CN105239732A - Extension roof pipe for preventing rainwater leakage and construction method thereof - Google Patents
Extension roof pipe for preventing rainwater leakage and construction method thereof Download PDFInfo
- Publication number
- CN105239732A CN105239732A CN201510742039.5A CN201510742039A CN105239732A CN 105239732 A CN105239732 A CN 105239732A CN 201510742039 A CN201510742039 A CN 201510742039A CN 105239732 A CN105239732 A CN 105239732A
- Authority
- CN
- China
- Prior art keywords
- pipe
- rainwater leakage
- roofing
- layer
- leakage prevention
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The invention discloses an extension roof pipe for preventing rainwater leakage and a construction method thereof, and solves the technical problem, the most difficult to be solved, that rainwater is leaked along roof pipe and roof hole gaps in the roof water prevention. The extension roof pipe for preventing rainwater leakage comprises an upper pipe body, a water stop plate and a lower pipe body. The construction method of the extension roof pipe for preventing rainwater leakage comprises the steps of: 1) hole reservation; 2) arrangement of a coiled material waterproof layer; 3) arrangement of a polyurethane waterproof paint leveling bonding layer; 4) installation of the extension roof pipe for preventing rainwater leakage; 5) fixation of the extension roof pipe for preventing rainwater leakage; 6) arrangement of a polyurethane waterproof paint covering layer; 7) arrangement of a polymer cement mortar protection layer; and 8) fixation of the extension roof pipe for preventing rainwater leakage. The extension roof pipe for preventing rainwater leakage and the construction method thereof have the following advantages: the connection between the extension roof pipe and the roof in the weakest link of roof water prevention is effectively designed to guarantee the prevention of roof rainwater leakage so as to prevent indoor loss caused by rainwater leakage.
Description
Technical field
What the present invention relates to a kind of rainwater leakage prevention stretches out roofing pipe and construction method thereof, be specifically related to a kind of for going out roof drainage pipe, go out roofing penetration pipe etc. and stretch out roofing pipe and construction method thereof from the indoor rainwater leakage prevention stretched out; Belong to construction work waterproof technology of roofing field.
Background technology
Building roofing, because of under being directly exposed to rainwash, very easily produces Seepage.For this reason, usually can do waterproofing work to roofing, to guarantee the leakage-proof and seepage-proof of roofing, avoid losing within doors because rain leakage causes.But the structure of building often produces the tubing stretching out roofing, as gutter, penetration pipe etc., these tubing bring very inconvenience to the waterproof of roofing, and in engineering construction, the binding site of these tubing and roofing often becomes the problem place of seepage.
At present, the processing method of roof waterproof hidden danger phenomenon is caused to adopt the method for polyurethane water-proof layer often for stretching out roofing pipe, this method Problems existing is that tubing connects roofing by polyurethane water-proof layer, tubing and be linearly connected between roofing hole gap and roofing, contact surface is little, once waterproofing course is in generation crack, junction, just lose waterproof action, therefore the effect of waterproofing protection is comparatively fragile; The waterproof technology of roofing also had is by increasing encapsulant, going out on roofing pipe to be welded umbrella shape rain shade etc., and these modes not can solve out roofing pipe and are connected contact surface this root problem little with roofing gap.
Summary of the invention
Technical problem to be solved by this invention is: for rainwater the most scabrous in roof waterproof along stretching out the technical problem of roofing pipe (as gutter, penetration pipe etc.) with roofing hole gap leakage.
Design philosophy of the present invention is, the linear protection being changed original waterproofing course by water baffle is Double-contact surfaces protection, realizes double plane waterproof, thus guarantees to stretch out roofing pipe periphery waterproof quality.
The object of the invention is to for roof waterproof weakest link---design effectively is carried out in the connection of stretching out roofing pipe and roofing, to guarantee the leakage-proof and seepage-proof of roofing to rainwater, avoids losing within doors because rain leakage causes.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
Rainwater leakage prevention stretch out a roofing pipe, comprise pipe shaft, water baffle and lower pipe shaft; Upper pipe shaft and lower pipe shaft are connected by water baffle and upper pipe shaft is connected with lower pipe shaft; Upper pipe shaft and all perpendicular settings with water baffle of lower pipe shaft; The junction of upper pipe shaft and lower pipe shaft and water baffle all seals.
The present invention is directed to roof waterproof weakest link---analyze and research in the junction of stretching out roofing pipe and roofing, devise a kind of for going out roof drainage pipe, go out roofing penetration pipe etc. and stretch out roofing pipe from the indoor rainwater leakage prevention stretched out.These technical scheme main contents are: the linear protection being changed original waterproofing course by water baffle is Double-contact surfaces protection, realizes double plane waterproof, thus guarantees to stretch out roofing pipe periphery waterproof quality.
Upper pipe shaft in the present invention, water baffle, lower pipe shaft and floor are all by casting or the processing of other technology modes, and seamless link is integral securely.
To the improvement of technical solution of the present invention, the junction of upper pipe shaft and water baffle and the junction of lower pipe shaft and water baffle are provided with floor.The floor set up in the present invention improves the intensity of stretching out roofing pipe of rainwater leakage prevention of the present invention effectively, increases the stressed of water baffle.
To the further improvement of technical solution of the present invention, the uniform setting of floor.In the present invention, floor is uniform is arranged so that water baffle uniform stressed.
Meanwhile, the invention allows for the construction method of stretching out roofing pipe of rainwater leakage prevention, comprise the steps:
1) when carrying out roof construction layer, cement mortar screeding to falls layer, insulation layer, the construction of cement mortar screeding layer, reserved stretch out rainwater leakage prevention and stretch out roofing pipe hole, hole diameter is greater than and stretches out roofing pipe diameter;
2) after the construction of cement mortar screeding layer terminates drying, roofing cement mortar levelling layer arranges coil waterproof layer; Diameter is stayed to be greater than the round breach of water baffle diameter at the periphery stretching out roofing pipe hole place;
3) in step 2 stay round indentation, there polyurethane water-proof paint to fill up except stretching out roofing pipe hole exterior domain, form polyurethane water-proof paint levelling tack coat;
4) after step 3 terminates, the lower pipe shaft that rainwater leakage prevention stretches out roofing pipe is inserted in hole by roofing, and water baffle is tightly pasted on the levelling tack coat of polyurethane water-proof paint;
5) after step 4 terminates, with blowing agent in doors to the filling of gap, hole, formation blowing agent loading layers is fixed rainwater leakage prevention and is stretched out roofing pipe;
6) after the levelling tack coat solidification of polyurethane water-proof paint, then cover water baffle with polyurethane water-proof paint, form polyurethane water-proof paint covering layer;
7) after the solidification of polyurethane water-proof paint covering layer, cover polyurethane water-proof paint covering layer with polymer cement mortar, form polymer cement mortar topping;
8) stretch out roofing pipe to rainwater leakage prevention in doors by clip to fix.
To the improvement of above-mentioned construction method, the polyurethane water-proof paint covering layer in step 6 is that taper stretches out the accumulation of roofing tube hub place to rainwater leakage prevention.
To the further improvement of above-mentioned construction method, the thickness of the polymer cement mortar topping in step 7 is 1.5-3.5cm.
Beneficial effect of the present invention is for roof waterproof weakest link---design effectively is carried out in the connection of stretching out roofing pipe and roofing, to guarantee the leakage-proof and seepage-proof of roofing to rainwater, avoids losing within doors because rain leakage causes.Advantage is:
(1) good water-proof effect.The present invention realizes the double plane waterproof technique of Double-contact surfaces by water baffle, greatly improves the water resistance of stretching out roofing pipe periphery.
(2) easy for installation.Compare and existingly stretch out roofing pipe waterproof technique, the present invention installs and wants easy to be many.
(3) applied range.Can apply at New Buildings, also can change according to construction method when existing building roof waterproof keeps in repair and stretch out roofing pipe.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present embodiment.
Fig. 2 is that the present invention stretches out that roofing is effective makes roof drainage pipe or go out roofing penetration pipe etc. from the indoor construction schematic diagram stretched out.
In figure: 1. go up pipe shaft, 2. floor, 3. water baffle; 4. descend pipe shaft, 5. rainwater leakage prevention stretches out roofing pipe, 6. the levelling tack coat of polyurethane water-proof paint; 7. blowing agent loading layers; 8. polymer cement mortar topping, 9. polyurethane water-proof paint covering layer, 10. coil waterproof layer; 11. cement mortar screeding layers; 12. insulation layers, 13. cement mortar screeding to falls layers, 14. roof construction layers.
Detailed description of the invention
Below technical solution of the present invention is described in detail, but protection scope of the present invention is not limited to described embodiment.
For making content of the present invention more become apparent, be further described below in conjunction with accompanying drawing 1-2 and detailed description of the invention.
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Embodiment:
As shown in Figure 1, the rainwater leakage prevention in the present embodiment stretch out roofing pipe, comprise, upper pipe shaft 1, water baffle 3, lower pipe shaft 4 and floor 2.Upper pipe shaft 1 and lower pipe shaft 4 are connected by water baffle 3 and upper pipe shaft 1 is connected with lower pipe shaft 4; Upper pipe shaft 1 and all perpendicular with water baffle 3 setting of lower pipe shaft 4; Upper pipe shaft 1 and lower pipe shaft 4 all seal with the junction of water baffle 3; Floor 2 is arranged on the junction of the junction of pipe shaft 1 and water baffle 3 and lower pipe shaft 4 and water baffle 3 and the uniform setting of floor 2.
Rainwater leakage prevention in the present embodiment stretch out roofing pipe available make roof drainage pipe or go out roofing penetration pipe etc. stretch out from indoor, stretching out roofing pipe and can applying in New Buildings of rainwater leakage prevention simultaneously in the present embodiment, also can stretch out roofing pipe when existing building roof waterproof keep in repair according to construction method replacing.
Rainwater leakage prevention in the present embodiment stretch out roofing effective make roof drainage pipe or go out roofing penetration pipe etc. as described below from indoor construction method of stretching out: for rainwater leakage prevention, this construction method stretches out that roofing is effective to be described in New Buildings.As shown in Figure 2.
1) carrying out roof construction layer 14, cement mortar screeding to falls layer 13, insulation layer 12, cement mortar screeding layer 11 be when constructing, and reservedly stretches out rainwater leakage prevention and stretch out roofing pipe 5 hole, hole diameter is slightly larger than stretching out roofing pipe diameter;
2) after cement mortar screeding layer 11 constructs end drying, roofing cement mortar levelling layer 11 arranges coil waterproof layer 10; Stay diameter slightly larger than the round breach of water baffle 3 diameter at the periphery stretching out roofing pipe hole place;
3) in step 2 stay round indentation, there polyurethane water-proof paint to fill up except stretching out roofing pipe hole exterior domain, form polyurethane water-proof paint levelling tack coat 6; Will first be coated with one deck primer during Specific construction, primer must evenly, and after primer solidification, carry out second time brushing, brushing direction and a front square crossing, carry out the levelling tack coat 6 of polyurethane water-proof paint;
4) after step 3 terminates, the lower pipe shaft 4 that rainwater leakage prevention stretches out roofing pipe 5 is inserted in hole by roofing, and water baffle 3 is tightly pasted on the levelling tack coat 6 of polyurethane water-proof paint;
5) after step 4 terminates, with blowing agent in doors to the filling of gap, hole, formation blowing agent loading layers 7 is fixed rainwater leakage prevention and is stretched out roofing pipe 5;
6) after the levelling tack coat 6 of polyurethane water-proof paint solidifies, then cover water baffle 3 with polyurethane water-proof paint, form polyurethane water-proof paint covering layer 9; Cover the upper surface of water baffle 3 during Specific construction with polyurethane water-proof paint, and become taper to stretch out the accumulation of roofing pipe 5 center to rainwater leakage prevention, film carries out polyurethane water-proof paint covering layer 9 several times;
7) after polyurethane water-proof paint covering layer 9 solidifies, cover polyurethane water-proof paint covering layer 9 with polymer cement mortar, form 2cm polymer cement mortar topping 8;
8) stretch out roofing pipe 5 to rainwater leakage prevention in doors by clip to fix.
Do not relate to partly all same as the prior art or employing prior art in the present invention to be realized.
With above-mentioned according to desirable embodiment of the present invention for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this invention technological thought, can carry out various change and amendment completely.The technical scope of this invention is not limited to the content on manual, must determine its technical scope according to right.
Claims (6)
1. rainwater leakage prevention stretch out a roofing pipe, it is characterized in that, comprise pipe shaft (1), water baffle (3) and lower pipe shaft (4); Upper pipe shaft (1) and lower pipe shaft (4) are connected by water baffle (3) and upper pipe shaft (1) is connected with lower pipe shaft (4); Upper pipe shaft (1) and lower pipe shaft (4) all with water baffle (3) perpendicular setting; Upper pipe shaft (1) and lower pipe shaft (4) all seal with the junction of water baffle (3).
2. rainwater leakage prevention as claimed in claim 1 stretch out roofing pipe, it is characterized in that, upper pipe shaft (1) is provided with floor (2) with the junction of water baffle (3) and the junction of lower pipe shaft (4) and water baffle (3).
3. rainwater leakage prevention as claimed in claim 2 stretch out roofing pipe, it is characterized in that, floor (2) uniform setting.
4. the construction method of stretching out roofing pipe of the rainwater leakage prevention as described in claims 1 to 3, is characterized in that, comprise the steps:
1) when carrying out roof construction layer (14), cement mortar screeding to falls layer (13), insulation layer (12), cement mortar screeding layer (11) construction, reserved stretch out rainwater leakage prevention and stretch out roofing pipe (5) hole, hole diameter is greater than and stretches out roofing pipe diameter;
2) after cement mortar screeding layer (11) construction terminates drying, roofing cement mortar levelling layer (11) arranges coil waterproof layer (10); Diameter is stayed to be greater than the round breach of water baffle (3) diameter at the periphery stretching out roofing pipe hole place;
3) in step 2 stay round indentation, there polyurethane water-proof paint to fill up except stretching out roofing pipe hole exterior domain, formed the levelling tack coat of polyurethane water-proof paint (6);
4) after step 3 terminates, the lower pipe shaft (4) that rainwater leakage prevention stretches out roofing pipe (5) is inserted in hole by roofing, and water baffle (3) is tightly pasted on the levelling tack coat of polyurethane water-proof paint (6);
5) after step 4 terminates, with blowing agent in doors to the filling of gap, hole, form the fixing rainwater leakage prevention of blowing agent loading layers (7) and stretch out roofing pipe (5);
6) after the levelling tack coat of polyurethane water-proof paint (6) solidification, then cover water baffle (3) with polyurethane water-proof paint, form polyurethane water-proof paint covering layer (9);
7) after polyurethane water-proof paint covering layer (9) solidification, cover polyurethane water-proof paint covering layer (9) with polymer cement mortar, form polymer cement mortar topping (8);
8) stretch out roofing pipe (5) to rainwater leakage prevention in doors by clip to fix.
5. construction method pipe as claimed in claim 4, is characterized in that, the polyurethane water-proof paint covering layer 9 in step 6 stretches out roofing pipe 5 center in taper to rainwater leakage prevention and piles up.
6. construction method pipe as claimed in claim 4, it is characterized in that, the thickness of the polymer cement mortar topping (8) in step 7 is 1.5-3.5cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510742039.5A CN105239732B (en) | 2015-11-04 | 2015-11-04 | A kind of construction method of the stretching roofing pipe of rainwater leakage prevention |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510742039.5A CN105239732B (en) | 2015-11-04 | 2015-11-04 | A kind of construction method of the stretching roofing pipe of rainwater leakage prevention |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105239732A true CN105239732A (en) | 2016-01-13 |
CN105239732B CN105239732B (en) | 2017-11-17 |
Family
ID=55037530
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510742039.5A Expired - Fee Related CN105239732B (en) | 2015-11-04 | 2015-11-04 | A kind of construction method of the stretching roofing pipe of rainwater leakage prevention |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105239732B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060115A (en) * | 2017-04-24 | 2017-08-18 | 中建二局第二建筑工程有限公司华东分公司 | A kind of combustion gas hole plugging system and its plugging construction method |
CN107859268A (en) * | 2017-11-02 | 2018-03-30 | 江苏经贸职业技术学院 | The exterior wall stringcourse eliminator plate and its construction method of a kind of rainwater leakage prevention |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0771094A (en) * | 1993-09-03 | 1995-03-14 | Kubota Corp | Roof for building and execution thereof |
CN101311456A (en) * | 2007-05-21 | 2008-11-26 | 熊永强 | Thermal insulation and water proof integrated system of roof covering and construction method thereof |
CN101586381A (en) * | 2008-05-20 | 2009-11-25 | 北京森聚柯高分子材料有限公司 | Waterproof structure and manufacturing method thereof |
CN203097140U (en) * | 2012-12-20 | 2013-07-31 | 上海钢之杰钢结构建筑有限公司 | Waterproof sleeve for air outlet pipe |
CN203808381U (en) * | 2014-05-09 | 2014-09-03 | 浙江海天建设集团有限公司 | Foam-concrete wear roofing pipeline structure |
CN205100445U (en) * | 2015-11-04 | 2016-03-23 | 江苏经贸职业技术学院 | That prevents rain water leakage stretches out roofing pipe |
-
2015
- 2015-11-04 CN CN201510742039.5A patent/CN105239732B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0771094A (en) * | 1993-09-03 | 1995-03-14 | Kubota Corp | Roof for building and execution thereof |
CN101311456A (en) * | 2007-05-21 | 2008-11-26 | 熊永强 | Thermal insulation and water proof integrated system of roof covering and construction method thereof |
CN101586381A (en) * | 2008-05-20 | 2009-11-25 | 北京森聚柯高分子材料有限公司 | Waterproof structure and manufacturing method thereof |
CN203097140U (en) * | 2012-12-20 | 2013-07-31 | 上海钢之杰钢结构建筑有限公司 | Waterproof sleeve for air outlet pipe |
CN203808381U (en) * | 2014-05-09 | 2014-09-03 | 浙江海天建设集团有限公司 | Foam-concrete wear roofing pipeline structure |
CN205100445U (en) * | 2015-11-04 | 2016-03-23 | 江苏经贸职业技术学院 | That prevents rain water leakage stretches out roofing pipe |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060115A (en) * | 2017-04-24 | 2017-08-18 | 中建二局第二建筑工程有限公司华东分公司 | A kind of combustion gas hole plugging system and its plugging construction method |
CN107859268A (en) * | 2017-11-02 | 2018-03-30 | 江苏经贸职业技术学院 | The exterior wall stringcourse eliminator plate and its construction method of a kind of rainwater leakage prevention |
Also Published As
Publication number | Publication date |
---|---|
CN105239732B (en) | 2017-11-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100278173B1 (en) | Double waterproof sheet for concrete structure | |
CN205100447U (en) | Prevent rain water leakage's roofing blast pipe | |
CN110735499B (en) | Parapet waterproof structure and construction method thereof | |
CN205399843U (en) | Roofing system structure | |
CN208293929U (en) | A kind of roofing flashing structure | |
CN103195104A (en) | Method for improving waterproof quality by adopting drain-proof combination at waterproof part of building structure | |
CN104452984A (en) | Double-layer steel wire gauze insulating mortar outer wall outer insulating structure and construction method thereof | |
CN105239732A (en) | Extension roof pipe for preventing rainwater leakage and construction method thereof | |
CN209760629U (en) | Just put local seepage maintenance structure in formula roofing pipe root position | |
KR101649563B1 (en) | The glass fiber with wire and construction method for waterproof using there of | |
CN206722238U (en) | Antiseepage spills roof pipeline construction | |
CN205100445U (en) | That prevents rain water leakage stretches out roofing pipe | |
CN103774797A (en) | Construction technology of bituminous waterproof sheet materials | |
CN204626470U (en) | A kind of winter construction pile crown water-tight device | |
CN110067346A (en) | A kind of roof construction method of bridge cut-off water-proof roofing gutter spout funnel | |
CN208168645U (en) | A kind of exterior window waterproof construction in masonry project | |
CN207863323U (en) | A kind of roof seepage preventing structure | |
CN204199947U (en) | Antiseep Combined aluminium alloy window | |
KR20180129229A (en) | Complex waterproof structure for rooftop of the building and construction method for thereof | |
CN103498514A (en) | Method for preventing and treating leakage in joint portion between outer wall eave grid and roof and water blocking and draining component | |
KR101466644B1 (en) | The construction method for root | |
CN211368801U (en) | Tunnel engineering seam waterproof construction | |
CN209958622U (en) | Waterproof and heat-preservation integrated roof | |
CN208869899U (en) | Cement pavement repairs structure | |
CN207582820U (en) | A kind of roof covering waterproof thermal insulation multifunction board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171117 Termination date: 20211104 |