CN105241257A - Inner barrel hanging piece for cement preheater - Google Patents
Inner barrel hanging piece for cement preheater Download PDFInfo
- Publication number
- CN105241257A CN105241257A CN201510779369.1A CN201510779369A CN105241257A CN 105241257 A CN105241257 A CN 105241257A CN 201510779369 A CN201510779369 A CN 201510779369A CN 105241257 A CN105241257 A CN 105241257A
- Authority
- CN
- China
- Prior art keywords
- lacing film
- hook
- hanging piece
- upper arm
- centrosymmetric
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
The invention discloses an inner barrel hanging piece for a cement preheater. The hanging piece is in a centrosymmetric S-shape, and an upper half part of the hanging piece comprises an upper arm extending slantwise and upwards and a first hook extending from a top end of the upper arm toward one side of the hanging piece and open downwards; a lower half part of the hanging piece comprises a lower arm arranged centrosymmetrically with the upper arm, and a second hook extending from a bottom end of the lower arm toward the other side of the hanging piece and open upwards; the first hook and the second hook are centrosymmetric about a symmetric center of the upper arm and the lower arm; a first trapezoidal wind shield extends upwards from the top of the first hook of the hanging piece, while a second trapezoidal wind shield extends downwards from the bottom of the second hook of the hanging piece; the shapes of the first trapezoidal wind shield and the second trapezoidal wind shield are matched with the spatial shapes of the side surfaces of the upper arm and the lower arm. The inner barrel hanging piece for the cement preheater is of a centrosymmetric S-shaped structure, and is high in productivity and long in service life.
Description
Technical field
The present invention relates to cement manufacture plant technical field, relate to a kind of inner core lacing film for cement preheater specifically.
Background technology
At present, in manufacture of cement, cyclone cylinder inner core lacing film is all straight-arm type.Such structure makes lacing film joint have space, and wind speed then can be weakened in space, and can have influence on the service life of lacing film.
Summary of the invention
For the deficiencies in the prior art, the object of the invention is to propose the hanging piece for inner barrel of preheater that a kind of joint does not exist gap.
For achieving the above object, the present invention is achieved by the following technical solutions: a kind of inner core lacing film for cement preheater, the S type that described lacing film is centrosymmetric, downward opening first hook that its first half comprises the upper arm that tilts upward extension and extends to the side of described lacing film in described top arm's tip; The latter half of described lacing film comprises the underarm that is centrosymmetric with described upper arm and second of opening upwards linking up with of extending to the opposite side of described lacing film in described underarm bottom; Described first hook and described second is linked up with and is centrosymmetric with the symmetrical centre of described upper arm and described underarm; First hook top of described lacing film has extended upward the first trapezoidal shaped windshield, and the second hook bottom of described lacing film is extended downwards the second trapezoidal shaped windshield; The shape of described first trapezoidal shaped windshield, the second trapezoidal shaped windshield and the lateral space form fit of described upper arm and described underarm.
Compared with prior art, the present invention has following beneficial effect:
1, the inner core lacing film for cement preheater provided by the invention adopts centrosymmetric S type structure, gapless after making suspension member combination, and wind speed strengthens, therefore cement output significantly improves, in addition, gapless structure also can guarantee suspension member not by wind impact, because this increasing service life.
2, the first hook top of lacing film has extended upward the first trapezoidal shaped windshield; Second hook bottom of lacing film is extended downwards has the second trapezoidal shaped windshield, the shape of described first trapezoidal shaped windshield, the second trapezoidal shaped windshield and the lateral space form fit of described upper arm and described underarm.Like this, after lacing film mounting, first trapezoidal shaped windshield of below lacing film just to have filled up the space that the upper arm of top lacing film and underarm are formed slopely, second trapezoidal shaped windshield of top lacing film just to have filled up the space that the upper arm of below lacing film and underarm are formed slopely, further prevent upset distinguished and admirable, reach better protection effect.
Accompanying drawing explanation
Fig. 1 is for illustration of the inner core lacing film schematic diagram of the cement preheater of the embodiment of the present invention.
Fig. 2 is for illustration of the inner core lacing film combination schematic diagram of two cement preheaters of the embodiment of the present invention.
Parts title and sequence number in figure: 1-upper arm 2-underarm 3-first links up with 4-second and links up with 5-first trapezoidal shaped windshield 6-second trapezoidal shaped windshield 7-lacing film.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail, but does not limit the scope of the invention and range of application:
As depicted in figs. 1 and 2, a kind of inner core lacing film for cement preheater, the S type that described lacing film 7 is centrosymmetric, its first half comprises the upper arm 1 tilting upward extension and downward opening first hook 3 extended to the side of described lacing film 7 on described upper arm 1 top; The latter half of described lacing film 7 comprise the underarm 2 that is centrosymmetric with described upper arm 1 and extend to the opposite side of described lacing film 7 in described underarm 2 bottom second of opening upwards link up with 4; Described first hook 3 and described second is linked up with 4 and is centrosymmetric with the symmetrical centre of described upper arm 1 and described underarm 2; First hook 3 tops of described lacing film 7 have extended upward the first trapezoidal shaped windshield 5, and extending downwards bottom the second hook 4 of described lacing film has the second trapezoidal shaped windshield 6; The described shape of the first trapezoidal shaped windshield 5, second trapezoidal shaped windshield 6 and the lateral space form fit of described upper arm 1 and described underarm 2.
Inner core lacing film for cement preheater adopts centrosymmetric S type structure, gapless after making suspension member combination, wind speed strengthens, therefore cement output significantly improves, in addition, gapless structure also can guarantee suspension member not by wind impact, and because this increasing service life, when reality is tested, service life can arrive more than 1.5 times of original structure.First hook 3 tops of lacing film 7 have extended upward the first trapezoidal shaped windshield 5; Extend downwards bottom second hook 4 of lacing film 7 and have the second trapezoidal shaped windshield 6, the described shape of the first trapezoidal shaped windshield 5, second trapezoidal shaped windshield 6 and the lateral space form fit of described upper arm 1 and described underarm 2.Like this, after lacing film 7 mounts, first trapezoidal shaped windshield 5 of below lacing film 7 has just filled up the space that the upper arm 1 of top lacing film 7 and underarm 2 are formed slopely, second trapezoidal shaped windshield 6 of top lacing film 7 has just filled up the space that the upper arm 1 of below lacing film 7 and underarm 2 are formed slopely, further prevent upset distinguished and admirable, reach better protection effect.Other first hurricane globe 5, second hurricane globe 6 adopts trapezoidal design can avoid corner angle other objects of scratch easily, also avoids self damaging.
During use, as shown in Figure 2, lacing film 7 is hooked together mutually, and the structure of S type makes contact portion profile complete, no longer has gap, adds the design of the first trapezoidal shaped windshield 5, second trapezoidal shaped windshield 6, thus can not reduce wind speed, causes resonance.Cement output is promoted, and lacing film 7 improves service life.
Above content is in conjunction with concrete preferred embodiment further description made for the present invention, can not assert that specific embodiment of the invention is confined to these explanations.For general technical staff of the technical field of the invention; make some equivalent alternative or obvious modification without departing from the inventive concept of the premise; and performance or purposes identical, all should be considered as belonging to the scope of patent protection that the present invention is determined by submitted to claims.
Claims (1)
1. the inner core lacing film for cement preheater, it is characterized in that: the S type that described lacing film (7) is centrosymmetric, its first half comprises the upper arm (1) tilting upward extension and downward opening first hook (3) extended to the side of described lacing film (7) on described upper arm (1) top; The latter half of described lacing film (7) comprises the underarm (2) that is centrosymmetric with described upper arm (1) and second of opening upwards linking up with (4) of extending to the opposite side of described lacing film (7) in described underarm (2) bottom; Described first hook (3) and described second is linked up with (4) and is centrosymmetric with the symmetrical centre of described upper arm (1) and described underarm (2); First hook (3) top of described lacing film (7) has extended upward the first trapezoidal shaped windshield (5), and the second hook (4) bottom of described lacing film is extended downwards the second trapezoidal shaped windshield (6); The shape of described first trapezoidal shaped windshield (5), the second trapezoidal shaped windshield (6) and the lateral space form fit of described upper arm (1) and described underarm (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510779369.1A CN105241257A (en) | 2015-11-13 | 2015-11-13 | Inner barrel hanging piece for cement preheater |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510779369.1A CN105241257A (en) | 2015-11-13 | 2015-11-13 | Inner barrel hanging piece for cement preheater |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105241257A true CN105241257A (en) | 2016-01-13 |
Family
ID=55038993
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510779369.1A Pending CN105241257A (en) | 2015-11-13 | 2015-11-13 | Inner barrel hanging piece for cement preheater |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105241257A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013023581A1 (en) * | 2011-08-18 | 2013-02-21 | 江苏华信达特钢科技有限公司 | Preheater cyclone inner tube having ultrastrong-type heat-resistant steel-belt |
CN103673637A (en) * | 2013-12-12 | 2014-03-26 | 兴化市金牛机械铸造有限公司 | Cement preheater internal cylinder hanging sheet |
CN203672151U (en) * | 2014-01-09 | 2014-06-25 | 兴化市金牛机械铸造有限公司 | Cement preheater inner barrel hanging piece |
CN203772028U (en) * | 2014-04-02 | 2014-08-13 | 南京凯盛国际工程有限公司 | Novel hanging sheet of inner barrel of preheater |
CN204286119U (en) * | 2014-11-26 | 2015-04-22 | 兴化市恒源特钢有限公司 | A kind of hanging piece for inner barrel of preheater |
CN104613778A (en) * | 2014-12-13 | 2015-05-13 | 广西科技大学 | Pre-heater rotary barrel air barrel inner barrel provided with ultra-strong heat resistant steel belt |
CN205156637U (en) * | 2015-11-13 | 2016-04-13 | 广西壮族自治区建筑材料科学研究设计院 | A inner tube lacing film for cement pre -heater |
-
2015
- 2015-11-13 CN CN201510779369.1A patent/CN105241257A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013023581A1 (en) * | 2011-08-18 | 2013-02-21 | 江苏华信达特钢科技有限公司 | Preheater cyclone inner tube having ultrastrong-type heat-resistant steel-belt |
CN103673637A (en) * | 2013-12-12 | 2014-03-26 | 兴化市金牛机械铸造有限公司 | Cement preheater internal cylinder hanging sheet |
CN203672151U (en) * | 2014-01-09 | 2014-06-25 | 兴化市金牛机械铸造有限公司 | Cement preheater inner barrel hanging piece |
CN203772028U (en) * | 2014-04-02 | 2014-08-13 | 南京凯盛国际工程有限公司 | Novel hanging sheet of inner barrel of preheater |
CN204286119U (en) * | 2014-11-26 | 2015-04-22 | 兴化市恒源特钢有限公司 | A kind of hanging piece for inner barrel of preheater |
CN104613778A (en) * | 2014-12-13 | 2015-05-13 | 广西科技大学 | Pre-heater rotary barrel air barrel inner barrel provided with ultra-strong heat resistant steel belt |
CN205156637U (en) * | 2015-11-13 | 2016-04-13 | 广西壮族自治区建筑材料科学研究设计院 | A inner tube lacing film for cement pre -heater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201458529U (en) | Brick hoisting clamp | |
CN205753301U (en) | A kind of buffer-type power transmission line bracket | |
CN205156637U (en) | A inner tube lacing film for cement pre -heater | |
CN105241257A (en) | Inner barrel hanging piece for cement preheater | |
CN203672151U (en) | Cement preheater inner barrel hanging piece | |
CN208634269U (en) | A kind of high strength overlong spring | |
CN203756830U (en) | Steering wheel adjusting torsion spring | |
CN205503837U (en) | Tensile spacing couple spring | |
CN212429101U (en) | Tower barrel shockproof structure of wind generating set | |
CN204755697U (en) | Multidirectional damping shock absorber | |
CN203895491U (en) | Full-color LED bead used for high-luminance outdoor high-resolution display screen | |
CN203960735U (en) | Be assembled bridge floor device | |
CN207110610U (en) | A kind of building damping device | |
CN202123899U (en) | Ring traveler for high-position guard ring tire | |
CN206512599U (en) | A kind of anchor of bridge expanssion joint | |
CN202901133U (en) | Spring for hanging articles | |
CN202905309U (en) | Anti-drop fixing frame for high-altitude 330kV power transmission line V-shaped insulator chain | |
CN205134540U (en) | Node slides based on joint bearing | |
CN204885148U (en) | Novel rectifier diode | |
CN205457899U (en) | Paper tube trousers frame | |
CN202194934U (en) | Steel wire nose | |
CN204530484U (en) | A kind of bridge construction support | |
CN202047640U (en) | High-voltage power transmission iron tower with variable section length | |
CN206206476U (en) | A kind of vibration damper assembly | |
CN204772907U (en) | Lower mould chamfer structure of permanent magnetic ferrite magnetic shoe mould |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160113 |