial discharge comprehensive itinerant detector for high voltage electric power equipment
CN103731219B (en) A kind of bluetooth end properties method of testing and system
CN105307196B (en) A kind of acquisition terminal wireless public network communication test system and method
CN105141379B (en) A kind of special transformer terminals GPRS communication test systems and method
CN111817795A (en) Beidou radio frequency baseband product testing device
CN105022020A (en) RF electromagnetic field and radio immunity test system and method of electric energy meter
CN105243834B (en) A kind of acquisition terminal GPRS communication test systems and method
CN105162534B (en) A kind of concentrator wireless public network communication test system and method
CN201903620U (en) Pinpoint discharging testing system for transformer
CN110659711A (en) RFID temperature measurement label for cable connector, installation method and temperature measurement method
CN201909828U (en) Test system for bubble electric discharge of transformer
CN102033184A (en) Voltage distribution wireless measurement system of lightning arrester
CN108732472A (en) Compound field based on high-frequency method couples paper oil insulation partial discharge detecting system
CN106841863A (en) Radio frequency testing seat, printed circuit board (PCB) and terminal
CN102735957A (en) Method and system for monitoring antenna oscillator of base station as well as integrated monitoring equipment
CN107276690A (en) A kind of WiFi coupling sensitivities deterioration test system and method for testing
CN206743253U (en) A kind of wireless test and the device for being easy to convert built-in aerial
CN208076659U (en) Compound field based on high-frequency method couples paper oil insulation partial discharge detecting system
CN103108063A (en) Test system and method of radio frequency identification device (RFID)-subscriber identity module (SIM) card
CN103063939A (en) Ground cascade system external radio frequency electromagnetic environment test method
CN105004980A (en) Substation discharge signal detection device
CN203688769U (en) 10KV switch cabinet residue frequency detection apparatus based on antenna array
CN209728057U (en) A kind of inductance measurement device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant