CN105221117B - A kind of fracturing drainage from coal seam coal seam device of air and application process - Google Patents

A kind of fracturing drainage from coal seam coal seam device of air and application process Download PDF

Info

Publication number
CN105221117B
CN105221117B CN201510765898.6A CN201510765898A CN105221117B CN 105221117 B CN105221117 B CN 105221117B CN 201510765898 A CN201510765898 A CN 201510765898A CN 105221117 B CN105221117 B CN 105221117B
Authority
CN
China
Prior art keywords
fracturing
coal seam
exhaust tube
pipe
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510765898.6A
Other languages
Chinese (zh)
Other versions
CN105221117A (en
Inventor
袁亮
张通
赵毅鑫
聂晓东
杨东辉
蔡永博
郝宪杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201510765898.6A priority Critical patent/CN105221117B/en
Publication of CN105221117A publication Critical patent/CN105221117A/en
Application granted granted Critical
Publication of CN105221117B publication Critical patent/CN105221117B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Solid Fuels And Fuel-Associated Substances (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses a kind of fracturing drainage from coal seam coal seam device of air and application processes.Fracturing drainage from coal seam coal seam device of air, including fracturing extraction mechanism and control mechanism, fracturing extraction mechanism is provided with fracturing exhaust tube, connection bolt, end safety valve, pumping pipe connector, heating tube, tube wall safety valve, atomizing piece, hole for water spraying, defeated spool, water-supply-pipe, safe clack valve, support arm, and control mechanism is provided with controller, water supply pumping pumping plant, cable, feed pipe, exhaust tube.The present invention provides water, electric current and negative pressure by control mechanism to fracturing extraction mechanism, last fracturing extraction mechanism carries out loosening fracturing using the coal seam that high-pressure steam adopts complex geologic conditions gas permeability of coal seam difference coal bed gas hard-pumped, and realize the extraction in situ of coal bed gas, coal bed gas extraction efficiency is further increased while increasing gas permeability of coal seam, coal bed gas desorption quantity, reach same position fracturing coal seam and extraction coal bed gas, manpower and materials input is reduced, the purpose of coal bed gas extraction efficiency is improved.

Description

A kind of fracturing drainage from coal seam coal seam device of air and application process
Technical field
The present invention relates to mining machinery field more particularly to a kind of fracturing drainage from coal seam coal seam device of air and apply institute The method for stating device.
Background technology
Coal bed gas is present in the rock stratum of coal seam and coal seam or more, is important fossil energy.China's coal bed gas resource is huge, However gas storage layer gas permeability is low under natural conditions, desorption quantity is small, gas extraction efficiency is low, and unreasonable coal bed gas is taken out in addition Adopt and control huge coal mine gas from explosion and the corresponding secondary disaster accident of often resulting in, thus how efficient methane drainage and utilization project coal Layer gas resource becomes current China's urgent problem.For this problem, each colleges and universities and coal mining enterprise have carried out positive discussion And research, formulate and apply coal-bed gas takes out in advance, adjacent layer release extraction, low air permeability coal seam reinforcing extraction, high-yield and high-efficiency Mine Integrated extraction scheduling theory and technology, for the locality extraction problem of coal bed gas, existing advance borehole, hydraulic flushing in hole, coal The measures technologies such as layer water filling, standing, hydraulic fracturing, hydrodynamic behavior, however above-mentioned technology has some limitations.Base In the above situation, it is badly in need of a kind of fracturing drainage from coal seam coal seam device of air, to reach same position fracturing coal seam and extraction coal bed gas, reduces Manpower and materials are put into, and improve the purpose of coal bed gas extraction efficiency.
Invention content
The purpose of the embodiment of the present invention is to propose a kind of fracturing drainage from coal seam coal seam device of air, be given by control mechanism Fracturing extraction mechanism required water, electric current and negative pressure when working, then fracturing extraction mechanism is by high-pressure steam to geological conditions The coal seam that complicated seam poor air permeability coal bed gas hard-pumped is adopted carries out loosening fracturing, while realizing the extraction in situ of coal bed gas, is increasing Coal bed gas extraction efficiency is further increased while adding gas permeability of coal seam, coal bed gas desorption quantity, is reached same position fracturing coal seam and is taken out Mining coal seam gas reduces manpower and materials input, improves the purpose of coal bed gas extraction efficiency.To achieve the goals above, the present invention adopts With following technical solution:
A kind of fracturing drainage from coal seam coal seam device of air, including:
Fracturing extraction mechanism, including fracturing exhaust tube, connection bolt, end safety valve, pumping pipe connector, heating tube, Tube wall safety valve, atomizing piece, hole for water spraying, defeated spool, water-supply-pipe, safe clack valve, support arm pass through between the fracturing exhaust tube Bolt thread connection is connected, the end safety valve is threadedly connected to fracturing pumping pipe end and inside has safe clack valve, institute State defeated spool, water-supply-pipe is placed in inside fracturing exhaust tube, the atomizing piece is placed in its end in fracturing exhaust tube inner pipe wall It is connected with defeated spool, the heating tube is placed in fracturing exhaust tube inner pipe wall, and the hole for water spraying is placed in inside fracturing exhaust tube Internal on tube wall to be connected with water-supply-pipe, the tube wall safety valve is placed in fracturing pumping tube wall, and the support arm is taken out with fracturing Tracheae external stability connects, and the pumping pipe connector is connect with fracturing exhaust tube lower thread;
Control mechanism, including controller, water supply pumping pumping plant, cable, feed pipe, exhaust tube, the cable passes through described Defeated spool is connected with controller and atomizing piece respectively, water supply pumping pumping plant by feed pipe and exhaust tube respectively with water delivery Pipe, pumping pipe connector are connected.
Preferably, the tube wall safety valve is the disk being made of three fanning strips, and each fanning strip both sides shape is From periphery to central dip, the connection of fanning strip periphery controls spring.
Preferably, there is safe clack valve, outside to have screw thread for perforation in the middle part of the end safety valve.
Preferably, the safe clack valve is placed in the middle part of the safety valve of end, is made of two disks, and two disk two ends are distinguished It is connected by hinge and magnetic stripe.
Preferably, perforation in the middle part of the connection bolt, outside have screw thread, size corresponding with fracturing exhaust tube.
Preferably, the support arm is arc-shaped, and upper end point is narrow, and lower end width is flat, on the outside of lower end by hinge with Fracturing exhaust tube external linkage, lower end inside are connect by spring with fracturing exhaust tube.
The invention also provides a kind of fracturing drainage from coal seam coal seam device of air application processes, using above-mentioned apparatus comprising Following work step:
A, required fracturing exhaust tube joint number is determined according to drilling depth;
B, sequential assembling is carried out according to each parts spatial position, heating tube, atomizing piece is placed in fracturing exhaust tube It is interior, it is bolted by connection between each fracturing exhaust tube, fracturing pumping pipe end and end tail block end safety valve, take out respectively Air pipe connector is connected finally by cable, feed pipe, exhaust tube with controller, water supply pumping pumping plant;
C, connection and the working condition of each component are checked, it is ensured that after it is worked normally, rotated clockwise by corresponding tool Fracturing extraction mechanism is passed to drilling precalculated position, and then inverting fracturing extraction mechanism makes support arm securely slotting and the wall of a borehole It is interior, by the fixation of fracturing extraction mechanism, drilling end is sealed using charges;
D, fracturing extraction mechanism electric energy is given by controller, being evacuated pumping plant by water supply gives fracturing extraction mechanism water Stream, fracturing extraction mechanism starts coal seam fracturing and works, and after the fracturing of coal seam, after the cooling of fracturing extraction mechanism, passes through water supply The negative pressure that extraction mechanism is given, fracturing extraction mechanism carry out coal bed gas extraction work;
E, after coal bed gas extraction, transposition is dismantled in reverse order, and properly preserve;
Step a-e is repeated when f, moving to next boring work.
The fracturing drainage from coal seam coal seam device of air that the present invention addresses, fracturing extraction mechanism mutually matches closely with control mechanism It closes, to reach same position fracturing coal seam and extraction coal bed gas, reduces manpower and materials input, improve the purpose of coal bed gas extraction efficiency; It is liquid particles that water supply, which is evacuated the flow that pumping plant supplies and is atomized by atomizing piece, and liquid particles produce vapor by heating tube, It is opened to safety valve on rear side of predetermined pressure when fracturing pumping intraductal atmospheric pressure reaches, release high steam carries out impact cause to coal seam It splits, while the vapor after liquefaction plays the role of weak seam, the coal seam fracturing effect further increased;Wait for that coal seam fracturing is complete After finishing the cooling of fracturing exhaust tube, the negative pressure that pumping plant is given is evacuated by water supply, fracturing exhaust tube automatically open end safety valve and Laterally security valve carries out extraction to coal bed gas;It is final to realize that fracturing coal seam is carried out with extraction coal bed gas with the safe and efficient rate in position.
Description of the drawings
Fig. 1 is the controller figure of the present invention;
Fig. 2 is the fracturing exhaust tube figure of the present invention;
Fig. 3 is the connection bolt figure of the present invention;
Fig. 4 is the end safety valve figure of the present invention;
Fig. 5 is the pumping pipe connector figure of the present invention;
Fig. 6 is that the water supply of the present invention is evacuated pumping plant figure;
Fig. 7 is the heating tube figure of the present invention;
Fig. 8 is fracturing exhaust tube sectional view in the present invention;
Fig. 9 is the laterally security valve closing state figure in the present invention;
Figure 10 is the laterally security the valve opening state figure in the present invention;
Figure 11 is the safe clack valve location drawing in the present invention;
Figure 12 is the safety valve tongue shape graph of the present invention;
Figure 13 is the support arm shape graph in the present invention;
Figure 14 is the overall package design sketch of the present invention;
Figure 15 is the working state figure of the present invention.
In figure:1- controllers;2- fracturing exhaust tubes;3- connection bolts;The ends 4- safety valve;5- is evacuated pipe connector;6- Water supply is evacuated pumping plant;7- heating tubes;8- tube wall safety valves;9- atomizing pieces;10- hole for water sprayings;The defeated spools of 11-;12- water-supply-pipes;13- Safe clack valve;14- support arms.
Specific implementation mode
In conjunction with Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Figure 10, Figure 11, Figure 12, Figure 13, Figure 14, Figure 15 Shown, a kind of fracturing drainage from coal seam coal seam device of air, including fracturing extraction mechanism and control mechanism, fracturing extraction mechanism are used for coal The extraction of layer fracturing and coal bed gas, control mechanism are used for the control of the fracturing extraction mechanism course of work.
In fracturing extraction mechanism, by connecting bolt thread connection, the end safety valve between the fracturing exhaust tube It is threadedly connected to fracturing pumping pipe end and inside has safe clack valve, the defeated spool, water-supply-pipe are placed in fracturing exhaust tube Inside, the atomizing piece are placed in its end in fracturing exhaust tube inner pipe wall and are connected with defeated spool, and the heating tube is placed in fracturing In exhaust tube inner pipe wall, the hole for water spraying is placed in inside in fracturing exhaust tube inner pipe wall and is connected with water-supply-pipe, the tube wall Safety valve is placed in fracturing pumping tube wall, and the support arm is connect with fracturing exhaust tube external stability, the exhaust tube connection Head is connect with fracturing exhaust tube lower thread;
In control mechanism, the cable is connected with controller and atomizing piece respectively by the defeated spool, the water supply is taken out Air pump station is connected with water-supply-pipe, pumping pipe connector respectively by feed pipe and exhaust tube.
In conjunction with shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Figure 14, Figure 15, atomizing piece, heating are first placed Manage and by water-supply-pipe, defeated spool to be evacuated with controller and water supply pumping plant connect it is unimpeded, then will cause using connection bolt It splits exhaust tube to be connected firmly, is finally putting into drilling and fixes and work.
Its monitoring step approximately as:
A, required fracturing exhaust tube joint number is determined according to drilling depth;
B, sequential assembling is carried out according to each parts spatial position, heating tube, atomizing piece is placed in fracturing exhaust tube It is interior, it is bolted by connection between each fracturing exhaust tube, fracturing pumping pipe end and end tail block end safety valve, take out respectively Air pipe connector is connected finally by cable, feed pipe, exhaust tube with controller, water supply pumping pumping plant;
C, connection and the working condition of each component are checked, it is ensured that after it is worked normally, rotated clockwise by corresponding tool Fracturing extraction mechanism is passed to drilling precalculated position, and then inverting fracturing extraction mechanism makes support arm securely slotting and the wall of a borehole It is interior, by the fixation of fracturing extraction mechanism, drilling end is sealed using charges;
D, fracturing extraction mechanism electric energy is given by controller, being evacuated pumping plant by water supply gives fracturing extraction mechanism water Stream, fracturing extraction mechanism starts coal seam fracturing and works, and after the fracturing of coal seam, after the cooling of fracturing extraction mechanism, passes through water supply The negative pressure that extraction mechanism is given, fracturing extraction mechanism carry out coal bed gas extraction work;
E, after coal bed gas extraction, transposition is dismantled in reverse order, and properly preserve;
Step a-e is repeated when f, moving to next boring work.
Certainly, described above is only that presently preferred embodiments of the present invention is answered the present invention is not limited to enumerate above-described embodiment When explanation, any technical person familiar with the field is all equivalent replacements for being made, bright under the introduction of this specification Aobvious variant, all falls within the essential scope of this specification, ought to be protected by the present invention.

Claims (1)

1. a kind of fracturing drainage from coal seam coal seam device of air application process, which is characterized in that filled using fracturing drainage from coal seam coal bed gas It sets, includes the following steps:
A, required fracturing exhaust tube joint number is determined according to drilling depth;
B, sequential assembling is carried out according to each parts spatial position, heating tube, atomizing piece is placed in fracturing exhaust tube, respectively It is bolted by connection between fracturing exhaust tube, fracturing pumping pipe end and end tail block end safety valve, exhaust tube respectively Connector is connected finally by cable, feed pipe, exhaust tube with controller, water supply pumping pumping plant;
C, connection and the working condition of each component are checked, it is ensured that after it is worked normally, fracturing is rotated clockwise by corresponding tool Extraction mechanism is passed to drilling precalculated position, then invert fracturing extraction mechanism make support arm securely insert in the wall of a borehole, will The fixation of fracturing extraction mechanism seals drilling end using charges;
D, fracturing extraction mechanism electric energy is given by controller, being evacuated pumping plant by water supply gives fracturing extraction mechanism flow, causes It splits extraction mechanism and starts the work of coal seam fracturing, after the fracturing of coal seam, after the cooling of fracturing extraction mechanism, pass through water supply extraction machine The negative pressure that structure is given, fracturing extraction mechanism carry out coal bed gas extraction work;
E, after coal bed gas extraction, transposition is dismantled in reverse order, and properly preserve;
Step a-e is repeated when f, moving to next boring work;
Fracturing drainage from coal seam coal seam device of air includes:
Fracturing extraction mechanism, including fracturing exhaust tube, connection bolt, end safety valve, pumping pipe connector, heating tube, tube wall Safety valve, atomizing piece, hole for water spraying, defeated spool, water-supply-pipe, safe clack valve, support arm pass through connection between the fracturing exhaust tube Bolt thread connects, and the end safety valve is threadedly connected to fracturing pumping pipe end and inside has safe clack valve, described defeated Spool, water-supply-pipe are placed in inside fracturing exhaust tube, the atomizing piece be placed in fracturing exhaust tube inner pipe wall its end with it is defeated Spool is connected, and the heating tube is placed in fracturing exhaust tube inner pipe wall, and the hole for water spraying is placed in fracturing exhaust tube inner pipe wall Upper inside is connected with water-supply-pipe, and the tube wall safety valve is placed in fracturing pumping tube wall, the support arm and fracturing exhaust tube External stability connects, and the pumping pipe connector is connect with fracturing exhaust tube lower thread;
Control mechanism, including controller, water supply pumping pumping plant, cable, feed pipe, exhaust tube, the cable pass through the defeated line Pipe is connected with controller and atomizing piece respectively, water supply pumping pumping plant by feed pipe and exhaust tube respectively with water-supply-pipe, take out Air pipe connector is connected.
CN201510765898.6A 2015-11-11 2015-11-11 A kind of fracturing drainage from coal seam coal seam device of air and application process Expired - Fee Related CN105221117B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510765898.6A CN105221117B (en) 2015-11-11 2015-11-11 A kind of fracturing drainage from coal seam coal seam device of air and application process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510765898.6A CN105221117B (en) 2015-11-11 2015-11-11 A kind of fracturing drainage from coal seam coal seam device of air and application process

Publications (2)

Publication Number Publication Date
CN105221117A CN105221117A (en) 2016-01-06
CN105221117B true CN105221117B (en) 2018-07-27

Family

ID=54990341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510765898.6A Expired - Fee Related CN105221117B (en) 2015-11-11 2015-11-11 A kind of fracturing drainage from coal seam coal seam device of air and application process

Country Status (1)

Country Link
CN (1) CN105221117B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107461185A (en) * 2017-10-09 2017-12-12 中国矿业大学(北京) A kind of new fracturing drainage from coal seam coal seam device of air
CN112832715B (en) * 2021-01-07 2022-09-30 安徽理工大学 Intelligent multiphase fracturing coupling carbon dioxide flooding coal bed gas extraction system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474409A (en) * 1982-09-09 1984-10-02 The United States Of America As Represented By The Secretary Of The Interior Method of enhancing the removal of methane gas and associated fluids from mine boreholes
CN102434192A (en) * 2011-08-24 2012-05-02 中原工学院 Device and method for enhancing coal seam fracturing effect
RU2487246C1 (en) * 2012-02-27 2013-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to degas coal-bearing series
CN104074499A (en) * 2014-06-23 2014-10-01 山西潞安工程有限公司 Fracturing rod connecting device
CN104614497A (en) * 2015-03-09 2015-05-13 中国矿业大学 True-triaxial integrated experimental system for fracturing due to flowing pressure, slotting, seepage and gas driving
CN104653161A (en) * 2015-02-12 2015-05-27 中国矿业大学(北京) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method
CN205189834U (en) * 2015-11-11 2016-04-27 中国矿业大学(北京) Send and split coal seam and take out and adopt coal bed gas device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4474409A (en) * 1982-09-09 1984-10-02 The United States Of America As Represented By The Secretary Of The Interior Method of enhancing the removal of methane gas and associated fluids from mine boreholes
CN102434192A (en) * 2011-08-24 2012-05-02 中原工学院 Device and method for enhancing coal seam fracturing effect
RU2487246C1 (en) * 2012-02-27 2013-07-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный университет" Method to degas coal-bearing series
CN104074499A (en) * 2014-06-23 2014-10-01 山西潞安工程有限公司 Fracturing rod connecting device
CN104653161A (en) * 2015-02-12 2015-05-27 中国矿业大学(北京) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method
CN104614497A (en) * 2015-03-09 2015-05-13 中国矿业大学 True-triaxial integrated experimental system for fracturing due to flowing pressure, slotting, seepage and gas driving
CN205189834U (en) * 2015-11-11 2016-04-27 中国矿业大学(北京) Send and split coal seam and take out and adopt coal bed gas device

Also Published As

Publication number Publication date
CN105221117A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
RU2616635C1 (en) Method of improved combustible gas recovery using underground two-phase gas-liquid variable based on phases of unworked coal fracturing in coal mine
US20150125210A1 (en) Excavated underground caverns for fluid storage
CN206439041U (en) A kind of experimental provision for simulating the anti-reflection coal seam of carbon dioxide fracturing
CN102852506A (en) High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103306657B (en) A kind of coal seam cutting release is anti-reflection and slot holding device and method
CN104481575B (en) A kind of vapours displacement gas improves the method for gas pumping efficiency
CN103742115A (en) Underground coal mine fracture sealing device and method
CN107035352B (en) A kind of water-jet infinite stages fracturing device and fracturing process
CN204984343U (en) Split combined type bag hole sealing device
CN207080207U (en) A kind of oil field is every excavating technology tubing string
CN209083252U (en) A kind of brill downhole explosion and water filling or fracturing integrated hole packer
CN203531877U (en) Underground coal mine fracturing connecting device
CA2943638A1 (en) Production enhancement system using robot drill for drilling multi-branched fishbone and radial microholes in shale gas reservoir, and method thereof
CN104563974A (en) Supercritical carbon dioxide jet injection drilling exploitation hydrate device and method
CN105221117B (en) A kind of fracturing drainage from coal seam coal seam device of air and application process
CN106285561B (en) Downhole safety valve system
CN109931062A (en) The method of the double envelope single deck tape-recorder staged fracturings of tight roof horizontal well in coal mine roadway
CN109113637A (en) A kind of brill downhole explosion and water filling or fracturing integrated hole packer and construction method
CN204663509U (en) Anti-reflection system is shaken in carbon dioxide coal seam
CN202659194U (en) Novel well wall restoring device with combined sleeve and corrugated pipe
CN103470233B (en) A kind of heavy crude reservoir natural gas huff and puff oil recovery process system and oil production method
CN107191218B (en) Suspended slag water seal blasting permeability increasing and gas extraction method
CN203808896U (en) Long-section casing damage well expansion pipe double-card casing pipe layered packing repairing device
CN104373093A (en) Underground nitrogen-making induced flow completion pipe string having pressure monitoring function
CN104879097A (en) Gas well production string provided with double parallel pipes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yuan Liang

Inventor after: Zhang Tong

Inventor after: Zhao Yixin

Inventor after: Nie Xiaodong

Inventor after: Yang Donghui

Inventor after: Cai Yongbo

Inventor after: Hao Xianjie

Inventor before: Zhao Yixin

Inventor before: Zhang Tong

Inventor before: Yuan Liang

Inventor before: Hao Xianjie

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180727

Termination date: 20181111

CF01 Termination of patent right due to non-payment of annual fee