CN105225179A - Learning process monitoring method and learning process monitoring device - Google Patents

Learning process monitoring method and learning process monitoring device Download PDF

Info

Publication number
CN105225179A
CN105225179A CN201510540149.3A CN201510540149A CN105225179A CN 105225179 A CN105225179 A CN 105225179A CN 201510540149 A CN201510540149 A CN 201510540149A CN 105225179 A CN105225179 A CN 105225179A
Authority
CN
China
Prior art keywords
mobile terminal
learning process
timing
completion
estimated time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510540149.3A
Other languages
Chinese (zh)
Other versions
CN105225179B (en
Inventor
陈伏玲
罗才干
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Genius Technology Co Ltd
Original Assignee
Guangdong Genius Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Genius Technology Co Ltd filed Critical Guangdong Genius Technology Co Ltd
Priority to CN201510540149.3A priority Critical patent/CN105225179B/en
Publication of CN105225179A publication Critical patent/CN105225179A/en
Application granted granted Critical
Publication of CN105225179B publication Critical patent/CN105225179B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Telephonic Communication Services (AREA)
  • Telephone Function (AREA)
  • Electrically Operated Instructional Devices (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The invention discloses a learning process monitoring method and a learning process monitoring device. The learning process monitoring method comprises the following steps: the mobile terminal receives the operation information and generates predicted completion time according to the operation information; timing and monitoring the placement state of the mobile terminal based on the estimated completion time; and when the placing state of the mobile terminal changes or the timing reaches a preset duration, the camera of the mobile terminal collects the current image and sends the current image to a second mobile terminal. The mobile terminal receives the homework information, generates the predicted completion time according to the homework information, manages and controls the time of the homework process, and acquires the learning state of the user through the camera on the mobile terminal so that parents of students can effectively supervise the homework process of the students.

Description

A kind of learning process method for supervising and learning process supervising device
Technical field
The present invention relates to intelligent terminal field, particularly relate to a kind of learning process method for supervising and learning process supervising device.
Background technology
Joyful, active is the nature of children.Childhood autocontrol force is poor, when Childhood is independently done one's assignment, often can not be absorbed in and put in operation process, be subject to the external world and bother and cause diverting one's attention, and the time that one-stop operation task is spent exceeds this time required for subjob task reality.In the process that Childhood is independently done one's assignment, the head of a family to the workload of child and consuming time can not accurate evaluation, sometimes operation is done and is over, and the head of a family does not know yet, just can not obtain the information that child has finished operation in time, and Inspection.Generally speaking supervision is lacked to the operation process of Childhood.
Summary of the invention
The invention provides a kind of learning process method for supervising and learning process supervising device, it is by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.
For realizing above-mentioned design, the present invention by the following technical solutions:
Adopt a kind of learning process method for supervising on the one hand, comprising:
Mobile terminal receives job information, generates Estimated Time Of Completion according to described job information;
Carry out timing based on described Estimated Time Of Completion and monitor the laying state of described mobile terminal;
When the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
Wherein, describedly carry out timing based on described Estimated Time Of Completion and after monitoring the laying state of described mobile terminal, also comprise:
Complete and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
Wherein, also comprise:
According to the duration of described timing and the average velocity of job information computational tasks;
The historical average speeds of described average velocity and preservation is compared, and according to the result output feedack of described comparison.
Wherein, also comprise:
Also do not receive operation when timing arrives Estimated Time Of Completion and complete confirmation instruction, output operation completes and confirms that the operation of instruction is reminded.
Wherein, animated feedback and/or voice feedback is fed back to described in.
Adopt a kind of learning process supervising device on the other hand, comprising:
Time presets unit, receives job information for mobile terminal, generates Estimated Time Of Completion according to described job information;
Timing monitoring unit, for carrying out timing based on described Estimated Time Of Completion and monitoring the laying state of described mobile terminal;
Information process unit, for when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
Wherein, also comprise:
Complete confirmation unit, for completing and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
Wherein, also comprise:
Speed computing unit, for according to the duration of described timing and the average velocity of job information computational tasks;
Relatively feedback unit, for comparing the historical average speeds of described average velocity and preservation, and according to the result output feedack of described comparison.
Wherein, also comprise:
Time reminding unit, completes confirmation instruction for also not receiving operation when timing arrives Estimated Time Of Completion, and output operation completes and confirms that the operation of instruction is reminded.
Wherein, animated feedback and/or voice feedback is fed back to described in.
Beneficial effect of the present invention is: by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing the embodiment of the present invention is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the content of the embodiment of the present invention and these accompanying drawings.
Fig. 1 is the method flow diagram of the first embodiment of a kind of learning process method for supervising provided in the specific embodiment of the invention.
Fig. 2 is the method flow diagram of the second embodiment of a kind of learning process method for supervising provided in the specific embodiment of the invention.
Fig. 3 is the block diagram of the first embodiment of a kind of learning process supervising device provided in the specific embodiment of the invention.
Fig. 4 is the block diagram of the second embodiment of a kind of learning process supervising device provided in the specific embodiment of the invention.
Embodiment
The technical matters solved for making the present invention, the technical scheme of employing and the technique effect that reaches are clearly, be described in further detail below in conjunction with the technical scheme of accompanying drawing to the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those skilled in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Please refer to Fig. 1, it is the method flow diagram of the first embodiment of a kind of learning process method for supervising provided in the specific embodiment of the invention.As shown in the figure, the method, comprising:
Step S101: mobile terminal receives job information, generates Estimated Time Of Completion according to described job information.
For Childhood, subject involved by operation less (mainly Chinese language and arithmetic), and job content mainly Scientific basis repeatability exercise, such as stroke is learnt to write by tracing over characters printed in red, Chinese Character Copying is how many all over, mathematics plus-minus method how many roads etc. within 10, for the exercise of this content-form, be easy to quantize, and then realize the estimation of Estimated Time Of Completion.
Step S102: carry out timing based on described Estimated Time Of Completion and monitor the laying state of described mobile terminal.
Estimated Time Of Completion is the important parameter in whole operation process, carry out timing based on described Estimated Time Of Completion and refer to that Childhood starts operation and namely carries out timing, timing can the deadline carries out countdown on the estimation, also can from 0 timing until timing duration starts subsequent treatment after reaching Estimated Time Of Completion.Certainly, have different responses if any other state in this timing course, even terminate timing.
Step S103: when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
Putting mobile terminal makes the camera of mobile terminal just to Childhood region, the state be well placed is set to the laying state of mobile terminal, the state being detected mobile terminal by the sensor of mobile terminal inside changes, when sensor detects that current state changes to some extent compared with laying state, be considered as mobile terminal to be moved by Childhood and cause position to change, now the camera collection camera front region of mobile terminal image and be sent to the second mobile terminal, the namely mobile terminal that carries of the head of a family.
Preset duration is arranged by the head of a family, and this preset duration is not a time point, can be multiple time point, be equivalent to periodically carry out image acquisition and transmission, for the job state of head of a family's random observation Childhood.
In sum, by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, being obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.
Please refer to Fig. 2, it is the method flow diagram of the second embodiment of a kind of learning process method for supervising provided in the specific embodiment of the invention.As shown in the figure, the method, comprising:
Step S201: mobile terminal receives job information, generates Estimated Time Of Completion according to described job information.
Specifically, the estimation mode of Estimated Time Of Completion has two kinds, implements two stages of this programme mainly for Childhood.
First stage, when user is first or the initial stage implements this programme, because now the usage data of this user is not also collected on backstage, so when user has selected corresponding grade, subject, during the information such as job content (copying XX word, reciting text xth class), system can push an average data (such as copy 1 word is taken time, reciting text X class taken time) of all users that match with this content by backstage, by these average datas calculate this learn required for time.Estimated Time Of Completion now calculates based on the large sample of overall user.
Subordinate phase, when user's access times reach a certain amount of time, in use after this, System Priority using the usage data of this user as Primary Reference, simultaneously in conjunction with the data of other users under large data platform as auxiliary, the acquiescence workload comprehensively drawn and operation deadline are pushed to user, reach the generation that intelligence realizes Estimated Time Of Completion gradually.
Step S202: carry out timing based on described Estimated Time Of Completion and monitor the laying state of described mobile terminal.
The detection of laying state can by realizations such as the gravity sensor of mobile terminal inside setting, acceleration transducer or range sensors.
Step S203: complete and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
Operation is completed instruction and can be realized by the bullet window on the operation interface of mobile terminal or button control, and the process of simple reception information and the information of transmission, does not repeat at this.
Step S204: according to the duration of described timing and the average velocity of job information computational tasks.
Average velocity obtains according to the duration calculation of job information and timing, and average velocity finally will upload to backstage for further subsequent reference.
Step S205: the historical average speeds of described average velocity and preservation is compared, and according to the result output feedack of described comparison.
Comparison procedure is mainly used to the learning state change procedure confirming Childhood, if average velocity is accelerated or remained unchanged, can be considered as learning state normal; If average velocity slows down, then need specific aim analysis.
Describedly be fed back to animated feedback and/or voice feedback.
Concrete feedback content is various encouragement or excitation mainly, carries out interaction with Childhood according to its learning state.
Step S206: when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
Before implementing this programme, first mobile terminal is placed on fixing position, such as support is first-class.Now gravity sensor can get data, this data setting is a primary data, before not completing in operation, child has the behavior of taking dynamic flat board, and the data that gravity sensor obtains exceed primary data when reaching a threshold value, now we just judge that child has the phenomenon of half-hearted study (such as playing games), by sending out notice at once in the mobile device of the head of a family.
Further, the initial information that front-facing camera grabs is as the core information of auxiliary judgment, when child leaves cam lens scope, or capture jitter head as picture while the data that get of gravity sensor comparatively primary data there occurs change and just judge that child is not studying hard.
Above 2 hypothesis are all be placed on a fixed equipment based on mobile terminal, and before operation, the head of a family arranges the head portrait picture of lambling, then timing and monitoring results behavior (whether whether complete, divert one's attention, whether posture departs from) are reminded with mobile phone terminal.
Step S207: also do not receive operation when timing arrives Estimated Time Of Completion and complete confirmation instruction, output operation completes and confirms that the operation of instruction is reminded.
In the implementation process of reality, Estimated Time Of Completion is a theoretical value after all, substantially can not single operation just finish in that time of timing arrival Estimated Time Of Completion.If fulfiled assignment in Estimated Time Of Completion, so receive operation and complete comparatively morning time confirming instruction; If fulfiled assignment after Estimated Time Of Completion, so after the timing of Estimated Time Of Completion terminates, also have continuation timing, until operation completes, receive operation and complete confirmation instruction.And at the end of the timing of Estimated Time Of Completion, output operation completes and confirms that the operation of instruction is reminded, and reminds Childhood whether not input operation because of forgeing and completes confirmation instruction.
In this programme, operation completes instruction and all likely inputs at any time, and the step S203 that is described in the present embodiment ~ step S205, can after step S202 as one group of continuous action, also can after step S206 or step S207.Even, at some in particular cases, if Childhood does not input operation and completes instruction after operation completes, the step S203 in the present embodiment ~ step S205 can not occur, and current operation can count historical data or to have estimated to count historical data based on duration.In fig. 2, describe three kinds of situations, the first is that before having estimated that duration arrives, any response that may occur not yet occurs just to fulfil assignment, and input operation completes instruction, i.e. step S201-step S202-step S203.The second is that all possible response all occurs, and fulfil assignment with the duration of the timing of deadline more than expected, input operation completes instruction, i.e. step S201-step S202-step S206-step S207-step S203-step S204-step S205; And the collection present image in this course, in step S206 is also sent to the second mobile terminal and may repeatedly occurs.The third is step S201-step S202-step S206-step S203-step S204-step S205, and in this course, the timing of Estimated Time Of Completion not yet arrives.
In sum, by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, being obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.Meanwhile, the statistics to the real time that operation completes and the feedback for statistics also provide Data support for the study growth of Childhood, provide strong reference to the head of a family.
It is below the embodiment of a kind of learning process supervising device of this programme, the embodiment of learning process supervising device realizes based on the embodiment of learning process method for supervising, description not most in the embodiment of learning process supervising device, please refer to the embodiment of learning process method for supervising.
Please refer to Fig. 3, it is the block diagram of the first embodiment of a kind of learning process supervising device provided in the specific embodiment of the invention.As shown in the figure, this learning process supervising device, comprising:
Time presets unit 310, receives job information for mobile terminal, generates Estimated Time Of Completion according to described job information;
Timing monitoring unit 320, for carrying out timing based on described Estimated Time Of Completion and monitoring the laying state of described mobile terminal;
Information process unit 330, for when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
In sum, the collaborative work of above-mentioned each unit, by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.
Please refer to Fig. 4, it is the block diagram of the second embodiment of a kind of learning process supervising device provided in the specific embodiment of the invention.As shown in the figure, this learning process supervising device, comprising:
Time presets unit 310, receives job information for mobile terminal, generates Estimated Time Of Completion according to described job information;
Timing monitoring unit 320, for carrying out timing based on described Estimated Time Of Completion and monitoring the laying state of described mobile terminal;
Information process unit 330, for when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
Wherein, also comprise:
Complete confirmation unit 340, for completing and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
Wherein, also comprise:
Speed computing unit 350, for according to the duration of described timing and the average velocity of job information computational tasks;
Relatively feedback unit 360, for comparing the historical average speeds of described average velocity and preservation, and according to the result output feedack of described comparison.
Wherein, also comprise:
Time reminding unit 370, completes confirmation instruction for also not receiving operation when timing arrives Estimated Time Of Completion, and output operation completes and confirms that the operation of instruction is reminded.
Wherein, animated feedback and/or voice feedback is fed back to described in.
In sum, the collaborative work of above-mentioned each unit, by receiving job information at mobile terminal, generate Estimated Time Of Completion according to job information and time management and control is carried out to operation process, obtained the learning state of user by the camera on mobile terminal, for parents of student, the operation process of student is effectively supervised.Meanwhile, the statistics to the real time that operation completes and the feedback for statistics also provide Data support for the study growth of Childhood, provide strong reference to the head of a family.
Below know-why of the present invention is described in conjunction with specific embodiments.These describe just in order to explain principle of the present invention, and can not be interpreted as limiting the scope of the invention by any way.Based on explanation herein, those skilled in the art does not need to pay performing creative labour can associate other embodiment of the present invention, and these modes all will fall within protection scope of the present invention.

Claims (10)

1. a learning process method for supervising, is characterized in that, comprising:
Mobile terminal receives job information, generates Estimated Time Of Completion according to described job information;
Carry out timing based on described Estimated Time Of Completion and monitor the laying state of described mobile terminal;
When the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
2. learning process method for supervising according to claim 1, is characterized in that, describedly carries out timing based on described Estimated Time Of Completion and after monitoring the laying state of described mobile terminal, also comprises:
Complete and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
3. learning process method for supervising according to claim 2, is characterized in that, also comprise:
According to the duration of described timing and the average velocity of job information computational tasks;
The historical average speeds of described average velocity and preservation is compared, and according to the result output feedack of described comparison.
4. learning process method for supervising according to claim 2, is characterized in that, also comprise:
Also do not receive operation when timing arrives Estimated Time Of Completion and complete confirmation instruction, output operation completes and confirms that the operation of instruction is reminded.
5. learning process method for supervising according to claim 3, is characterized in that, described in be fed back to animated feedback and/or voice feedback.
6. a learning process supervising device, is characterized in that, comprising:
Time presets unit, receives job information for mobile terminal, generates Estimated Time Of Completion according to described job information;
Timing monitoring unit, for carrying out timing based on described Estimated Time Of Completion and monitoring the laying state of described mobile terminal;
Information process unit, for when the laying state of described mobile terminal changes or timing reaches preset duration, the camera collection present image of described mobile terminal is also sent to the second mobile terminal.
7. learning process supervising device according to claim 6, is characterized in that, also comprise:
Complete confirmation unit, for completing and confirm to stop timing after instruction when receiving operation and send confirmation to described second mobile terminal.
8. learning process supervising device according to claim 7, is characterized in that, also comprise:
Speed computing unit, for according to the duration of described timing and the average velocity of job information computational tasks;
Relatively feedback unit, for comparing the historical average speeds of described average velocity and preservation, and according to the result output feedack of described comparison.
9. learning process supervising device according to claim 7, is characterized in that, also comprise:
Time reminding unit, completes confirmation instruction for also not receiving operation when timing arrives Estimated Time Of Completion, and output operation completes and confirms that the operation of instruction is reminded.
10. learning process supervising device according to claim 8, is characterized in that, described in be fed back to animated feedback and/or voice feedback.
CN201510540149.3A 2015-08-28 2015-08-28 Learning process monitoring method and learning process monitoring device Active CN105225179B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510540149.3A CN105225179B (en) 2015-08-28 2015-08-28 Learning process monitoring method and learning process monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510540149.3A CN105225179B (en) 2015-08-28 2015-08-28 Learning process monitoring method and learning process monitoring device

Publications (2)

Publication Number Publication Date
CN105225179A true CN105225179A (en) 2016-01-06
CN105225179B CN105225179B (en) 2019-08-30

Family

ID=54994132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510540149.3A Active CN105225179B (en) 2015-08-28 2015-08-28 Learning process monitoring method and learning process monitoring device

Country Status (1)

Country Link
CN (1) CN105225179B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107025615A (en) * 2017-04-26 2017-08-08 北京正保育才教育科技股份有限公司 A kind of study situation statistical method based on study trace model
CN107657558A (en) * 2016-07-26 2018-02-02 钟苑菁 Learning progress monitoring system
CN108429804A (en) * 2018-03-09 2018-08-21 福州米鱼信息科技有限公司 A kind of method and terminal of automatic monitoring task
CN108805764A (en) * 2018-05-31 2018-11-13 上海与德科技有限公司 A kind of job scheduling monitoring method, device, terminal and readable medium
CN109147444A (en) * 2018-09-27 2019-01-04 广东小天才科技有限公司 Learning condition feedback method and intelligent desk lamp
CN110310086A (en) * 2019-06-06 2019-10-08 安徽淘云科技有限公司 Auxiliary recites based reminding method, equipment and storage medium
CN110533973A (en) * 2019-09-05 2019-12-03 上海乂学教育科技有限公司 The adaptive and learning system and operating method of knowledge based assessment
CN110955727A (en) * 2019-11-27 2020-04-03 上海乂学教育科技有限公司 Automatic student homework recording system
CN112083628A (en) * 2019-06-13 2020-12-15 广东小天才科技有限公司 Intelligent projection device and projection interaction method
CN112150777A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Intelligent operation reminding device and method
CN112308503A (en) * 2020-03-09 2021-02-02 北京字节跳动网络技术有限公司 Time supervision method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093619A (en) * 2007-07-12 2007-12-26 魏益刚 Recordable language learning device, and recordable language learning method
CN102346976A (en) * 2011-03-03 2012-02-08 郭华 Electronic device assisted learning method based on knowledge structure and effect feedback
CN102694853A (en) * 2012-05-18 2012-09-26 何丽英 Remote monitoring management system for student computer
CN103021215A (en) * 2013-01-16 2013-04-03 吴楷龙 Mobile internet based teaching-and-studying dual terminal application system and realizing method thereof
CN103513768A (en) * 2013-08-30 2014-01-15 展讯通信(上海)有限公司 Control method and device based on posture changes of mobile terminal and mobile terminal
CN104575142A (en) * 2015-01-29 2015-04-29 上海开放大学 Experiential digitalized multi-screen seamless cross-media interactive opening teaching laboratory
CN104853371A (en) * 2015-06-09 2015-08-19 上海斐讯数据通信技术有限公司 Mobile terminal monitoring method and system, and corresponding mobile terminal

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101093619A (en) * 2007-07-12 2007-12-26 魏益刚 Recordable language learning device, and recordable language learning method
CN102346976A (en) * 2011-03-03 2012-02-08 郭华 Electronic device assisted learning method based on knowledge structure and effect feedback
CN102694853A (en) * 2012-05-18 2012-09-26 何丽英 Remote monitoring management system for student computer
CN103021215A (en) * 2013-01-16 2013-04-03 吴楷龙 Mobile internet based teaching-and-studying dual terminal application system and realizing method thereof
CN103513768A (en) * 2013-08-30 2014-01-15 展讯通信(上海)有限公司 Control method and device based on posture changes of mobile terminal and mobile terminal
CN104575142A (en) * 2015-01-29 2015-04-29 上海开放大学 Experiential digitalized multi-screen seamless cross-media interactive opening teaching laboratory
CN104853371A (en) * 2015-06-09 2015-08-19 上海斐讯数据通信技术有限公司 Mobile terminal monitoring method and system, and corresponding mobile terminal

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107657558B (en) * 2016-07-26 2023-09-26 钟苑菁 Learning progress supervision system
CN107657558A (en) * 2016-07-26 2018-02-02 钟苑菁 Learning progress monitoring system
CN107025615B (en) * 2017-04-26 2020-09-11 北京正保育才教育科技股份有限公司 Learning condition statistical method based on learning tracking model
CN107025615A (en) * 2017-04-26 2017-08-08 北京正保育才教育科技股份有限公司 A kind of study situation statistical method based on study trace model
CN108429804A (en) * 2018-03-09 2018-08-21 福州米鱼信息科技有限公司 A kind of method and terminal of automatic monitoring task
CN108805764A (en) * 2018-05-31 2018-11-13 上海与德科技有限公司 A kind of job scheduling monitoring method, device, terminal and readable medium
CN109147444A (en) * 2018-09-27 2019-01-04 广东小天才科技有限公司 Learning condition feedback method and intelligent desk lamp
CN110310086A (en) * 2019-06-06 2019-10-08 安徽淘云科技有限公司 Auxiliary recites based reminding method, equipment and storage medium
CN110310086B (en) * 2019-06-06 2022-04-05 安徽淘云科技有限公司 Recitation-assisted reminding method, recitation-assisted reminding equipment and storage medium
CN112083628A (en) * 2019-06-13 2020-12-15 广东小天才科技有限公司 Intelligent projection device and projection interaction method
CN112150777A (en) * 2019-06-26 2020-12-29 广东小天才科技有限公司 Intelligent operation reminding device and method
CN112150777B (en) * 2019-06-26 2022-05-27 广东小天才科技有限公司 Intelligent operation reminding device and method
CN110533973A (en) * 2019-09-05 2019-12-03 上海乂学教育科技有限公司 The adaptive and learning system and operating method of knowledge based assessment
CN110955727B (en) * 2019-11-27 2020-07-14 上海乂学教育科技有限公司 Automatic student homework recording system
CN110955727A (en) * 2019-11-27 2020-04-03 上海乂学教育科技有限公司 Automatic student homework recording system
CN112308503A (en) * 2020-03-09 2021-02-02 北京字节跳动网络技术有限公司 Time supervision method and device

Also Published As

Publication number Publication date
CN105225179B (en) 2019-08-30

Similar Documents

Publication Publication Date Title
CN105225179A (en) Learning process monitoring method and learning process monitoring device
Rusu et al. Sim-to-real robot learning from pixels with progressive nets
US12087069B2 (en) Artificial intelligence-based action recognition method and related apparatus
EP3462384A1 (en) Simple programming method and device based on image recognition
CN110766169A (en) Transfer training optimization method and device for reinforcement learning, terminal and storage medium
CN108139951A (en) Collection is tied for the notice of the affinity between data are notified
WO2007130582A3 (en) Computer imput device having gearing effects
CN107885871A (en) Synchronous superposition method, system, interactive system based on cloud computing
CN107103802A (en) Real-time human eye discrimination system and method based on online education
CN104165434A (en) Intelligent control method of air purifier
CN108983979A (en) A kind of gesture tracking recognition methods, device and smart machine
CN112416323B (en) Control code generation method, operation method, device, equipment and storage medium
CN104464412A (en) Remote education system and implementation method thereof
CN109147444A (en) Learning condition feedback method and intelligent desk lamp
CN106355968A (en) Japanese teaching system based on intelligent terminal
CN105589576B (en) Direction of action recognition methods and device
CN103473827A (en) Classroom automatic attendance method, system and server
CN103124327A (en) Method and apparatus for taking a self camera recording
CN103019541A (en) Single-smart key implementing method, device and mobile terminal
CN107463096A (en) A kind of Computer Control Experiment System with cloud controller programing function
CN106933585A (en) A kind of self-adapting multi-channel interface system of selection under distributed cloud environment
CN110992645A (en) Mobile vendor detection and alarm system in dynamic scene
CN118154968A (en) Identification error correction method and terminal for classifying dry garbage and wet garbage
JP2020024597A5 (en) Information processing device learning system, information processing device, information processing device control method and program
CN103517311A (en) Method and device simulating wireless network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant