CN105239709A - Permeable combined filling box formed by metal sheets - Google Patents

Permeable combined filling box formed by metal sheets Download PDF

Info

Publication number
CN105239709A
CN105239709A CN201510725112.8A CN201510725112A CN105239709A CN 105239709 A CN105239709 A CN 105239709A CN 201510725112 A CN201510725112 A CN 201510725112A CN 105239709 A CN105239709 A CN 105239709A
Authority
CN
China
Prior art keywords
filling box
metal sheet
spillage
assembly
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510725112.8A
Other languages
Chinese (zh)
Other versions
CN105239709B (en
Inventor
徐焱
郭伍常
王立国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Oriental Nanjing Ning Building Materials Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510725112.8A priority Critical patent/CN105239709B/en
Publication of CN105239709A publication Critical patent/CN105239709A/en
Application granted granted Critical
Publication of CN105239709B publication Critical patent/CN105239709B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a permeable combined filling box formed by metal sheets and a manufacturing method thereof, and belongs to the field of general building structures. The filling box (1) comprises an upper assembly (2), a lower assembly (3), a stiffener (4) and a slurry leaking cylinder (5); dense meshes (7) are formed in strip-shaped metal sheets (6) in a die-cutting forming manner; two meander lines (8) are formed on each metal sheet; a slurry leaking hole (9) is formed in a central portion of each metal sheet; the metal sheets are bent into the upper and lower assemblies of a U-shaped structure; the slurry leaking cylinder and the stiffener are mounted in the upper and lower assemblies; the slurry leaking cylinder is united with the slurry leaking hole in position; two U-shaped abutting edges between the locked upper and lower assemblies are connected to form the filling box. The filling box is convenient to produce, transport and mount, and good in mechanical properties; besides, a hollow floor system formed by use of the filling box is good in reliability, earthquake resistance and cracking resistance.

Description

A kind of permeability type combination filling box of metal sheet
(1) technical field
The present invention relates to the packing material in a kind of reinforced concrete hollow floor structure, permeability type combination filling box of especially a kind of metal sheet and preparation method thereof, belong to buildings in general structure field.
(2) background technology
At building field, along with large-span concrete structure is increasing, increasing floor adopts hollow floor structure technology.Replace part concrete substantially can not affect the stress performance of structure with lightweight filler, but greatly can alleviate the deadweight of structure.
In previous hollow building cover, make pipe of cement and cement box as packing material using Qiu Zeyou, Wang Benmiao scholar's proposition high-strength cement that is representative; Afterwards, in view of the goods of cement class are from afterwards great, I once proposed the packing material of polyphenyl foam one class; Above-mentioned technology is all used widely in engineering.
But for built-in packing material, no matter polyphenyl class or cement class material, all will produce larger buoyancy in construction.According to Archimedes' principle, as long as the unit weight of packing material is less than concrete density, in the process of concreting, certainly lead to buoyancy.In order to overcome buoyancy, to take several steps in construction and carrying out anti-floating, except expensive, take a lot of work, time-consuming except, also larger to the damage of plate soffit formwork, and once certain road technical measures packing material that causes not in place floats, bring very large potential safety hazard by structure.Although it is light that the defect also existed in addition is exactly material, shared volume causes greatly cost of transportation large.
The concept of reinforcing mat is introduced hollow building cover packing material by Mr. Guo Wuchang the earliest, and 2011, Guo Wuchang proposed " a kind of obturator of filling concrete in situ " (ZL201120161932.6); After, Mr. Guo proposes again " a kind of cast-in-place concrete cored " (ZL201420109836.0), in the art, Mr. Guo is clear and definite " being provided with core " further before upper and lower steel mesh reinforcement, and propose " displacement and the flotation issue " existing for structure solution Conventional filler material that utilize " steel mesh reinforcement ".But, first clearly proposition steel mesh solve buoyancy problem be Wang Benmiao, 2013, he proposed " cast-in-situ hollow building roof of the netted box component pore-forming of a kind of combined type " (CN203514592U).In the art, Mr. Wang utilizes the gas permeability of mesh greatly to reduce to eliminate even completely the buoyancy of packing material first, ensure that concrete can not flow in packing material by the maximum size controlling mesh, utilize moisture surface tension force that moisture can not be infiltrated in packing material.After, Mr. Wang proposes the technology such as " a kind of steel mesh and organic object combine the cast-in-situ hollow building roof of pore-forming " (CN104005501A), " cast-in-situ hollow building roof of a kind of steel mesh and gas tube combination box pore-forming " (CN103967181A) and " a kind of hollow building cover pore-forming steel mesh and thin plate combine obturator " (CN104631681A) again successively.Above-mentioned correlation technique brings revolutionary change to whole hollow building cover industry, has formed the trend that whole industry whole updating is regenerated at present.
But, there is following defect respectively in the above-described techniques, mainly contain: 1, larger buoyancy can be produced in work progress; 2, the hollow rate of floor is not high; 3, more its globality that causes of parts forming packing material product is bad; 4, Product transport cost is high; 5, the vertical and lateral stiffness of packing material product is smaller, and in the process of trampling with concreting personnel during construction, deformation of products is larger; 6, can not solve well and not only reduce buoyancy but also avoided concrete mortar to flow into this contradiction of packing material box house.
In this case, develop and a kind ofly both overcome the buoyancy of concreting process concrete to packing material, again good integrity, rigidity comparatively large, can effectively ensure packing material surrounding concrete pouring quality and the box filling product of convenient transportation, become urgent problem in present hollow superstructure.
(3) summary of the invention
In existing hollow building cover technology, there is packing material buoyancy and cause constructional difficulties more greatly, or packing material globality is poor, rigidity is less, effectively can not ensure that the problems such as high crossed by packing material surrounding concrete pouring quality or cost of transportation, the object of the present invention is to provide a kind of combined metal filling box with plasma resistance sheet.
On the basis of existing technology, for achieving the above object, the technical solution used in the present invention is: this filling box comprises assembly, lower assembly, stiffener, spillage cylinder, the strip metal thin plate being less than 1mm at thickness forms intensive mesh by the mode of punching molding, every sheet metal sheet roof covering has 2 road folding lines, between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have the slurry leakage hole of a size >=50mm and≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
The strip metal thin plate being less than 1mm at thickness forms intensive mesh by the mode of punching molding, can greatly be reduced in concreting process the buoyancy that filling box produces by the filling box of this band dense mesh manufacture.Strip metal thin plate presses one folding line, along folding line, metal sheet roof covering is curved the upper assembly of U-shaped structure or lower assembly, in making, assembly and lower assembly and follow-up assembled process can be carried out in factory, more can carry out at the construction field (site).If upper for making assembly, lower assembly and follow-up assembled procedural arrangements are carried out at the construction field (site), because of transport of strip metal thin plate slices pile being got up, can greatly reduce the volume that equal number packing material is shared in transportation, conevying efficiency at least improves 5 times.In the prior aries such as CN104631681A, normally " steel mesh forms the monolithic molding tetrahedron of the top panel of hexahedron Cavity structural member, bottom panel and two sidewalls ", tetrahedral globality is obviously better, but 2 faces remaining in 6 faces form by with the free parts that aforementioned 4 faces are not directly connected, first the parts forming these 2 faces are large in installation process positioning difficulty, and secondly the globality of installation rear box is also poor.And in the technical program, for any one face in filling box, each face has at least a limit to be that mother metal is directly connected with mother metal by folding line and other face, the face of dissociating completely with other face is there is not in filling box, therefore, in assembled process, the effect do not checked and balance between coplanar must cause location each other convenient and assembled rear good integrity; Be foursquare casing for end face modal in engineering in addition, the size of the upper assembly of U-shaped structure and lower assembly in this programme, size and dimension are just the same, which reduce the quantity of manufacturing process Plays part, can greatly enhance productivity.Opening a slurry leakage hole at the central part of metal sheet roof covering is to install spillage cylinder, after spillage cylinder is set, when can make larger by the size of filling box (usual filling box short side dimension can >=700mm), while raising floor hollow rate, ensure that filling box lower concrete is built closely knit; In construction, spillage cylinder can strengthen the vertical rigidity of filling box, after the concrete setting in spillage cylinder, increases and connects quite and a kind of effect of pillar, can improve the ability of flooring bearing load between the upper and lower edge of a wing of floor.Because the rigidity of metal sheet roof covering is very little, easily deform under the effect of external force, in upper assembly and lower assembly, 2 road stiffeners are at least installed in each direction, are to strengthen metal sheet roof covering.First, stiffener and spillage cylinder together constitute the vertical applied force component of filling box, prevent the upper surface of filling box in work progress from larger distortion occurring; Secondly, stiffener becomes again the support of side-wall metallic thin plate, greatly can strengthen the horizontal rigidity of sidewall.
The invention is characterized in the mesh short size >=4mm on metal sheet roof covering and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when installing filling box, plasma resistance sheet tilts towards the lateral direction of filling box.In the prior aries such as CN104631681A, the critical component reticular lamina eliminating buoyancy effect is " making shaping the die-cut of special purpose machinery and expansion by same thin steel plate "; Steel sheet punches out the finedraw that many bar width can be ignored, be arranged according to certain rules, steel plate is stretched to both sides, make finedraw expand into regular net structure; This sizing grid can not be too large, stops concrete inflow filling box internal main will lean on the surface tension of moisture in concrete.And in this programme, by forming the intensive mesh having obvious size on metal sheet roof covering, plasma resistance sheet is formed by sheet metal out die-cut in mesh, can breathe freely and eliminate the buoyancy produced in concreting process in gap between mesh and plasma resistance sheet, the surface tension of moisture and the mechanical resistance of plasma resistance sheet stop concrete mortar to flow into filling box jointly.Verify through test of many times: mesh size can reach fundamental technics effect within aforementioned range, especially with the average of numerical value and upper lower limit value close to time best results.Found through experiments: under the prerequisite ensureing exhaust, the tilting direction of plasma resistance sheet and concrete pouring quality have much relations.If plasma resistance sheet tilts to the direction, inner side of filling box, under concrete pressure effect, Zhang Yue great is got in gap between mesh and plasma resistance sheet, once concrete pressure is greater than the value of making a concerted effort of wawter tension and plasma resistance sheet mechanical resistance, plasma resistance sheet will continue to tilt to filling box inside, make concrete flow into filling box inner.If plasma resistance sheet tilts to the lateral direction of filling box, under concrete pressure effect, plasma resistance sheet has towards the closed trend of mesh, but die-cut mesh out can not be closed into plasma resistance sheet the degree that air all cannot penetrate again, therefore, reaching the technique effect greatly reducing buoyancy while, prevent again concrete from flowing into filling box inner.
The invention is characterized in that metal sheet roof covering has the stiffening rib utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line, height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box 4 sidewalls is all vertical with soffit with the upper surface of filling box, and stiffening rib is positioned at the outside of filling box sidewall, upper surface and soffit.Filling box upper surface and arranging of soffit stiffening rib can improve the ability that filling box bears vertical load.Stiffening rib is vertical with folding line, first be easy to realize from machining, add the upper assembly that limited in aforementioned schemes and lower assembly is U-shaped structure, naturally ensure that the stiffening rib on sidewall is all vertical with soffit with the upper surface of filling box, greatly can strengthen the vertical rigidity of filling box like this.In the tecnical regulations of any hollow building cover, all there is clear and definite requirement (being generally >=10mm) to the distance on steel bar stress and packing material surface, when stiffening rib be positioned at the outside of filling box sidewall, upper surface and soffit and height >=10mm time, stiffening rib is except rising except the booster action of filling box, also play a part isolation reinforcing bar and filling box simultaneously, can reduce construction material cost, economic benefit is obvious.
The invention is characterized in that stiffener can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, with welding or iron wire colligation or buckle connects or stiffener and upper assembly or lower assembly are fixed together by the mode of insertion of slotting.
The invention is characterized in that spillage cylinder plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connects or spillage cylinder and upper assembly or lower assembly are fixed together by the mode of insertion of slotting.
The invention is characterized in that the upper surface be made up of upper assembly in filling box or the soffit be made up of lower assembly are the curved surface to filling box outer projection, the section configuration of curved surface is arc line type or broken line type, the edges of metal sheet shape forming filling box sidewall in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener and spillage cylinder and bottom shape and also upper and lower surface configuration matches with filling box respectively.The upper and lower surface of filling box is the curved surface to projection, compared with pure rectangular cross section, slightly loses some hollow rates, but can obtain following effect: the degree that 1, can alleviate concrete girt strip stress concentration between filling box, and concrete is not easy to crack; 2, the concrete punch resistant capability in filling box top is improved; 3, filling box lower concrete is easily built closely knit.
The preparation method of the permeability type combination filling box of a kind of metal sheet of the present invention is: this filling box comprises assembly, lower assembly, stiffener, spillage cylinder, the strip metal thin plate being less than 1mm at thickness forms intensive mesh by the mode of punching molding, every sheet metal sheet roof covering has 2 road folding lines, between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have the slurry leakage hole of a size >=50mm and≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
The preparation method of the permeability type combination filling box of a kind of metal sheet of the present invention is characterised in that mesh short size >=4mm on metal sheet roof covering and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when filling box is installed, plasma resistance sheet tilts towards the lateral direction of filling box, metal sheet roof covering has the stiffening rib utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line, height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box 4 sidewalls is all vertical with soffit with the upper surface of filling box, stiffening rib is positioned at filling box sidewall, the outside of upper surface and soffit.
The preparation method of the permeability type combination filling box of a kind of metal sheet of the present invention is characterised in that stiffener can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, to connect with welding or iron wire colligation or buckle or stiffener and upper assembly or lower assembly are fixed together by the mode of insertion of slotting, spillage cylinder plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connect or spillage cylinder and upper assembly or lower assembly are fixed together by the mode of insertion of slotting.
The preparation method of the permeability type combination filling box of a kind of metal sheet of the present invention is characterised in that the upper surface be made up of upper assembly in filling box or the soffit be made up of lower assembly are the curved surface to filling box outer projection, the section configuration of curved surface is arc line type or broken line type, the edges of metal sheet shape forming filling box sidewall in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener and spillage cylinder and bottom shape and also upper and lower surface configuration matches with filling box respectively.
After adopting such scheme, the present invention compared with prior art has following beneficial effect:
Filling box of the present invention can reduce to eliminate the buoyancy in concreting process even completely, first solves built-in packing material in existing hollow building cover technology and produces the defect of buoyancy; Secondly also there is following effect: 1, can eliminate in concreting process the buoyancy that filling box produces; 2, filling box volume is comparatively large, and the hollow rate of superstructure is also larger; 3, the level of filling box and vertical rigidity large; 4, the assembled convenience of filling box and good integrity, can also reduce the number of standardized component; 5, because can assembled filling box at the construction field (site), transport cost can be greatly reduced; 6, prevent concrete from flowing into the effective of filling box inside; 7, the cost of the auxiliary material of construction is effectively reduced; 8, the scope of application of filling box is expanded.Compared with prior art, instant invention overcomes superstructure hollow rate little, packing material buoyancy causes constructional difficulties more greatly, or the problem such as product rigidity is little, packing material surrounding concrete pouring quality cannot ensure, cost of transportation is high.The permeability type combination filling box of a kind of metal sheet of the present invention, produce, transport and install all very convenient, mechanical property is good, and, sound insulation large, lightweight by the hollow building cover span of this product formation, good heat-insulation effect, reliability of structure, shock resistance, crack resistance are also better.The present invention has good economy and applicability, plays a driving role to the development of Building technology.
(4) accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described.
Fig. 1 is the top view of filling box side direction of the present invention.
Fig. 2 is filling box internal structure schematic diagram of the present invention.
Fig. 3 is the assembled schematic diagram of lower assembly, stiffener and spillage cylinder substep.
Fig. 4 is that in Fig. 3, assembled parts and upper assembly continue assembled schematic diagram.
Fig. 5 is the schematic diagram that in the present invention, strip metal sheet roof covering is provided with folding line.
Fig. 6 is filling box bight of the present invention partial enlarged drawing in Fig. 1.
Fig. 7 is the schematic diagram of metal sheet roof covering die-cut formation plasma resistance sheet in the present invention.
Fig. 8 is the schematic diagram that in the present invention, metal sheet roof covering extruding forms stiffening rib.
Fig. 9 be filling box of the present invention upper and lower outwardly protruding time combination schematic diagram.
Figure 10 is filling box soffit of the present invention when being arc line type upper assembly and lower assembly schematic diagram.
Figure 11 is filling box soffit of the present invention when being broken line type upper assembly and lower assembly schematic diagram.
In figure: 1. filling box, 2. go up assembly, 3. play assembly, 4. stiffener, 5. spillage cylinder, 6. metal sheet roof covering, 7. mesh, 8. folding line, 9. slurry leakage hole, 10. plasma resistance sheet, 11. stiffening ribs, 12. sidewalls, 13. upper surfaces, 14. soffits, 15. curved surfaces, 16. arc line types, 17. broken line types.
(5) detailed description of the invention
The present invention realizes in such a way:
In Fig. 1-embodiment illustrated in fig. 5, a kind of permeability type combination filling box of metal sheet, this filling box (1) comprises assembly (2), lower assembly (3), stiffener (4), spillage cylinder (5), the mode being less than strip metal thin plate (6) the upper punching molding of 1mm at thickness forms intensive mesh (7), every sheet metal sheet roof covering has 2 road folding lines (8), between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have a size >=50mm and the slurry leakage hole (9) of≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
In Fig. 6-embodiment illustrated in fig. 8, mesh (7) short size >=4mm on metal sheet roof covering (6) and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet (10) outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when installing filling box (1), plasma resistance sheet tilts towards the lateral direction of filling box.
Fig. 1, Fig. 6, embodiment illustrated in fig. 8 in, metal sheet roof covering (6) has the stiffening rib (11) utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line (8), height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box (1) 4 sidewall (12) is all vertical with soffit (14) with the upper surface (13) of filling box, and stiffening rib is positioned at the outside of filling box sidewall, upper surface and soffit.
In Fig. 2-embodiment illustrated in fig. 4, stiffener (4) can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, with welding or iron wire colligation or buckle connects or stiffener and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
In Fig. 2-embodiment illustrated in fig. 4, spillage cylinder (5) plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connects or spillage cylinder and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
In Fig. 9-embodiment illustrated in fig. 11, the upper surface (13) be made up of upper assembly (2) in filling box (1) or the soffit (14) be made up of lower assembly (3) are the curved surface (15) to filling box outer projection, the section configuration of curved surface is arc line type (16) or broken line type (17), metal sheet roof covering (6) edge shape forming filling box sidewall (12) in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener (4) and spillage cylinder (5) and bottom shape and also respectively with on filling box, underside shape matches.
In Fig. 1-embodiment illustrated in fig. 5, a kind of preparation method of permeability type combination filling box of metal sheet is: this filling box (1) comprises assembly (2), lower assembly (3), stiffener (4), spillage cylinder (5), the mode being less than strip metal thin plate (6) the upper punching molding of 1mm at thickness forms intensive mesh (7), every sheet metal sheet roof covering has 2 road folding lines (8), between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have a size >=50mm and the slurry leakage hole (9) of≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
At Fig. 1, in Fig. 6-embodiment illustrated in fig. 8, a kind of preparation method of permeability type combination filling box of metal sheet is: mesh (7) short size >=4mm on metal sheet roof covering (6) and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet (10) outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when filling box (1) is installed, plasma resistance sheet tilts towards the lateral direction of filling box, metal sheet roof covering (6) has the stiffening rib (11) utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line (8), height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box (1) 4 sidewall (12) is all vertical with soffit (14) with the upper surface (13) of filling box, stiffening rib is positioned at filling box sidewall, the outside of upper surface and soffit.
In Fig. 2-embodiment illustrated in fig. 4, a kind of preparation method of permeability type combination filling box of metal sheet is: stiffener (4) can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, to connect with welding or iron wire colligation or buckle or stiffener and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting, spillage cylinder (5) plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connect or spillage cylinder and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
In Fig. 9-embodiment illustrated in fig. 11, a kind of preparation method of permeability type combination filling box of metal sheet is: the upper surface (13) be made up of upper assembly (2) in filling box (1) or the soffit (14) be made up of lower assembly (3) are the curved surface (15) to filling box outer projection, the section configuration of curved surface is arc line type (16) or broken line type (17), metal sheet roof covering (6) edge shape forming filling box sidewall (12) in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener (4) and spillage cylinder (5) and bottom shape and also respectively with on filling box, underside shape matches.

Claims (10)

1. the combination of the permeability type with a metal sheet filling box, this filling box (1) comprises assembly (2), lower assembly (3), stiffener (4), spillage cylinder (5), it is characterized in that the mode being less than strip metal thin plate (6) the upper punching molding of 1mm at thickness forms intensive mesh (7), every sheet metal sheet roof covering has 2 road folding lines (8), between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have a size >=50mm and the slurry leakage hole (9) of≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
2. the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that mesh (7) short size >=4mm on metal sheet roof covering (6) and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet (10) outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when installing filling box (1), plasma resistance sheet tilts towards the lateral direction of filling box.
3. the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that metal sheet roof covering (6) has the stiffening rib (11) utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line (8), height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box (1) 4 sidewall (12) is all vertical with soffit (14) with the upper surface (13) of filling box, stiffening rib is positioned at filling box sidewall, the outside of upper surface and soffit.
4. the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that stiffener (4) can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, with welding or iron wire colligation or buckle connects or stiffener and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
5. the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that spillage cylinder (5) plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connects or spillage cylinder and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
6. the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that the upper surface (13) that is made up of upper assembly (2) in filling box (1) or the soffit (14) be made up of lower assembly (3) are the curved surface (15) to filling box outer projection, the section configuration of curved surface is arc line type (16) or broken line type (17), metal sheet roof covering (6) edge shape forming filling box sidewall (12) in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener (4) and spillage cylinder (5) and bottom shape and also respectively with on filling box, underside shape matches.
7. the preparation method of the permeability type combination filling box of a kind of metal sheet according to claim 1, it is characterized in that this filling box (1) comprises assembly (2), lower assembly (3), stiffener (4), spillage cylinder (5), the mode being less than strip metal thin plate (6) the upper punching molding of 1mm at thickness forms intensive mesh (7), every sheet metal sheet roof covering has 2 road folding lines (8), between 2 road folding lines of metal sheet roof covering and the central part of metal sheet roof covering width range have a size >=50mm and the slurry leakage hole (9) of≤150mm, by the two ends of metal sheet roof covering along folding line towards equidirectional 90-degree bent respectively, formed and there is the U-shaped structural component in three faces and lower assembly, spillage cylinder and road, each direction at least 2 stiffener are installed in upper assembly and lower assembly, spillage cylinder and slurry leakage hole position coincide mutually, upper assembly and lower assembly are buckled togather, by the mode that welding or peg anchoring or iron wire colligation or buckle connect, two U-shaped butt joint edges between upper assembly and lower assembly are joined together to form filling box.
8. according to claim 1, the preparation method of the permeability type combination filling box of a kind of metal sheet described in 2 and 3, it is characterized in that mesh (7) short size >=4mm on metal sheet roof covering (6) and≤12mm, grow to size >=5mm and≤15mm, from mesh, punched sheet metal out forms the plasma resistance sheet (10) outwards tilted, one end of plasma resistance sheet is still connected with metal sheet roof covering mother metal, when filling box (1) is installed, plasma resistance sheet tilts towards the lateral direction of filling box, metal sheet roof covering (6) has the stiffening rib (11) utilizing self mother metal extruded along its length, stiffening rib is vertical with folding line (8), height >=the 4mm of stiffening rib, adjacent stiffening rib is parallel to each other, adjacent stiffening rib spacing >=50mm and≤150mm, stiffening rib on filling box (1) 4 sidewall (12) is all vertical with soffit (14) with the upper surface (13) of filling box, stiffening rib is positioned at filling box sidewall, the outside of upper surface and soffit.
9. according to claim 1, the preparation method of the permeability type combination filling box of a kind of metal sheet described in 4 and 5, it is characterized in that stiffener (4) can play the accessory of horizontal and vertical direction supporting role simultaneously, the material of stiffener is metal material or plastic materials or cement class material, to connect with welding or iron wire colligation or buckle or stiffener and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting, spillage cylinder (5) plays spillage and vertical support, the flat shape of spillage cylinder is circular or oval or rectangle or polygon, the material of spillage cylinder is metal material or plastic materials or cement class material, with bonding or welding or iron wire colligation or buckle connect or spillage cylinder and upper assembly (2) or lower assembly (3) are fixed together by the mode of insertion of slotting.
10. the preparation method of the permeability type combination filling box of a kind of metal sheet according to claim 1 and 6, it is characterized in that the upper surface (13) that is made up of upper assembly (2) in filling box (1) or the soffit (14) be made up of lower assembly (3) are the curved surface (15) to filling box outer projection, the section configuration of curved surface is arc line type (16) or broken line type (17), metal sheet roof covering (6) edge shape forming filling box sidewall (12) in corresponding upper assembly and lower assembly matches with soffit and upper surface butt joint edge shape respectively, the top of stiffener (4) and spillage cylinder (5) and bottom shape and also respectively with on filling box, underside shape matches.
CN201510725112.8A 2015-11-02 2015-11-02 A kind of permeability type combination filling box of use metal sheet Active CN105239709B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510725112.8A CN105239709B (en) 2015-11-02 2015-11-02 A kind of permeability type combination filling box of use metal sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510725112.8A CN105239709B (en) 2015-11-02 2015-11-02 A kind of permeability type combination filling box of use metal sheet

Publications (2)

Publication Number Publication Date
CN105239709A true CN105239709A (en) 2016-01-13
CN105239709B CN105239709B (en) 2017-09-12

Family

ID=55037507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510725112.8A Active CN105239709B (en) 2015-11-02 2015-11-02 A kind of permeability type combination filling box of use metal sheet

Country Status (1)

Country Link
CN (1) CN105239709B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863142A (en) * 2016-05-25 2016-08-17 丁艳涛 Steel-mesh-combined filling body for forming holes of hollow floors
CN110219406A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case with frame bar
CN110219407A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case of cluster
CN110219405A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case with inner sheath
CN111622406A (en) * 2020-05-22 2020-09-04 河南中烟工业有限责任公司 Hollow concrete floor slab

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328488A (en) * 2003-05-06 2003-11-19 Sumitomo Metal Steel Products Inc Panel for construction
CN102031870A (en) * 2010-11-23 2011-04-27 徐焱 Foaming material filling box with reinforced layer and slurry leakage hole
CN104314215A (en) * 2013-07-26 2015-01-28 王本淼 Combined netlike box-shaped component for forming holes in cast-in-situ hollow floor
CN104314218A (en) * 2013-07-26 2015-01-28 王本淼 Netlike box-shaped component for forming holes in cast-in-situ hollow floor
CN204435640U (en) * 2015-01-29 2015-07-01 郭伍常 A kind of concrete hollow board is with filling core
CN205088831U (en) * 2015-11-02 2016-03-16 徐焱 Fill case with combination of fashioned ventilative formula of sheet metal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328488A (en) * 2003-05-06 2003-11-19 Sumitomo Metal Steel Products Inc Panel for construction
CN102031870A (en) * 2010-11-23 2011-04-27 徐焱 Foaming material filling box with reinforced layer and slurry leakage hole
CN104314215A (en) * 2013-07-26 2015-01-28 王本淼 Combined netlike box-shaped component for forming holes in cast-in-situ hollow floor
CN104314218A (en) * 2013-07-26 2015-01-28 王本淼 Netlike box-shaped component for forming holes in cast-in-situ hollow floor
CN204435640U (en) * 2015-01-29 2015-07-01 郭伍常 A kind of concrete hollow board is with filling core
CN205088831U (en) * 2015-11-02 2016-03-16 徐焱 Fill case with combination of fashioned ventilative formula of sheet metal

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863142A (en) * 2016-05-25 2016-08-17 丁艳涛 Steel-mesh-combined filling body for forming holes of hollow floors
CN110219406A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case with frame bar
CN110219407A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case of cluster
CN110219405A (en) * 2019-07-04 2019-09-10 阮蕾 A kind of ventilative case with inner sheath
CN111622406A (en) * 2020-05-22 2020-09-04 河南中烟工业有限责任公司 Hollow concrete floor slab

Also Published As

Publication number Publication date
CN105239709B (en) 2017-09-12

Similar Documents

Publication Publication Date Title
CN105332455A (en) Ventilation metal filling tank
CN105239709A (en) Permeable combined filling box formed by metal sheets
CN105239710A (en) Combined metal filling box with slurry blocking pieces
US20150040505A1 (en) Precast reinforced concrete structure and method for forming the same
CN105297980A (en) Assembled breathable filling box
CN103628618A (en) Precast concrete hollow component, and manufacturing method thereof
KR101456391B1 (en) Formed steel beam with holes and structure of composite floor
CN103306463B (en) Metal liner concrete air channel construction method
KR101191502B1 (en) Structure system using bar truss integrated asymmetry h-beam and end beam
CN203096923U (en) Precast concrete hollow member
CN205063134U (en) Case is filled to combination formula metal of band stop lodicule
CN205088831U (en) Fill case with combination of fashioned ventilative formula of sheet metal
KR101547540B1 (en) Hybrid beam having different type flange
CN205134663U (en) Hollow superstructure with ventilative case packing of metal
KR20130096969A (en) Steel composite beam for reducing story height, slim floor structure and construction method using the same
CN105484418A (en) Vertical assembly type ventilation filling box
CN205134666U (en) Ventilative case of filling of pin -connected panel
CN105908893A (en) Steel net cage filling body
CN202850192U (en) Prefabricated concrete hollow member
CN210458913U (en) Combination beam with shear partition connecting piece in channel steel flange
CN205134664U (en) A upper and lower double -deck concrete slab structure for girder steel
CN103572884A (en) Prefabricated concrete hollow component
CN202767349U (en) Prefabricated reinforced concrete member with grooves
CN105297981A (en) Hollow floor filled by breathable box
CN206888328U (en) A kind of steel mesh case obturator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220617

Address after: No. 37, West Street, yukou village, yukou Town, Pinggu District, Beijing

Patentee after: Beijing Oriental Nanjing Ning Building Materials Technology Co.,Ltd.

Address before: 100084 Beijing Haidian District Tsinghua University Campus Beijing Water Control Wood Construction Engineering Co., Ltd.

Patentee before: Xu Yan