CN105224173B - It is a kind of that visualization method is carried out to water attack protection in advance program - Google Patents
It is a kind of that visualization method is carried out to water attack protection in advance program Download PDFInfo
- Publication number
- CN105224173B CN105224173B CN201510632813.7A CN201510632813A CN105224173B CN 105224173 B CN105224173 B CN 105224173B CN 201510632813 A CN201510632813 A CN 201510632813A CN 105224173 B CN105224173 B CN 105224173B
- Authority
- CN
- China
- Prior art keywords
- implementation procedure
- procedure information
- water attack
- attack protection
- advance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
Visualization method is carried out to water attack protection in advance program the invention discloses a kind of, gathers the implementation procedure information for meeting preset condition in the water attack protection in advance program first;Then processing is patterned to the implementation procedure information;Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure information visualization, enable actual operating mode and specific demand of the scheduling operation personnel according to oil pipeline, it is made choice to whether different water attack protection in advance programs puts into operation, and it can also know the result that water attack protection in advance program performs, and the specific steps and detailed process that water attack protection in advance program performs clearly are grasped at any time, for scheduling operation, personnel are timely, comprehensively, the accurate operation controlled under oil pipeline unusual service condition provides directly perceived, visual information.
Description
Technical field
A kind of carry out this application involves electronic technology field more particularly to water attack protection in advance program visual side
Method.
Background technology
At present, for the water attack protection in advance program of oil pipeline, worked out in system server or programmable controller
After finishing, what is taken is the operational mode of black box.
The pattern has the following disadvantages:
1st, the actual operating mode and specific demand that scheduling operation personnel cannot be according to oil pipeline, surpass different water attacks
Whether preceding protective program, which puts into operation, makes choice;
2nd, water attack protection in advance program is triggered after operation, and scheduling operation personnel are only capable of receiving in man-machine interface (HMI)
To water attack protection in advance program be triggered execution, water attack protection in advance program perform failure and water attack protection in advance program perform into
The warning message of work(can not grasp the specific steps and detailed process of the execution of water attack protection in advance program at any time.
3rd, when water attack protection in advance protective program performs failure, it is impossible to which timely alarm can not show and perform mistake
The reason for losing and pilot process cause scheduling operation personnel that cannot make operation adjustment to oil pipeline operation in time, to scheduling
Operating personnel carry out the regulation and control of all fronts and operation brings difficulty, while also increase the potential risk of oil pipeline operation.
The content of the invention
In order to solve the above technical problems, visual side is carried out to water attack protection in advance program the present invention provides a kind of
Method, the described method includes:
Gather the implementation procedure information for meeting preset condition in the water attack protection in advance program;
Processing is patterned to the implementation procedure information;
Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure visualization of information
Change.
Preferably, the implementation procedure information is divided according to working condition of water hammer point.
Preferably, after processing is patterned to the implementation procedure information, the method further includes:
Monitor the implementing result of the implementation procedure information.
Preferably, after the implementing result of the monitoring implementation procedure information, the method further includes:
If the implementing result expression of the implementation procedure information runs succeeded, increase by first in the implementation procedure information
Mark is limited in the predetermined interface;
If the implementing result expression of the implementation procedure information performs failure, increase by second in the implementation procedure information
Mark is limited in the predetermined interface.
Preferably, if the implementing result expression of the implementation procedure information performs failure, the method further includes:
Alarm.
Preferably, the implementation procedure information for meeting preset condition specifically includes:The implementation procedure information reaches pre-
If important threshold value.
Preferably, the implementation procedure information is specifically:The water attack protection in advance program pin is to each site design
Perform step.
By one or more technical solution of the present invention, the invention has the advantages that advantage:
Visualization method is carried out to water attack protection in advance program the present invention provides a kind of, the water attack is gathered first and surpasses
Meet the implementation procedure information of preset condition in preceding protective program;Then processing is patterned to the implementation procedure information;
Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure information visualization, makes scheduling
Operating personnel can be according to oil pipeline actual operating mode and specific demand, to different water attack protection in advance programs whether
It puts into operation and makes choice, and can also know that water attack protection in advance program performs as a result, simultaneously clearly grasping water attack at any time
Protection in advance program perform specific steps and detailed process, for scheduling operation personnel in time, comprehensively, accurately control oil pipeline
Operation under unusual service condition provides directly perceived, visual information.Furthermore it is also possible to scheduling operation personnel is enable to be surpassed according to water attack
Preceding protection protective program performs carrying out practically operating mode during failure, and the subjective initiative and operation for playing scheduling operation personnel pass through
It tests, operation adjustment is made to oil pipeline operation in time, eliminates what is brought by water attack protection in advance procedure failure to greatest extent
Potential risk.
Description of the drawings
Fig. 1 is to carry out visualization method flow chart to water attack protection in advance program in the embodiment of the present invention;
Fig. 2 is visualization circle that water attack protection in advance program performs specific steps and detailed process in the embodiment of the present invention
Face;
Fig. 3 is the visualization interface that water attack protection in advance program performs failure alarm in the embodiment of the present invention;
Fig. 4 is water attack protection in advance procedure selection visualization interface in the embodiment of the present invention.
Specific embodiment
The main object of the present invention is:It solves to deposit under current petroleum pipeline water attack protection in advance program black box operational mode
Deficiency, while make scheduling operation personnel water attack protection in advance program perform failure when, can be according to the reality of oil pipeline
Border operating condition plays the subjective initiative and operating experience of scheduling operation personnel, makes operation to oil pipeline operation in time
Adjustment, eliminates the potential risk brought by water attack protection in advance procedure failure to greatest extent.Specifically, first described in acquisition
Meet the implementation procedure information of preset condition in water attack protection in advance program;Then the implementation procedure information is patterned
Processing;Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure information visualization, makes
Scheduling operation personnel can be according to oil pipeline actual operating mode and specific demand, to different water attack protection in advance programs
Whether put into operation and make choice, and can also know that water attack protection in advance program performs as a result, simultaneously clear at any time grasp
Water attack protection in advance program perform specific steps and detailed process, for scheduling operation personnel in time, comprehensively, accurately control oil transportation
Operation under pipeline unusual service condition provides directly perceived, visual information.Furthermore it is also possible to enable scheduling operation personnel according to water
Carrying out practically operating mode when protection in advance protective program performs failure is hit, plays subjective initiative and the operation of scheduling operation personnel
Experience is made operation adjustment to oil pipeline operation in time, is eliminated to greatest extent because water attack protection in advance procedure failure is brought
Potential risk.
In order to which the application the technical staff in the technical field is made to be more clearly understood that the application, below in conjunction with the accompanying drawings,
Technical scheme is described in detail by specific embodiment.
It refer to Fig. 1 below, be provided by the invention a kind of to water attack protection in advance program progress visualization method
Method flow diagram.
Specifically, this method includes:
S1 gathers the implementation procedure information for meeting preset condition in the water attack protection in advance program.
The implementation procedure information for meeting preset condition specifically includes:The implementation procedure information reaches default important threshold
Value.
Specifically, present invention utilizes configuration softwares can pass through communication protocol and yard Programmable logical controller
The function that device communicates, by the database of the implementation procedure information gathering of water attack protection in advance program to configuration software.
The implementation procedure information is specifically execution step of the water attack protection in advance program pin to each site design.
In addition, the implementation procedure information is divided according to working condition of water hammer point.
S2 is patterned processing to the implementation procedure information.
After implementation procedure information is collected, the present invention can also utilize the abundant graphics edition and dynamic of configuration software
Display function makes the information that water attack protection in advance program performs and display known to operator and alarm graphical association, complete
It into the graphical of water attack protection in advance program information, and is shown on operator workstation, completes water attack protection in advance journey
The implementation procedure visualization function of sequence.
In addition, after processing is patterned to the implementation procedure information, following measures can be also taken:
Monitor the implementing result of the implementation procedure information.
If the implementing result expression of the implementation procedure information runs succeeded, increase by first in the implementation procedure information
Mark is limited in the predetermined interface.
If the implementing result expression of the implementation procedure information performs failure, increase by second in the implementation procedure information
Mark is limited in the predetermined interface.
Specifically, water attack protection in advance program is worked out in programmable logic controller (PLC) at the scene, advanced in water attack
When protective program is programmed, the execution step of water attack protection in advance program is divided according to working condition of water hammer point, and
The monitoring and control that the information realization for running succeeded or failing is set to perform water attack protection in advance program on important step node,
Run succeeded using configuration software to important step or the information of failure be acquired, configuration and programming, as shown in Fig. 2, being water
Hit the visualization interface that protection in advance program performs specific steps and detailed process.Wherein, run succeeded with red " √ " table
Show, perform and unsuccessfully represented with green " X ", selection so as to fulfill water attack protection in advance program performs step, implementation procedure, holds
The visualization function of row result.Enable actual operating mode and specific demand of the scheduling operation personnel according to oil pipeline, it is right
Whether different water attack protection in advance programs, which puts into operation, makes choice, and not only ensure that the security of oil pipeline operation, but also carries
The high operability of oil pipeline operation.
If in addition, the implementing result expression of the implementation procedure information performs failure, can also alarm.Fig. 3 is water attack
Protection in advance program performs the visualization interface of failure alarm.
S3, will it is graphical after implementation procedure presentation of information in predetermined interface so that the implementation procedure information can
Depending on change.Make scheduling operation personnel can not only know water attack protection in advance program perform as a result, and can also clearly slap at any time
The specific steps and detailed process of water attack protection in advance program execution are held, in time, comprehensively, are accurately controlled for scheduling operation personnel defeated
Operation under oil-piping unusual service condition provides directly perceived, visual information.Furthermore it is also possible to enable scheduling operation personnel according to
Water attack protection in advance protective program performs carrying out practically operating mode during failure, plays subjective initiative and the behaviour of scheduling operation personnel
Make experience, operation adjustment is made to oil pipeline operation in time, is eliminated to greatest extent because of water attack protection in advance procedure failure band
The potential risk come.
Fig. 4 is water attack protection in advance procedure selection visualization interface.
By one or more embodiment of the present invention, the invention has the advantages that advantage:
Visualization method is carried out to water attack protection in advance program the present invention provides a kind of, the water attack is gathered first and surpasses
Meet the implementation procedure information of preset condition in preceding protective program;Then processing is patterned to the implementation procedure information;
Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure information visualization, makes scheduling
Operating personnel can be according to oil pipeline actual operating mode and specific demand, to different water attack protection in advance programs whether
It puts into operation and makes choice, and can also know that water attack protection in advance program performs as a result, simultaneously clearly grasping water attack at any time
Protection in advance program perform specific steps and detailed process, for scheduling operation personnel in time, comprehensively, accurately control oil pipeline
Operation under unusual service condition provides directly perceived, visual information.Furthermore it is also possible to scheduling operation personnel is enable to be surpassed according to water attack
Preceding protection protective program performs carrying out practically operating mode during failure, and the subjective initiative and operation for playing scheduling operation personnel pass through
It tests, operation adjustment is made to oil pipeline operation in time, eliminates what is brought by water attack protection in advance procedure failure to greatest extent
Potential risk.
Specifically, beneficial effects of the present invention can be the following:
1st, actual operating mode and specific demand of the scheduling operation personnel according to oil pipeline are enable, to different water attacks
Whether protection in advance program, which puts into operation, makes choice, and not only ensure that the security of oil pipeline operation, but also improves petroleum pipeline
The operability of road operation.
2nd, make scheduling operation personnel that can not only know that water attack protection in advance program performs as a result, and can also be clear at any time
The clear specific steps and detailed process grasped water attack protection in advance program and performed are timely, comprehensive, the accurate palm of scheduling operation personnel
The operation controlled under oil pipeline unusual service condition provides directly perceived, visual information.
3rd, scheduling operation personnel is enable to perform carrying out practically operating mode when failing according to water attack protection in advance protective program,
The subjective initiative and operating experience of scheduling operation personnel is played, operation adjustment, maximum limit are made to oil pipeline operation in time
Degree ground eliminates the potential risk brought by water attack protection in advance procedure failure.
Although the preferred embodiment of the application has been described, one of ordinary skilled in the art once knows substantially
Creative concept can then make these embodiments other change and modification.So appended claims are intended to be construed to wrap
It includes preferred embodiment and falls into all change and modification of the application scope.
Obviously, those skilled in the art can carry out the application essence of the various modification and variations without departing from the application
God and scope.In this way, if these modifications and variations of the application belong to the scope of the application claim and its equivalent technologies
Within, then the application is also intended to comprising including these modification and variations.
Claims (7)
1. a kind of carry out visualization method to water attack protection in advance program, which is characterized in that the described method includes:
Gather the implementation procedure information for meeting preset condition in the water attack protection in advance program;
Processing is patterned to the implementation procedure information, is specifically included:It is aobvious using the graphics edition and dynamic of configuration software
Show function, make the implementation procedure information of the water attack protection in advance program and graphical association of alarming, complete water attack and protect in advance
The graphical of program information is protected, and is shown on operator workstation;
Implementation procedure presentation of information after will be graphical is in predetermined interface, so that the implementation procedure information visualization.
2. the method as described in claim 1, which is characterized in that the implementation procedure information is divided according to working condition of water hammer point.
3. the method as described in claim 1, which is characterized in that processing is being patterned to the implementation procedure information
Afterwards, the method further includes:
Monitor the implementing result of the implementation procedure information.
4. method as claimed in claim 3, which is characterized in that the monitoring implementation procedure information implementing result it
Afterwards, the method further includes:
If the implementing result expression of the implementation procedure information runs succeeded, increase first flag in the implementation procedure information
It is limited in the predetermined interface;
If the implementing result expression of the implementation procedure information performs failure, increase second identifier in the implementation procedure information
It is limited in the predetermined interface.
5. method as claimed in claim 4, which is characterized in that if the implementing result expression of the implementation procedure information performs mistake
It loses, the method further includes:
Alarm.
6. the method as described in claim 1, which is characterized in that the implementation procedure information for meeting preset condition is specifically wrapped
It includes:The implementation procedure information reaches default important threshold value.
7. the method as described in claim 1, which is characterized in that the implementation procedure information is specifically:The water attack is protected in advance
Protect execution step of the program pin to each site design.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510632813.7A CN105224173B (en) | 2015-09-29 | 2015-09-29 | It is a kind of that visualization method is carried out to water attack protection in advance program |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510632813.7A CN105224173B (en) | 2015-09-29 | 2015-09-29 | It is a kind of that visualization method is carried out to water attack protection in advance program |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105224173A CN105224173A (en) | 2016-01-06 |
CN105224173B true CN105224173B (en) | 2018-06-01 |
Family
ID=54993183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510632813.7A Active CN105224173B (en) | 2015-09-29 | 2015-09-29 | It is a kind of that visualization method is carried out to water attack protection in advance program |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105224173B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202870591U (en) * | 2012-10-18 | 2013-04-10 | 中煤科工集团武汉设计研究院 | Long-distance pipeline coal-transporting SCADA monitoring system |
CN104504990A (en) * | 2015-01-15 | 2015-04-08 | 魏亮 | Long-distance oil pipeline water hammer advance protection program demonstration device |
CN104637555A (en) * | 2014-09-12 | 2015-05-20 | 中广核工程有限公司 | Intelligent monitoring method and intelligent monitoring system based on nuclear power station unit |
CN104657900A (en) * | 2013-11-19 | 2015-05-27 | 中国石油天然气股份有限公司 | Regulation and control service support system for oil and gas pipelines and realization method for regulation and control service support system |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2585884B1 (en) * | 2010-06-24 | 2018-11-21 | ABB Schweiz AG | Method and tool for automatic distribution of control code in a safety system |
-
2015
- 2015-09-29 CN CN201510632813.7A patent/CN105224173B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202870591U (en) * | 2012-10-18 | 2013-04-10 | 中煤科工集团武汉设计研究院 | Long-distance pipeline coal-transporting SCADA monitoring system |
CN104657900A (en) * | 2013-11-19 | 2015-05-27 | 中国石油天然气股份有限公司 | Regulation and control service support system for oil and gas pipelines and realization method for regulation and control service support system |
CN104637555A (en) * | 2014-09-12 | 2015-05-20 | 中广核工程有限公司 | Intelligent monitoring method and intelligent monitoring system based on nuclear power station unit |
CN104504990A (en) * | 2015-01-15 | 2015-04-08 | 魏亮 | Long-distance oil pipeline water hammer advance protection program demonstration device |
Also Published As
Publication number | Publication date |
---|---|
CN105224173A (en) | 2016-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106506202B (en) | Towards the half visual illustration verification platform and method of industrial control system protecting information safety | |
CN113055375B (en) | Power station industrial control system physical network oriented attack process visualization method | |
CN106525415A (en) | Wind turbine generator system driving chain health state evaluation system and method | |
CN104076770A (en) | Method and system for monitoring production line | |
CN108036941A (en) | A kind of steam turbine bearing abnormal vibration analysis method based on correlation visual analysis | |
CN107037782B (en) | The method and apparatus for monitoring lathe | |
CN113627897B (en) | Method and device for controlling safety of field operators and storage medium | |
CN103235240B (en) | Based on the warning diagnostic method and system of protection message | |
CN105224173B (en) | It is a kind of that visualization method is carried out to water attack protection in advance program | |
CN104809851A (en) | Key security parameter alarming method for chemical engineering devices | |
JP2010026725A (en) | Display method for production monitoring system, and work management indicator | |
CN104051038A (en) | Method for quickly entering digital nuclear power plant accident procedure | |
CN105448369B (en) | A kind of nuclear power plant equipment fault diagnosis method and system | |
CN113467404A (en) | Thermal power plant intelligent cloud control system and method based on safe and credible wireless communication | |
CN103986597A (en) | Automatic grading method for alarm threshold values | |
CN108156217A (en) | A kind of monitoring method of straight-bar machines, terminal and storage device | |
CN104047879A (en) | Diagnosis control system and method for turbine compressor unit | |
CN206281656U (en) | A kind of TDM systems for realizing Steam Turbine process variable data monitoring | |
CN203376626U (en) | A textile fabric production monitoring system | |
CN106408175A (en) | Wind power equipment health management system and method | |
CN209811120U (en) | Cold header control device | |
CN107121975A (en) | A kind of Machine Fault Diagnosis method and apparatus based on information geometry | |
CN106444569A (en) | Pumping unit belt protection method and device | |
CN104166949A (en) | Logic control method for visual management of generator-transformer unit protection devices | |
CN110163536A (en) | A kind of habilimentation guidance method based on APS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211105 Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013 Patentee after: National Petroleum and natural gas pipeline network Group Co.,Ltd. Address before: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen Patentee before: PETROCHINA Co.,Ltd. |
|
TR01 | Transfer of patent right |