CN105240843B - Modular construction for biomass boiler and gas fired-boiler - Google Patents

Modular construction for biomass boiler and gas fired-boiler Download PDF

Info

Publication number
CN105240843B
CN105240843B CN201510712317.2A CN201510712317A CN105240843B CN 105240843 B CN105240843 B CN 105240843B CN 201510712317 A CN201510712317 A CN 201510712317A CN 105240843 B CN105240843 B CN 105240843B
Authority
CN
China
Prior art keywords
box
boiler
upper box
lower box
modular construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510712317.2A
Other languages
Chinese (zh)
Other versions
CN105240843A (en
Inventor
谭章军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changshu Dayang Co Ltd
Original Assignee
Changshu Dayang Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changshu Dayang Co Ltd filed Critical Changshu Dayang Co Ltd
Priority to CN201510712317.2A priority Critical patent/CN105240843B/en
Publication of CN105240843A publication Critical patent/CN105240843A/en
Application granted granted Critical
Publication of CN105240843B publication Critical patent/CN105240843B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)
  • Combustion Of Fluid Fuel (AREA)

Abstract

The invention discloses a kind of modular construction for biomass boiler and gas fired-boiler, including upper box, lower box, water-cooling wall and some communicating pipes, it is the cavity of sealing inside the upper box and lower box, the center of upper box and lower box is provided with the through hole of up/down perforation, the water-cooling wall is arranged between upper box and lower box and connects upper box and the cavity of lower box, the water-cooling wall, upper box and lower box enclose boiler furnace, the communicating pipe is hollow pipeline, it is arranged between upper box and lower box and connects upper box and the cavity of lower box, the upper end of the communicating pipe is piercing in upper box roof, the lower end of the communicating pipe is piercing in lower box bottom wall, the part for being located at the cavity of upper box and lower box the communicating pipe is provided with opening.The modular construction assembles beneficial to dilatation, and water-cooling wall scale removal is convenient, also allows for packing.

Description

Modular construction for biomass boiler and gas fired-boiler
Technical field
The present invention relates to a kind of boiler structure, more particularly to a kind of modularization for biomass boiler and gas fired-boiler Structure.
Background technology
The furnace binding of biomass boiler and gas fired-boiler typically designs on request at present, and has fixed structure, should It is complicated, it is necessary to design multiple pipe interfaces.The boiler being completed can not need to change with production, be pressed for different clients Require to need to redesign processing and assembling according to different.The boiler that other structure is fixed is, it is necessary to which individually designed scale removal working hole comes Water-cooling wall scale removal work is carried out, scale removal efficiency is poor.
The content of the invention
For above-mentioned the deficiencies in the prior art, it is an object of the invention to provide one kind to be used for biomass boiler and gas fired-boiler Modular construction, solve the problems such as water-cooling wall scale removal, boiler dilatation.
It is the technical scheme is that such:A kind of modular construction for biomass boiler and gas fired-boiler, bag Include upper box, lower box, water-cooling wall and some communicating pipes, be the cavity of sealing, top box inside the upper box and lower box The center of body and lower box is provided with the through hole of up/down perforation, and the water-cooling wall is arranged between upper box and lower box and connected The cavity of casing and lower box, the water-cooling wall, upper box and lower box enclose boiler furnace, and the communicating pipe is hollow tube Road, it is arranged between upper box and lower box and connects upper box and the cavity of lower box, the upper end of the communicating pipe are piercing in Upper box roof, the lower end of the communicating pipe are piercing in lower box bottom wall, the communicating pipe are located at the sky of upper box and lower box The part of chamber is provided with opening.
Further, include stretching into stove by the through hole of upper box for the modular construction of biomass boiler and gas fired-boiler The water jacket of thorax, the water jacket include the flue for the outer barrel of water storage and for flow of flue gas, and the outer sleeve is located at outside flue, The top of the outer barrel is provided with delivery port and oral siphon, and the oral siphon stretches into outer barrel bottom.
Preferably, the communicating pipe it is provided with even number root and is symmetricly set on the surrounding of the through hole.
Preferably, the communicating pipe is provided with four.
Preferably, the both ends of the communicating pipe are provided with plug, silk mouth or flange.
Preferably, the water-cooling wall is fin panel casing.
Preferably, the upper box and lower box are rectangular box body or positive square box, and the water-cooling wall is arranged on upper box At least one side in the space formed with lower box.
It is using the beneficial effect of the technical program:Modular boiler structure is easy to assemble different capabilities according to actual needs Boiler, and be symmetrical structure, turning upside down during installation nor affects on assembling, not error-prone.The design of communicating pipe is met The requirement of scale removal blowdown, while water-cooling wall heat-transfer surface is added, it is each passed through upper box and lower box while serves in increase The effect of casing and lower box intensity., can be easily by the interconnection between communicating pipe in parallel or series during multiple modules Realize the connection between connection and lower box and the lower box between upper box and upper box.The upper and lower ends of single communicating pipe Between in burner hearth ft connection and connect liquid level gauge and can easily measure liquid level.Whole modular construction opens up in side surface part to be connect Mouthful, reduce packaging opening.On the one hand the through hole of upper box and lower box adds casing intensity and can simultaneously serve as burner hearth inspection Repair detonation safety vent in hole and stove, coordinate water jacket using when add flue gas utilization rate.
Brief description of the drawings
Fig. 1 is the schematic perspective view of modular construction;
Fig. 2 is jacket structure for water schematic diagram;
Fig. 3 is structural representation when two modular constructions and water jacket coordinate;
Overlooking the structure diagram when Fig. 4 is four modular construction combinations.
Embodiment
With reference to embodiment, the invention will be further described, but not as a limitation of the invention.
Refer to Fig. 1, the modular construction for being used for biomass boiler and gas fired-boiler that the present embodiment is related to, including top box Body 1, lower box 2, water-cooling wall 3 and more communicating pipes 4, the present embodiment are four, and upper box 1 and lower box 2 are rectangular box body Or positive square box, inside are through hole 5 of the center provided with up/down perforation of the cavity of sealing, upper box 1 and lower box 2.Membrane type Water-cooling wall 3 is arranged between upper box 1 and lower box 2 and connected the cavity of upper box 1 and lower box 2, water-cooling wall 3, upper box 1 Boiler furnace 6 is enclosed with lower box 2.Communicating pipe 4 is hollow pipeline, and four communicating pipe 4 is around upper box 1 and lower box 2 Through hole 5 is arranged symmetrically, and it is arranged between upper box 1 and lower box 2 and connected the cavity of upper box 1 and lower box 2.Communicating pipe 4 upper end is piercing in the roof of upper box 1, and the lower end of communicating pipe 4 is piercing in the bottom wall of lower box 2, communicating pipe 4 is located at the He of upper box 1 The part of the cavity of lower box 2 is provided with opening 7.
Can in parallel or string during multiple combination progress boiler dilatations for the modular construction of biomass boiler and gas fired-boiler Connection arranges multiple modular constructions.So that two modular constructions combine as an example, with reference to Fig. 2 and Fig. 3, two modular constructions are each Comprising three face fin panel casings 3, the connected part of two modular constructions sets the membrane type center water-cooling wall of 2/3rds height 31, cover plate is set on the through hole 5 of upper box 1 of previous modular construction, inserted in the through hole 5 of upper box 1 of latter modular construction Enter water jacket 8, water jacket 8 includes the flue 10 that waste heat recovery is carried out for the outer barrel 9 of water storage and for flow of flue gas, and outer barrel 9 is arranged In outside flue 10, the top of outer barrel 9 is provided with delivery port 11 and oral siphon 12, and oral siphon 12 stretches into the bottom of outer barrel 9.Water jacket 8 goes out The mouth of a river 11 connects the upper end of a communicating pipe 4, selects a pair of communicating pipes 4 of two modular constructions to connect its upper end, makes two The upper box 1 of modular construction is interconnected.A pair of communicating pipes 4 of two modular constructions of selection connect its lower end, make two The lower box 2 of modular construction is also interconnected.During boiler operatiopn, the flue gas of biomass or combustion of natural gas generation is by first The through hole 5 of modular construction lower box 2 enters the first modular construction burner hearth 6, and flue gas passes through central membrane after being exchanged heat with water-cooling wall 3 The gap of formula water-cooling wall 31 and upper box 1 enters the second modular construction burner hearth 6, and is discharged by the flue 10 of water jacket 8.Water is by water The oral siphon 12 of set 8 adds, and enters communicating pipe 4 by delivery port 11 after being preheated in water jacket 8 and is injected into the upper of modular construction Casing 1 and lower box 2, it is heated in fin panel casing 3.Flue gas in the second modular construction burner hearth 6 into after ash by lower box 2 Through hole 5 discharge.
Four modular parallel structures are as shown in figure 4, the first modular construction 100, the second modular construction the 200, the 3rd The modular construction 400 of modular construction 300 and the 4th composition matrix pattern construction, wherein the first modular construction 100 and the 4th mould Blocking structure 400 is each provided with three face water-cooling walls 3, and the second modular construction 200 and the 3rd modular construction 300 are each provided with two The adjacent water-cooling wall 3 in face.First modular construction 100 and the connected position of the second modular construction 200 are not provided with water-cooling wall, and the 3rd Modular construction 300 and the connected position of the 4th modular construction 400 are not provided with water-cooling wall.Second modular construction 200 and the 3rd The connected position of modular construction 300 sets central water-cooling wall 31, and the connection combination is only a kind of example, can be as needed, Central water-cooling wall 31 is arranged on the first modular construction 100 and the connected position of the second modular construction 200, now the second module Change structure 200 and the connected position of the 3rd modular construction 300 and the 3rd modular construction 300 and the 4th modular construction 400 Connected position is not provided with water-cooling wall;Central water-cooling wall 31 is either arranged on the 3rd modular construction 300 and the 4th modularization The connected position of structure 400, now the first modular construction 100 and the connected position of the second modular construction 200 and the second module Change structure 200 and the connected position of the 3rd modular construction 300 is not provided with water-cooling wall.The height of central water-cooling wall 31 is other water coolings 2/3rds of the height of wall 3, or other height, form the path that previous modular construction is connected with latter modular construction .Water jacket is inserted in needing to carry out the through hole 5 of upper box for the modular construction that fume afterheat utilizes, remaining modularization knot Cover plate is set at the through hole 5 of the upper box of structure.Each pipeline connecting mode combines similar with two modular constructions, repeats no more.

Claims (7)

1. a kind of modular construction for biomass boiler and gas fired-boiler, it is characterised in that including upper box (1), nowel It is the cavity of sealing inside body (2), water-cooling wall (3) and some communicating pipes (4), the upper box (1) and lower box (2), on The center of casing (1) and lower box (2) be provided with up/down perforation through hole (5), the water-cooling wall (3) be arranged on upper box (1) with Between lower box (2) and connect the cavity of upper box (1) and lower box (2), the water-cooling wall (3), upper box (1) and lower box (2) boiler furnace (6) is enclosed, the communicating pipe (4) is hollow pipeline, is arranged between upper box (1) and lower box (2) simultaneously The cavity of upper box (1) and lower box (2) is connected, the upper end of the communicating pipe (4) is piercing in upper box (1) roof, the company The lower end of siphunculus (4) is piercing in lower box (2) bottom wall, and the communicating pipe (4) is located at the cavity of upper box (1) and lower box (2) Part be provided with opening (7).
2. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:Including The water jacket (8) of burner hearth (6) is stretched into by the through hole (5) of upper box (1), the water jacket (8) includes the outer barrel (9) and use for water storage In the flue (10) of flow of flue gas, the outer barrel (9) is sheathed on flue (10) outside, and the top of the outer barrel (9) is provided with delivery port (11) and oral siphon (12), the oral siphon (12) stretch into outer barrel (9) bottom.
3. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:It is described Communicating pipe (4) it is provided with even number root and is symmetricly set on the surrounding of the through hole (5).
4. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:It is described Communicating pipe (4) is provided with four.
5. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:It is described The both ends of communicating pipe (4) are provided with plug, silk mouth or flange.
6. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:It is described Water-cooling wall (3) is fin panel casing.
7. the modular construction according to claim 1 for biomass boiler and gas fired-boiler, it is characterised in that:It is described Upper box (1) and lower box (2) are rectangular box body or positive square box, and the water-cooling wall (3) is arranged on upper box (1) and lower box (2) at least one side in the space formed.
CN201510712317.2A 2015-10-28 2015-10-28 Modular construction for biomass boiler and gas fired-boiler Active CN105240843B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510712317.2A CN105240843B (en) 2015-10-28 2015-10-28 Modular construction for biomass boiler and gas fired-boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510712317.2A CN105240843B (en) 2015-10-28 2015-10-28 Modular construction for biomass boiler and gas fired-boiler

Publications (2)

Publication Number Publication Date
CN105240843A CN105240843A (en) 2016-01-13
CN105240843B true CN105240843B (en) 2018-01-16

Family

ID=55038586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510712317.2A Active CN105240843B (en) 2015-10-28 2015-10-28 Modular construction for biomass boiler and gas fired-boiler

Country Status (1)

Country Link
CN (1) CN105240843B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3384975B2 (en) * 1988-08-12 2003-03-10 三浦工業株式会社 Water tube boiler
CN2639719Y (en) * 2003-07-02 2004-09-08 姜世庆 Water cooling wall pipe driving jet circulation boiler
JP4400921B2 (en) * 2004-05-24 2010-01-20 株式会社タクマ Multi-pipe once-through boiler
JP2007240093A (en) * 2006-03-10 2007-09-20 Kyushu Olympia Kogyo Kk Solid fuel combustion device
CN203454404U (en) * 2013-07-26 2014-02-26 江苏双良锅炉有限公司 Large-scale module-assembled efficient condensation type gas-fired hot water boiler
CN204115517U (en) * 2013-12-31 2015-01-21 上海双木机械设备有限公司 A kind of Modular heat exchanger
CN204268687U (en) * 2014-12-03 2015-04-15 金牛股份有限公司 The big-and-middle-sized gas-fired water heating boiler of a kind of two large part assembly type
CN104807178B (en) * 2015-05-24 2017-09-12 杨飞 Efficiently without burnt molded coal boiler
CN205119032U (en) * 2015-10-28 2016-03-30 常熟大洋热能技术有限公司 A modular structure for biomass boiler and gas boiler

Also Published As

Publication number Publication date
CN105240843A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN204404144U (en) Combustion hydrogen corner tube type steam boiler
CN104613638B (en) A kind of liner biomass boiler
CN105240843B (en) Modular construction for biomass boiler and gas fired-boiler
CN204201855U (en) A kind of coal burning and gas burning atmospheric steam boiler
CN205119032U (en) A modular structure for biomass boiler and gas boiler
CN101694353B (en) Tunnel kiln waste heat boiler
CN203785230U (en) Positive displacement steam wall-hanging stove
CN206771754U (en) A kind of boiler heat-exchanging device
CN210921341U (en) Biomass steam generator
CN202709438U (en) Multi-return-stroke counter-burning boiler with internally-arranged smoke-fire tubes
CN203704330U (en) Coal, gas and oil boiler
CN107781828A (en) Yellow phosphoric tail gas utilization system
CN201589418U (en) Combined type circulatory heating system
CN207049893U (en) A kind of horizontal single drum uses fuel boiler
CN205191576U (en) Combustion chamber base and combustor
CN206191892U (en) Support formula straw direct combustion boiler
CN201731617U (en) Horizontal pipe array hot water boiler
CN204693801U (en) A kind of energy-saving environmental protection boiler
CN203857449U (en) Boiler structure
CN103940071A (en) Volumetric steam wall-hanging stove
CN205002362U (en) Energy -conserving vertical boiler suitable for many fuel
CN203177445U (en) Vertical environment-friendly boiler
CN202032733U (en) Boiler for common bathing pools
CN204227688U (en) A kind of gas-fired boiler
CN203223897U (en) High calorific value gas boiler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant