CN105224404B - Relay protection fixed value setting calculation method based on Clustering - Google Patents

Relay protection fixed value setting calculation method based on Clustering Download PDF

Info

Publication number
CN105224404B
CN105224404B CN201510647051.8A CN201510647051A CN105224404B CN 105224404 B CN105224404 B CN 105224404B CN 201510647051 A CN201510647051 A CN 201510647051A CN 105224404 B CN105224404 B CN 105224404B
Authority
CN
China
Prior art keywords
task
server
cluster
computing cluster
fixed value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510647051.8A
Other languages
Chinese (zh)
Other versions
CN105224404A (en
Inventor
毕兆东
郑杨斌
俞秋阳
方胜文
杨利民
何俊峰
王新宝
常宝立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NR Electric Co Ltd
Original Assignee
NR Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NR Electric Co Ltd filed Critical NR Electric Co Ltd
Priority to CN201510647051.8A priority Critical patent/CN105224404B/en
Publication of CN105224404A publication Critical patent/CN105224404A/en
Application granted granted Critical
Publication of CN105224404B publication Critical patent/CN105224404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Computer And Data Communications (AREA)

Abstract

The present invention discloses a kind of relay protection fixed value setting calculating implementation method based on Clustering; relay protection fixed value setting system by computing cluster and client workstation two parts it is main at; computing cluster is responsible for all computation-intensive tasks for completing to be related to during fixed value adjusting, and the work such as task schedule, node administration, the calculated result processing of computing cluster are automatically performed by operating in the cluster management program in computing cluster on server.The computation-intensive task that computing cluster is responsible for completing is divided to two classes, i.e. " the whole network scan task " and " client submission task ".Client workstation is user and the terminal that relay protection fixed value setting system interacts, and is equipped with adaptive setting software, can submit calculating task to computing cluster.Cluster management program in computing cluster automatically dynamically distributes calculating task according to the loading condition of server node each in server cluster, then the result of analysis is uniformly processed after finding new calculating task request.

Description

Relay protection fixed value setting calculation method based on Clustering
Technical field
The invention belongs to the methods of the relay protection of power system fixed value adjusting of field of relay protection in power, especially relate to And the relay protection fixed value setting calculation method based on Clustering.
Background technique
Traditional relay protection fixed value setting calculation method is all client/server (abbreviation C/S) frame using standard Structure is realized, i.e., installs commercial data base server software in the server end of better performances, be responsible for the storage of data;User's Client installs relay protection fixed value setting program.When setting procedure is run, as client from the commercial data of server end Various data needed for reading adaptive setting and calculation of short-circuit current in library, and subsequent all adaptive setting work is all in visitor Family end is completed, and client is after the completion of calculating task calculation result data write service device client database.Traditional adaptive setting The framework of system such as Fig. 1, using the system of client/server (C/S) framework, there are the following problems:
(1) client process calculating speed is slow.Since calculating task is completed on the client, and client performance is limited, The biggish task of calculation amount during adaptive setting, such as the tasks such as braning factor calculates, limiting value calculates, can be such that client falls into Enter " no response " state, it is sometimes desirable to could calculate within several hours and finish, during which the work of user is not due to being available computer It is greatly affected, the user experience of entire adjusting system is very poor.
(2) server and client are one-to-many relationships.One server is directly facing all clients, all numbers According to interaction all by network implementations, when the data interaction that server end and client are frequent, especially work as multiple client When interacting simultaneously with server, it be easy to cause the corresponding slow of database interface.And with the increase of client terminal quantity, Due to database interface, the inquiry of commercial data base and write-in response speed can be slower and slower on server.
(3) server is merely responsible for data management.Common server possesses in more CPU and high speed compared to client It deposits, computing capability outclass client workstation.And the relay protection fixed value setting of traditional client/server framework calculates System, which only is used to server to install commercial data base, does data management work, suffers the hardware resource with superior calculated performance It has arrived and has left unused, caused the huge waste of server hardware performance.
(4) what existing adjusting software server end used is all windows operating system, is easy by virus and wooden horse It threatens, and then causes the safety and reliability for protecting fixed value adjusting system that can not ensure.
Summary of the invention
The technical problems to be solved by the invention are to provide for the defects of aforementioned background art and deficiency based on collection The relay protection fixed value setting calculation method of group's technology.Its object is to improve the calculating speed of relay protection fixed value setting calculating Degree, higher efficiency utilize server end hardware resource, improve the operating experience of user.
To realize the above-mentioned technical purpose, the technical scheme adopted by the invention is as follows: the relay protection constant value based on Clustering The computation-intensive task being related to during fixed value adjusting is transferred to computing cluster to be responsible for completion by synchronizing calculation method, can be with Significantly improve the calculating speed of relay protection fixed value setting, it is characterised in that the following steps are included:
(1) computing cluster and client being made of multiple servers using the relay protection fixed value setting system of this method Work station two parts it is main at;Computing cluster is responsible for completing all computation-intensive tasks, the task schedule of computing cluster, node pipe Reason, calculated result processing work are automatically performed by the cluster management program operated on computing cluster server;
(2) computing cluster is responsible for two class of computation-intensive task dividable completed, i.e. the whole network scan task and client mentions Friendship task;
(3) the whole network scan task refers to the cluster management program in computing cluster in grid operation mode or power grid mould The computation-intensive task of automatic trigger when type changes, the computation-intensive task of the automatic trigger include limiting value meter It calculates, braning factor calculates;Its distinguishing feature is scanned for primary equipment all in adjusting target grid.
(4) client workstation is user and the terminal that relay protection fixed value setting system interacts, and is equipped with adjusting Client software is calculated, it can be achieved that pre-processing to user's operation;If user's operation belongs to computation-intensive task, adjusting Software for calculation first automatically inquire database in the whole network scan task as a result, if inquiring correlation calculation result, terminate the meter Calculate process;If not inquiring calculated result, automatically generates client and submit task and submit to computing cluster, then certainly Dynamic cyclic query calculated result simultaneously completes subsequent calculating;Client submits task to be characterized in for part primary equipment in power grid Calculating task.
(5) cluster management program in computing cluster is responsible for after finding new calculating task request, by server cluster In each server node loading condition calculating task is dynamically distributed automatically;It is close that the server of computing cluster is equipped with calculating The calculation procedure of collection type task, the calculation procedure of the computation-intensive task include that limiting value calculates, braning factor calculates;Root It is calculated according to the task call relevant calculation program of distribution and feeds back calculated result;Cluster management program can be by different server Analysis result be uniformly processed.
Further, the cluster management program meeting automatic election generates unique command node in computing cluster, commander Node is responsible for task distribution, the processing work of calculate node Stateful Inspection, calculated result;Server as command node occurs different Chang Hou, management and computing function are replaced by the normal server node of another mesa-shaped state for re-electing generation in a group of planes automatically Command node originally.
Further, the cluster management program and intensive calculations program support cross operating system operation;The operation system System includes Windows, Linux, Unix, domestic kylin secure operating system, domestic loses in thought secure operating system.
Further, the computing cluster can realize the redundant configuration of computing resource, the calculating task meeting of abnormal server In Autonomic Migration Framework to normal server, system, which only has a server normal operation, can also complete all calculating tasks;Entirely The normal calculating service of system is not influenced by separate unit or multiple servers node failure;Whether each server node, which participates in, is counted Calculation task can be by user setting.
Using the relay protection fixed value setting calculation method described in the invention based on Clustering, by calculating task Processing has been put into server end, and uses Clustering and carry out being uniformly coordinated pipe to server end Servers-all node Reason, the hardware resource that server end is utilized significantly more efficient compared to traditional user terminal/server framework reduce client The work load and network burden of work station improve the overall calculation efficiency of adaptive setting system, improve user experience, will The computation-intensive task being related to during fixed value adjusting transfers to computing cluster to be responsible for completion, can significantly improve relay protection The calculating speed of fixed value adjusting.
Detailed description of the invention
Fig. 1 is domestic traditional adaptive setting system C/S architecture diagram;
Fig. 2 is system architecture diagram of the invention.
Specific embodiment
Below with reference to attached drawing 2, technical solution of the present invention is described in detail.
As shown in Fig. 2, the implementation of the relay protection setting calculation method based on Clustering is by computing cluster and client Work station composition, computing cluster and client workstation two parts including multiple servers composition.
Computing cluster is responsible for completing all computation-intensive tasks, the task schedule of cluster, node administration, at calculated result The cluster management program that reason operates in computing cluster is automatically performed.
(1) general frame
Server operating system can be used (SuSE) Linux OS, it is domestic lose in thought secure operating system, domestic kylin safely grasp Make system, Unix operating system and Windows operating system, and server end can be several operation systems mixed running. In view of the use habit of user, client operating system is recommended to use Window operating system.
(2) server end computing cluster
(1) computing cluster is responsible for completing all computation-intensive tasks, the task schedule of computing cluster, node administration, meter The work such as result treatment is calculated to be automatically performed by the cluster management program operated on computing cluster server.
(2) computing cluster is responsible for two class of computation-intensive task dividable completed, i.e. " the whole network scan task " and " client Submission task ".
(3) cluster management program in computing cluster is responsible for after finding new calculating task request, by server cluster In each server node loading condition calculating task is dynamically distributed automatically.The server of computing cluster is equipped with limiting value The calculation procedure of the computation-intensives tasks such as calculating, braning factor calculating, is counted according to the task call relative program of distribution It calculates and feeds back calculated result.The analysis result of different server can be uniformly processed for cluster management program.
(4) cluster management program " election " can generate unique " commander " node in computing cluster automatically, be responsible for task point Match, calculate node Stateful Inspection, calculated result processing etc. work.After there is exception in server as " commander " node, pipe Reason and computing function are replaced by the normal server node of another mesa-shaped state that " election " generates again in a group of planes automatically.
(5) cluster management program and intensive calculations program support cross operating system operation, can be equipped with Windows, Linux, Unix, domestic kylin secure operating system, it is domestic lose in thought operated normally in the several operation systems such as secure operating system.
(6) computing cluster can realize that the redundant configuration of computing resource, the calculating task meeting Autonomic Migration Framework of abnormal server arrive In normal server, system, which only has a server normal operation, can also complete all calculating tasks.Whole system it is normal The service of calculating is not influenced by separate unit or multiple servers node failure.Each server node whether participate in calculating task be can With set by the user.
(3) client workstation
Client workstation is user and the terminal that relay protection fixed value setting system interacts, and is equipped with adaptive setting Client software is, it can be achieved that pre-process user's operation.If user's operation belongs to computation-intensive task, adaptive setting Software first automatically inquire database in " the whole network scan task " as a result, if inquiring correlation calculation result, terminate the calculating Process.If not inquiring calculated result, automatically generate " client submission task " and submit to computing cluster, then certainly Dynamic cyclic query calculated result simultaneously completes subsequent calculating." client submission task " is characterized in once setting for part in power grid Standby calculating task.

Claims (4)

1. a kind of relay protection fixed value setting calculation method based on Clustering, it is characterised in that the following steps are included:
(1) computing cluster and client operation being made of using the relay protection fixed value setting system of this method multiple servers Two parts of standing composition;Computing cluster is responsible for completing all computation-intensive tasks, the task schedule of computing cluster, node administration, Calculated result processing work is automatically performed by the cluster management program operated on computing cluster server;
(2) computing cluster is responsible for two class of computation-intensive task dividable completed, i.e., the whole network scan task and client, which are submitted, appoints Business;
(3) the whole network scan task refers to that the cluster management program in computing cluster is sent out in grid operation mode or electric network model The computation-intensive task of raw automatic trigger when changing, the computation-intensive task of the automatic trigger include limiting value calculate, Braning factor calculates;
(4) client workstation is user and the terminal that relay protection fixed value setting system interacts, and is equipped with adaptive setting Client software is, it can be achieved that pre-process user's operation;If user's operation belongs to computation-intensive task, adaptive setting Software first automatically inquire database in the whole network scan task as a result, if inquiring correlation calculation result, terminate the calculating stream Journey;If not inquiring calculated result, automatically generates client and submit task and submit to computing cluster, then follow automatically Ring inquiry calculated result simultaneously completes subsequent calculating;
(5) cluster management program in computing cluster is responsible for after finding new calculating task request, by each in server cluster Server node loading condition automatically dynamically distributes calculating task;The server of computing cluster is equipped with computation-intensive The calculation procedure of task, the calculation procedure of the computation-intensive task include that limiting value calculates, braning factor calculates;According to point The task call relevant calculation program matched is calculated and feeds back calculated result;Cluster management program can be by point of different server Analysis result is uniformly processed.
2. the relay protection fixed value setting calculation method based on Clustering as described in claim 1, it is characterised in that: described Cluster management program meeting automatic election generates unique command node in computing cluster, and command node is responsible for task distribution, is calculated Node state monitoring, calculated result handle work;After there is exception in server as command node, management and computing function Automatically original command node is replaced by another normal server node of mesa-shaped state for re-electing generation in a group of planes.
3. the relay protection fixed value setting calculation method based on Clustering as described in claim 1, it is characterised in that: described Cluster management program and intensive calculations program support cross operating system operation;The operating system include Windows, Linux, Unix, domestic kylin secure operating system, domestic lose in thought secure operating system.
4. the relay protection fixed value setting calculation method based on Clustering as described in claim 1, it is characterised in that: described Computing cluster can realize that the redundant configuration of computing resource, the calculating task of abnormal server understand Autonomic Migration Framework to normal server On, system, which only has a server normal operation, can also complete all calculating tasks;The normal calculating service of whole system is not It is influenced by separate unit or multiple servers node failure;Whether each server node participates in calculating task can be set by user It sets.
CN201510647051.8A 2015-10-08 2015-10-08 Relay protection fixed value setting calculation method based on Clustering Active CN105224404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510647051.8A CN105224404B (en) 2015-10-08 2015-10-08 Relay protection fixed value setting calculation method based on Clustering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510647051.8A CN105224404B (en) 2015-10-08 2015-10-08 Relay protection fixed value setting calculation method based on Clustering

Publications (2)

Publication Number Publication Date
CN105224404A CN105224404A (en) 2016-01-06
CN105224404B true CN105224404B (en) 2019-05-07

Family

ID=54993394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510647051.8A Active CN105224404B (en) 2015-10-08 2015-10-08 Relay protection fixed value setting calculation method based on Clustering

Country Status (1)

Country Link
CN (1) CN105224404B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107257380A (en) * 2017-07-03 2017-10-17 南京南瑞继保电气有限公司 A kind of relay protection fixed value setting computing architecture and method based on improved thin client technology
CN107391256A (en) * 2017-07-03 2017-11-24 南京南瑞继保电气有限公司 A kind of relay protection fixed value setting computing architecture and method based on cloud computing technology
CN107887879A (en) * 2018-02-07 2018-04-06 海南电网有限责任公司 A kind of relay protection constant value on-line check system
CN109584101B (en) * 2018-12-07 2022-12-06 国网浙江省电力有限公司培训中心 Multi-person operation setting training examination software modeling method
CN111090610A (en) * 2019-11-13 2020-05-01 罗应建 System for computing unit super-large cluster architecture

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714780A (en) * 2008-10-07 2010-05-26 上海思南电力通信有限公司 Relay protection running management information system
CN102255391A (en) * 2011-07-29 2011-11-23 南京因泰莱配电自动化设备有限公司 Feeder automation system with on-line protective fixed value setting function
CN103617494A (en) * 2013-11-27 2014-03-05 国家电网公司 Wide-area multi-stage distributed parallel power grid analysis system
CN103873321A (en) * 2014-03-05 2014-06-18 国家电网公司 Distributed file system-based simulation distributed parallel computing platform and method
CN103955866A (en) * 2014-04-24 2014-07-30 国家电网公司 Processing method for relay protection setting parameter calculation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101714780A (en) * 2008-10-07 2010-05-26 上海思南电力通信有限公司 Relay protection running management information system
CN102255391A (en) * 2011-07-29 2011-11-23 南京因泰莱配电自动化设备有限公司 Feeder automation system with on-line protective fixed value setting function
CN103617494A (en) * 2013-11-27 2014-03-05 国家电网公司 Wide-area multi-stage distributed parallel power grid analysis system
CN103873321A (en) * 2014-03-05 2014-06-18 国家电网公司 Distributed file system-based simulation distributed parallel computing platform and method
CN103955866A (en) * 2014-04-24 2014-07-30 国家电网公司 Processing method for relay protection setting parameter calculation

Also Published As

Publication number Publication date
CN105224404A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN105224404B (en) Relay protection fixed value setting calculation method based on Clustering
WO2021129367A1 (en) Method and apparatus for monitoring distributed storage system
CN105915405A (en) Large-scale cluster node performance monitoring system
CN107391256A (en) A kind of relay protection fixed value setting computing architecture and method based on cloud computing technology
CN103873321A (en) Distributed file system-based simulation distributed parallel computing platform and method
WO2020192649A1 (en) Data center management system
WO2020119060A1 (en) Method and system for scheduling container resources, server, and computer readable storage medium
CN110933147A (en) Information technology analysis system based on cloud computing
CN108520004A (en) Based on method parameter section multi-tenant data source switching system
US20180285169A1 (en) Information processing system and computer-implemented method
CN114666333A (en) Control method for cloud computing resource scheduling problem based on multi-tenant theory
CN105162632A (en) Automatic processing system for server cluster failures
CN103117874A (en) Blade server management network rapid configuration method
CN103309723A (en) Virtual machine resource integration system and method
CN102811141A (en) Method and system for monitoring running of virtual machines
CN106407013B (en) Method and device for dynamically scheduling resources, resource scheduling server and system
CN103297514A (en) Virtual machine management platform and virtual machine management method based on cloud infrastructure
CN111797314A (en) Data processing method, device, equipment and storage medium
CN106936643B (en) Equipment linkage method and terminal equipment
CN112613626B (en) Method and device for monitoring running state of standby system and computer equipment
CN110868330A (en) Evaluation method, device and evaluation system for CPU resources which can be divided by cloud platform
CN110504689B (en) Power system load flow calculation method based on cloud calculation technology
CN113393087A (en) Concurrent processing method and system for relay protection fault calculation task
CN108924013B (en) Network flow accurate acquisition method and device
CN113487132A (en) Distribution network post-disaster first-aid repair resource allocation method and device and computer equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant