CN105217543A - Insulator emptying equipment - Google Patents
Insulator emptying equipment Download PDFInfo
- Publication number
- CN105217543A CN105217543A CN201510575110.5A CN201510575110A CN105217543A CN 105217543 A CN105217543 A CN 105217543A CN 201510575110 A CN201510575110 A CN 201510575110A CN 105217543 A CN105217543 A CN 105217543A
- Authority
- CN
- China
- Prior art keywords
- support
- insulator
- bay
- lift
- lifting rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Insulator emptying equipment, the problem wasted time and energy during for solving insulator unloading.It comprises the first support, the second support, bay-lift, driver train, lifting rope and dash plate, bay-lift is provided with above the first support, first support is provided with the driver train driving bay-lift to move up and down, at the lower slide of the first support, outer bar is installed, at the lower slide of the second support, interior bar is installed, the free end of interior bar is arranged in the inner chamber of outer bar free end, between interior bar and outer bar, be provided with locking piece; First crossbeam is provided with at the top of bay-lift, second cross beam is provided with at the top of the second support, first crossbeam and second cross beam are slidably fitted with slide block respectively, and the slide block one_to_one corresponding on first, second crossbeam is arranged, between paired slide block, be provided with lifting rope.This device, in use, by lorry to a section of freight house, insulator tumbles voluntarily, instead of manpower, alleviate the manual labor of people, and handling efficiency is high.
Description
Technical field
The present invention relates to electric power insulator technology field, specifically a kind of emptying equipment of insulator.
Background technology
At power department, by purchase the insulator come unload from lorry time, need manually direct insulator to be moved down from car, and then be transported to the freight house of power department.Because insulator weight is large, therefore workman will feel tired out from head to foot after carrying tens insulators.Thisly manually insulator to be taken off from lorry, and then be transported to the mode of freight house, not only waste time and energy, and inefficiency.Therefore, be badly in need of a kind of insulator emptying equipment, for realizing the unloading to insulator.
Summary of the invention
The object of the present invention is to provide a kind of insulator emptying equipment, the problem wasted time and energy during for solving insulator unloading.
The present invention solves the technical scheme that its technical matters takes: insulator emptying equipment, it is characterized in that, it comprises the first support, second support, bay-lift, driver train, lifting rope and dash plate, bay-lift is provided with above described first support, the driver train driving bay-lift to move up and down is provided with between described bay-lift and the first support, at the lower slide of described first support, outer bar is installed, the first locking piece is provided with between described outer bar and the first support, at the lower slide of described second support, interior bar is installed, the second locking piece is provided with between described interior bar and the second support, the free end of described interior bar is arranged in the inner chamber of outer bar free end, and described interior bar can move by external bar mutually, is provided with the 3rd locking piece between described interior bar and outer bar, the top of described second support is far below the top of bay-lift, first crossbeam is provided with at the top of described bay-lift, second cross beam is provided with at the top of described second support, described first crossbeam and second cross beam are slidably fitted with slide block respectively, and the slide block one_to_one corresponding on first, second crossbeam is arranged, between paired slide block, be provided with lifting rope, between described slide block and first, second crossbeam, be respectively equipped with the 4th locking piece,
Be provided with groove at the top of described second support, in described groove, be slidably fitted with dash plate, between described dash plate and the second support, be provided with spring, described dash plate stretches out one section, the top of the second support.
Further, described driver train comprises leading screw, feed screw nut, worm gear, worm screw, bearing and strut bar, some described strut bars are fixed on the top of the first support, described bearing is fixed on the free end of some strut bars, described feed screw nut is fixed in the inner ring of bearing, described leading screw is fixed on the bottom of bay-lift and coordinates with feed screw nut, described worm gear is fixed on the outside of feed screw nut, described worm screw be rotatably installed in the first support top and with worm gear engagement fit, be fixed with handle in one end of described worm shaft.
Further, be provided with supporting leg in the bottom of described bay-lift, the top sliding block joint of described supporting leg and the first support.
Further, roller is provided with in the bottom of described first support and the second support.
Further, be provided with an inclined-plane on the top of described second support, described inclined-plane is near the side at the first support place.
Further, the upper fixed end of described lifting rope is positioned on first crossbeam, and the lower fixed end of described lifting rope is positioned on second cross beam, and under state of nature, the lifting rope one section near lower fixed end is in hang.
Further, described lifting rope is three.
Further, sponge or rubber is provided with in the outside of described dash plate.
The invention has the beneficial effects as follows: insulator emptying equipment provided by the invention, the top of bay-lift is placed in break bulk point place, second is placed on freight house place, insulator can be placed on the lifting rope between bay-lift and the second support, then insulator rolls from high to low under self gravitation effect, dash plate the effect can playing deceleration to insulator is set, avoid insulator to dish out from the second support.Insulator can take off in the side of the second support by workman, to deposit.By lorry to a section of freight house, insulator tumbles voluntarily, instead of manpower, alleviate the manual labor of people, and handling efficiency is high.
Accompanying drawing explanation
Fig. 1 is schematic diagram of the present invention;
Fig. 2 be the first support with feed screw nut coordinate schematic diagram;
Fig. 3 is the driving schematic diagram of feed screw nut;
Fig. 4 is the schematic top plan view of lifting rope;
Fig. 5 is the A place partial enlarged drawing in Fig. 4;
Fig. 6 is the scheme of installation of dash plate;
Fig. 7 is the schematic diagram of insulator on lifting rope;
Fig. 8 is the schematic diagram that insulator rolls on lifting rope;
Fig. 9 is the effect schematic diagram of insulator and dash plate;
In figure: 1 first support, 11 rollers, 12 chutes, 13 outer bars, 2 bay-lifts, 21 supporting legs, 22 leading screws, 23 feed screw nuts, 24 worm gears, 25 worm screws, 26 handles, 27 bearings, 28 strut bars, 29 bearings, 3 second supports, bar in 31,32 inclined-planes, 33 grooves, 34 dash plates, 35 springs, 41 first bolts, 42 second bolts, 43 the 3rd bolts, 44 the 4th bolts, 5 lifting ropes, fixed end on 51,52 times fixed ends, 61 first crossbeams, 62 second cross beams, 63 slide blocks, 7 insulators, H diff-H.
Detailed description of the invention
As shown in Figures 1 to 9, the present invention includes the first support 1, roller 11, outer bar 13, bay-lift 2, supporting leg 21, leading screw 22, feed screw nut 23, worm gear 24, worm screw 25, handle 26, bearing 27, strut bar 28, bearing 29, second support 3, interior bar 31, dash plate 34, spring 35, first bolt 41, second bolt 42, the 3rd bolt 43, the 4th bolt 44, lifting rope 5, first crossbeam 61, second cross beam 62 and slide block 63, describe the present invention below in conjunction with accompanying drawing.
As shown in Figure 1, the first support 1 is section bar weldment, overall squarely structure, and the first support is support component, and the first support is installed other parts.Be provided with roller 11 in the bottom of the first support, roller is cardan wheel.Be provided with vertical chute 12 at the top of the first support, chute is four, is provided with bay-lift 2 above the first support, is provided with four supporting legs, 21, four supporting legs lays respectively in four chutes and to be connected with the first bracket slide in the bottom of bay-lift.Bay-lift can move up and down by relative first support, leading screw 22 is fixed with in the bottom of bay-lift, as shown in Figure 2, the strut bar 28 of some horizontal positioned is provided with on the top of the first support, bearing 29 is fixed with at the free end of some strut bars, bearing horizontal positioned, in bearing inner ring, be fixed with feed screw nut 23, feed screw nut coordinates with leading screw.A pair bearing 27 is provided with on the top of the first support, as shown in Figure 3, two bearings are rotatablely equipped with worm screw 25, handle 26 is fixed with in one end of worm shaft, rotating handles can drive the rotation of worm screw, worm and wheel engagement fit, and then drives worm gear wheel, and then driving feed screw nut to rotate in horizontal surface, eventually with movable wire thick stick moves up and down.Leading screw, feed screw nut, handle, bearing, strut bar, worm gear and worm screw constitute the driver train driving bay-lift to move up and down.
Be provided with outer bar 13 at the lower slide of the first support, the installation end of outer bar extend in the first support, for realizing the relative fixing of outer bar and the first support, is provided with the first bolt 41 outside between the installation end of bar and the first support.The second support 3 is provided with in the side of the first support, second support is also section bar weldment, roller is provided with in the second frame bottom, at the lower slide of the second support, interior bar 31 is installed, the installation end of interior bar extend in the second support, for realizing the relative fixing of interior bar and the second support, between the second support and interior bar installation end, be provided with the second bolt 42.Outer bar and interior bar are the Metallic rod of horizontal positioned, the free end of outer bar is hollow structure, and the free end of interior bar is placed in the inner chamber of outer bar, and interior bar can sway in bar outside, for realizing the relative fixing of outer bar and interior bar, be provided with the 3rd bolt 43 between bar and interior bar outside.The height of the second support is significantly less than the height of bay-lift, first crossbeam 61 is provided with at the top of bay-lift, second cross beam 62 is provided with at the top of the second support, first crossbeam and second cross beam are slidably fitted with slide block 63 respectively, as shown in Figure 5, at slide block and first crossbeam, between slide block and second cross beam, be respectively equipped with the 4th bolt 44, to realize the relative fixing of first crossbeam and slide block, second cross beam and slide block.Slide block on first crossbeam and the slide block one_to_one corresponding on second cross beam, as shown in Figure 4, be provided with lifting rope 5 between the slide block of correspondence, and the upper fixed end of lifting rope is fixed on the slide block on first crossbeam, and the lower fixed end of lifting rope is fixed on the slide block on second cross beam.Lifting rope is used for supporting insulator, and the radical of lifting rope is the half of insulator, can regulate the distance between adjacent lifting rope, to adapt to the needs of different length insulator.After insulator being placed on the upper fixed end of lifting rope, under the effect of self gravitation, insulator can roll downwards along lifting rope.Lifting rope can select three, is just enough to supporting insulator, and ensures insulator rolling from high to low.
As shown in Figure 6, be provided with groove 33 at the top of the second support, be slidably fitted with dash plate 34 in a groove, be provided with spring 35 between dash plate and groove walls, under the action of the spring, dash plate is positioned at the left side of the second support.Inclined-plane 32 is provided with in the left side of the second cradle top, concordant with the upper surface of the second support the high-end of inclined-plane.Lifting rope is arranged on after between first crossbeam and second cross beam, and under self gravitation effect, on lifting rope, one section of close lower fixed end is hang.As shown in Figure 7, when insulator is placed on the lifting rope of drooping section, the top of insulator is slightly lower than lower fixed end, namely bottom insulator and between lower fixed end, there is certain height difference H, like this effect can playing reduction of speed to the insulator rolled down by eminence is set, in the process that the nadir sliding to drooping section under insulator moves up, kinetic energy reduces, and potential energy increases.
During use, first by driving assembly that bay-lift is placed in suitable height, the break bulk point height on top and the lorry of now bay-lift adapts, and regulates the length of outer bar and interior bar, and passes through the 3rd bolt-locking.Then insulator 7 is placed on lifting rope, as shown in Figure 8, makes it along the side roll of lifting rope by the downward fixed end place of upper fixed end.As shown in Figure 9, insulator, after lower fixed end, rolls along the inclined-plane on the second support to the top of the second support, and when insulator touches dash plate, under the action of the spring, the speed of insulator reduces rapidly, and now insulator can take off by workman.For alleviating collision, dash plate is surrounded by sponge or rubber pad.
Claims (8)
1. insulator emptying equipment, it is characterized in that, it comprises the first support, the second support, bay-lift, driver train, lifting rope and dash plate, bay-lift is provided with above described first support, the driver train driving bay-lift to move up and down is provided with between described bay-lift and the first support, at the lower slide of described first support, outer bar is installed, the first locking piece is provided with between described outer bar and the first support, at the lower slide of described second support, interior bar is installed, between described interior bar and the second support, is provided with the second locking piece; The free end of described interior bar is arranged in the inner chamber of outer bar free end, and described interior bar can move by external bar mutually, is provided with the 3rd locking piece between described interior bar and outer bar; The top of described second support is far below the top of bay-lift, first crossbeam is provided with at the top of described bay-lift, second cross beam is provided with at the top of described second support, described first crossbeam and second cross beam are slidably fitted with slide block respectively, and the slide block one_to_one corresponding on first, second crossbeam is arranged, between paired slide block, be provided with lifting rope, between described slide block and first, second crossbeam, be respectively equipped with the 4th locking piece;
Be provided with groove at the top of described second support, in described groove, be slidably fitted with dash plate, between described dash plate and the second support, be provided with spring, described dash plate stretches out one section, the top of the second support.
2. insulator emptying equipment according to claim 1, it is characterized in that, described driver train comprises leading screw, feed screw nut, worm gear, worm screw, bearing and strut bar, some described strut bars are fixed on the top of the first support, described bearing is fixed on the free end of some strut bars, described feed screw nut is fixed in the inner ring of bearing, described leading screw is fixed on the bottom of bay-lift and coordinates with feed screw nut, described worm gear is fixed on the outside of feed screw nut, described worm screw be rotatably installed in the first support top and with worm gear engagement fit, handle is fixed with in one end of described worm shaft.
3. insulator emptying equipment according to claim 1, is characterized in that, is provided with supporting leg in the bottom of described bay-lift, the top sliding block joint of described supporting leg and the first support.
4. insulator emptying equipment according to claim 1, is characterized in that, is provided with roller in the bottom of described first support and the second support.
5. insulator emptying equipment according to claim 1, is characterized in that, is provided with an inclined-plane on the top of described second support, and described inclined-plane is near the side at the first support place.
6. insulator emptying equipment according to claim 1, is characterized in that, the upper fixed end of described lifting rope is positioned on first crossbeam, and the lower fixed end of described lifting rope is positioned on second cross beam, and under state of nature, the lifting rope one section near lower fixed end is in hang.
7. insulator emptying equipment according to claim 6, is characterized in that, described lifting rope is three.
8. insulator emptying equipment according to claim 1, is characterized in that, is provided with sponge or rubber in the outside of described dash plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510575110.5A CN105217543B (en) | 2015-09-10 | 2015-09-10 | Insulator easing gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510575110.5A CN105217543B (en) | 2015-09-10 | 2015-09-10 | Insulator easing gear |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105217543A true CN105217543A (en) | 2016-01-06 |
CN105217543B CN105217543B (en) | 2017-07-07 |
Family
ID=54986906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510575110.5A Active CN105217543B (en) | 2015-09-10 | 2015-09-10 | Insulator easing gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105217543B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105540297A (en) * | 2016-01-25 | 2016-05-04 | 王晶怡 | Mechanical buffer lifting unloading device |
CN108689350A (en) * | 2017-03-30 | 2018-10-23 | 雷蒙德股份有限公司 | Extended mobile jib system and method for materials handling vehicle |
CN109720804A (en) * | 2017-07-25 | 2019-05-07 | 郑州国知网络技术有限公司 | The slow drop discharging method in two-part abrupt slope carried applied to cable reel, electric pole |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4553375A (en) * | 1983-02-09 | 1985-11-19 | Ptx-Pentronix, Inc. | Tray locator and loader for conveyor apparatus, and method |
CN201240803Y (en) * | 2008-07-31 | 2009-05-20 | 新疆新能天宁电工绝缘材料有限公司 | Worm wheel raising platform |
CN202423994U (en) * | 2011-12-14 | 2012-09-05 | 河南省电力公司郑州供电公司 | Disk-shaped suspended insulator human carrying tool |
CN203581681U (en) * | 2013-11-28 | 2014-05-07 | 国网河南省电力公司鹤壁供电公司 | Insulator carrying tool |
CN203958206U (en) * | 2013-11-28 | 2014-11-26 | 国网河南省电力公司鹤壁供电公司 | Insulator floor truck |
-
2015
- 2015-09-10 CN CN201510575110.5A patent/CN105217543B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4553375A (en) * | 1983-02-09 | 1985-11-19 | Ptx-Pentronix, Inc. | Tray locator and loader for conveyor apparatus, and method |
CN201240803Y (en) * | 2008-07-31 | 2009-05-20 | 新疆新能天宁电工绝缘材料有限公司 | Worm wheel raising platform |
CN202423994U (en) * | 2011-12-14 | 2012-09-05 | 河南省电力公司郑州供电公司 | Disk-shaped suspended insulator human carrying tool |
CN203581681U (en) * | 2013-11-28 | 2014-05-07 | 国网河南省电力公司鹤壁供电公司 | Insulator carrying tool |
CN203958206U (en) * | 2013-11-28 | 2014-11-26 | 国网河南省电力公司鹤壁供电公司 | Insulator floor truck |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105540297A (en) * | 2016-01-25 | 2016-05-04 | 王晶怡 | Mechanical buffer lifting unloading device |
CN108689350A (en) * | 2017-03-30 | 2018-10-23 | 雷蒙德股份有限公司 | Extended mobile jib system and method for materials handling vehicle |
CN108689350B (en) * | 2017-03-30 | 2021-06-08 | 雷蒙德股份有限公司 | Extendable mast system and method for a materials handling vehicle |
US11618660B2 (en) | 2017-03-30 | 2023-04-04 | The Raymond Corporation | Extendable mast systems and methods for a material handling vehicle |
CN109720804A (en) * | 2017-07-25 | 2019-05-07 | 郑州国知网络技术有限公司 | The slow drop discharging method in two-part abrupt slope carried applied to cable reel, electric pole |
CN109720804B (en) * | 2017-07-25 | 2020-11-10 | 江苏格利尔光电科技有限公司 | Two-section type steep slope slow descending unloading method applied to cable reel and telegraph pole transportation |
Also Published As
Publication number | Publication date |
---|---|
CN105217543B (en) | 2017-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105217543A (en) | Insulator emptying equipment | |
CN104440490A (en) | Automatic derusting machine of steel pipes | |
CN203496955U (en) | Movable type lifting trolley | |
CN103144975A (en) | Pipe loading-unloading machine | |
CN106564767A (en) | Flat grinding device for coal in train carriages | |
CN208916012U (en) | A kind of production line transfer device | |
CN203111210U (en) | Power distribution cabinet installation transport cart | |
CN209648689U (en) | Mold rack | |
CN203143722U (en) | Tube loading and unloading machine | |
CN205442525U (en) | Supplementary device of changing of part | |
CN205043708U (en) | Motor overhauls specialized tool | |
CN206437822U (en) | A kind of plain type carries dummy car | |
CN207002064U (en) | A kind of moveable novel cantilever is hung | |
CN104444463B (en) | The Commercial Vehicle handling engineering truck of railway freight-car double-layered transport vehicles special-purpose vehicle | |
CN205677222U (en) | A kind of civil engineering work construction bracket | |
CN207120776U (en) | Plate pusher | |
CN105932580A (en) | Overhaul platform of switch handcart | |
CN105539545B (en) | Cu-Ag deposits stove trolley | |
CN204525885U (en) | A kind of pipe fitting quickly cooling device | |
CN202156698U (en) | Adjustable tire carrying vehicle | |
CN102303634B (en) | Conveying vehicle with adjustable tires | |
CN101708730B (en) | Inflatable axis handling transport vehicle | |
CN104527488B (en) | Truck lifting device | |
CN206126749U (en) | Lifting device for slip worm drive | |
CN104985008B (en) | A kind of feeding device of two roller cold pilger mills of large-scale side charging |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |